paper to electronic

40
Paper to Electronic The Electronic Self Monitoring Report System (eSMR)

Upload: freira

Post on 19-Jan-2016

46 views

Category:

Documents


1 download

DESCRIPTION

Paper to Electronic. The Electronic Self Monitoring Report System (eSMR). Introduction. Presented by John Ginn Agenda: History of eSMR and eSMR 2 eSMR 2 Overview Demonstration of System Overview of Complete Report Paper to Electronic Process Rollout Schedule Questions. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Paper to Electronic

Paper to Electronic

The Electronic Self Monitoring Report System

(eSMR)

Page 2: Paper to Electronic

Introduction

Presented by John Ginn Agenda: History of eSMR and eSMR2

eSMR2 Overview

Demonstration of System Overview of Complete Report Paper to Electronic Process Rollout Schedule Questions

Page 3: Paper to Electronic

A Brief History of eSMR

Paper Reports Discharger compiles data Discusses violations in cover letter Submits report to Regional Board Case worker reviews report on paper

Decision to go electronic eSMR Development and Completion

Page 4: Paper to Electronic

History of eSMR (cont.) Features

Fully coded reports Electronic uploads (EDF/CDF) Compliance checker Automatically generated violations

Failings Automatically generated violations Inflexible Does not facilitate Case Worker/Discharger

interaction Resource intensive

Decision to move forward

Page 5: Paper to Electronic

eSMR2

Revision of original eSMR system Development Process/Timeline

Began in 2007 Involved User Group Completed mid 2008 Trial facility (Yuba City) Rollout to Region 5-Redding

Page 6: Paper to Electronic

eSMR2 (cont.)

Features: Easy to locate reports/reported data Data export Simplified process Discharger generated violations No coded requirements No compliance checker

What’s Changed & Why?

Page 7: Paper to Electronic

Walkthrough of eSMR2

Page 8: Paper to Electronic
Page 9: Paper to Electronic
Page 10: Paper to Electronic
Page 11: Paper to Electronic
Page 12: Paper to Electronic
Page 13: Paper to Electronic
Page 14: Paper to Electronic
Page 15: Paper to Electronic
Page 16: Paper to Electronic
Page 17: Paper to Electronic
Page 18: Paper to Electronic
Page 19: Paper to Electronic
Page 20: Paper to Electronic
Page 21: Paper to Electronic
Page 22: Paper to Electronic
Page 23: Paper to Electronic
Page 24: Paper to Electronic
Page 25: Paper to Electronic
Page 26: Paper to Electronic
Page 27: Paper to Electronic
Page 28: Paper to Electronic
Page 29: Paper to Electronic
Page 30: Paper to Electronic
Page 31: Paper to Electronic
Page 32: Paper to Electronic
Page 33: Paper to Electronic
Page 34: Paper to Electronic
Page 35: Paper to Electronic

Complete Reports Will Contain

Data Points Analytical & Calculated Data

• Influent, Effluent, Surface Water, Internal Process

Self Determined Violations Attachments

Pollution Prevention Plan Biosolids/sludge report Pretreatment Reports/monitoring

Coversheet Data Summary Report (system generated)

Page 36: Paper to Electronic

Paper to Electronic Process Training Initial Period of Dual Submissions (Paper and

Electronic Reports) Review Paper and Electronic Submissions Check for Completeness Paper Submission Enforceable

3 Successful Submissions per Facility Data entered correctly Reports are complete

“Electronic Reports Only” Submittal Letter Include electronic report completeness section

Page 37: Paper to Electronic

Tentative Training ScheduleLocation 99 101 102 103a 103b

Redding Done Done Done Done March ’09

Fresno Done Done Done Feb ‘09 April ‘09

Sacramento March ’09 April ’09 May ‘09 June ‘09

Los Angeles May ’09 June ’09 July ‘09 Aug ’09

Santa Rosa July ’09 Aug ’09 Sept ’09 Oct ’09San Diego Sept ’09 Oct ’09 Nov ’09 Dec ’09South Lake Tahoe Nov ’09 Dec ’09 Jan ‘10 Feb ’10Victorville Dec ’09 Jan ’10 Feb ‘10 March ’10Palm Desert Feb ’10 March ‘10 April ‘10 May ’10

Riverside April ’10 May ’10 June ’10 July ’10San Luis Obispo June ’10 July ‘10 Aug ‘10 Sep ’10Oakland TBA TBA TBA TBA

Page 38: Paper to Electronic

Outreach & Training Plan

103a “One-to-Many Training” (Dischargers) Demo eSMR2 System Water Board Entry Tool (WET) Hands-on

103b “One-on-One Training” (Dischargers) Individual training WET

Page 39: Paper to Electronic

Plans for the Future

eSMR 2.5 DMR submission Vetting possible solutions

eSMR 3-4 Reintroduce Compliance Checking

How you can participate: Bi-Weekly eSMR User Group Meetings

Page 40: Paper to Electronic

Questions

Contact Information [email protected] 916-341-6883 1-866-792-4977 (Ask for John)