TRIAD Well ServiceAdvanced Innovation for Enhanced Well Productionwww.triadwellservice.com

Motion(Basic)

Note: This video template is optimized for Microsoft PowerPoint 2010.In PowerPoint 2007, video elements will play, but any content overlapping the video bars will be covered by the video when in slideshow mode.In PowerPoint 2003, video will not play, but the poster frame of the videos will remain in place as static images.

The video:Plays automatically after each slide transition.Is 15 seconds long.Seamlessly loops for infinite playback.

To add slides or change layout:To add a new slide, on the Home tab, in the Slides group, click the arrow under New Slide, then click under Motion Background Theme, then select the desired layout.To change the layout of an existing slide, on the Home tab, in the Slides group, click Layout, then select the desired layout.

Other animated elements:Any animated element you insert will begin after the slide transition and the background video has started.

1

About: TRIAD Well ServiceBased in Houston, Texas, TRIAD Well Service provides superior products and services to the upstream and midstream oil and gas industry.

Through the application of innovative technologies, we are dedicated to maximizing production, solving complex problems and meeting the specific needs of our customers.

Our predominant specialty is paraffin remediation utilizing our leading edge, patent pending paraffin inhibition products.

RELEASE Paraffin InhibitorRELEASE is a uniquely formulated paraffin inhibition product designed to guarantee optimum flow assurance. With a multifunctional composition, it combines the actions of a crystal modifier, dispersant, solvent and surfactant in one product.

Multi-Action Process:

Prevents Growth of Paraffin CrystalsPrevents Pipe Wall Deposition Dissolves Problematic SolidsReduces Fluid FrictionInhibits Scale and Corrosion

Laboratory testingRELEASE Paraffin Inhibitor

RELEASE LAB TESTINGIndependent Testing by Texas Oil Tech Laboratories

Crude Sample from Eagle Ford Well Site Pour Point Reduced by 83% w/RELEASE500ppmPour Point Reduced by 114% w/ RELEASE1000ppm

RELEASE LAB TESTING

Eagle Ford Crude Sample WAT = 98C, 208FAt 1000 psi

RELEASE LAB TESTINGEagle Ford Crude Sample with RELEASE500ppm WAT = 58C, 136FAt 1000 psi

RELEASE LAB TESTINGEagle Ford Crude Sample (High Pressure Microscope)WAT = 98C, 208FAt 1000 psi

RELEASE LAB TESTINGEagle Ford Crude Sample with RELEASE500ppm WAT = 58C, 136FAt 1000 psi

case studyeagle ford shaleRELEASE Paraffin Inhibitor

Case Study: Eagle FordRELEASE paraffin inhibition treatment was implemented on a three well pad for Sanchez Oil & Gas in the Eagle Ford Shale. Severe paraffin deposition in tubing and flowlines caused downtime and production losses.

Application Method: Annular Injection at 300 ppm

Parameters monitored to analyze treatment effectiveness:

Production (BOPD)Total Production of Three Wells On PadRod Load (lb)Average of Polished Rod Load Cell Continuous ReadoutsRun Time (Hr)Total Run Time of Three Rod Pump Units On PadPower Usage (kW/h)Electricity Consumption of Well Pad

Case Study: Eagle FordResults from comparative data representing one month before and after treatment with RELEASE

Production Oil Production Increased by 396 bbls, 10.3%Rod Load Average Polished Rod Load decreased by 1.9%Run Time Total Run Time increased by 4.9%Power UsageElectricity Consumption decreased by 9.97%, ~ 10% SavingsBefore treatment, wells were being hot oiled every 10-14 days.After treatment, hot oiling program was discontinued due to no evidence of paraffin plugging or deposition.

Case Study: Eagle FordVisual Inspections: Before Treatment With RELEASE

Case Study: Eagle FordVisual Inspections: After Treatment With RELEASE

Case Study: Eagle FordRELEASE Capillary String Treatment implemented for Penn Virginia Oil & Gas. A problematic well was Hot Oiled every 5 days. Treatment was initiated at 500 ppm.

Hot Oil Program DiscontinuedOil Production Increased by 32%

Pilot ProgramsTel: (281) 416 - 4149, (713) 398 - 4049Fax: (281) 416 - 4274 Email: [email protected]

TRIAD Well Service Offers RELEASE Treatment Trial Programs to Verify Product Resultswww.triadwellservice.com