Parsons Slough Project, Elkhorn Slough,CA
Moving the crane barge into position at the start of the project
![Page 2: Parsons Slough Project, Elkhorn Slough,CA Moving the crane barge into position at the start of the project](https://reader030.vdocuments.net/reader030/viewer/2022032703/56649d085503460f949d9c29/html5/thumbnails/2.jpg)
Preparation on the RR tie-in at the southern end of the sill
![Page 3: Parsons Slough Project, Elkhorn Slough,CA Moving the crane barge into position at the start of the project](https://reader030.vdocuments.net/reader030/viewer/2022032703/56649d085503460f949d9c29/html5/thumbnails/3.jpg)
Completion of the RR tie-in at the southern end of the sill
![Page 4: Parsons Slough Project, Elkhorn Slough,CA Moving the crane barge into position at the start of the project](https://reader030.vdocuments.net/reader030/viewer/2022032703/56649d085503460f949d9c29/html5/thumbnails/4.jpg)
Work on the RR tie-in at the northern end of the sill, includinginstallation of sheet pile with the vibratory hammer
![Page 5: Parsons Slough Project, Elkhorn Slough,CA Moving the crane barge into position at the start of the project](https://reader030.vdocuments.net/reader030/viewer/2022032703/56649d085503460f949d9c29/html5/thumbnails/5.jpg)
Installation of sheet pile across Parsons channel with the vibratory hammer
![Page 6: Parsons Slough Project, Elkhorn Slough,CA Moving the crane barge into position at the start of the project](https://reader030.vdocuments.net/reader030/viewer/2022032703/56649d085503460f949d9c29/html5/thumbnails/6.jpg)
Surveying the sill across the channel before dropping the sheets to grade
![Page 7: Parsons Slough Project, Elkhorn Slough,CA Moving the crane barge into position at the start of the project](https://reader030.vdocuments.net/reader030/viewer/2022032703/56649d085503460f949d9c29/html5/thumbnails/7.jpg)
Installation of the H pileswith the impact hammer
![Page 8: Parsons Slough Project, Elkhorn Slough,CA Moving the crane barge into position at the start of the project](https://reader030.vdocuments.net/reader030/viewer/2022032703/56649d085503460f949d9c29/html5/thumbnails/8.jpg)
Placing the rock ramp
![Page 9: Parsons Slough Project, Elkhorn Slough,CA Moving the crane barge into position at the start of the project](https://reader030.vdocuments.net/reader030/viewer/2022032703/56649d085503460f949d9c29/html5/thumbnails/9.jpg)
The marine mammal monitoring post on the west side of the sill