part c survey questionnaire - gard.no c ro-ro.pdf · international group of p&i clubs - ship...

5
International Group of P&I Clubs - Ship Technical Committee Condition Survey Report - Version 9.00.00 - Date 25.09.2017 Survey Questionnaire Part C Ro-Ro This report, and any accompanying documentation or photographs, has been compiled for the sole use of the Club for insurance purposes only and should not be disclosed to third parties without prior written permission from the Club. The information contained in this report, and any accompanying documentation or photographs, is not exhaustive as to the general condition of the ship and should not be relied upon by members or by any other party as any assurance, representation or warranty as to the condition of the ship and nothing herein shall prejudice the Club's rights under the insurance policy in the event of a dispute between the Club and the member relating to the condition of the ship. Date survey completed: Ship name: IMO No: Survey port: Surveyor's name: Order club: Club ref. no.: Survey company: Surveyor's ref. number:

Upload: others

Post on 27-Jan-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

  • International Group of P&I Clubs - Ship Technical Committee Condition Survey Report - Version 9.00.00 - Date 25.09.2017

    Survey Questionnaire

    Part C

    Ro-Ro

    This report, and any accompanying documentation or photographs, has been compiled for the sole use of the Club for insurance purposes only and should not be disclosed to third parties without prior written permission from the Club. The information contained in this report, and any accompanying documentation or photographs, is not exhaustive as to the general condition of the ship and should not be relied upon by members or by any other party as any assurance, representation or warranty as to the condition of the ship and nothing herein shall prejudice the Club's rights under the insurance policy in the event of a dispute between the Club and the member relating to the condition of the ship.

    Date survey completed:

    Ship name:

    IMO No:

    Survey port:

    Surveyor's name:

    Order club:

    Club ref. no.:

    Survey company:

    Surveyor's ref. number:

  • International Group of P&I Clubs - Ship Technical Committee Condition Survey Report - Version 9.00.00 - Date 25.09.2017

    5. Survey Questionnaire - Ro-Ro5.1 Vehicle decks and cargo spaces

    Y N NA NI Remarks

    5.1.1 Are cargo spaces suitable for the carriage of the nominated cargo? NIN/ANo

    Yes

    5.1.2 Are bilges clean, non-return valves working and bilge pumps in apparent good working order?

    NIN/ANo Yes

    5.1.3 Are bilges and water leakage alarms routinely function tested and results logged?

    NIN/ANo Yes

    5.1.4 Is the overall steel structure apparently free from significant corrosion, pitting, scaling, buckling, dents, fractures, wastage, doublers, temporary repairs, etc.?

    NIN/ANo Yes

    5.1.5 Are manhole covers in apparent satisfactory condition? NIN/ANo

    Yes

    5.1.6 Is the pipe work in the vehicle decks / cargo spaces in apparent satisfactory condition and suitably protected against mechanical damages?

    NIN/ANo Yes

    5.1.7 Is cargo space and vehicle deck ventilation in apparent satisfactory condition?

    NIN/ANo Yes

    5.1.8 Are internal ramps, cargo hoists and associated electrical / hydraulic systems in apparent satisfactory condition?

    NIN/ANo Yes

    YesNo N/A NIAre permissible cargo heights, deck / ramp and lift loads, maximum speed and other relevant signboards fitted and clearly visible?

    5.1.9

  • International Group of P&I Clubs - Ship Technical Committee Condition Survey Report - Version 9.00.00 - Date 25.09.2017

    5.1.12 Are vehicle deck ventilator stops and fire dampers in apparent satisfactory condition and regularly tested?

    NIN/ANo Yes

    5.1.10 Are pedestrian access routes on the vehicle decks clearly marked? NIN/ANo

    Yes

    Additional information

    5.2 Shell doors, ramps and other closing appliances

    Y N NA NI Remarks

    5.2.5 Can doors / ramps be closed / opened without undue delay? NIN/ANo

    Yes

    5.2.4 Are drain channels and non-return devices in apparent satisfactory condition?

    NIN/ANo Yes

    5.2.3 Are closing and sealing arrangements in apparent satisfactory condition and properly adjusted?

    NIN/ANo Yes

    5.2.2 Do audible and visual alarms for moveable decks, ramps and flood barriers operate correctly and are appropriate test records maintained?

    NIN/ANo Yes

    5.2.1 Are shell doors, internal subdivision doors and other hull openings and their closing appliances apparently structurally sound and free from signs of water leakage?

    NIN/ANo Yes

    YesNo N/A NIAre vehicle deck freeing ports / scuppers / drainage systems clear of obstructions?

    5.1.11

    Y N NA NI Remarks

    YesNo N/A NIAre drain covers constructed so as to prevent blockage by debris?

    5.2.6

  • International Group of P&I Clubs - Ship Technical Committee Condition Survey Report - Version 9.00.00 - Date 25.09.2017

    Y N NA NI Remarks

    5.3 Cargo and vehicle securing

    5.3.6 Is lashing and securing carried out in accordance with the requirements of the Cargo Securing Manual?

    NIN/ANo Yes

    5.3.5 Are trestles in apparent satisfactory condition? NIN/ANo

    Yes

    5.3.3 Is the lashing and securing equipment of the same type as specified in the approved Cargo Securing Manual?

    NIN/ANo Yes

    5.3.2 Is loose lashing and securing equipment including twist locks in apparent satisfactory condition?

    NIN/ANo Yes

    5.3.1 Are fixed lashing points in apparent satisfactory condition? NIN/ANo

    Yes

    Additional information

    YesNo N/A NIAre remote indicators confirming shell door and water tight door status fitted, operational and regularly tested?

    5.2.7

    Y N NA NI Remarks

    YesNo N/A NIAre lashing maintenance and testing records kept?

    5.3.4

    YesNo N/A NIAre appropriate procedures in place to take damaged lashing equipment out of service?

    5.3.7

  • International Group of P&I Clubs - Ship Technical Committee Condition Survey Report - Version 9.00.00 - Date 25.09.2017

    5.4.1 Engine room bilge high level alarms NIN/ANo

    Yes

    5.4 Safety and operational tests

    5.4.2 Emergency fire pump with two fire hoses on separate hydrants NIN/ANo

    Yes

    5.4.3 Emergency power sources and emergency lighting NIN/ANo

    Yes

    5.4.4 Engine room remote stops and shutdowns NIN/ANo

    Yes

    NIN/ANo YesCargo space bilge suction test

    5.4.5

    5.4.6 Cargo space water ingress alarms NIN/ANo

    Yes

    Additional information

    Y N NA NI Remarks

    Additional information

    YesNo N/A NIAre procedures in place for confirming that parking brakes and wheel chocks are correctly applied, where applicable?

    5.3.8

    YesNo N/A NIAre portable electric power cables in apparent satisfactory condition and tested for continuity, integrity and earth faults?

    5.3.9

    Y N NA NI Remarks

    Were the following tests carried out and found satisfactory?

    International Group of P&I Clubs - Ship Technical Committee                                                                           Condition Survey Report - Version 9.00.00 - Date 25.09.2017 

    Survey Questionnaire

    Part C

    Ro-Ro

    This report, and any accompanying documentation or photographs, has been compiled for the sole use of the Club for insurance purposes only and should not be disclosed to third parties without prior written permission from the Club. The information contained in this report, and any accompanying documentation or photographs, is not exhaustive as to the general condition of the ship and should not be relied upon by members or by any other party as any assurance, representation or warranty as to the condition of the ship and nothing herein shall prejudice the Club's rights under the insurance policy in the event of a dispute between the Club and the member relating to the condition of the ship.

    5. Survey Questionnaire - Ro-Ro

    5.1Vehicle decks and cargo spaces

    Y N NA NI Remarks

    5.1.1

    Are cargo spaces suitable for the 

    carriage of the nominated cargo?

    5.1.2

    Are bilges clean, non-return 

    valves working and bilge pumps in

    apparent good working order?

    5.1.3

    Are bilges and water leakage 

    alarms routinely function tested 

    and results logged?

    5.1.4

    Is the overall steel structure 

    apparently free from significant 

    corrosion, pitting, scaling, buckling,

    dents, fractures, wastage, doublers,

    temporary repairs, etc.?

    5.1.5

    Are manhole covers in apparent

    satisfactory condition?

    5.1.6

    Is the pipe work in the vehicle 

    decks / cargo spaces in apparent

    satisfactory condition and suitably

    protected against mechanical 

    damages?

    5.1.7

    Is cargo space and vehicle deck

    ventilation in apparent satisfactory

    condition?

    5.1.8

    Are internal ramps, cargo hoists

    and associated electrical / hydraulic systems

    in apparent satisfactory condition?

    Are permissible cargo heights, 

    deck / ramp and lift loads, 

    maximum speed and other relevant signboards fitted and clearly visible?

     

    5.1.9

    Emma Crompton

    Part C Ro-Ro Condition Survey Form

    9.00.00

    23/03/2017

    CTRL Marine Solutions Ltd

    Emma Crompton

    25/09/2017

    Version 9.00.00 Date 25/09/17 Changes agreed at WG meeting 02/08/17Version 9.00.00 Date 23/03/17 - Transferred from word to LiveCycle, formatting, add colour, change association to Club, change font and size to allign with all other forms

    5.1.12

    Are vehicle deck ventilator stops and fire dampers in apparent satisfactory condition and regularly tested?

    5.1.10

    Are pedestrian access routes on 

    the vehicle decks clearly marked?

    Additional information

    5.2Shell doors, ramps and other closing appliances

    Y N NA NI Remarks

    5.2.5

    Can doors / ramps be closed /

    opened without undue delay?

    5.2.4

    Are drain channels and non-return

    devices in apparent satisfactory 

    condition?

    5.2.3

    Are closing and sealing 

    arrangements in apparent satisfactory condition and properly adjusted?

    5.2.2

    Do audible and visual alarms for 

    moveable decks, ramps and flood 

    barriers operate correctly and are

    appropriate test records 

    maintained?

    5.2.1

    Are shell doors, internal subdivision doors and other hull openings and their closing

    appliances apparently structurally

    sound and free from signs of 

    water leakage?

    Are vehicle deck freeing ports / scuppers / drainage systems clear of obstructions?

    5.1.11

    Y N NA NI Remarks

    Are drain covers constructed so as to prevent blockage by debris?

    5.2.6

    Y N NA NI Remarks

    5.3Cargo and vehicle securing

    5.3.6

    Is lashing and securing carried out in accordance with the requirements of the Cargo Securing Manual?

    5.3.5

    Are trestles in apparent 

    satisfactory condition?

    5.3.3

    Is the lashing and securing 

    equipment of the same type as 

    specified in the approved Cargo 

    Securing Manual?

    5.3.2

    Is loose lashing and securing 

    equipment including twist locks in 

    apparent satisfactory condition? 

    5.3.1

    Are fixed lashing points in 

    apparent satisfactory condition?

    Additional information

    Are remote indicators confirming shell door and water tight door status fitted, operational and regularly tested?

    5.2.7

    Y N NA NI Remarks

    Are lashing maintenance and testing records kept?

    5.3.4

    Are appropriate procedures in place to take damaged lashing equipment out of service?

    5.3.7

    5.4.1

    Engine room bilge high level 

    alarms

    5.4Safety and operational tests

    5.4.2

    Emergency fire pump with two fire

    hoses on separate hydrants

    5.4.3

    Emergency power sources and 

    emergency lighting

    5.4.4

    Engine room remote stops and 

    shutdowns 

    Cargo space bilge suction test

     

     

    5.4.5

    5.4.6

    Cargo space water ingress alarms

     

    Additional information

    Y N NA NI Remarks

    Additional information

    Are procedures in place for confirming that parking brakes and wheel chocks are correctly applied, where applicable?

    5.3.8

    Are portable electric power cables in apparent satisfactory condition and tested for continuity, integrity and earth faults?

    5.3.9

    Y N NA NI Remarks

     Were the following tests carried out and found satisfactory?

    global_imo_no: global_shipname: global_ordering_club: global_survey_date: global_survey_port: global_surveyor: Some text about help regarding this field: global_surveyor_company: global_surveyor_refno: remark: : information: