part chnical bid...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf...

69
S A SB PART TENDE NAME ADDR DATE 5 STATE BA SBIIMS AIR COND BIIMS, AHM CON T – A: TE ER SUBMI ESS CONSU 5,SAHYAD SBI INFR ANK OF IN LA S INVITE T DITIONING MEDABAD NTRACTOR ECHNICA ITTED BY V LTING AR DRI APPAR AHMED RA MANAG NDIA, 3 RD LDARWAJ TENDERS G WORKS D EMPANE RS UNDE AL BID : : : : A R . VIJAY SAH RCHITECT GOVT. A RTMENT, DABAD – 3 1 GEMENT S FLOOR, L JA, AHME S ON BEHA OF BANT ELLED AC R CATEGO ARCHITE VIJAY SA HIJWANI & T. ENGINE APPROVA NEAR ST 80009 PH SOLUTION LOCAL HE EDABAD-3 ALF OF SB TWA BRAN C SUPPLIE ORY UP T ECT: AHIJWANI &ASSOCIA ERS,INTE L VALUER ADIUM CI ONE. NO7 TENDER NS PVT. LT EAD OFFIC 380001 BI FOR PR NCH, DIST ERS AND TO RS.20. ATES ERIOR DES RS RCLE. NA 794801084 ID: AHM2 TD. CE, BHAD ROPOSED T. JUNAGA MAINTEN .0 LAKH SIGNERS AVRANGPU 45 201911003 RA, D ADH NANCE & URA, 3

Upload: others

Post on 05-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

S

A

SB

PART

TENDENAME

ADDR

DATE

5

STATE BA

SBIIMSAIR COND

BIIMS, AHMCON

T – A: TE

ER SUBMI

ESS

CONSU

5,SAHYAD

SBI INFRANK OF IN

LA

S INVITE TDITIONING

MEDABADNTRACTOR

ECHNICA

ITTED BY

VLTING AR

DRI APPAR

AHMED

RA MANAGNDIA, 3RD LDARWAJ

TENDERSG WORKS

D EMPANERS UNDE

AL BID

: :

:

:

A R . VIJAY SAHRCHITECT

GOVT. A

RTMENT,

DABAD – 3

1

GEMENT SFLOOR, LJA, AHME

S ON BEHA

OF BANT

ELLED ACR CATEGO

ARCHITE

VIJAY SAHIJWANI &T. ENGINE

APPROVA

NEAR ST

80009 PH

SOLUTIONLOCAL HEEDABAD-3

ALF OF SBTWA BRAN

C SUPPLIEORY UP T

ECT:

AHIJWANI&ASSOCIAERS,INTE

L VALUER

ADIUM CI

ONE. NO7

TENDER

NS PVT. LTEAD OFFIC380001

BI FOR PRNCH, DIST

ERS AND TO RS.20.

ATES ERIOR DES

RS

RCLE. NA

794801084

ID: AHM2

TD. CE, BHAD

ROPOSEDT. JUNAGA

MAINTEN.0 LAKH

SIGNERS

AVRANGPU

45

201911003

RA,

D ADH

NANCE

&

URA,

3

Page 2: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

SBIIMSinvitessupplie

The deS.No

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

ijwani And A

S on behals tenders ers and ma

etails of teno. Descrip

Name of

Nature o

Time allo

Applicati

Earnest

Initial Se

Total Se

Start adownloadocumenwebsite Online subid on“https://et

Addressapplicatisubmitte

Associates

f of SBI thin two bid

aintenance

nder are asption

f work

of Work

owed for c

ion Fees

Money De

ecurity Dep

ecurity depo

and end ading ofnts from

ubmission on the wtender.sbi/S

s at whichon fees

ed

NOTICE

rough its Ad systems contracto

s under:

completion

eposit

posit

osit

date forf tender

m Bank’s

of technicalweb siteSBI” .

h EMD &has to be

2

E INVITING

Architect Ms from thers under ca

Proposed of India BaAir Condit

(45 days) of work oRs. 1,000through SBanking wflow chartmentionedshould beApplicatiofees paymRs.2,600/by meansfor a perisubmissioNationalizManagemat Bhavna2% of con

5% of the

rr s

12.11.201under<Lin

le

From : 12 To 19.11.

& e

Dy. ManagSolution POffice, Nr.364001.O

G TENDER

M/s. VIJAY e SBIIMS,ategory up

Air Conditantwa Brantioning Wo

1½ Monthorder. 0/- Applic

SBI Collectweb-site wt about hod below). Oe enclosen received

ment receip- (Two Ths of Demaod of 180

on of the tzed Bank dment Solutagar)

ntract amou

final bill am

19 to 19nk>procure

2.11.2019 .2019 (time

ger ElectricPvt. Ltd., G.Nilambaug

On or Befor

RS

SAHIJWA Ahmedab

p to Rs.20.0

tioning wonch, Dist. Jrk

hs from d

ation feest only by www.onlineow to pay Online fee

ed with thd without pt shall be housand Sand Draft /0 Days frotender) fro

drawn in fations Pvt.

unt includin

mount inclu

9.11.2019ement new

BY (time 1e 18.00 hou

cal, SBI InGround Floo

gh Circle, Be 20.11.20

ANI & ASSbad empa0 Lakh.

orks of StaJunagadh.

ate of acc

s should using SBIesbi.com (tender fee

es paymenhe Technonline ap

rejected. Six Hundr/ Pay Ordm the lastom any scavour of S

Ltd. and

ng EMD

uding ISD.

at wwws.

12.00 hoursurs)

fra Managor, SBI AdBhavnaga019 at 3:30

SOCIATESanelled AC

ate Bank

ceptance

be paid Internet (Detailed es online nt receipt ical Bid. pplication

ed only) er (Valid t date of cheduled SBI Infra payable

.

.sbi.co.in

s)

ement dmin r-0 PM.

S C

Page 3: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

21. The Pa

a. b. c. d.

11.

12.

13.

14.

15.

16. 17. 18. 19.

20.

21.

22.

ijwani And A

e contractort A- TechnForwardinNIT cum dBill of quaSet of all d

Date andonline SBIIMS,mentioneDate &SubmissindicativDate & tonline inDate & tauction Liquidate

Defects Validity oValue ofInsuranc

Water &

Agency fbidding (indicativeprice bid auction).

Contract Engineerclarificati

Associates

or shall subnical bid (Cg letter.

draft tenderntities stamdrawings s

d time of otechnical

office ed at sr. N& timesion of e price bidime for ope

ndicative prime for e-r

ed Damag

liability peof offer f Interim Cece

electricity

for arrangin(Technical e and e re- v

no of Bankr for any teion.

bmit the teCover-A) s

r stamped mped and stamped an

opening ofbid ataddress

o.10 e for

onlined. ening of rice bid. reverse

es

riod

ertificate

ng online bid

verse

k�s chnical

3

ender in twohall contai

and signesigned on nd signed.

f t s

20.11.201

e Date and bid will beseparatelyDate and contractorNA.

0.50% of max. 5% o12 Months90 days frNO INTERThe coninsurance the centreoriginal papplicableWater & Eat one pextension switches, be arrangwithin therecover consumpM/s. e-ProB-705, WaBridge, AhContact N/6835 / 6840278 / 251

o bid systen the follow

d on each each pape

9 at 3:30 P

time for se informedy after scru

time will r separatel

contract aof contracts from the rom the daRIMtractor shpolicies a

e & shall policies ane in the maElectricity spoint. How

& light fixswitch boed by the e accepte

0.5% ption of waocurementall Street

hmedabad –No.-40270540 / 6857 /19533 / 760

em kept in wing docum

paper. er.

PM

submissiond to the qutiny of thebe informey.

amount pet value or fidate of Virte of open

hall obtaas per thebe require

nd receiptatter to the shall be prowever furtxture etc. woards, lamp

contractoed tender of fina

ater & elect Technolo- II, Opp.– 380006, 506-90, 7963 / 20 / 52

00040003

separate cments:

n of indicatqualified coeir Technicaed to the

r weeks sinal bill valrtual Comping of Pric

in all nee law appled to prodt of the Architect/Bovided by ther distribwith requirps, tube, er at their o

cost. Bal bill ctricity.

ogy, Orient CState Guja9-6813 682

covers.

tive price ontractor al bid qualified

ubject to ue.

pletione-bid

ecessary icable at duce the premium Bank.the Bank bution & red MCB etc. shall own cost ank will amount

lub, Ellis rat, India

853 /843

Page 4: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

e.

f.

Part B Both th Mentio

22. TenderNews>technicbe disq

23. The coensurin

24. No conwill hav

25. The SBor in pshall be

26. Tendersuch te

27. In caseopened

28. SBIIMSand no Yours For: AR. VI55, SANEAR NAVRA

ijwani And A

Online feeApplicationrejected. Banker chEMD (RefBhavnaga

- Financialhe covers soned in Pa

rs can be d>. It shall becal and finaqualified.

ontractor sng the num

nditions othve to be wi

BIIMS resepart withoue entertain

rs receivedenders sha

e the dated on the ne

S has the o correspon

Faithfully,

JAY SAHIJAHYADRI A

STADIUMANGPURA

Associates

es paymentn received

eque/ DD undable) fa

ar.

l bid (Coveshall be kera 10 abov

downloadee responsiancial bid

shall sign mber and s

her than mithdrawn b

erve their rut assigningned in this

d without Eall not be a

e of openinext working

right to acndence sha

JWNAI & AAPPARTM

M CIRCLE, A, AHMEDA

t receipt sh without on

of Rs. 2,60avoring SB

er-B) shall ept in a largve.

ed from theibility of theare prope

and stamequence o

mentioned efore open

ights to acg any reasregard.

EMD andllowed to p

ng of tendg day at th

ccept / rejeall be ente

ASSOCIATMENT

ABAD – 38

4

hould be enline applic

00/- (RupeBI Infra Ma

contain thege cover a

e bank’s we contractorly bound

mp each of all pages

in the tendning of the

ccept or rejson for do

Applicatioparticipate

ders is dece same tim

ect any / aertained in t

TES

80 0090

nclosed wcation fees

ees Two Thanagement

e Price bidand it shall

websitewwwor to arrangseparately

page of ts.

der will beprice-bid.

ect any oroing so an

n Fees shin the onli

clared as me.

ll tenders this regard

ith the Tecs payment

housand St Solutions

d only. be send to

w.sbi.co.inge and ensy. Tenders

the tender

e considere

r all the tend any clai

hall be sumne price bi

a holiday,

without asd.

chnical Bidreceipt sh

Six HundredPvt Ltd, p

o the addre

n(link) <Prosure that ain loose p

r documen

ed, and if

nders, eithem / corres

mmarily rejidding proc

, the tende

ssigning an

. all be

d only) as ayable at

ess as

ocurementall pages ofpages may

nt thereby

given they

er in wholespondence

jected andcess.

ers will be

ny reasons

t f y

y

y

e e

d

e

s

Page 5: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

ijwani And A

Go

Select "Al

Select "

Select "T

The Vend

paymeContracto

Associates

HOW

o to SBI Inte

l India " intype

SBI INFRA

Tender App

or will hav

ent a receipor/Supplier

W TO MAKE

ernet Bank

Select SB

Click

n state Corpof Corpora

A MANAGEServ

plication Fe

e to fill up

pt will be ger has to en

emp

5

ONLINE A

king web si

BI Collect

Check box

porate/Instate / Institu

EMENT SOLices Name

ee" in Paymand Sub

↓the fields penerated wclose the o

panelment a

APPLICATIO

ite-https://w

from Top M

x to Procee

titution anution after t

LUTIONS P and Subm

ment categbmit

↓ properly an

with a refereonline paymapplication

ON FEES

www.online

Menu

ed

d "Commethat click g

PVT. LTD." mit

ory and En

nd submit ence no. oment receipn.

esbi.com/

ercial Servigo

IN Comme

nter "Tende

upon makin submit. Tpt along w

ces" in

ercial

er ID "

ing the The ith the

Page 6: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

S No

1

2

3

4

5

6

7

(i)

1

2

3

4

5

6

7

8

9

ijwani And A

List of SB

M/s MD ARoad, VadM/s Optra059, PH-0M/s ShreePH-99984M/s PoweAmbawadPatel ElecTalaja RoaEmail: patS.M EnterSchool, N84014970Prince EntRoad, KrisEmail: prin

Catego M/s PranaNagar Roamail: pranM/s ForamRd., SatelM/s HCP AhmedabaM/s VrindaStation, VM/s ShainRampura,M/s MaimoSangrampM/s ConceCentral ExPH-02652CHILL-AIRChhani, V(M)982560chillair.kruCool Air E360001, (M

Associates

BIIMS, Ahm

Aircon, A-11dodara-390 Power Sys

0792688021e Maruti AC486570, e-mr Control, 5

di, Ahmedabctricals ad, Bhavnatelelectricalsrprise ew Sama R

038. terprise shnanagar, nceenterpris

ory up to R

am Technolad, Opp. Seamhvac@g

m HVAC, g-lite, AhmedEnterprise, ad-382480,a Air Conditarachha Rd

na Cooling S Surat-3950oon Aircon,pura, Surat,ept Marketinxcise Bhava2391348, e-R SYSTEM

Vadodara-3903471/9825

unal@gmailEnterprise M)9426165

medabad emof

6, Ashwam 001, PH-02

stem, 22, S.12, e-mail-o Services, S

mail-shreem503, Ashwambad-06, PH-

agar. Ps55@gmail

Road, Vadod 60, Naroda, Ah

se18@gma

Rs.20 Lakh

ogies., A-40eema Hall, gmail.com 11, Kavita C

dabad-380 0A-8, Some

, m-997977tion Solutiod., Surat, PHSystems, 7/003, PH-98, 101, Relax Mob-98243ng, "Concean, B/H Sub-mail-mananS 90024, 5083471, E.com Op786, Email:

6

mpanelled f ACs up to

egh Compl265242708.G. Mall, Op

optrapowersS/B, 42, Pa

marutiacservmegh Elega-0794002241/A Aastha

Ph: 0278-22.com 23, Central dara. Email: ajaMaruti Plaz

hmedabad. ail.com

(S-2):

05/406, 4THSatellite, Ah

Complex-B015, PH-079shwar Tena5742, e-man, C-1060, H-98247323/2077,78,8698140380x Apartmen392576, e-mpt Arena", Pbhanpura Gn@concept 1&2, Induc phEmail: chilla

pp. 13 Ram: coolair9@

contractoro Rs.5.0 La

ex, Opp. Sa

82, e-mail:mpp. Home Tsystem@gmradise Com

vice2014@gance, Bhuda404, e-mail-Complex, N25584, (M)9

Governme

aytondon20za, Nr. Vijay (M)9

H Floor, Nehmedabad-

, Times of I926730218ament, Nr. Nail-hcpenterCentral Baz305, e-mail-

6, 404, 4th F

t, Haldiya Smail-maimoPayal Park

Garden, Subt.net.in chacha Houh: 0265-277airsystems@

nathpara, [email protected]

rs for suppkh

ayaji Vihar Cmdaircon@gTown, Thaltemail.com

mplex, Sayajgmail.com arpura Rd.,-info@poweNr. Sanskar937475474

ent Housing (M)987

[email protected] Park BRT9979861449

el Kanth Pa-380015 PH

ndia Road, 8, e-mail-foraNishan Schprise@gmazar, Opp. V-vrinda_ac@Floor, Al. Me

Sheri, Navsaoonsales52@Soc., Nr. TV

bhanpura, V

use, Chhan73729/[email protected]

Garud Garb

ply and mai

Club, Raj Mgmail.com ej, Ahmeda

jiganj, Vado

Nr Kalyan ercontrol.cormandal Ch

47,98250880

Society,Nr79562994, com

TS, Sardar C9,99798590

alace, 100 FH-07926933

Nr. Shyamamengg@gool, Ranip,

ail.com Varachha [email protected] Appt.

ari Bazar, @gmail.comVS Motors,

Vadodara-39

i Jakat Nak1022, m,

bi Chowk, R

intenance

Mahal

bad-380

odara-05,

Jewelers, om howk, 095

. MGM

Chowk 049

Ft, Anand 3579 e-

al Cross gmail.com

olice m .,

m Opp.

90023,

ka,

ajkot-

Page 7: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

10

11

12

13

14

ijwani And A

Sharda ReTravels, R(M)942626Real EnteRoad,Nr. KPh: 0281-realenterpMilestone Station, N27456155System DVasna, AhEmail: sdeHimanshu079-40070

Associates

efrigeration Rubber Fact61853 rprise Kotecha Sc2474753, 2

prise97@gmEngineers r. 132 Feet

5, (M)97277esigning

hmedabad-3esign_trs@yu Sales 0200, (M)99

Shtory Circle,

chool, Off. A2474759, (Mmail.com 6, GrounRing Road73330, 1

380007 Pyahoo.com 1

924464218

7

hop No-35, Bhavnagar-Email: thomFirst Floor,

Amin Marg, M)98251890

nd Floor, Bid, Naranpura

02, Aagam

Ph:-079266

15, Binali C,

Suryadars-364001, masvyas@y104-PanchRajkot-360

029,

inali Compla , AhmedaEmail: careComplex, N31673, (M)9

Complex, Na Ema

han ComplePh: 0278-2

yahoo.co.inhshil Plaza, 0005,

Em

ex, Opp. Toabad-38001e@milestoneNr. Pratapk982502465

aranpura, Ail: himanshu

ex, Opp. Ta2510479, Kotechanag

mail:

orrent Powe3, Peengineers

kunj Busstan51,76008807

hmedabad usales15@

anna

gar Main

er Sub h: 079-.com nd, 736

Ph-gmail.com

Page 8: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

To, The CiCircle OSBI InfAhmed Dear S Havingto the examinthe reqexecutattachespecifictender,Conditirespec

Descri

Earnes

Percendeductto be reTime aWorks date ohandinlater)toI/We htotal teinteresherebySolutio

ijwani And A

rcle Head Office, fra Managedabad- 380

Sir,

g examinedworks spe

ned the sitequisite infoe the wored Schedcations, de, the Articions of Co

cts in accor

iption of w

st Money

ntage, if anted from Bietained allowed fofrom four

of writteng over of

o commenchave deposender amost. Should Iy agree thons

Associates

& VP (Civi

ement Solu0001.

d the drawecified in te of the wo

ormation rerks specifiedule of Qesign, drawcles of Agontract andrdance with

work

ny, to be ills and tota

or complerteenth da

n order othe site (wce the worksited a sumount as EaI / We fail

hat this su

F

il),

utions Pvt.

wings, speche memororks specielating theed in the

Quantities wings andgreement, d with suchh such con

M

al amount

etion of thay after thor date owhichever k m of Rs.2arnest Monto execute

um shall b

8

ORM TEN

Ltd.,

cification, drandum hefied in the

ereto as afsaid memand in

instructioSpecial C

h materialsnditions so

MEMORANProposeBranch, Rs. 2,60only) byfrom anyfavour oLtd, paya10 % froTotal 5%value inc

heheofis

1 ½ (On

,600/- (Twney with te the Contbe forfeite

Pv

NDER

design andereinafter s said memffecting the

morandumaccordancns in writi

Conditions,s as are pfar as they

NDUM ed Air CondDist. Juna00.00 - (Ty means oy scheduleof SBI Infrable at Bha

om Running% of contraccluding EMne & half )

wo Thousathe SBI Intract when ed by me/vt.

schedule set out and

morandum e tender, Iat the rate

ce in all ng referred, Schedulerovided foy may be a

ditioning wogadh

Two Thouof Demanded Nationara Manageavnagar. g Bills, subct amount

MD & Initialmonths (4

and Six Hfra whichcalled upo

/us to SBI

of quantitid having vand havingI/We herebes mention

respects d to in coe of Quanr by, and iapplicable.

orks of Ba

usand Six d Draft / P

alized Bankement Sol

bject to maor actual F Security D

45 days)

undred onh is not toon to do soI Infra Ma

es relatingvisited andg acquiredby offer toned in the

with thenditions ofntities andin all other

ntwa

HundredPay Orderk drawn inutions Pvt

aximum Final Bill Deposit.

nly) of theo bear anyo I/ We doanagement

Ltd

g d d o e e f d r

d r n t

e y o t .

Page 9: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

1) Our Ban

ii) The na

ii) Name

Or (Name

(Certifi

Yours f

Signat

Signatu

i)

i

ijwani And A

nkers are:

ames of pa

of the part

e of person

ed true co

faithfully,

ture of Con

ure and ad

Associates

i)

artners of o

ner of the

having Po

py of the P

ntractors.

ddresses o

our firm are

firm Autho

ower of Att

Power of A

of Witnesse

9

e: i)

orized to sig

orney to si

Attorney sho

es

gn

ign the Co

ould be att

ntract.)

tached)

Page 10: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

(The bibefore To, M/s. e-PB-705, Ellis BriState G E:yashrD: +91 Email: AONLINEBRANC Dear SiThis hadocume1) The u2) We hmention3) We athe func4) We liable &tenderinwith the5) We Authorit6) We, With reg Date: Signatu Name: Designa Address

Scan it

ijwani And A

PRidders are emailing)

ProcuremeWall Street idge, Ahme

Gujarat, India

rajsinh@au079-40270

AGREEMEE E-TENDECH, JUNAG

ir, as referencent. This letundersignehave studiedned in RFP also confirmctionality of confirm tha

& responsibng platforme PC, any oconfirm thaty hereby con

gards,

ure with com

Company /

ation within

s of Compa

and send to

Associates

ROCESS Crequired to

ent Techno- II, Opp. O

edabad – 38a

ctiontiger.n579/580/56

ENT TO THERING FO

GADH

ce to the Ttter is to cond is authorid the Commof SBIIMS

m that we hathe same t

at SBIIMS ale in any m due to losther unforesat we have

firm that we

mpany seal

Organizatio

Company /

any / Organ

o this Docu

COMPLIAo print this

ology, Orient Club,80006,

et sujith@e67/596, 079-

HE PROCER PROPOS

Terms & Confirm that: zed represe

mercial Termas well as t

ave taken thhoroughly. and M/s. e-

manner whass of interneseen circume a valid d

e will honor

on:

/ Organizat

ization:

ment on ---

10

ANCE STATs on their c

eptl.in web:--40016815,

SS RELATSED AIR C

onditions fo

entative of tms and the this documehe training o -Procurematsoever foret connectivmstances etigital signa

the Bids pl

ion:

---------------

TEMENT (ompany’s

- https://eten, 937451975

TED TERMSCONDITION

or the E-ten

the companBusiness ru

ent and conon the E-ten

ent Technr my/our faivity, electrictc. before oture certific

aced by us

-------

(ANNEXUletter head

nder.sbi 554, 98799

S AND CONING WOR

ndering me

ny. ules govern

nfirm our agndering too

ology, Ahmilure to acccity failure, r during thecate issued

during the

RE II) d and sign,

996111

ONDITIONSRK OF SBI

entioned in

ning the E-tereement to

ol and have

medabad scess & bid ovirus attack

e E- tenderind by a valid

E-tendering

, stamp

S FOR THEI BANTWA

the tender

endering asthem. understood

shall not beon the e-E-k, problemsng event. d Certifying

g process.

E A

r

s

d

e -s

g

Page 11: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

(On no

ARTICSBIIMSService

and haprepare

AND Winclusivbehalf AND WConditiConditiare colthe saScheduthereinreferre NOW I

1) In consset forConditidescrib

2) The Emas shaConditi

The teSahijwArchitepersonwhom Employbe Arch

ijwani And A

on-judicial S

CLES OF AS PVT. LTe Provider"WHEREAS

as caused ded by M/s.

WHERE ASve, the Speof the partWHEREASions set fions and illectively hid Drawingule of Qua

n arrived atd to as “ the

T IS HEREsideration rth in the ions execbed in the smployer shall becomeions.

erm “the Awani & Assects for thens as shall the Contrayer, PROVhitects und

Associates

Stamp Pap

AGREEMEND., on beh" of t

S the

drawings a. Vijay Sah

S the said Decificationsties heretoS the Conforth heren the Sch

hereinafter gs and / o

antities at tht our such e said Con

EBY AGREof the saidsaid Cond

cute and said Specihall pay to e payable

Architects” sociates Ae purpose obe nomina

actor shall VIDED ALWder this Co

ARTICL

per of Rs. 5

NT made thalf of SBI,the SBIIMS

and specifihijwani & A

Drawings ns and the . ntractor hain and toedule of Qreferred t

or describehe respectother sum

ntract Amo

EED AS FOd Contract ditions, thecomplete fications athe Contra

e, at the

in the saidArchitects,of this Conated for thaobject for r

WAYS that ontract sha

11

ES OF AG

500/- or as

the having its

OPVT.LT

cations deAssociate

numberedSchedule

as agreed the Con

Quantities o as “ the ed in the tive rates t

m as shall bount.)

OLLOWS:Amount toe Contracthe work

and the pricactor, the stimes and

d Conditio, or in the etract for w

at purpose reasons cono personll be entitle

GREEMEN

s per latest

s office at MOneTD. is

escribing thes, its Arch

of Quantit

d to execuditions seand Condsaid condsaid Spec

therein set become pa

o be paid actor shall u

shown uced Schedsaid Contrad in the m

ns shall mevent of thhatever reby the Em

onsidered tn or personed to disreg

NT

t Govt. Rul

date oMumbai he

desirou

he work to hitects.

ies have b

ute upon et forth heitions of Citions” ) thecifications forth amo

ayable the

at the timeupon and upon the ule of Quaact Amounmanner sp

ean the Mheir ceasingason, such

mployer, noto be sufficns subsequgard or ove

es)

of erein after

Part us of

be done to

to been signe

and subjeerein in thContract (ae works shand includ

ounting to tre under (h

es and in thsubject tosaid Draw

antities. nt, or such pecified in

M/s. Vijay g to be theh other perot being a pcient by theuently appoerrule any

between called" the

o be

ed by or on

ect to thehe Speciaall of whichhown uponded in thehe sum ashereinafter

he mannero the saidwings and

other sumn the said

e rson or person to e ointed to previous

e and

n

e l

h n e s r

r d d

m d

Page 12: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

decisioArchite

3) The saof this to the sConditi

4) The PlContra

5) This CcontracaccordQuanti

6) The Corelatinginstallain the after th

7) The SBby addwithout

8) Time sagreesof issuand to for exte

9) All pay10) All disp

to haveto dete

11) That thundersIN WIThands written SIGNA SIGNE

ijwani And A

ons or apprects for theaid ConditioAgreemensaid Condiions contaans, Agre

act. Contract is ct to carry ing to actties and Rontractor sg to AIR ations, fittinsaid Cond

he completBIIMS reseding to or ot prejudiceshall be cos to commee of formacomplete

ension of tyments by tputes arisine arisen at ermine the he severastood by thTNESS WHto these p.

ATURE CLA

ED AND DE

Associates

roval or dire time beingons and Ant, and the itions and ined. ements an

neither aout the w

tual measates or as shall afford

CONDITngs air-conditions, andion of his werves to itsomitting an

e to this Coonsidered ence the wal work ordthe entire

ime. the SBI unng out of o Ahmedabsame. l parts of e Contract

HERE OF Tresents an

AUSE

ELIVERED

rection giveg.

Appendix thparties heperform th

nd Docume

a fixed lumwork in resured quanprovided i

d every reIONING wnditioning ad shall mawork. self the rigny items o

ontract. as the ess

work soon ader as pro

e work with

nder this coor in any wabad and on

this Conttor. THE SBIIMnd two dup

D by the

12

en or expre

hereto shaereto shallhe Agreem

ents ment

mp-sum cospect of thntities at tn the said

easonableworks, insand other ake good a

ght of alterof work or

sence of tafter the Siovided for ihin 45 day

ontract will ay connec

nly the cour

ract have

MS and thelicates her

essed in w

ll be read respectiveents on th

ioned here

ontract nore entire bthe rates Conditionsfacility for

stallation oancillary wany dama

ring the drahaving po

this Contraite is handein the said

ys subject

be made octed with thrts in Ahme

been rea

e Contractoreof the da

writing by th

and constely abide beir part res

ein shall fo

r a piece uilding comcontained s. r the carryof lifts, Tworks in thges done

awings andortions of t

act and thed over to

d Conditionto neverth

only at Ahmhis agreemedabad i s

d by the

or have setay and year

he outgoing

trued as foby submit thspectively

orm the ba

work contmplex to bin the Sc

ying out ofTelephone, he manner

to walls, f

d nature ohe same c

e Contrachim or fro

ns whichevheless the

medabad. ment shall bshall have j

Contractor

t their respr first herei

g

orming parthemselvesin the said

asis of this

tract but abe paid forchedule of

f all workselectrica

r laid downfloors, etc

of the workcarried out

ctor herebym the datever is laterprovisions

be deemedjurisdiction

r and fully

pective inabove

t s d

s

a r f

s l

n .

k t

y e r s

d n

y

Page 13: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

hand o (Name

presen

1) Shri /S

Addres _____ (Witne SIGNE

(Contra in the p

Shri/ S

Addres

(Witnes

ijwani And A

of Shri

e and Desig

nce of:

mt.

ss _______

_________

ess)

ED AND DE

actor)

presence o

mt.

ss

ss)

Associates

gnation) In

_________

_________

ELIVERED

of:

By

the

_________

______

D by the

By

13

the (Emplo

___

the

oyer)

(Signat

(Signat

ture of Em

ture of Wit

(Signa

(Signa

mployer)

tness)

ature of Co

ature of Wit

ontractors)

tness)

Page 14: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

1.0

2.0

2.1

2.2

2.3

3.0

r. Vijay Sah

Scope SealedAir ConSite an The proTender The wtender InstrucGeneraSpeciaAdditioDrawinPriced The abone anorder g

a) Price B

b) Additio

c) Techni

d) Drawin

e) Specia

f) Genera

g) Instruc Complethe we The ten Site Vi

ijwani And A

e of work

d Tenders nditioning wnd its locati

oposed wor documen

ork has toconsisting

ctions to tal conditioal conditioonal Specngs d bid A

bove docunother but given belowBid

onal Specif

cal specific

ngs

al condition

al condition

ctions to Te

ete set of tbsite www

nder docum

isit:

Associates

INS

are inviteworks for Bion

ork is to bents

o be carrieg of the foll

tenderers ons of Coons of Concifications

ments shain case of

w;

fications

cations

ns of contra

ns of contr

enderers

tender docw.sbi.co.in

ments are

STRUCTIO

ed by SBIIMBantwa Bra

e carried ou

ed out strowing doc

ntract ntract

all be takef ambiguiti

act

ract

cuments in

not transfe

14

SECTION

ONS TO TH

MS for andanch, Dist.

ut at Bantw

ictly accoruments an

en as comies or disc

ncluding re

erable.

– 1

HE TENDE

d behalf of. Junagadh

wa Branch,

rding to thnd the mos

plementarcrepancies

elative draw

ERERS

f SBI for thh

, Dist. Juna

he conditiost workmen

ry and mut, shall tak

wings can

he work of

agadh

ons stipulan like mann

tually explke precede

be downlo

f Proposed

ated in thener.

lanatory ofence in the

oaded from

d

e

f e

m

Page 15: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

3.1

4.0

4.1

4.2

4.3

4.4

4.5

5.0

r. Vijay Sah

The teinformaand enrequescommulaw anregulatof any Earnes The tenThousperiod Nationapayabl EMD inaccom No inte EMD o EMD o

Initial S The suvalue bdays of 5.1 SecTotal sin the fbe dedrespec10% til50% ofcertifyinthe def

ijwani And A

nderer muation and dnter into a sted satisfyunication fand order tions etc; Tor all the fa

st Money:

nderers arand Six Hof 180 Daalized Banle at Bhav

n any othepanied by

erest will be

of unsucces

of successf

Security D

uccessful teby means of acceptan

curity Depsecurity deform of Iniducted froctive runninl Total Secf the Total ng the virtufects liabilit

Associates

ust obtain data that mcontract foy himself acilities, thsituation,

The tenderactors whi

re requesteHundred ays from thnk drawn vnagar.

er form oththe EMD i

e paid on t

ssful tende

ful tendere

Deposit:

enderer wiof DD draw

nce of tend

posit: posit shallitial Securi

om the runng accountcurity DepoSecurity Dual complety period a

himself onmay be reqor the satiregarding

he characteclimatic

rer will be fle submitti

ed to submonly) by

he last datein favor

her than asn accorda

the EMD.

erer will be

r will be re

ill have to wn in favoer.

be 5% of ity Depositnning accot bill i.e., dosit (TSD) Deposit shaetion. The as specified

15

n his own uired for thsfactory p

g the avaier quality aconditions

fully respong his tend

mit the Earmeans ofe of submof SBI In

s specifiednce with cl

e refunded

etained as

submit a sur of SBI P

f contract vt (ISD) whount bill o

deduction fincluding I

all be paid balance 50d in the co

responsibhe purposeerformancilability of and quantis local aonsible for der.

rnest Monef Demandission of thnfra Mana

d above wilause 4.1 a

within 30 d

a part of se

sum equivaPayable at

value. Out ich includeof the worfrom eachISD reacheto the con

0% would ntract.

bility and he of filling tce of the w

water, poity of the muthorities considerin

ey of Rs 2d Draft/Pahe tender) agement

ll not be aabove shal

days of aw

ecurity dep

alent to 2%t Junagadh

of this 2%es the EMrk at therunning b

es to 5% ontract on thbe paid to

his own exthis tender

work. The tower, tranmaterials, l

requiremeng the finan

,600/- (Ruay Order(V

from any Solutions

accepted. Tll be reject

ward of Con

posit.

% of acceph within a p

% of contraD. Balancerate of 10ill account

of contract he basis of

the contra

xpenses alr documenttenderer isnsport andlabour, theent, trafficncial effect

pees TwoValid for ascheduled

s Pvt Ltd,

Tender noted.

ntract.

pted tenderperiod of 7

act value ise 3% shal0% of thet will be @value. Thearchitect’s

actors after

l t s d e c t

o a d ,

t

r 7

s l

e @ e s r

Page 16: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

5.2 AdIn caseprojectequivaof contFDR / of workwork inat liberits sole No intethe deHowe

5.3 SigThe suagreemof intimof the succesnot. 6.0 ComTime iaccordof work 7.0 ValTenderdate ofor makprejudi 8.0 LiqThe liqcontrac 9.0 Ra 9.0.1 InThe tecase oin word

ijwani And A

ditional Se L-1 biddt cost), thelent to diffetract. SuchBank’s guak ASD willn time or arty to recove discretion

erest shall efect liabilitver, interes

gning of couccessful ment and cmation of a

tenders byssful tende

mpletion Pis essencance with

k.

idity of ters shall ref e-reversekes modificce to any o

uidated Dquidated dct value.

te and pri

n case of nderers shf discrepands will prev

Associates

Security Deder quotes bank mayerence of

h ASD couarantee as be return

as per tendver the duen.

be paid to ty period ost on FDR

ontract Dotenderer

conditions cceptancey the Bankerer wheth

Period: e of the the terms

nder: main valid

e auction. Ications in hother right

Damages: damages s

ces:

item rate thall quote ncy betweevail. If no r

eposit: s abnormay ask suchestimatedld be in th

s per formaed to the c

der specifices from AS

the amounof one year

for additio

ocumentsshall be bof contract

e of the tenk will conser such fo

contract.of contrac

d and openIf the tendehis/her origor remedy

shall be 0

tender: their rates

en the raterate is quo

16

ally low ratbidder tocost vis-à

he joint namat approvedcontractor.cation or leSD or to for

nt retainedr from the donal securit

s: bound to t attached

nder by thestitute a binormal agre

The workct within a p

n for acceerer withdrginal offer wy the Bank

.50% per

s for indive quoted inoted for a p

tes (i.e. 10deposit ad-vis L-1qume of the Bd by the B. In case ceave the jorfeit such A

d by the Badate virtuaty deposit

implemenherewith w

e Bank. Honding agreeement is

k shouldperiod of 4

ptance forraws his/hewhich are shall be a

week sub

idual itemsn words anparticular it

0% or modditional seoted amouBank and ank. On su

contractor ob incomplASD as the

ank as Secl completiowill be rec

nt the conwithin 15 dowever, theeement besubseque

be compl45 days fro

r a period er offer dunot accept

at liberty for

bject to a

s both in wnd figures, tem the co

ore, below ecurity depunt for duebidder in tuccessful cfails to comlete, the bae case may

curity Depoon certificaceived by th

ntract by sdays from te written atween the ntly entere

leted in aom the dat

of 90 dayring the vatable to Barfeit the EM

maximum

words andthe unit ra

ontractor s

estimatedposit (ASD)e fulfillmentthe form ofcompletionmplete theank will bey be within

osit for ate (VCC).he bidder.

signing anthe receipt

acceptanceBank and

ed in to or

all respecte of award

s from thealue periodank withoutMD.

of 5% of

d figure. Inte quantityhall not be

d ) t f n e e n

n t e d r

t d

e d t

f

n y e

Page 17: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

paid fothe reqamounwill gov

The tecase thnot be The techangewould descripthe knoauthoriEach p The ralabour

The SBentrustprojectclaim / 10.0 M

wthreinreereac Tinafo

SIGNA

ijwani And A

or that itemquisite totant calculatevern and th

nderers nehe tendereconsidered

enderers sed the tenbe paid a

ption of theowledge oized persopage shall

ate quotedrs, taxes e

BIIMS reset the workt within its correspon

Material hawork is morhe differenecovered fnclude all espect. Ranquiry by easonable ccount.

he SBIIMSn part or mny stage oor doing so

ATURE OF

Associates

m when it isal is given.ed from muhe amount

eed not quers quote td during exhould not

nders woulaccordinglye item. If af the Archn and cuttibe totaled

d shall beetc. except

erve their rk in phase

sole discndence sha

aving basire or less tnce will befrom the coother tax

ates shouldthe bank

and advan

S Pvt. Ltd. may entrusof the projeo and no cl

F THE CON

s executed. In case oultiplicationt will be co

uote their their rates xecution. change th

ld be evaly. The tenany discreitect/ SBIIMing or overand the gr

e firm andt G.S.T, w

rights to acs or mayretion withall be enter

c price: Ifhen the bae calculatontractor. Ges, transpd be howek and thentageous,

Reserve tt the workect within aim/corres

NTRACTO

17

d. The amoof discrepan of unit rarrected.

rates for wfor such it

he units aluated asderer shopancy is oMS Each pr writing shrand total s

d shall inchich shall

ccept any tdrop the

hout assignrtained in t

f the basic asic rate gied (eitherGST shall portation, lever, fair quantity if any due

heir rights k in phasesits sole dis

spondence

R WITH S

ount of eacancy betweate and the

which no qtems those

as specifiedper the ould not ch

observed hpage of th

hall be dulyshall be giv

clude all cl be payab

tenders, eipart scopening any rthis regard

rate of anyven in sch

r plus or be excludloading, uand comppurchasedto bulk pu

to accept s or may dscretion w

e shall be e

EAL

ch item shaeen the une quantity

quantities e rates wil

d in the teriginal unit

hange or mhe should he BOQ shy attested bven.

costs, alloble / reimb

ither in whe of workreason(s) f.

y material hedule of qminus) aned from th

unloading, petitive andd in everyurchase ma

any tendedrop the p

without assientertained

all be calcnit rate anthe unit ra

have beenl be ignore

ender. If at and the modify or immediate

hall be signby him.

owances, bursed at a

ole or in pat any stafor doing

actually usuantities, ind shall bhe basic ra

etc compd verified y period ay be also

ers, either iart scope igning any

d in this reg

ulated andd the totaate quoted

n given. Ined and wil

any unit iscontractordelete the

ely bring toned by the

materials,actual

part or mayage of theso and no

sed for then the case

be paid orate and wilplete in alby marketshould be taken into

n whole orof work at

y reason(s)gard.

d l

d

n l

s r e o e

,

y e o

e e r l l t

e o

r t )

Page 18: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

1.0 De“Contraformal and thconditiotime byto form In the have th 1.0.1 ManagBhadrasucces 1.0.2 Archite 1.0.3 represecontrac 1.0.4 incorpoindividuindividu The edescripincludekinds tothe con 1.0.5 1.0.6 Engineas maythe entthere tcontain

ijwani And A

efinitions:-act means agreemen

he contracons, the sy the Arch

m one contr

contract thhe meaning

‘SBIIMS’ gement Sea, Laldarwssors and a

‘Architectsects & Inter

‘Site Enginentative foctors.

‘The Conorate not, uual or theual or firms

xpression ption in thees materiao be providntractor un

‘Engineer’

‘Drawings’eer and refy be issuedtire work ato or deduned.

Associates

GEN

- the docum

nt executedctor, togethspecificatioitects / Baract and sh

he following hereby r

shall mervices Pro

waja, Ahmassigns.

s/ Consultrior Design

neer’ shall or day-to-

ntractor’ sundertakine composis of compa

‘works’ oe “Scope ofals, apparaded, the obder the co

shall mea

’ shall meafer red to id by the E

as stipulateuctions the

NERAL CO

ments formd betweenher with t

ons, designnk and all

hall be com

ng expressespectively

ean SBIvider-PMSedabad-38

tants’ shaners, Ahme

mean an day supe

hall meang the workng the fir

any.

or ‘work’ f work” and

atus, equipbligations o

ontract.

an the repre

an the drawin the specngineer fro

ed in the leere from a

18

ONDITIONS

ming the tenn SBI Infra the documns, drawinthese doc

mplementa

sions shally assigned

Infra MaS) having it80001 and

all mean edabad.

Engineer rvision of

n the indks and sharm or com

shall mead/or to be epment, temof the cont

esentative

wings prepcificationsom time to

etter of accas may be

S OF CON

nder and tManagem

ments refegs and ins

cuments tary to one a

l, unless thd to them.

nagementts Circle Od includes

M/s Vija

appointed work and

dividual oll include le

mpany and

an the peexecuted imporary sutractor here

of the Arc

pared by thand any m

o time Contceptance ofe made u

NTRACT

he acceptament Soluti

rred therestructions

aken togethanother.

he context

SolutionOffice at Ths the clien

ay Sahijw

by the SBd to give

r firm or egal persod the perm

ermanent n accordaupports, fieunder and

chitect/cons

he Architecmodificatiotract valuef tender su

under the

ance thereons Pvt. L

e in includissued fro

her shall b

t otherwise

s Pvt. Lhird Floor, nt’s repres

wani & A

BIIMS at siinstructio

companyonal represmitted ass

or temponce with thttings andd work to b

sultant.

cts and issons of suche shall meaubject suchprovide he

eof and theLtd. (client)ding theseom time tobe deemed

e requires

Ltd.(ProjectSBI, LHOsentatives

Associates

ite as theirons to the

y whethersentative ofsignees of

orary workhe contractd things ofbe done by

ued by theh drawingsan value ofh additionserein after

e ) e o d

,

t , ,

s

r e

r f f

k t f y

e s f s r

Page 19: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

1.0.7 modificArchite 1.0.8 1.0.9 1.0.10 respec 1.1.11 chargeAhmed 1.1.12 to as Jissue inArchiteexecut i) Viceii) SBIIiii) Con CLAUS

1.0 Tot

Total SRetent

1.1 EaThe teonly) iManagtender interesrefundeEMD speriod is acceto pay work w

ijwani And A

Specificatications thect/Consult

“Month” m“Week” m “Day” m

ctively.

“SBIIMS’se of the Prdabad

The followJPC) for asnstructions

ects Site Eion of the p

e PresidentMS Enginecerned pa

SE

tal Securit

Security deion Money

rnest Monnderer shain the form

gement Soshall be c

st shall be ed soon ashall standwhen he is

epted by ththe initial

within the st

Associates

ions’ shalereof as tant.

means calemeans seve

eans a ca

Engineer”roject, as n

wing shall cssessing as or directioEngineer /project.

t – Circle Heer (AIR Crtner of the

ty Deposit

eposit compy

ney Deposall furnish m of Demolutions Pvconsidered

paid on tafter the de absolutelys required he SBIIMSsecurity detipulated ti

l mean thmay tim

endar monen consecualendar da

” shall meanominated

constitute tand reviewons from t/ PMC and

Head of SBCONDITIONe Architect

t

prise of Ea

sit- EMD of Rand draft

vt Ltd, payd unless ththis EMD. ecision toy forfeited to keep hi, the contreposit as sme.

19

he specificme to time

th. utive days.ay beginni

an The AIRd by the C

the Joint Pwing the pro

ime to timed other co

BIIMS NING and ts and their

arnest Mon

Rs. 2,600/-or banker

yable at Bhe EMD is

The EMDaward theif the tend

is tender oractor fails stipulated

cations ree be fur

. ing and e

R CONDITircle Head

Project Comogress of te for beingonsultants

Electrical) r Resident

ney Deposi

(Rupees rs cheque havnagar.s so deposD of the ue contractderer revo

open accepto enter in

or fails to

eferred to nished or

ending at

TIONING/Ed and Vice

mmittee (hthe work o

g observed/ contract

in-charge Architect M

it, Initial se

Two Thoudrawn in on any S

sited in thunsuccessf

is taken wkes his te

ptance by tnto a formacommence

in the ter approve

00 Hrs an

lectrical Ee Presiden

herein undeon the projd and followtors engag

of the ProMember.

ecurity dep

usand Sixfavour of

Scheduled he requiredful tenderewithout intnder at anthe SBIIMSal agreeme the com

ender anded by the

nd 24 Hrs

ngineer in-t, SBIIMS

er referredject and towed by theged in the

oject

osit and

x Hundredf SBI Infra

Bank. Nod form. Noer shall beterest. Theny time theS or after itent or failsmence the

d e

s

-,

d o e e

d a o o e e e t s e

Page 20: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

1.2 InitThe amform odeposi

1.3 ADIn caseprojectequivaof contFDR / of workwork inat liberits sole No intedefect Howev 1.4 ReBesidemoneyvalue odeposithe cocontracArchitethe conprovideconditio 2.0 LanThe lan 3.0 ErrIn casdimensfollowin

i) Betwbe ado

ii) Betw

ijwani And A

tial Securimount of ISf DD/Fixedted within

DDITIONALe L-1 biddt cost), thelent to diffetract. SuchBank’s guak ASD willn time or arty to recove discretion

erest shall liability pe

ver, interes

tention Moes the SD ay shall be dof work dot i.e. ISD pntract valuctor withoect/consultantractors wed the conons of con

nguage: nguage in

rors, omisse of errosions on tng order sh

ween scaleopted.

ween the w

Associates

ity DeposiSD shall bd Deposit 15 days fro

L SECURITder quotes bank mayerence of eh ASD couarantee as be returns per tend

ver the duen.

be paid toeriod of onst on FDR f

oney: as depositededucted fne by the plus EMD ue. The 5ut any inant. The b

without intentractor hastract includ

which the

ssions andors, omissthe drawinhall apply.

ed and wri

written or

it (lSD) be 2% of aReceipt (Fom the dat

TY DEPOSs abnormay ask suchestimatedld be in th

s per formaed to the c

der specifices from AS

o the amoune year frfor addition

ed by the cfrom the rucontractor plus Rete

50% of thenterest on alance 50

erest withins satisfactoding site cl

contract do

d discrepasions and/ngs or be

tten dimen

shown de

20

accepted vFDR) drawte of accep

SIT / PERFally low rat

bidder tocost vis-à-

he joint namat approvedcontractor.

cation or leSD or to for

unt retainedrom the danal security

contractorunning accand claimntion Mone total sec

issue of% of the to

n fifteen daorily attendlearance.

ocuments

ancies: / or disag

etween the

nsion (or d

escription

value of tewn on any ptance of te

FORMANCtes (i.e. 10deposit ad-vis L-1 qume of the Bd by the B. In case c

eave the jorfeit such A

d by the Baate virtual y deposit w

in the abocount bill a

med in eachey shall bocurity depf Virtual Cotal securi

ays after thded to all d

shall be dr

greement e drawings

description

or dimens

nder includscheduled

ender.

CE GUARA0% or mo

dditional seuoted amouBank and ank. On su

contractor ob in compASD as the

ank as Seccompletio

will be rece

ove said mat the rate h bill providoth togethe

posit shall Completionty deposit

he end of ddefects in

rawn shall

between s and spe

) on a dra

sions in th

ding the Ed Bank an

ANTEE ore, below ecurity depunt for duebidder in tuccessful cfails to comlete, the bae case may

curity Depoon certificaeived by th

anner, theof 10% of

ded the toter not excbe refund

n certificashall be re

defects liabaccordanc

be in Engl

written aecifications

awing, the

he drawing

EMD in thend shall be

estimatedposit (ASD)e fulfillmentthe form ofcompletionmplete theank will bey be within

osit for theate (VCC)e bidder.

e Retentionf the grosstal security

ceed 5% ofded to thete by theefunded to

bility periodce with the

lish.

nd scaleds etc., the

latter shal

gs and the

e e

d ) t f n e e n

e .

n s y f e e o d e

d e

l

e

Page 21: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

corresp iii) Betwof quan

a) In cashall pr

b) Betwtaken a

4.0 ScoThe costrictly Bank tthe dirinstrucreferenmodificsubstituand/or Contraexecutengage 5.0 i) LWithin directlycontracper thebetwee ii) ConOn recsuccesthere o 6.0 OwAll drawArchiteother w 7.0 DeThe SBadditio

ijwani And A

ponding on

ween writtentities of th

ase of diffrevail. ween the das correct.

ope of Woontractor saccordanc

o be commrections of tions, det

nces to ascation of thution workspecificati

actor and aion of anyed the re u

Letter of Athe validit

y or througctor as givee terms ofen the SBII

tract Agreceipt of intssful tendeof shall sign

wnership owings, spe

ect / consuwork.

tailed drawBIIMS thronal instruc

Associates

ne in the sp

en descriphe same ite

ference be

duplicate /

ork: shall carryce with thimunicated f the SBIIMails directs Architecthe design, k. Any discions. The

any substity work exeupon.

Acceptancety period o

gh the archen in the tef the tendeIMS and th

eement: timation of

erer shall bn an agree

of drawingecificationsultants are

wings andough its actions by m

pecification

tion of theem, the for

etween rate

subseque

out complis contractthrough th

MS from titions and t’s / consquality or

crepancy inremoval frution of anecuted by

e: of the tendhitect by reender to ener. The lethe contract

f the accebe boundement in a

gs: s and copiee the prope

d instructirchitects /

means of dr

21

n the forme

e item in thrmer shall b

es written

nt copies o

ete and mt and with he architecime to tim

explanatiultant’s inquantity o

n the drawom the siteny other mhim. The

der the SBegistered pnter into atter of acctor.

eptance ofto implemnon-judicia

es thereof ferties of th

ions: / consultanrawings or

er shall be

he specificbe adopted

in figures

of the tend

maintain ththe direct

ct/consultame issue fu

ions whicstructions f any work

wings or bee of any m

materials thdismissal

BIIMS shapost or othContract f

ceptance s

f tender frment the co

al stamp p

furnished bhe SBIIMS

nts shall fuotherwise

taken as c

ations andd:

and word

der, the ori

he said wotions of anant. The arurther drawh are hein regard

k or the adetween BOmaterial broherefore the

from the

ll issue a erwise dep

for the exeshall const

rom the SBontract andaper of ap

by the SBIS They are

urnish with necessary

correct.

d descriptio

ds, the rate

ginal tende

ork in evend to the srchitect/cowings andre after c to the vdition or o

OQ and / oought theree removal work of a

letter of apositing atcution of thitute a bin

BIIMS /Arcd within fifpropriate v

IMS / SBI e not to b

h reasonay for the ex

ons in bills

e in words

er shall be

ery respectsatisfactionnsultant at / or writecollectivelyariation or

omission orr drawingseon by theand/or re-

any person

acceptancet the of thehe work asnd contract

chitect thefteen daysvalue.

through itse used on

ble properxecution of

s

s

e

t n t e y r r s e - n

e e s t

e s

s n

r f

Page 22: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

the wodocum The wdetaileactivitiearchite 7(a) CoTwo cohanded

8.0 LiqIf the cto comcontracof delaunder tthe ratcontrac 9.0 MaUnlesslabour,requirespecifiequalityhis emin the unsatisimmed 10.0 PePermitscontracregulatobservnotify contracmeet aarising 11.0 SeThe co

ijwani And A

ork. All sents, true

work shall d programes on rece

ect/consulta

opies of aopies of ad over to th

quidated dcontractor f

mplete the wcted or ext

ay, he may the law to te of 0.50ct value.

aterials, Aps or otherw, water, poed for the sed all mate. The contployees anwork ass

sfactory byiately.

ermits, Las and licector at his tions, lawsves any disthe SBIIMctor perforall the cost

there from

etting out ontractor s

Associates

such drawdevelopme

be executm schedule eipt of the ant

greementgreement he contract

damages: fails to mawork and tended datbe called the SBIIM% of the

ppliances wise speciower, toolssatisfactoryerials shaltractor shand shall nosigned to y the SBIIM

aws and Rnses requown expe

s, and ordscrepancy MS in writrms any ats arising t

m.

Work: hall set ou

wings andents thereo

ted in conindicatingwork orde

t: duly signetors.

intain the rclear the ste or compupon withoS on accocontract v

and Empified the cs, equipmey executiol be new a

all at all timot employ him. Wor

MS /Archit

Regulationired for th

enses. Thedinances r

between tting undect, whichthe reform

ut the work

22

instructioof and reas

nformity th therein th

er and sub

ed by both

required psite includipletion, witout prejudi

ount of sucvalue whic

loyees: contractor ent transpon and comand both w

mes enforcon the workman whtect/ consu

s: he executioe contractoules, applthe drawinr intimatiois againstand shall

k and shal

ons shall sonably inf

here with e date of smit the sa

h the parti

rogress ining vacatinthout justifice to any

ch breach tch subject

shall provortation an

mpletion of workmanshe strict dis

ork any unfhose work ultant he s

on of the wor shall givicable to

ngs and spon of the

the law, indemnify

l be respo

be consiferable the

and the cstart and cme to the

ies with th

terms of cng their offfication in sother rightto pay a liq

to a max

vide and pnd any oththe work.

hip and mascipline andfit person o

or behavshall be re

work shallve notices the contra

pecificationArchitect/

rules andy the SBIIM

onsible for

istent withere.

contractor completion

SBIIMS th

he drawing

clause 6.0 fice on or support of t of remedyquidated dximum of

pay for all her facilitieUnless or

aterials shad good ordor anyone vior is foumoved fro

be obtainand comp

act. If the ns, he sha/ Consultaregulation

MS any leg

the true a

h contract

prepare aof various

hrough the

gs shall be

of GOC orbefore thethe cause

y availableamages at5% of the

materialses that arer otherwiseall be bestder amongnot skilled

und to beom the site

ned by theply with the

contractorll promptlyant. If thens he shalgal actions

and perfect

t

a s e

e

r e e e t e

, e e t g d e e

e e r y e l s

t

Page 23: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

setting alignmproceeprogresarchiteexpens 12.0 PrThe codamagwith cobeyond He shacontracworks laws anor adjaclause SBIIMS 13.0 InThe SBhave frwhere every finspectunless /Consuat any also beVigilan 14.0 AThe whnot direany pathroughresponprogres 15.0 QAll matcontrac

ijwani And A

out of theent of all

eding with tss of the w

ect / consuses rectify

rotection ontractor sge and shaontract. Hed his contro

all take adctor shall tand shall nd buildingacent to hat his own

S and the o

nspection BIIMS / Arcree accessmaterials

facility to thtion and eauthorized

ultant excetime. The e inspectece commis

ssignmenhole of worectly entru

art or shareh the Arc

nsibility of ss.

Quality of mterials andct and in a

Associates

e same andparts therethe work. I

works, irresltant the csuch error

of works ashall continall protect te shall makol and due

dequate catake all precomply wi

g codes to is place o

n cost. Theoriginal po

of work: chitect / Cos to the ware lying ohe SBIIMSexaminatiod by the SB

ept the reprproposed w

ed by the ssion.

nt and subrk included

ust and enge there of chitect anthe contra

materials, d workmanaccordanc

d for the coeof and geIf at any timspective ofcontractor sr, if so, req

and propenuously mthe SBI’s ke good ane to his fau

are and stecautions fth all applprevent ac

of work. Te policy malicy may be

onsultant owork site anor from whS/Architect/on and tesBIIMS/ Arcresentativework eitheChief Tec

bletting: d in the congage or inor interest

nd no undactor from

workmannship shalle with Arc

23

orrectnesset it approme any errf the fact thshall be reuired to sa

erty: maintain ad

properties ny such dalt or neglig

eps for prfor safety icable proccidents, ohe contracay be takene lodged w

or their repnd / or to ere they a/consultanst of the mchitect e of Publicer during itshnical Exa

ntract shaldirectly trat therein wdertaking

active &

ship &Tesl be best ochitect/con

of the posoved by theror in this rhat the layoesponsible atisfaction o

dequate prfrom injur

amage, injugence.

rotection oand protecvisions of

or injuries toctor shalln in joint n

with the SB

presentativethe works

are obtainet and theirmaterials a

c authorities constructaminer’s O

l be execuansfer, ass

without the shall reliesuperinten

st: of the respsultant ins

sitions, leve architectrespect shaout had befor the sa

of the SBII

rotection. Ory or loss aury, loss, e

f the adjacctions of hGovt. ando personstake insurames of th

BIIMS

es shall at hop, facto

ed and the r representand workm

s shall be tion stage

Organizatio

uted the cosign or undwritten co

eve the cndence of

pective kinstructions a

els, diment / consultall appear een approvame ad shaIMS

Of all his arising in cexcept due

cent propeis employe

d local bodor propert

rance covehe contract

all reasonries, or otcontractor

tatives necmanship. N

allowed oor its comp

on a wing

ontractor anderlet the consent of thcontractor

the work

nds descriand shall

nsions, andtant beforeduring the

ved by, theall his own

work fromconnection

e to causes

erties. Theees on the

dies’ safetyy on abouters as pertor and the

nable timesher placesr shall givecessary forNo person

n the workpletion canof Centra

nd he shalcontract orhe SBIIMS

from theduring its

bed in thebe subject

d e e e n

m n s

e e y t r e

s s e r n

k n l

l r

S e s

e t

Page 24: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

from timanufacontracas are part ofrequire

ii) Sam All samsupplieused adetaileArchitehimselfmeet win writiand insthe sigsite offArchitemight oother dmanufaequipm

iii) CosThe cosprovide

iv) CosIf any tea) If sparticuConsulor the approv

16.0 ONo claconseqaffectininformathe ent

ijwani And A

me to timeacture or ctor shall pnormally r

f work befed by the a

mples: mples of aded by the are of sucd literature

ect/consultaf that the

with the reqng by the stallation oned by thefice until thect/Consultoccur in apdiscrepancacturers an

ment etc. sh

st of testsst of makined for in th

sts of testest is orderso intendelarized, orltant to be place of m

ved laborat

Obtaining iaim by thquent uponng the exeation or thetire respon

Associates

e to such fabrication

provide surequired fofore in co

architect/co

dequate nucontractor

ch nature te / test certant beforematerial / quirement architect/c

of the parte Architecthe complettant shall tpproving thcies inadeqnd such othall be to t

s: ng any test e specifica

ts not provred by the

ed by or pr though scarried ou

manufacturtory, then t

nformatioe contracn failure ocution of te failure tosibility for

tests as tn or on t

uch assistaor examininorporationonsultant.

umbers, sizwithout a

that samptificate of t

e submittinequipmentof tender s

consultanticular matt / Consulttion of the take reasohe samplesquacy in fther aspecthe accoun

shall be bation or BO

vided for:Architect/

provided foso intendeut by an inre or fabricthe cost of

on related tor for adon his parhe work n

o obtain cothe fulfillm

24

the architethe site oance, instrung measurin the wo

ze, shadesany extra cples cannohe same sg the samt for whichspecificatiothe contraerial / equant for idework for i

onable times for reasofurnishing

cts causingnt of the co

borne by thOQ.

Consultanor or (in t

ed or provndependencation of thsuch test s

to executdditional prt to obtaior any mis

orrect informent of cont

ect/consultar an appruments, mring sampl

ork for test

s & patterncharges. Ifot be presshall be promple/literatuh he is subon. Only wactor shalluipment. Thentification nspection e to approns of its nosamples

g delay on ontractor.

he contract

t which is ethe cases

vided for bt person a

he materiashall be bo

ion of worpayment sn correct

sunderstanmation relitract.

ant may droved test

machinery, ing and teting as m

n as per spf certain iteented or povided to ture the cobmitting th

when the saproceed whe approvand shall / comparisve the samot meetingof best quthe approv

or if such t

either above m

but orderedat any placals tested oorne by the

rk: shall be e

informationding or theve him fro

direct at thting laboralabor, andsting any may be sel

pecificationems propoprepared ahe satisfac

ontractor she sample

amples arewith the proved samplebe kept onson at anymple. Any the specifualities froval of the

test is inten

mentioned) d by the

ce other thaor any Gove contracto

entertainedon as to ae obtainingom any ris

e place ofatory. Thed materialsmaterial orected and

ns shall beosed to beat the sitection of thehall satisfy/ literature

e approvedocurementes shall byn record aty time. The

delay thatfications orom variousmaterials /

nded by or

is not soArchitect /an the sitevernment /or.

d which isany matterg incorrect

sks or from

f e s r d

e e e e y e d t y t

e t r s /

r

o /

e /

s r t

m

Page 25: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

17.0 CThe coworks the exp 18.0 QThe bilpreparequantititem toamoun 19.0 WThe ArequirequantitcalculaSuch mdetail imeasuenteredsign alrecorderepreseattend measuAll autmeasu 20.0 VaNo altethe conprogresor any.Consulwithin somit froany woany decontracthe vadetermfrom th

ijwani And A

ontractor’ontractor shand as lonpiry of the d

Quantities:ll of quanted in accties. The rao any extents of prime

Works to beArchitect/Coes the worty represeation and tomeasuremin the sperements wd in the mell the pageed in tokeentatives. or neglec

rements rethorized exrement.

ariations: eration, omntract. In css of work. Alterationltant shall seven dayom as theork extra toeviation froct drawing

alue of sucmined by thhe contract

Associates

’s superinhall give nng, thereaftdefects lia

ities (BOQcordance ate quotedent. The ee cost and

e measureonsultant mrk to be mentative too furnish aents shallcifications.with the ceasuremenes of the mn of his acNo over wct or omitecorded byxtra work,

mission or vcase the Sks to maken in the kin

give noticys of giving case may

o or make om any of s without ch extras,

he Architect value, as

ntendenceecessary pter, as thebility perio

Q) unless owith the

d shall rementire amoprovision s

ed: may fromeasured a

o assist thll particula be taken. The reprontractor’snt book. Thmeasuremcceptance

writings shat to deputy the repreomissions

variation oBIIMS/ Arc

e any alterad or quality

ce thereof g such oray be in accany alteratthe provisprevious c, alterationct / Consuthe case m

25

e: personal s Architect/d, stated h

or otherwisIndian Sta

main valid fount paid usums, if an

time to tand the cohe Architers or to giv

n in accordresentatives represenhe contrac

ment book. All the co

all be madete his repesentatives and all v

rdered in wchitect / Coation in, ory of the main writing

al instructiocordance wtions or adsions of theconsent in ns, additioltant and t

maybe.

superintend/Consultanhereto.

se stated sandard Mfor variatiounder Clauny, shall be

time intimaontractor shect in takive all assisdance with

e of the Arntative andctor or his ain which t

orrections e in the Mpresentativ

of the Arcvariations

writing by tonsultant tr additions aterials toto the conons the cowith such

dditions to oe contractwriting of

ons or omthe same s

dence durit may cons

shall be deethod of n of quantuse 19, 2e excluded

ate to thehall forthwing such

stance requh the Modrchitect / Cd the meaauthorizedthe measushall be dbook shoue to take

chitect/consmade sha

the Architethinks propto or omisbe used th

ntractor shontract shabut the coor omissio, stipulatiof the Archi

missions shshall be ad

ng the exesider nece

eemed to hMeasurem

tity against0 hereof a

d.

e contractowith attend

measuremuired by ande of meaConsultant asurementsd representurements hduly attesteuld the con

measuresultant shaall be inclu

ect/consultaper at any ssion fromherein, the all confirm

all alter to, ontractor shons from thons, speciftect/ Conshall in all dded to or

ecution theessary unti

have beenments andt individuaas well as

or that heor send a

ments andny of themsurementsshall take

s shall betative shalhave beened by bothntractor notments theall be finaluded such

ant vitiatesduring the the worksArchitect /

m in writingadd to, or

hall not doe works or

fications orsultant and

cases ber deducted

e l

n d l s

e a d . s e e l

n h t e . h

s e s / g r o r r d e d

Page 26: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

21.0 VaNo claauthorimentioin acco (i) The where the wo(ii) Ratpriced The neprovideWorks Clause Where conditioremainreceiptintendsclaimedin his oWhere allowedstated provideArchiteverificawhich t It is fuderivedanalysiequipmoverhe 22.0 FiThe memonths 23.0 VOn suc

ijwani And A

aluation oim for an ity of the A

oned. Any sordance wi

net rates such extrark price hees for all itBOQ.

et prices ofed if omissare carried

e ‘c’ hereun

the extraons as afo

ning items t of the letts to charged and the Aopinion are

extra wod day workthen in a

ed that in ect/Consultations to ththe work h

urther clarid from theis worked

ment and weads and p

inal measeasuremens of the virt

irtual Comccessful co

Associates

of Variatioextra shaArchitect /such extrath the follo

or prices ia work is oerein. tems, wher

f the originasions do nod out, othender.

a works aoresaid or or works ater of accee for such Architect/c

e reasonabork cannotk prices at

accordanceeither casetant) the w

he Architecas been ex

ified that fe tender, on the ‘mawastages rofit. Such

urement: nt and valutual compl

mpletion Completion o

ns: ll be allow/ Consultaa is herein owing prov

n the contof similar c

rever poss

al tender sot vary the erwise the

are not of where the

are carriedeptance infitems of w

consultant sble and prot be propet the net rae with thee, voucherworkman’sct /consultaxecuted.

for all sucthe Contr

arket rate etc. plus items sha

uation in reetion of the

Certificate of entire w

26

wed unlessnt with thereferred toisions.

ract shall dcharacter a

sible should

shall determconditionsprices for t

similar che omission

d out, then form the A

work, duly sshall fix su

oper, basederly measuates stated

local dayrs specifyi

s name anant at or be

ch authorizractor shabasis for m15% towa

all, not be e

espect of the work.

(VCC): works cover

s it shall he concurreo as autho

determineand execut

d be derive

mine the vas under whthe same s

haracter ans vary ththe contra

Architect/ csupported uch rate ord on the mured or vad in the teny work rateng the dai

nd materiaefore the en

zed extrall submitmaterial, laards estabeligible for

he contrac

red by the

have been ence of thorized extra

the valuatted under

ed out of th

alue of theich any remshall be va

and/or exee conditioactor shall consultant by analysiprices asarket rate.alued thender, of thes and waily time (anals employnd of the w

items wherates duly

abour hire lishment cescalation

ct shall be c

contract t

executed e SBIIMS a and shal

tion of the similar con

he rates giv

e items omimaining ite

alued unde

ecuted undns under within 7 dof the rates of the rain the circu contracto

he BOQ orages for thnd if requiyed be deweek follow

ere rates y supporte/ running c

charges, c.

completed

o the full s

under theas herein

ll be made

extra worknditions as

ven in the

itted, ems of r sub-

der similarwhich any

days of thee which heate or ratesumstances

or shall ber, if not, sohe districtred by the

elivered forwing that in

cannot beed by ratecharges ofontractor’s

within two

satisfaction

e n e

k s

r y e e s s

e o ; e r n

e e f s

o

n

Page 27: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

of the comple Clear tequipm Demoliincludinbroughnot inc Removthe SB Shall pby the Shall h All defArchite Upon tentitledRelativshall wissue aThis iscontracliabilityconstrurespec

24.0 WThe SBthe sitedesire only alcontracexecutcarriedcontrac

ijwani And A

SBIIMS, eted the sa

the site oment and m

ish, dismang labor sht upon or orporated

ve all rubbIIMS and s

put the SBISBIIMS

hand over t

fects / impects to the

the satisfad to apply ve to whichwithin fourtea VCC in ressuance octor liability nor shall uction as act of or wor

Work by otBIIMS / Arce for executo have callow but actor howevion of such

d out in succt.

Associates

the contatisfaction o

f all scaffomachinery.

ntle and reheds/camperected atin the perm

ish, debrisshall clear,

IIMS in und

the work in

perfectionsfull satisfa

actory fulfilto the Ar

h the compeen (14) daespect of thf a VCC ties under

the issuaa waiver ork at the sit

her agencchitect / coution of anyarried out b

also extendver shall h work excch manner

ractor shaof the SBII

olding, wir

emove theps and cont the site omanent wo

s etc. from, level and

disputed c

n a peacefu

s have bection of SB

llment by rchitect / cpletion cerays of thehe work foshall not the contr

nce of VCof any righte and in re

cies: onsultant rey work notby other pd reasonanot be re

cept by sper as not to

27

all ensureIMS:

ring, pipes

contractonstructions

or any landorks.

the site adress, com

custody and

ul manner

een attendBIIMS

the contraconsultant rtificate hareceipt of

or which thebe withou

ract includCC in respt or claim espect of w

eserves tht included iersons simble facilitie

equired toecial arrano impede th

e that the

s, surplus

r’s site offis and othed allotted to

and the lanmpact the

d possess

to the SBI

ed and re

actor as stis satisfie

as been sothe applic

e VCC hasut prejudicding the cect of the of the SB

which the V

he rights toin the scop

multaneouses for the

provide agement wihe progres

following

materials,

ce, tempor items ano the contr

nd allotted site as req

ion of the s

IMS

ectified as

tated aboved of the ought, the ation for cos applied.e to the Sontractor’sworks or

BIIMS agaiVCC has b

o use prempe of this csly and the

executionany plantith the SBIss of the w

g works h

, contracto

rary worksnd things wractor by th

to the conquired by th

site and al

pointed o

ve, the cocompletionArchitect/ ompletion

SBIIMS’s s liability f

work at anst the coeen issued

mises and acontract whe contracton of such

or materI. Such woworks inclu

have been

or’s labour

s, structurewhatsoeverhe SBIIMS

ntractor byhe SBIIMS

ll land allot

out by the

ontractor isn of workconsultantcertificate

rights andfor defectsany site beontractor ind.

any portionhich it mayor shall notwork. Theial for the

ork shall beuded in the

n

r

e r

S

y

t

e

s . t ,

d s e n

n y t e e e e

Page 28: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

25.0 InWithoushall indamagresponcontracduring prior tooccasiopurpos The Wor suchin the w The coreplace Such inwhich requirepayme 26.0 DThe cothe SBmateriaconseqproceerelation a) The

b) The throughc) Injurexecutd) InjurSBIIMScontracexpenscontribas maySBIIMS

ijwani And A

nsurance out limiting nsure in thges from wnsible undector are cothe period

o the commoned by th

se of comp

Works for thh additionaworks at th

onstructionement valu

nsurance sapproval s

ed producent of the c

amage to ontractor sBI against aal or physiquence of edings, damn thereto e

permanen

right of Sh any landries or damion or mainries or damS their agctor or for ses in respbuted to byy be just aS, their em

Associates

of works: his obligahe joint na

whatever cer the termovered for d of maintmencemenhe contractlying with h

he time beial sum as mheir replace

al plant anue of such

shall be efshall not be to the Arcurrent prem

persons ahall, excepall losses aical damagthe execu

mages, coexcept any

nt use or oc

BIIMS to es. mages to ntenance omage to pgents, emor in respepect thereoy the contrand equita

mployees, o

tions and ames of thcause arisims of contthe periodenance font of the ptor in the chis obligat

ng executmay be spement valu

nd other thconstructio

ffected withbe unreasochitect / comiums.

and propept if and soand claimsge to any ution and osts, chargcompensa

ccupation o

execute th

persons oof the work

persons orployees oect of any of or in reractor, his able havinor agents o

28

responsibhe SBIIMSng other ttract and d stipulatedor loss or deriod of mcourse of aions under

ed to the eecified tog

ue.

hings brougonal plant

h an insureonably withonsultant th

erty: o far as th in respectproperty wmaintenan

ges and exation of dam

of land by

he works o

or propertiks in accor

property or other coclaims, pro

elation therservants og regard tor other em

bilities undS And thethan the ein such a d I clause damage a

maintenancany operatr clause.

estimated gether with

ght on to thand other

er and in thheld and he policy if

he contractt of injurieswhatsoevence of the xpenses wmages for

or any par

or any part

ies which rdance withresulting fontractors oceedings,reto or whor agents sto the extemployees,

er the concontracto

excepted rimanner tof GCC a

rising fromce and for tions carrie

current Co the mater

he site by things.

terms apprthe contra

f insurance

t provides s or damagr which mworks an

whatsoeveor with res

rt thereof.

t thereof o

are unavoh the contrfrom any a

not being, damagesere the injsuch part oent of the or agents

ntract the or against isks, for what the SB

and are alsm a cause,

any loss oed out by h

ontract valurials for inc

the contra

roved by thactor shall e and the r

otherwiseges to anyay arise o

nd against r in respespect to:

on, over, u

oidable resract. act or negg employe

s, costs, chjury or daof the comresponsib or other c

contractorall loss of

which he isBIIMS andso covered, occurringor damagehim for the

ue thereofcorporation

actor to the

he SBIIMSwhenever

receipts for

indemnifyy person orout of or in

all claimsct of or in

nder, in or

sult of the

lect of theed by theharges andmage was

mpensationbility of thecontractors

r f s d d g e e

, n

e

S r r

y r n s n

r

e

e e d s n e s

Page 29: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

for the 27.0 CThe cocosts, clause 28.0 CThe coaction, any allerespecmade uthe conat his there frinfringeresult o 29.0 ThBefore obligatliabilitypropertSBIIMScontracthereof 30.0 MSuch inwhich below. the popremiu

The moccurrecontracoccurre 31.0 AThe Spayablother pexcept

ijwani And A

damage o

ontractor ontractor scharges a26.0 of thi

ontractor’ontractor sclaim, or

eged patect to any arunder or antractor shown experom, providement of tof an order

hird Partycommenc

ions and y for any mty includinS, by or act, otherwif.

Minimum ansurance sapproval sThe contr

olicy or poums.

inimum insence with ctor will pences alwa

ccident orBIIMS Shae at law inperson in

an accide

Associates

or injury.

to indemnshall indemnd expensis clause.

’s superinshall fully proceedinnt or desigrticle or paaction brouall be immnses to seded that thhe patent r passed by

y Insuranccing the eresponsib

material orng that of arising out se than du

mount of shall be afshall not bractor shaolicies of

surance cothe numb

pay additioays.

r Injury toall not be

n respect othe emplo

ent or inju

nify SBIIMmnify the Sses in resp

ntendenceindemnify

ng relating gn rights anart thereofught agains

mediately nettle any dhe contractor design y the Arch

ce: execution oilities undr physical SBIIMS, oof the exe

ue to the m

Third Parffected withbe reasonll, whenevinsurance

over for phber of occonal premi

workmanliable for

or inconseqoyment of

ury resultin

29

MS: SBIIMS agpect of the

e: y and kee

to infringend shall paincluded i

st SBIIMSotified ther

dispute ortor shall noor any allitect / cons

of the worer clausedamage,

or to any ecution ofmatters re

rty Insuranh an insureably withh

ver requirecover an

hysical procurrences ium neces

n: or in res

quence of af the contng from an

gainst all cmatters re

p indemnement or uay any royan the contin respec

reof and thto conduc

ot be liableeged patesultant in th

rk the con25.0 of Gloss, or inperson, inthe works

eferred to i

nce: er and in theld and fod, produce

nd receipts

perty, injurlimited to

ssary to m

spect to anany accideractor or ny act or d

claims, proeferred to

ified the Suse of anyalties whictract. In the

ct of such mhe contractct any litige to indemnent or desihis behalf.

tractor butGCC shalnjury whichncluding as or in then the prov

terms appror at lease to the. As for paym

ry, and deo four. Aftmake insu

ny damagent or injurany sub-cdefault of

oceedings, in the prov

SBIIMS agy patent orch may be e event ofmatters astor shall beation that nify the SBgn right is

t without ll insure ah may occ

any employe carrying vision to c

roved by tht the amo

Architect / ment of th

ath is Rs.5ter each orance vali

es or comry to any wcontractor,

the SBIIM

damagesvision sub-

gainst anyr design orpayable in

f any claims aforesaide at libertymay arise

BIIMS if thes the direct

imiting hisagainst hiscur to anyyee of theout of thelause 25.0

he SBIIMSount stated

consultanthe current

5 Lakh peroccurrenceid for four

mpensationworkmen or

save andMS or their

, -

y r n

m d , e e t

s s y e e 0

S d t t

r e r

n r d r

Page 30: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

agentsagainsagainsthereof 32.0 InThe coDuring shall, wreceiptpersonaforesainsuredindemnproducthe pay 33.0 RIf the cother iand in pay sutime dewhich contrac Withousuch dcontracSBIIMSshall upolicy tdestroyof suchto any of the m

34.0 CThe daby the 35.0 TiTime isentire comme

ijwani And A

s, or emplot all sucht all claimf or in relat

nsurance aontractor sh

the wholewhen requt for paymns employeaid under d against tnified undece to the Ayment of th

emedy oncontractor fnsurance wany such ch premiueduct the may beco

ctor.

ut prejudicedefault, thector the amS And whipon settlemtaken undeyed or damh damage further pa

materials o

ommenceate of commSBIIMS

ime for cos essencework sha

encement.

Associates

oyees. Thh damagess, proceedtion thereto

against achall insure e of the timired, produ

ment of theed by anythis sub-

the liabilityer the pol

Architect /che current

n contractofails to effewhich he case the Sm or premamount so

ome due

e to the ote employemount of aich are pament by ther this claumaged. In t

shall be pyment in r

or goods de

ement of Wmencemen

ompletion:e of the coall be com

If required

e contracts and comdings, coso.

ccidents eagainst su

me that anuce to the e current py sub-con-clause shy in respecicy but th

consultant premium.

or’s failurect and kemay be re

SBIIMS mamiums as mo paid by tto the co

thers rightsr shall beny damage

ayable bye Insurer ouse, procethis event

paid to the respect of estroyed o

Works: nt of the wo

: ontract andmpleted wd in the co

30

tor shall inmpensationsts, charge

etc. to woruch liabilityy personsarchitect /

premium. Pntractor thehall be sact of such e contractwhen such

re to insureep in forceequired toay effect an

may be necthe SBIIMntractor, o

s of the Sentitled to

es costs, cthe contra

of any claimed with duall the mocontractorthe expen

or damaged

ork will be

d shall be within a pontract or a

ndemnify an, save aes and exp

rkmen: y with an in

are emplo/ consultanProvided ae contracttisfied if tpersons intor shall rh policy of

re: e the insureffect undnd keep incessary forS as afore

or recover

BIIMS agao deduct fcharges, aactors undm made ague diligencenies receivr and the Cditure incud.

reckoned

strictly obperiod of as directed

and keepand exceptpenses wh

nsurer appoyed by hint such polalways thator’s obligthe sub-con such marequire sucf insurance

rance refeder the tern force anyr that purpoesaid fromr the same

ainst contrfrom any snd other eer this clagainst the e to rebuildved from thContractor urred for re

from the d

bserved by45 days

d by the A

indemnifiet as aforehatsoever

roved by thim on the licy of insuat, in respation to iontractor sanner that ch sub-coe and the

rred to aborms of cony such insuose and fro

m any amoe as debt

ractors. In sums payaexpenses pause. The insurer purd or repairhe Insurer shall not

ebuilding o

ate of awa

y the contr from the

Architect / c

ed SBIIMSesaid, andin respect

he SBIIMSworks and

urance andect of anynsured asshall haveSBIIMS isntractor toreceipt for

ove or anyntract, thenurance andom time tount due ort from the

respect ofable to thepaid by thecontractor

rsuant to ar the works

in respectbe entitled

or repairing

ard of letter

ractor. Thee date ofconsultant

S d t

S d d y s e s o r

y n d o r e

f e e r a s t

d g

r

e f .

Page 31: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

The cowork. Hwork is 36.0 ExIf, in thcontrolSBIIMSthe termwork odate ofThrougschedudetail atheir retime. Wextendin exceprovisioFurthercomple 37.0 RWhole manneconducprogresconsulttime osuch sso as commufulfillingout of s 38.0 WSubjecshall sapermisabsoluwhich cthe probecomand qu

ijwani And A

ontractor sHowever, ts complete

xtension ohe opinion o of the con

S to grant ms of contr if the comf completiogh the Arculed time aand his juecommendWhile graned time wess of origon of liquidr the contretion irresp

ate of proof the mat

er and speected in a mss of the wtant too Sr extendedteps as co

to compunications g obligatiosuch direct

Work durinct to any pave as he

ssion in wrtely necescase the covisions oes essent

uality of the

Associates

hall compthe compled as per th

of time: of the Archntractor, tha fair andtract. If thempletion ofon as stipuchitect’ Conand while stification

dations to tnting extenhich will qginal stipudated damract shall rpective whe

ogress: terials, plaed of exec

manner to work or anylow to ensd time for onsidered plete the from the Ans under ttions.

g nights aprovision torein providiting of the

ssary for thcontractor f the clauial to carrye part of th

lete certainetion date he terms of

hitect/conshe Architec reasonab

e contractof work is liklated in thensultant inapplying foif an’, for

the SBIIMSnsion of tualify for lelated perio

mages as sremain in ether the e

nt and labocution and the satisfay part thersure the co

completionecessaryworks by

Architect / cthe contrac

and holidao the contded be care Architect/he saving shall immese shall ny by rotaryhe works b

31

n portions shall be ref the contra

sultant, thect/consulta

ble extensioor needs akely to be e contract, writing ator extensiothe delay

S in the prtime the cevy of liquod and dustated undforce even

extension is

our to be pmaintenan

action of theof be at aompletion on the Arcy by the Ary the presconsultant ct nor he w

ays: rary contarried on du/consultanof life or p

ediately adnot be appy or doublebeing techn

of work beckoned aact.

work be dant may suon of timen extensiodelayed fo, the contrat least 30on of timeys. The arescribed fo

contractor uidated damuly sanctioder clause n for the ps granted o

provided bynce of the he Architecany time bof the who

chitect/consrchitect / cscribed timneither sh

will be entit

ined in theuring the nt, save whproperty odvise the Aplicable ine shifts in nically req

before comas the date

delayed forubmit a rec

for complon of time for any reasactor shall Days befohe shall f

rchitect/conormat for gshall be

mages. Fooned exten

10.0 shallperiod beyor not.

y the contrworks are

ct/consultae in the opole of the sultant shaonsultant tme or ex

hall relieve.tled to rais

e contract ight or on

hen the woor for the sArchitect / the caseorder to auired / con

mpletion of e by which

r reasons bcommendaletion of wfor the comsons beyonapply to th

ore the exfurnish thensultant shgranting exinformed t

or the balansion of tim become a

yond the d

ractor and e to be of ant should

pinion the. work the

all the re to expeditextended ti. The contrse any clai

no permaholidays w

ork is unavsafety of thconsultant of any w

achieve thentinued wit

f the entirethe whole

beyond theation to thework as permpletion ofnd the duehe SBIIMSpiry of the

e reason inhall submitxtension ofthe periodnce periodme by theapplicableue date of

the modea kind andthe rate ofArchitect /prescribedupon takee progressme. Suchractor fromims arising

anent workwithout thevoidable orhe work int. However

work whiche progressth the prior

e e

e e r f e S e n t f d d e . f

, d f / d e s h

m g

k e r n r h s r

Page 32: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

approv All worwithout 39.0 NIf at anthe scopart of that effcontracever oexecutclosure Provideactuallysurplusand theshall hpurcha In casecontracwhich deductthe con 40.0 SThe co(whoseworks consideor enda a) On ab) For the conc) For sThe coextent consulti)If the

The co

ijwani And A

val of the A

rk at night t unreason

o compenny time afteope of worthe work

fect to thector shall h

on accountion of thee of the wh

ed that they and bons as a resuen taken b

have in suase price o

e of such ctor to stowere orig

tion for clantractor an

uspensionontractor se decision or any parer necessaanger the s

account anproper exentractor, orsafety of th

ontractor shnecessarytant. suspensio

ontractor sh

Associates

Architect / c

after obtainable noise

nsation or er acceptark for any rto be carri contractohave no ct of any p Work full

hole or part

e contractonafide brouult of the aback by thch cases r a local cu

stores haores, creditginally issuims on accd in this re

n of work:shall, on rshall be f

rt the offerary so as safety ther

ny default oecution of r he works ohall, duringy and carr

on is ordere

hall be ent

consultant

ning approe and distu

restrictioance of thereason whied out. Th

or and thelaim to an

profit or adly but whit of the wo

or shall be ught to theabandonme contractthe option

urrent rate

aving beent shall be ued to thecount of a

espect the

: receipt of inal and br such timenot to caureof for any

on the partthe works

or part therg such susry out the

ed for reas

itled to an

32

at no extra

oval from curbance.

ons of wore tender SBhatsoever ahe Architeccontractory paymendvantage ch he did rk.

paid the ce site of thent, curtaior, provide

n of takingwhichever

n issued frgiven to he contractny deteriodecision o

the order binding on e and in sse any day of followi

t of the cons or part th

reof. pension, pinstruction

sons (b) an

extension

a cost to th

competent

rk: BIIMS shaand hencect / consulr shall actt of compewhich he not deriv

charges onhe work byilment of thed howeveg over all or is less.

rom SBIIMhim at the tor after tration or d

of Architect

in writingthe contrauch mannmage or inng reason

ntractor, orhereof for

properly prons given in

nd (c) in su

of time eq

he SBIIMS.

authorities

ll decide toe not requirtant shall gaccordinglensation omight have in conse

n the cartay the conthe work orer that theor any suc

MS stores arates not

taking intodamage wht / consulta

g of the Aactor) susper as Archnjury to thes:

r reasons ot

otect and sn that beha

b-para (i) a

qual to the

.

s shall be c

o abandonred the whgive noticely in the m

or otherwisve derivedequence o

age only otractor andr any portiArchitect/C

ch materia

and return exceedingo considerhile in the ant shall be

Architect / pend the phitect/conse work alre

ther than t

secure thealf by the

above:

period of e

carried out

n or reducehole or anye in writing

matter. These what sod from theof the fore

f materialsd renderedion thereofConsultantals at their

ned by theg those atration andcustody of

e final.

consultantprogress ofultant mayeady done

the default

e works theArchitect /

every such

t

e y g e o e e

s d f t r

e t d f

t f y e

t

e /

h

Page 33: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

suspen 41.0 AIn any have rsecuritfollowin To resArchitedeposi To empart of such laconclusall resphad bearchitecontrac To meunexeccase apaid toof whicconclusto him procee In the ehave npurchaadvancof the the confor actuhave cthereof 42.0 OIf the cadjustecompu

ijwani And A

nsion. No c

ction whecase in w

rendered hy deposit ng course

scind the cect / consut of the con

ploy labouthe work,

abour and sive againpects in theeen carriedect /consultctor.

easure up cuted, out ny expens

o the originch excess sive) shall by SBIIM

eds of sale

event of ano claim toased or prces on acccontract antractor shually perfo

certified in wf, and he s

Owner’s rigcontractor ed an insolsory wind

Associates

compensat

en the whowhich unde

himself liathe Architas they ma

contract (oultant shalntractor sh

ur paid by tdebiting thmaterials

st the cone same mad out by ttant as to

the work of his han

ses which mal contractthe certifibe borne

S under ththereof, or

ny of abovo compensaocured an

count of, orand incase hall not be rmed undewriting the

shall only b

ght to termbeing an iolvent or ding up vo

tion whatso

ole securitr any clau

able to patect / consay deem b

of which rll be conc

hall be forfe

the SBIIMShe contract

as worketractor) ananner andhe contracthe value

of the conds, and tomay be inctor, if the wcates in wby origina

he contracr sufficient

ve coursesation for a

ny materiar with a viethe contra

entitled to er this conte performabeen titled t

minate thendividual obeing an

oluntarily o

33

oever shal

ty depositse or clau

ay compensultant sha

best suited

rescission clusive evideited and b

S and to stor with the

ed out by tnd crediting at the samctor underof work do

ontractor, o give it to curred in exwhole workwriting of thal contractoct or otherw part there

s being adoany loss sul or entereew to the eact shall brecover o

tract, unlesnce of sucto be paid

e contract:or a firm co

incorporaor subject

l be paid o

t is forfeiteses of this

nsation amall have thto the inte

notice in dence) anbe absolute

supply mate cost of ththe Architeg him withme manner the termsone shall b

and to takanother c

xcess of thk had beenhe Architecor and maywise, or fr

eof.

opted by thustained byed into anexecution obe rescindr to be paiss, and untch work anthe value

: ommit any

ated compto the su

on this acco

ed: s contract, mounting the power erest of the

writing to nd in whichely at the d

terials to che labour aect / consuthe value

er and at ths of this cbe final co

ke such pcontractor the sum whn executedcts / consy be deducrom his se

he SBIIMSy him by reny engageof the workunder thed any sumtil the Arch

nd the valuso certified

y ‘Act of inspany shall pervision

ount.

the Contrto the whto adopt a SBIIMS:

the contrh case thedisposal of

arry out thand materiultant shalof the wor

he same racontract ceonclusive a

part thereoto completich would by him (T

ultant shalcted any m

ecurity dep

S the contreasons of ments or k or the pe provision

m or any wohitect / cone payable d.

solvency’ ohave an

of Govt. a

ractor shalole of hisany of the

ractor by -e securityf SBIIMS.

he work, orials cost ofll final andrk done, inates as if itertificate ofagainst the

of as shalte in whichhave beenhe amountll final andmoney dueosit or the

ractor shalhis havingmake any

erformanceaforesaid

ork theretosultant wilin respect

or shall beorder for

and of the

l s e

- ,

r f d n t f e

l h n t d e e

l g y e , o l t

e r e

Page 34: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

Officialunablesatisfaccontrac Or if thexecutor on b Or shathroughpayme has ab has faconditioSBIIMS has faiprogreshas faiseven the sathese cany of contacobservdefiancany paconsultwriting powerscontracbeen dof the cor empscaffoldlands oon andand theor hindor usin

ijwani And A

l Assigneee within section of thct, and to d

he contracion to be is

behalf of an

all assign h the Arcnt due to w

bandoned t

iled to coons suspeS through t

iled to pross as wouled to remdays afterid materiaconditions;the acts mtor for sev

ve or perfoce of the Srt of the cotant, may n

to the cos of the SBctor the whdeterminedcontractor.ployees mdings, mator roads usd completine contracto

der such otg the mate

Associates

e of the liqeven dayshe Architedye securit

ctor (whethssued or sny of the cr

or sublet hitect/Conwhich may

he contrac

ommence tended the the Archite

ceed with uld enable

move the mr written noals were c; or has n

matters or ven days aorm the sSBIIMS or ontract. Thnot withstaontractor, BIIMS or thole of whd and as if . And, furthay enter uterials, shese the samng the workor shall notther contraerials and p

quidator in after notct / Consty therefore

her an indishall sufferreditors of

this contrsultant or become d

ct; or

the worksprogress

ect / consu

the worksthe works

materials frootice from ondemnedeglected othings by t

after writtensame or h

Architect’sen and in

anding anydeterminehe Archite

hich shall cthe works

her the SBupon and eds, machime by meak or by engt in any wa

actor or othplant for th

34

n such actice to himultant thate if so requ

ividual firmany paymthe contra

act withoushall cha

due to the c

, or has wof the worltant writte

s with suchs to be comom the sitethe SBIIM

d and rejeor failed pethis contran notice sh

has to thes / consultany of said

y previous e the contect/consultacontinue ins subsequeIIMS throutake poss

ineries lyinans of theirgaging anyas interrupther personshe works.

ts of insolm to do sot he is abuired by the

m or incorpment underactor.

ut the conarge or encontractor

without anrks for 14

en notice to

h diligencempleted we or to pullS through

ected by thersistently act to be ohall have b detrimenttant’s instrd cases thewaiver, afttract, but ant or then force as ently had bugh the Arcsession of ng upon thr own empy other cont or do anys employed

vency oro, to showble to carre Architect

porated Cothis contra

sent in wrncumber tthere unde

ny lawful edays afte

o proceed,

e and failewithin the ti

down andthe Archit

he Architeto observbserved a

been givent of good uctions to e SBIIMS ater giving swithout thobligationfully as if been execchitect / cothe work

e premisesployees or ntractors ory act, matted for comp

winding uw to the rry out andt /Consulta

ompany) sact to be a

riting of ththis contraer:

excuse uner receiving

or

d to makeime agreedd replace wtect / Consct/ consulte and pernd perform

n to the coworkmanthe contra

and or the seven dayshereby aff

and liabilithe contra

cuted by oronsultant th

and all ps or on theworkmen

r persons ter or thing plement an

p shall bereasonabled fulfill theant.

shall sufferttached by

he SBIIMSact or any

nder theseg from the

e such dued upon, orwork withinsultant thattant under

rform all ormed by theontractor toship or in

ary subjectArchitect /

s’ notice infecting theities of the

act had notr on behalfheir agentslants, tooke adjoiningin carryingto the workto prevent

nd finishing

e e e

r y

S y

e e

e r n t r r e o n t / n e e t f s k g g k t g

Page 35: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

When tarchitemateriathereofshall, aquestio 43.0 CThe coconsultpaymeother dalwaysworks contrac The Arpart thecertificaThe SconsultThe coproperl

The finof virtuwithin amonthsrates a The co 44.0 A. SettExceptmeaninmentioany othrelatingor thesexecutcancellmentio If the c

ijwani And A

the works ect/consultaals and plaf by him thadjust the on any of th

ertificate oontractor stant to thent from SBdues inclus that the i

or complector from h

rchitect / cereof is noate make a

SBIIMS shtant from tontractor sly recorded

nal bill mayual complea period ofs from theand quantit

ontractor sh

tlement oft where otng of theoned and aher questiog to the cose conditioe the samlation, term

oned herein

contractor

Associates

shall be coant shall gants and she SBIIMSamount rehe act of th

of paymenshall be ene contractBIIMS Fromding the rssue of anetion shal

his liability u

consultant ot carried oany correc

hall modifyime to timeshall submd in the Me

y be submietion and Af two mont date of isies.

hall submit

f Disputestherwise p

e specificaas to the quon , claim, ontract, desons or othme whethmination, cnafter:

considers

ompleted oive a notichould the c sell the s

ealized by she SBIIMS

nt: ntitled undtor within m time to tretention any certifical not haveunder clau

shall haveout to their

ctions requy the certe while ma

mit interim easuremen

tted by coArchitect /hs. The SBssue of ce

t the interim

s and Arbiprovided inations, deuality of wright, mattsigns, draw

herwise coer arisingcompletion

that he is

35

or as soonce in writingcontractor ame by pusuch aucti

S incidental

er the cer10 workintime SBIIMamount froate by the e effect a

use.

e power tor satisfactiired previotificate of

aking the pabills only

nt books.

ntractor wi/ consultanBIIMS Shaertificate pr

m bills in th

tration: n the conesign, draorkmanshiter or thingwings speconcerning during th

n or aband

entitled to

n thereafteg to the cofail to do s

ublication, on. The col to the sal

rtificates tong days frMS shall reom the ceArchitect /

as certifica

o withhold on. The A

ous certificapayment

ayment after taki

ithin a perint shall issall pay the arovided the

he prescrib

tract all qawings anip or mateg whatsoevcifications,the work he progredonment t

o any extra

r as conveontractor toso within 1and after

ontractor se of the ma

o be issuerom the decover theertificate of/ consultanate of sat

the certificrchitect/coate.

as issue

ng actual

iod of onesue the ceamount witere is no d

bed format

questions ad instructrials used ver in any , estimatesor the exe

ess of thethereof sh

a payment

enient the So remove h14 days aftdue public

shall have aterials etc

ed by the date of ce

statutory f paymentnt during pisfaction r

cate if the onsultant m

ed by the

measurem

month fromertificate othin a periodispute in

with all de

and disputions hereon the woway arisin

s, instructioecution or

e work or all be dea

t or compe

SBIIMS Orhis surpluster receivecation, andno right to

c.

Architect /ertificate torecovering. Provided

progress ofrelieve the

work or inmay by any

architect/

ments and

m the dateof paymentod of threerespect of

etails.

tes to theein beforeork or as tong out of orons ordersr failure tor after thealt with as

ensation in

r s e d o

/ o g d f

e

n y

/

d

e t e f

e e o r s o e s

n

Page 36: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

respecor in cmade oforthwiSBIIMS30 daysaid nodetaileraise aby the the Setime ashis righMumba B. SettThe Seclaims decisionamelyall deta If the ccontracthe coadjudicto have ExceptcontracaforesaarbitratDeputythe Arbto whicarbitratvacateappoinpersonby his p It is a twith amof arbit

ijwani And A

ct of the woase the coor proposeth give noS, Head Oys from theotice shalld calculati

any claim ncontractornior Vice Ps aforesaidhts in respai in writing

tlement ofenior Vice notified by

on of the Sy the M.D. ails and co

conciliationctor shall, oncerned Mcate the noe been con

t where thct, all dispuaid and all tion by they General Mbitrator so ch the Cotor so apps his officted in the

n shall be epredecess

term of thismounts clatrator.

Associates

orks over aontractor wed to be maotice in wr

Office, Mume date of di give full ions of theor shall the

r unless noPresident, d. The Conect of any g in the ma

f DisputesPresident,y the receSr. V.P., H & C.E.O.,pies of cor

n proceedwithin a pM.D. & Cotified claimnsidered ab

e decisionutes or diffclaims of

e Sole ArbManager rappointed

ontract relapointed is ce due toe manner entitled to sor.

s contract aimed in re

and abovewants to dade from thriting of hismbai and eisallowancparticulars

e amount ce SBIIMS otice of sucSBIIMS, H

ntractor shclaim not

anner and w

s and Arbi Head Offiipt of the c

Head Offic, SBIIMSPrresponden

ings are teriod of 30

C.E.O. of ms falling wbsolutely b

n has becoferences athe SBIIMSbitrator apprank. It will is a SBIIM

ates in theunable o

o any reasaforesaidproceed w

that the paespect of e

36

the amouispute the he contracs claim, o

endorse a cce thereof os of the clclaimed anPvt. Ltd bech claim shHead Officall be deemnotified towithin the

tration: ice, Mumbcontractor

ce / SubmiPL, Head Once exchan

erminated 0 days of tthe SBIIMwhich the cbarred and

ome final, arising out oS Pvt. Ltdpointed byalso be no

MS, Officere course o

or unwillingson whatsby the sa

with the refe

arty invokieach dispu

unts admittvalidity of

ctor raise ar dispute tcopy of theor the datelaim, ground the cone in any wahall have b

ce, Mumbamed to hav

o the Seniotime afore

ai shall givmay within

it his claimOffice, Mumnged betw

without stermination

MS for apclaims of twaived.

binding aof the notifshall be re

y the M.D.o objectionr and that hof his dutig to act osoever anoaid M.D. &erence fro

ng arbitratute along w

ed as payaf any dedu

any disputeto The See same to

e of deductnds on wh

ntractor shay liable inbeen givenai in the mave waivedor Vice Presaid.

ve his decin 30 days

ms to the cmbai for co

ween him a

settlement n thereof spointment the contrac

and conclufied claimseferred for. & C.E.O.n to any suhe had to dies as SBor resigns other sole

& C.E.O. om the stag

tion shall gwith the no

able by theuctions or e, the contrenior Vice

the Archittion or recohich it is ball not be respect of

n by the coanner andand exting

esident, He

sion in writof the rec

conciliatingonciliation nd the SBI

of the disshall give a

of an arctor shall b

usive in ters of the conadjudicatio. and whouch appoindeal with th

BIIMS, Offihis appo

e arbitratoof the SBIge at which

give a list ootice for ap

e Architectrecoveriesractor shalPresident

tect, withinovery. Thebased andentitled to

f any claimontractor to within theguished alead Office

ting on theceipt of theg authorityalong withIIMS

sputes, thea notice torbitrator tobe deemed

rms of thentractor ason through

o will be ofntment thathe matterscer. If theintment orr shall beIIMS Suchh it was let

of disputesppointment

t s l . n e d o

m o e l ,

e e y h

e o o d

e s h f t s e r e h t

s t

Page 37: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

It is alsChief GarbitratConcilithe rule It is alsbe paidhe is a It is alsthe reftheir stshall bany ofpublishthe awarbitratthereof 45.0 WThe conothing i) Thasatisfac ii) ThearrangeArchite iii) In cconnecof cont

The co

taking wSBIIMSthe waaccidenwells. own coon com

ijwani And A

so a term General Mtion shall ation Act 1es made th

so a term od equally bSBIIMS O

so a term ference ontatement oe such plaf the arbithed, be paward (includtor who maf, shall be

Water suppontractor sg extra will

at the watection of the

e contractoement ma

ect / consu

case contction, Boretract amou

ontractor swater for cS The contater at his nts or damHe has toost. He shampletion of

Associates

of this conManager abe conduc1996 or anhere under

of the contby both theOfficer.

of the conn the date of claims aace as maytrators shaid half andding the feay direct topaid and fi

ply: shall make be paid fo

er used bye Architect

or shall made by theltant is uns

tractor is e well (exisnt form the

shall constconstructiotractor hasown cost

mages cauo obtain neall restore work or ha

ntract that as aforesacted in acy or any a

r.

tract that ife parties. H

ntract that the issuesnd countey be fixed all, if requd half by eaees, if anyo any by wix or settle

his own aor the same

y the contrt /consultan

ake alterne contractosatisfactory

permitted sting or nee final bill o

truct tempoon purposes to make t. He hassed due toecessary athe groundand over th

37

no personid should

ccordance ccordance

f any fees However, n

the Arbitras notice tor statemenby the arb

uired to beach of the y of the arwhom and

the amoun

arrangemee. This will

ractor shant’s.

native arraor for procy.

to use Sw) etc., th

of contracto

orary well s only aftehis own ato make

o constructapprovalsd to its orighe well to t

n other thaact as arwith the p

e modificati

are payabno fees wil

ator shall bboth the

nt of claimbitrator in he paid beparties. Thbitrator) shdin what mnt of costs

ents for wal be subjec

ll be fit for

ngements curement o

BIIMS’s se SBIIMS or.

/ tube weer obtainingrrangemennecessarytion and sfrom localginal condthe SBIIMS

an a persorbitrator. Tprovisions ion or reen

ble to the All be payab

be deemedparties cas. The venhis sole dis

efore the ahe Cost of hall be inmanner, su

to be so p

ater requirct to the fol

r construct

for the suof water in

ource of Pvt. Ltd w

ell in SBIIMg permissionts for drawy arrangemubsequent authoritieition after S without a

n appointeThe concilof the Ar

nactment th

Arbitrator tble to the a

d to have ealling themnue of the scretion. Taward is the referethe discre

uch costs opaid.

red for thelowing con

tion purpo

upply of wn the opin

water i.e. will recover

MS Pvt. Lton in writinwing and d

ments. To t maintena

es, if requiwells are d

any compe

ed by suchliation andbitration &hereof and

these shalarbitrator if

entered on to submitarbitration

The fees, ifmade andnce and oftion of theor any part

e work andndition.

oses to the

water if thenion of the

Municipar @ 0.25%

td land forng from thedistributingavoid any

ance of thered, at hisdismantled

ensation as

h d & d

l f

n t n f

d f e t

d

e

e e

l %

r e g y e s d s

Page 38: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

directe 46.0 PoThe cosystemcost, thprices, same inecess In casepoint, t 47.0 TrAny trepropert 48.0 M

Unlessthe meto datedisagrecorrect

49.0 MThe coof workwhenevrequire

50.0 FoNeitherobligathostiliticonflagordinanparty a30 daycontracdelay.

ijwani And A

ed by the a

ower suppontractor s

m for drivinhe cost of He shall p

n his tendesary approv

e contractothe SBIIMS

reasure treasure trovty of SBIIM

Method of m

s otherwiseeasuremene rules laideement thetor.

Maintenancontractor shk and shover desired

ed by the loi) Regii) Regiii) Regiv) Reg

orce Majer contractoions if sucies revolugrations, ences or anaffected or ys from thect, if it is no

Associates

rchitect /co

ply: shall makeg plant or running anpay all feesered rates val from th

or is permS will recov

rove etc. ve, coin or

MS and sha

measurem

e mentionent will be od down bye decision

ce of regishall maintauld producd by themocal authorgister for sgister for hgister for rgister for la

ure: or nor SB

ch performaution, rioepidemics, ny act of o

prevents e happeninot possible

onsultant.

e his own machiner

nd maintens and charand hold t

he appropr

itted to usver @ 0.25

r object anall be hand

ment:

ed in the sn the net q

y the Bureof the Arc

sters: ain the folloce the sam. The contrities / Govsecured adhindrance tunning accabour

IIMS shalance is prets, AIR

accidentsor for any or delayed

ng of the eve to serve a

38

arrangemery for the wnance of thrges requirthe owner fiate author

se Bank’s 5% of contr

ntique whicded over to

schedule oquantities au of India

chitect / co

owing regime for inspractor sha

vt. from timdvance to work count bill

l be consievented orCONDITIO

s, fire, stoother causd. Howevevent with ca notice, w

ents for powork and fhe plants ared, by thefree from arities, if req

source of ract amoun

ch may beo the bank

f quantitiesor work pran Standansultant sh

sters as pepection of ll also mai

me to time.

idered in r delayed bONING corms, floodse beyond

er, a noticecomplete dwithin the s

ower and for lightingare to be ine power suall such coquired.

power supnt from the

found on immediate

s or in moroduced inards. In thehall be fina

er the encSBIIMS /Antain the r

default in by eventscommotionds, droug

d the reasoe is requiredetails, to tshortest po

supply / d purpose ncluded in upply and iosts. He ha

pply provide bill of con

the site shely.

ode of mean accordane event anal and bind

losed perfoArchitect / records / re

performansuch as bu

n, strikeshts, earthonable coned to be githe other possible peri

distributionat his ownhis tendernclude the

as to obtain

ded at onentractor.

hall be the

asurementce with up

ny dispute/ding on the

orm at siteconsultant

egisters as

nce of theut not war, lockoutquakes orntrol of theiven within

party to theiod without

n n r e n

e

e

, p / e

e t s

e , , r e n e t

Page 39: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

As sooperformthe acsuppor From thaffecte

51.0 WThe raprovidiarrangequality well / open SBIIMS The rapower The cotake poby thearrangemutualconnecpayablthe SB The SBContrarespon

In casprovideelectric 51.0 FaThe coand womake tworkm 52.0 LiThe co

ijwani And A

on as the m its obligactual delayrt thereof.

he date of ed.

Water poweate quotedng all the ements fordrinking w

well and S will not b

te quoted connection

ontractors ower and we contracements to ly agreed ction for Ce for permIIMS will re

BIIMS as wactor’s to onsibility for

e contracted at one pcity separa

acilities foontractor shorkmen inthe arrangen to and f

ighting of ontractor sh

Associates

cause of ations has

y incurred

occurrenc

er and othd by the c

water reqr the supplwater for t

bring watebe liable to

in the tendns and sha

for other twater connctor Howe

draw the rates bet

Constructiomanent coneimburse t

well as the obtain the obtaining t

tor is perpoint, the Sately from t

or contrachall make

ncluding adements at from site o

works: hall at all t

force majs been affe

in such a

ce of a case

her facilitiecontractor quired for y of good

their worke

er by meanpay any c

der shall inall pay for t

trades direnections froever, the

supply antween themon purposennections,the amoun

Architect /requisite

the same i

rmitted to SBIIMS wilhe bill of c

ctor’s emphis own ardequate dhis own c

of work at h

times provi

39

jeure has ected, shaaffected a

e off or for

es: shall incluthe work quality waters If nece

ns of tankeharges in c

nclude thethe consum

ectly appoiom the tem

concernend pay direm. All mues shall bif any, sht on produ

/ consultanPermission time sha

use Bankll recover @ontractor.

ployees: rrangemen

drinking wacost for trahis own cos

ide adequa

been remll notify thctivity add

rce majeure

ude all exand the cter suitableessary the

ers at his connection

e expensesmption cha

inted by thmporary waed contraectly the anicipal cha

be borne ball be initiction of re

nt shall givon from thall be of the

k’s source@ 0.5% of

nt for the hater facilitinsport whest.

ate and ap

moved the e other of ducing nec

e obligatio

xpenses thcontractor e for the cocontracto

own cost n with the a

s for obtainarges

he SBIIMSater and poactor shalactual consarges for by the conally paid bceipts.

e all possihe various e contracto

e of waterf contract a

housing anies. The cere necess

pproved lig

party whsuch cess

cessary ev

ns of the p

hat are reshall mak

onstructionr has to s

for the puabove

ning and m

S shall be ower suppll make sumption cdrainage

ntactor anby the con

ble assistaauthoritie

or.

r and powamount for

d welfare contractor sary for his

ghting as re

ose abilitysation andvidence in

party

equired forke his ownn and goodsink a tube

rpose The

maintaining

entitled toy obtainedtheir owncharges atand waterd charges

ntactor and

ance to thees, but the

wer supplywater and

of his staffshall also

s staff and

equired for

y d n

r n d e

e

g

o d n t r s d

e e

y d

f o d

r

Page 40: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

the pro 53.0 FiThe copurposbucketthese eand sh Any deat his ofollowin a) Prob) Wo

c) Accd) Typ

rube) Typf) Ge

54.0 SA site betweeconveyto the osite ormainta/consulike to consultone cosecond 55.0 TeThe cogates apublic requirebe altecomple 56.0 S

ijwani And A

oper execu

irefightingontractor sse he shall s, some oequipmentall be prop

eficiency inown cost ang arrange

oper handliork operatio

cess for firepe, numberbbish. pe, size, nuneral hous

ite order border boo

en the Arcyed througother shallder book ined and pltant as anissue to

tant two coopy will bed copy will

emporary ontractor shat his cost and for the

ement of thered, relocetion of the

ite meetin

Associates

tion and su

g arrangemhall providprovide re

of which at shall be perly maint

n the fire saand, to the ements at h

ng, storagons which

e-fighting er and locat

umber andsekeeping.

book: k shall be

chitect / Ch records be deemeshall have

preserved bnd when dethe contraopies of sue handed be retaine

fencing/bhall providto adequa

e proper exhe architeccated and e work.

ngs:

upervision

ments: de suitableequisite nure to be aprovided a

tained.

afety or unapproval o

his own co

e and dispcan create

equipmenttion of cont

location o

maintaineonsultant. in the siteed to havee machineby the conemanded-actor or thuch instrucover to th

ed for their

barricadinge and mai

ately enclosxecution act/consultaadopted f

40

and inspe

e arrangemmber of fir

always kepat suitable

safe condiof the relev

ost but not

posal of come fire hazar

. tainers for

of fire exting

ed at site fAny commorder boo

e been adee numberetractor andAny instru

he contracctions shahe party arecord.

g: intain a suse all boun

and securitynt and regfrom time

ection of wo

ment for firre extinguispt filled wie prominen

itions shallvant autholimited the

mbustible rds.

the remov

guishers o

for the pumunicationk. Such a

equately sed pages id shall be muction whicctor may lill be taken

against pro

uitable temndaries of ty of the wo

gulations oto time a

ork.

refighting ashers andth sand a

nt and eas

be correcorities. The e following:

materials a

val of surpl

or other tire

rpose of qn relating tcommunic

erved in tern triplicatemade avaich the archike to brinn from the oper ackno

porary fenthe site forork and in

of local auts necessa

at his own adequate nd some sily access

cted by the contractor

and waste

us materia

e fighting e

quick commto the wor

cation fromrms of cone and shalable to the

hitect/consng to the

site orderowledgmen

ncing/barricr the protecaccordanc

thorities. Tary and re

cost. Thisnumber ofwith watersible place

contractorr make the

.

als and

quipment.

municationrk may be

m one partyntract Eachll carefullye architectultant mayarchitect /

r book andnt and the

cading andction of thece with the

These shalemoved on

s f r e

r e

n e y h y

y / d e

d e e l

n

Page 41: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

Site meshall dapprovfollow archite

57.0 DThe coand deresponeffect tother o 58.0 CThe cospecialdrawinthe wo 59.0 DThe coconsultarchite 60.0 AsFor theConsulchangeArchitereturn requireout thecorrect/ consucopy d For theThe cothe SBthe arcthe app 61.0 AThe co

ijwani And A

eetings wiepute a se

ved sub-coup action

ect/ consult

Disposal ofontractor sheposit the snsibility of that all ruboff-site activ

ontractor ontractor slists contrag and passrks.

isplaying ontractor stant indica

ect/consulta

s built drae drawingsltant will ises have beect / Consuthese cop

ed or the ce discrepantions and / ultant and uly approv

e drawingsontractor wBIIMS / arcchitect/ conproved dra

pproved montractor s

Associates

ll be held tenior repreontractors as. Any adtant.-

f refuse: hall cart awsame as dthe contra

bbish arisinvities borro

to verify shall check actors or os on the in

the namehall put up

ating there ant at his o

awings: s issued tossue two een made.ultant. The ies to the correctionsncies to thor attend resubmit t

ved by him

prepared will modify t

hitect / connsultant foawing to the

make: shall provid

to review tesentative aand suppliedditional re

way all debdirected byactor to ong out of cow pits has

site measand verify

ther sub-cnformation

of the wop a name in the nam

own cost a

o the contsets of dr. From thecontractorarchitect /

s are not phe contractto discrepto him for .

by the conthe drawinnsultant. Ar approvale contracto

de all mate

41

the progresalong withers as reqeview mee

bris, refusey the architbtain from

contractor’ss been pro

urement:y all site montractorswith suffic

ork: board of sme of the pnd remove

ractor by trawings to

e approvedr will make/ Consultanproperly mtor. The coancies eithapproval.

ntractor: g prepared

And submit l. The archor.

erials from

ss and quathe site reuired to thetings sha

e etc. arisitect / cons

m the locals activities operly dispo

measuremeto enable

cient promp

suitable sizproject ande the same

the Architeo the Contd drawings e the changnt for their

marked theontractor wher on copThe archit

d by him wtwo copie

hitect / con

m the list o

ality evaluaepresentathe site meeall he held

ing from thsultant at hl authoritieat the con

osed off.

ents whenethem to p

ptness as w

ze as direcd other de

e on comple

ect / Constractor for as instruc

ges made r approval.

architect/will have toies as diretect / cons

wherever ths of such m

nsultant wi

of approve

ation. The ive and othetings and d if requir

he work frohis own coses concernnstruction s

ever requerepare thewill in any

cted by theetails as givetion of wo

sultant. Thethe items

cted by theon these c In cases Consultano incorporaected by thultant will

he changemodified dll return on

d makes a

contractorher staff ofensure al

red by the

om the sitest. It is thened to thesite or any

ested othere own shop

way delay

e architect/ven by theork.

e architects for somee SBIIMS /copies andrevision ist will pointated thesee architectreturn one

s made bydrawings tone copy of

at his own

r f l

e

e e e y

r p y

/ e

t e / d s t e t e

y o f

n

Page 42: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

cost atreatmeThe argiven in 62.0 PrThe cofor the 63.0 ExThe coroyaltietax, taxequipmduties, Shall ntaxes, includeduties, the quonew taduring GST w 64.0 AThe Sreasontenderetranspa

65.0 PThe Cocopies from twduring In addphotogprogresconsideenterta 66.0 Sa

1. First a

ijwani And A

and also ent, aluminrchitect/conn the tende

rocuremeontractor swork. All w

xcise dutyontractor ses, fees, cex on work

ment plant levies, fe

not be requduties, fe

ed in the qfees, levie

oted rates ax or duty

the currenwill be paid

cceptanceBIIMS sha

n. They areers shall harency wou

hotographontractor sof large p

wo approvethe progre

ition to abgraphs aloss of work er returnin

ained.

afety Cod

id applianc

Associates

appoint thnum doorsnsultant mer after ins

nt of matehall make

wastages a

y, taxes, leshall pay aess or chaks contrac

and otheres and ch

uired to payes, levies

quoted ratees etc. if aand no exor levy or ncy of conextra.

e of tendeall have the not to bhave no riguld be mai

hs: shall at hishotographed portionsess of the w

bove, the ong with e

measuredg the Bill to

es:

ces includ

he specias and wind

may approvspection of

erials: his own a

and losses

evies etc.;and be resarges in rest excise dr things reharges shay any addietc. if an

es and no any, till comxtra claim o

cess or rontract the

er: he right toind to accght to quentained by

s own exps not less s of eachwork or at e

contractoreach Runnd and claimo the contr

ding adequ

42

lized agenows and a

ve any maf the sampl

arrangemes in weight

; sponsible spect of thduty, and equired forall be to thitional or ey, till comextra amo

mpletion ofon this accoyalty or Osame sha

o reject ancept the loestion the y the SBIIM

pense suppthan 25 cmbuilding, aevery impo

r shall bening Bill f

med thereinractor and

uate supply

ncy for thany other itake / agenle/mockup

ents to proshall be to

for paymee works inOctroi, par the contahe contracextra amoumpletion of

ount on thf work shacount will iOctroi is imll be borne

ny or all towest or an

acts of thMS

ply to the m. x 20 cmat intervalsortant stag

bound tofor the prn failing whno claim f

y of sterili

he waterptem as spe

ncy within .

cure all tho the contra

ent of all tncluding buyable in r

act. All of ctor’s accont on this work sha

his accountll be deemn any case

mposed une by the c

tenders winy tender e SBIIMS.

Architectsm. (10” x 8”s of not moe of constr

o submit aroject cleahich the Arfor delay on

zed dress

proofing, aecified in tthe approv

he requiredactors acco

taxes, dutiut not limiterespect of the aforesunt and thaccount. V

all be deemt. Variation

med to be ie be entertnder as stacontractor.

ithout assiand the te

. However

s with dupl) of the wo

ore than onruction.

adequate naring showrchitect/ SBn this acco

ing and co

anti-termitethe tenderved list as

d materialsount

es, leviesed to sales

materialssaid taxeshe SBIIMSVariation ofmed to ben of taxesncluded intained. If aatutory law However

igning anyenderer orr adequate

licate hardorks, takenne months

no. of sitewing majorBIIMS mayount will be

otton woo

e . s

s

, s , ,

S f e , n a w ,

y r e

d n s

e r y e

l

Page 43: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

shall be

2. An injuthe inju

3. Suitabl

safely b 4. No por

rails shrunningengage

5. The ex

half of provide

6. Every o

meanswhose

7. No floo

as to re 8. Worker

concre 9 Those

and glo 10. (i) No

readym(ii)Suitabl

in the f 11. Overa

be prov 12 Hoistin

suppor 13. The ro

durable

ijwani And A

e kept in a

ured personury necess

le and strobe done fro

rtable singhall not bg's shall noed for hold

xcavated mthe depth

ed with nec

opening ins to preven

minimum

or, roof or oender it un

rs employeete and lime

engaged ioves.

paint contmade paintle face maform of spr

alls shall bevided to en

ng machinrts shall be

opes usede quality an

Associates

a readily ac

n shall be sitates hosp

ong scaffolom the gro

le ladder se less thaot be moreing ladder

material shh of trenchcessary fen

the floor ont the fall oheight sha

other part osafe.

ed on mixe shall be

n welding

taining lea. sks shouldray or surfa

e supplied nable the w

es and tace in perfect

in hoistingnd adequa

ccessible p

taken to apitalization

ds should ound.

shall be ovan 30 cm.e than 30 c.

all not be h whichevencing and

of a buildinof persons all be one m

of the struc

xing and haprovided w

works sha

ad or lead

d be suppliace having

by the conworking pa

ckle used int condition.

g or lowerate strength

43

place.

public hosn.

be provide

ver 8 mete. (clear) acm. When

placed witer is morelighting.

g or in a wor materia

meter.

cture shall

andling mawith protect

all be prov

products s

ed for useg lead paint

ntractor to inters to w

n the work.

ing materiah and free

spital witho

ed for wor

ers in lengtand the dia ladder is

thin 1.5 mee. All trenc

working plaals by prov

be so ove

aterial suctive footwe

vided with

shall be us

by the wot dry rubbe

the paintewash during

ks including

al or as a form defec

out loss of

rkmen for a

th. The widstance bes used an

eters of thches and e

atform be pviding suita

erloaded w

ch as asphear and rub

welders’ p

sed except

orkers whened and scra

ers and adeg cessation

g their atta

means of cts.

f time, in ca

all works t

dth betweeetween twoextra labo

e edge of excavation

provided wiable fencing

with debris o

halt, cemebber hand

protective

in the form

n the paintapped.

equate facn of work.

achments a

suspensio

ases when

hat cannot

en the sideo adjacentur shall be

the trenchns shall be

ith suitableg or railing

or materia

nt, mortargloves.

eye shield

m of paste

t applied

cilities shal

anchor and

on shall be

n

t

e t

e

h e

e g

l

,

d

e

l

d

e

Page 44: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

1) NaSBIIMS

2) Con

3) Site

4) Sco

5) Nam

6) Add

7) Peri

8) EarnThousperiod Nationapayabl 9) Rete 10) De 11) Ins 12) Liqshown value. 13) Va

ijwani And A

ame of theS, Circle O

sultants

Address:

ope of Wo

me of the C

ress of the

od of Com

nest Moneyand Six Hof 180 Daalized Banle at Bhav

ention Mon

efects Liabi

surance to

quidated dain the tend

lue of Inter

Associates

APPEN

e organizaOffice, SBI,

: M/s. V

State Ban

ork :

Contractor

e Contracto

mpletion

y Deposit Hundred oays from thnk drawn ivnagar)

ney

lity Period

be underta

amages der per we

rim Bill (Mi

NDIX HER

ation OfferLHO, Bha

Vijay Sahi

nk of India,

Proposed

or

only) by mhe last datein favour

aken by the

eek subject

in.)

44

REIN BEFO

ring Contraadra, Lalda

ijwani & A

Bantwa B

Air Cond

means of e of submSBI Infra

e : Contract

t to max. 5

ORE REFE

act: The Carwaja, Ahm

Associates

Branch, Dis

ditioning wJunagadh

: -----------

: ------------

: 45• Iss: Rs

f Demand ission of thManagem

: As gen

: Tw Virt

: 125tor at his c

: 0.55% of the c

: Rs

ERRED TO

Circle Heamedabad-1

s

st. Junagad

works of B.

------------------------------------------

-------------------------------------------

days fromue of work. 2,600/Draft/Pay

he tender) ment Solu

per clauseneral Cond

welve Monthtual comple

5% of Contost(Contra

5% of thecontract va

. NIL

O

d & Vice 1

dh

Bantwa Br

--------------------------------------------

--------------------------------------------

the date ok order. /- (Rupey Order (V

from any utions Pvt

e no. 1.4 oitions

hs from theetion.

tract Valueactor’s all r

e Contracalue or actu

President

anch Dist

----- ----- ------

------ ------ ------

of

ees TwoValid for ascheduled. Ltd. and

f

e date of

e isk policy)

ct amountual final bil

.

.

o a d d

t l

Page 45: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

14) Daissued posses 15) Pe

16) Init 17) To 18) Re Compshall beonly af 19) Pe 20) Thfor comreceiptreports

ijwani And A

ate of Commto the Con

ssion of the

riod of Fina

tial Securit

otal Securit

efund of initrising of Ee refundedfter the Def

riod for Ho

he final bill mpletion wot of final bils etc. presc

Associates

mencemenntractor/ ore site whic

al Measure

y Deposit

ty Deposit

tial SecuritMD and IS

d to the Cofect Liabilit

onoring Ce

will be subork and thel provided cribed in th

nt r the day ohever is ea

ement

ty DepositSD. ontractor onty Period is

rtificate

bmitted by e Bill shall the bills a

he tender.

45

on which tharlier.

: 2

:

n completios over.

the Contrabe certifiedre submitte

Date:

: Frohe Contract

: 2 M Com

2% of the A

5% of the f

: 50%on of the w

: One Mon

actor withind within 3 ed with all

Signa

om the datetor is instru

Months frommpletion.

Accepted V

final bill am

% of the Swork and b

nth for R.A

n one monmonths fropre-requis

ature of Te

e of work oucted to ta

m the date

Value of th

mount inclu

ecurity Dealance refu

A.Bills

nth of the dom the datesite docum

enderer.

order ke

e of Virtual

he Tender.

uding ISD.

posit unded

date fixed e of ents/test

Page 46: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

To, The C.SBI InfBhadraAhmed Dear S PROPOJUNAG

Havingworks examinthe reqto execthe sain accowriting contrac MEMO (a) D

(b) Ea

(c) Tiww

Shouldprovisioapplica

ijwani And A

H. &V.P., Cfra Managea, Laldarwadabad-1

Sir,

OSED AGADH

g examinedspecified

ned the sitequisite infocute the woaid memoraordance in

referred ct and with

ORANDUM

escription

arnest Mon

ime allowework from thwork order.

d this tendeons of theable or in d

Associates

Circle Officement Soluaja,

AIR COND

d the termsin the m

e of the woormation reorks specifandum on all respecto in cond

h such cond

M

of work

ney

ed for comphe date of

er be accee said condefault the

LETTER

ce, utions Pvt.

DITIONING

s & conditiomemoranduorks speci

elating therfied in the the item r

ct with the ditions of ditions so f

pletion of issue of

epted, I/wenditions of ereof to for

46

R OF DEC

Ltd., Third

G WORK

ons, drawium hereinfied in thereto and a said mem

rate basis specificatioTender, tfar as they

ProposeBranch,. Rs. 2,6HundrePay OrBank Managepayable45 daysper tend

e hereby agContract

rfeit and p

LARATIO

d Floor, SB

KS OF B

ngs, specinafter set said mem

affecting thmorandummentionedons, desighe articles

y may be a

ed Air Con, Dist. Juna

00.00 - (Red only) bder from adrawn in

ement Se at Bhavns from the der.

gree to abannexed h

pay to SBII

N

BI, LHO,

BANTWA

ifications, dout and

morandumhe quotatiom within thd in the attn, drawings of agreepplicable.

nditioning wagadh

Rupees Twy means oany schedn favor olutions nagar) date of com

ide by andhereto so IMS, the a

BRANC

design relahaving v

and havingon, I/We hehe time sptached schgs and instement, con

works for

wo Thousaof Demanduled Natio

of SBI Pvt. Ltd

mmencem

d fulfill the far as the

amount me

CH, DIST.

ating to theisited andg acquiredereby offerpecified inhedule andtructions innditions of

Bantwa

and Sixd Draft / onalized

Infra d. and

ment as

terms andey may beentioned in

.

e d d r n d n f

d e n

Page 47: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

the sai

I/we ha(RupeeInfra Mcalled Infra M We undtender InstituttherefoBank dat any entrustwithoutto Tend We, heprices period. Yours f

Signatu

ijwani And A

d condition

ave deposes Two Th

Managemenupon to do

Managemen

derstand thin part o

e Buildingore, undertdeciding to stage duri

ted to us t any extraderers” of t

ereby, alsoof any o

.

faithfully,

ure of cont

Associates

ns.

ited Demahousand nt Solutiono so, I/we hnt Solution

hat as per r whole o

g, Staff Qtake that wdrop any

ing the conin phases

a claim for this tender

o undertakof the mat

tractor With

and Draft /Six Hund

ns Pvt. Ltdhereby agr

ns Pvt. Ltd.

terms of tr may enttrs. And D

we shall notof the buildntract perio

on our aprice esca

r.

ke that, weterial durin

h Seal

47

/ Banker’s red only)

d. Should I/ree that th

his tender,trust the w

Director’s Bt raise anyding/buildinod. Furtherpproved raalation as

e will not rng the cu

Cheque / as Earnes/we do faiis sum sha

, the SBIIMwork of vaBungalow/y claim/comngs from thr, we also ates and wprovided fo

raise any currency of

FDR for ast money dl to executall be forfe

MS may coarious buildInterior wo

mpensationhe scope oundertakewithin the or in Claus

claim for acontract/e

a sum of Rdeposit wite the cont

eited by me

onsider accdings propork) in phn in the eveof work of

e to executstipulated

se 9.0.1 “ In

any escalaexecution/c

Rs 2,600 /-th the SBtract whene/us to SB

cepting ourposed (i.eases. Weentuality ofthis tendere the work

d time limitnstructions

ation in thecompletion

- I

n I

r . , f r k t s

e n

Page 48: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

i.

ii.

iii.

iv.

v.

vi.

vii.

r. Vijay Sah

Name Name Sr. No. No. & D Refere Date of Date of

S.No

ItemDes

1 2

Note: 1.

2.

ijwani And A

of Contrac

of Work

. of this Bil

Date of pre

ence to Agr

f Written o

f Completi

m scription

U

3

If part ratshould bea rate.

If ad-hoc mentione

Associates

PR

ctor/ Agenc

l:

evious Bill

reement N

order to com

on as per A

Unit Rate (Rs.)

3 4

te is allowee indicated

payment ied specifica

ROFORMA

cy

:

o.

mmence :

Agreemen

As per Tend

Qty Amo(Rs.)

5 6

ed for any id with reaso

s made, it ally.

48

A FOR RUN

TABLE - X

nt

der Up PreviouBill

unt Qty A(

7 8

items, itons for allo

should be

NNING A/CXIII

:

:

:

:

to us R.A.

Up(Gr

Amount (Rs.)

Qty

8 9

owing such

C BILL

p to Date ross)

y Amount (Rs.) 10

h

Net Va

Present Bil

Qty Amo(Rs

11 12

alue since

bill

l Rema

ount .)

13

previous

arks

Page 49: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Arr. Vijay Sah

The me

---------

recorde

No.-----

--------Signa

Contra

The wo

satisfac

--------Archi

ijwani And A

easuremen

--------------

ed at page

--------------

--------------ature and d

actor

ork recorde

ctorily as p

--------------itect

Associates

nts on the

were mad

es -----------

---------.

-------------- date of

ed in the a

per tender

--------------

C

basis of w

de have be

---------------

---------Sign

Rep

bove-ment

drawings,

Sign

49

CERTIFICA

hich the ab

en taken jo

-- to --------

---------------nature and

Architecpresentative

tioned mea

conditions

--------nature and

ATE

bove entrie

ointly on --

--------------

-------------- date of

cts e (Seal)

asurement

s and spec

-------------- date of Si

es for the R

---------------

----- of me

- ---------Sign

Site En

ts has bee

ifications.

-------------ite Enginee

Running Bi

----------- an

asurement

--------------nature and gineer

n done at t

er

ill No.----

nd are

t book

-------------date of

the site

Page 50: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

R/A BI

1.

2.

3.

4.

5.

i)

ii)

iii)

(a)

(b)

iii.

iv.

ijwani And A

LL NO.

Totalprevi

Totalsince

Total(C) (A

PVA of Stand state

Total OBJ

SecuR/A

Reteper amou

Less

Balan

Mobi

Outsintere

To be

Any oto be

Any chargcontrstate

Associates

l value ous bill (A

l amount oe Previous

l amount dA+B)

on accounteel, Cemelabour as

ements enc

l amount d

ECTIONS

ured Advan

ntion moneaccepted

unt Rs.

already re

nce to be r

lization Ad

tanding est) as on

e recovere

other Depae recovered

other ges to be rract (water

ement.

MEMORA

of work)

of secured Bill (B)

due since P

nt of declaent and ots detailed closed.

due to the C

:

nce paid in

ey on valutenders

ecovered

recovered

dvance, if a

amount (date

ed in this b

artmental md as per co

Departmerecovered r, power etc

50

ANDUM FO

done sinc

advance d

Previous B

ration in prther mater

in separ

Contractor

the previo

e of worksup to d

any

(principal

ill

materials contract, if a

ntal servif any, as c.) enclose

OR PAYME

ce Rs...

due Rs...

ill Rs...

rice rials rate

Rs...

Rs...

ous Rs...

s as date

Rs...

Rs...

Rs...

Rs...

+ Rs...

Rs...

cost any

Rs...

vice per

e

Rs...

ENT

................

................

................

................

................

................

................

................

................

................

................

................

................

................

TA

.....

.....

.....

.....

.....

.....

.....

.....

.....

.....

.....

.....

.....

.....

ABLE - XV

V

Page 51: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

The bilafter dupayme Date:-- The bilafter dupayme

Date : Signatu

This figpayme Date:-- ---------Signatu

ijwani And A

l amount toue checkinnt.

---------------

l amount toue test chent for an a

--------------

ure of Ban

gures givennt ----------

---------------

---------------ure of the C

i)

ii)

iii)

Associates

o Rs. ------ng of the m

----------

o Rs.-------ecking of mamount of R

--------------

ks/ SBIIMS

n in the Me--------------

-------

------------ Circle Hea

STA

Total Am

Less I.T

Less S.T

Net Pay

------------ (bmeasureme

-----------cemeasuremeRs.............

--

S Engineer

emorandum--------------

ad & VP

ATUTORY

mount due

T. Payable

T. Payable

yable

51

both figureents of wor

ertified by Cents of wor.................

r

m for paya---------------

DEDUCTI

(E)

e

es and work as requir

---- Sig wit

Consultantsrks as requ......

ble has be--------------

ION:

ds) has bered and is

---------------gnature of Ath Seal

s has beenuired and is

een verified- (in words

een scrutinrecommen

------------ Architect

n scrutinizes recomme

d and bill pand figure

Rs. --------

Rs. --------

Rs. --------

Rs. --------

ized by usnded for

ed by me ended for

passed for es)

----

----

----

----

Page 52: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

TECH SR. NO 01 S

Wh4boTEsm

02 SWp4btTEsm

03 ITa&cTsl

04 Ea

ijwani And A

HNICAL S

Supply of sWall mounhour at the45/46 dB nbe suitableoperation. The air filteEvery unit sealed unmanufactuSUPPLY OWall mounper hour at45/46 dB nbe suitablethe operatiThe air filteEvery unit sealed unmanufactunstallation

Total work as outdoor& fabricatincontrol panThe installasplit and ceakages, lExtra coppa) The co

laggingwithouexcellelaying insulatand doTHAN

a) Then cthe peproper

Associates

SPECIFICA

split A/C 1.ted air cone ambient noise level e for 230 v(3- Start,In

er shall be shall be

nit uncondrer. COND

OF SPLIT anted air cot the ambienoise level e for 230 voons. (3- st

er shall be shall be

nit uncondrer. COND

n of split 1&comprisin

r. Connecting for hannel. ation of A/

cassette A/loading, un

per pipe : ontractor sg to make

ut joints anent workmit on conn

tion shall bo not com SUPPLIEcontractor erfect job r flare- up s

ATION FOR

.0 tr. (3 standitioner sof 40 degat the dist

volts powenverter ACeasy to msupported

ditional waDESOR MUa/c 1.5 Tr. onditioner sent of 40 dat the dist

olts of powar, Inverteeasy to msupported

ditional waDESOR MU& 1.5 Tr :-ng of unpaing the pipnging the u

/C. chargin/C. this incnloading, g

shall have e the perfnd proper

manship. Nnecting it tobe provide

mpromise aD for 1.0 &shall haveof insulatioshall be do

52

R THE AIR

Descripti

ar,Inverter) hall have 1gree centigtance of 1

er supply. W high wall taintain and

d by unconarrantee UST BE OF(3 star, Invshall have

degree centant of 1 M

wer supply.r A/C high aintain and

d by unconarrantee UST BE OF

cking till copes & electunit from c

ng towardscludes nitrgas chargin

to providefect job of

flare-up sNo dent sho machine/ed. Entire pany aesthe& 1.5 TR. Ae to provideon. All theone with to

R CONDIT

on of work

:- 1.0Tr i.e ngrade capaMT for ou

With tempetype split Ad preferablnditional wmust be F COPPERverter):-

e 1.5 Tr i.etigrade ca

MT for indo With tempwall type s

d preferablnditional wmust be F COPPER

ommissiontrical cableceiling. Ins

s installatiorogen flushng and pan

e extra lenf insulationshall be d

hall be allo/evaporatepiping shaetic look. TA/C with me copper pe copper pools and tac

IONING C

k

ominal 12.acity. Unittdoor/indooerature indA/C). le showingwarrantee

given forR METAL.

e. nominal pacity. Un

oor/outdooperature insplit A/C)ly showingwarrantee

given forR METAL.

ning of eaces/wires. Wstallation s

on testing hing, pressnel fittings.

ngth of con. All the done with owed whilee/condensell be doneTHIS IS Tanufacture

pipe with ppipe shall ckles for e

ONTRACT

.000 BTU/ct shall havor units. Tdicator and

g the statusof one yer 5 years

18,000 Bit shall havr units. Thdicator an

g the statusof one yer 5 years

ch units indWith necessshall be do

and commsure testin

opper pipe copper pitools and

e bending er. High gre over the THE LENGer kit. proper lagg

be withouxcellent wo

T WORK

capacity pve maximuhe unit shad remote f

s of chokinear howevs from th

BTU/capacive maximue units shad remote f

s of chokinear howevs from th

door as wesary suppoone with th

missioning g, attendin

with propipe shall b tackles fthe pipe

rade of foafalse ceilin

GTH OTHE

ging to makut joints anorkmanshi

er um all for

ng. ver he

ity m all for

ng. ver he

ell ort he

of ng

er be for of

am ng ER

ke nd ip.

Page 53: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

05 WSTeToaA

06 DCbcd

07 s08 C

Ttb

9.1. T

cso

9.2. U

ocpfo

Itsoty

- -

ijwani And A

No demachiprovidcomprsaddlin

Wiring :- SPLIT UNIThe A/C celectrical cThe wiring of materialand finisheA.C contraDrain wateCondensedblock throucarry conddone beforsupply andCivil work :The A/C cthe civil cobe done by

VARIABL

Scope: The scopecommissionspecificatioof quantities

Type: Unit shall bone outdoocool indepeprovided wior servicingt shall be shown in thon any circype of indo Ceiling m Wall Mou

Associates

nt shall bene/evaporaed. Entireromise anyng and cla

T TO OUTcontractor contractor i

shall passs. Any dril

ed by the Actor for ea

er piping :- d water in ugh gravitydensed ware connectd installatio: ontractor hntractor wy the A/C c

LE REFRIG

e of thisning of Vns and in as.

be air cooor unit andendently foith isolationg, while sypossible to

he drawingcuit can beoor units sh

mounted caunted Split

e allowed wator /cond

e piping sy aestheticmping.

TDOOR UNhas to g

n house. As through ling of the A.C contra

ach & every

the interioy-slop. Theater. All theing.

on of fabric

has to comhile doing

contractor w

GERANT F

s section Variable Raccordanc

led, variab multiple ior the reqn valves soystem keepo connect

gs or as inde of differehall be conssette typetype

53

while benddense. Hishall be dc look. Si

NIT et the wir

All the wirinISI approvwall for ge

actor. Size y A.C unit.

or of the be entire pipe piping s

cated steel

mplete the flooring towith requir

FLOW SYS

compriseefrigerant

ce with the

ble refrigerndoor unit

quirement o that a paps function

multiple indicated in sent type annnected to e.

ding the pipigh gradedone over ze of cop

ring from ng shall beved conduitetting copp

of the wir

banking haing shall bhall be ma

supports f

zari work o run the drred labour

STEM

es the suVolume requireme

rant volumts. Each iof the roo

articular uning in normndoor unitschedule ond also cothe system

pe of layin of foam

the falsepper shall

the MCB e of approvts as ment

per pipe or res shall be

all shall bebe 25 M.M.aintainable

for outdoor

in the warainage pip&materials

upply, ereSystem c

ents of Dra

me air condndoor unitoms. All init can be is

mal way. ts on one of quantitieontrolled inm:

g it or conm insulatioe ceiling asleeve ins

unit provved make otioned in awiring sha

e 3x 2.5 s

e drained o ISI approv

e and test

r units for (

all and coope etc. finiss.

ection, teconformingawings and

ditioner cot having candoor unitsolated and

refrigerantes. The inndividually.

nnecting it on shall band do nsulated wi

ided by thonly. approved liall be sealesq. m. m. f

outside/toilved pipes ing shall b

(1T.1.5 Tr)

ordinate wishing has

sting and to these

d Schedule

onsisting ofapability tos shall bed removed

t circuit asndoor units Following

to be not ith

he

ist ed for

let to

be

ith to

d e e

f o e d

s s g

Page 54: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

- mrecin

T

uss

B

fi 9.3. O T

fr

Ac

Ind

T

h T T

u 9.4. T

cthcsp

Te

Afls

ijwani And A

Compmechanismefrigerant

cooling. ndoor units

The refrigeupto 100m system shasystem / co

Both indoorrst charge

Out Door UThe outdoorom heavy

All outdoorcompresso

n case of disrupted w

The noise horizontally

The outdoo

The unit suncondition

CompressThe comprcontrolling. he variatiochanged byshall incorppressure. The invert

efficient andAll outdooructuation

sufficiently

Associates

pressor insm and cap

by scroll Outdoor u

s.

rant pipingwith maxim

all be manompressor.

r unit and o of refriger

Unit: or unit sha gauge mil

r units abrs.

outdoor uwith failure

level shall y 1m away

or unit shal

shall be pnal warrant

sor: ressor sha It shall ch

on in cooly speed moporate liqui

ter used, d quiet oper units shand indoolubricated.

stalled in opable of cengaging

unit shall b

g betweenmum 50 mnaged with

outdoor unrant before

all be factold steel pa

bove 5 HP

units with of any com

not be mand 1.5 m

l be modul

rovided wty of 5 yea

all be highhange the ling load odulation od sub-coo

shall be eration. hall have or unit ind. Forced l

54

outdoor unihanging th/ disenga

be suitable

indoor unm level diffehout distur

nit shall be e delivery a

ory assemnels with p

P rating s

multiple cmpressor.

ore than 6m above gro

lar in desig

with inverters.

h efficiencspeed / refrequiremeof compresling mecha

IGBT (ins

multiple sividual conlubrication

it shall be he rotating

aging meche for mix-m

nits and ouerence withrbance to

factory asat site.

mbled, weapowder coa

shall have

compresso

60 dB (A) ound level

gn with pos

er micropr

cy scroll tyfrigerant mnt. Refrige

ssor / mechanism with

ulated gat

steps of cntrol. All may also

equipped g speed /hanism to

match conn

utdoor unithout any onormal op

ssembled,

ather proofated finish.

minimum

rs, the op

at normal .

ssible futur

rocessor c

ype and cmass flow rerant mashanical con

h liquid inje

te bipolar

capacity coparts of cbe employ

with capac/ mass flo

follow vanection of

ts shall beoil traps. Operation cy

tested and

f casing c.

m two num

peration sh

operation

re expansio

control pan

capable forate in accoss flow ratntrol syste

ection at int

transistor

ontrol to compressoyed.

city controow rate ofariations inall type of

e extendedOil recoveryycle of the

d filled with

onstructed

mber scrol

hall not be

measured

ons.

nel having

or capacityordance tote can bem. Systemtermediate

r) type for

meet loador shall be

l f n f

d y e

h

d

l

e

d

g

y o e

m e

r

d e

Page 55: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

O 9.5. H T

to T

tr T

s T

ph

9.6. R T

sp

9.7. S A

s F

lofo

9.8. P A

q A In

a F

P F

p 9.9. O U

lo S

d T

w

ijwani And A

Oil heater s

Heat ExchaThe Heat Eo aluminumThe fins sreatment sThe casingstandard feThe unit shpropeller tyhave a safe

RefrigerantThe Refrigeshut off vaprovided to

Safety DevAll necessasystem. Following sow pressuror inverter,

Piping: All connectquality with All connectnsulation oand tubes oFor individuPiping with For outdoorpaints to wi

Oil RecoveUnit shall bong refrigeSystem shdistribution The refrigewithout oil t

Associates

shall be pro

anger: Exchanger m fins to foshall haveshall be suigs, fans, meatures. hall be provype fans aety guard.

t Circuit: erant Circualves and ensure th

vices: ary safety

safety devire switch, , and short

ions of Ref Eddy Curions, tees,

of cold linesof appropriual Piping Bands for r piping, thithstand ou

ery Systembe equippeerant pipingall be desof oil to inrant pipingtraps.

ovided in th

shall be coorm a crosse anticorroitable for amotors etc

vided with arranged fo

uit shall inca solenoi

e safety op

devices s

ices shall fuse, cran

t recycling

frigerant prent Testin reducers s shall be ate thickne50 / 100 midentificat

he finish shutside amb

m: d with an o

g. signed fordividual cog shall be

55

he compre

onstructeds fan coil aosion treatareas of higc. shall als

necessaryor vertical

clude an lid valve. peration of

shall be pr

be part ofnkcase heaguard time

iping shall ng and matetc. shall bcarried ouess so thatmm wide Aion.

hall be wovbient condit

oil recover

r proper oompressor.extended

essor casin

d with coppand larger stment for gh pollutionso be with

y number o/ horizont

iquid receiAll neces

f the system

rovided to

f the outdoater, fusibler.

be in highterial test Cbe standart with Armt condensa

Aluminum T

ven GRP Mtions and U

ry system t

oil return t. upped 100

ng.

per tubes msurface are

Heat Excn, moistureh anticorro

of direct dal discharg

iver /accumssary safem..

ensure s

oor unit: he plug, ov

h grade CoCertificatesrd make fittaflex / K-Fation does Tape shall

Mat finishedUV Radiati

to ensure s

to compre

0 M with 5

mechanicaea. changer Ce and salt lsion treatm

riven low nge. Each

mulator, liqety devices

afe operat

igh pressuver current

pper of Res. tings.

Flex insulatnot occur.l be used

d with coloon.

stable ope

ssor along

50-M level

ally bonded

Coil. Theaden air. ment as a

noise leveh fan shal

quid & gass shall be

tion of the

ure switchprotection

efrigeration

tion sheets. at joints of

ored Epoxy

eration with

g with the

difference

d

e

a

l l

s e

e

, n

n

s

f

y

h

e

e

Page 56: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

9.10. In U U

e U

N U A

m U A

p A A

c V

in C

w A A C

suteseT

9.11. C T

asc

Uh

Elo

9.12 C U

sg

ijwani And A

ndoor UniUnits shall Units shall efficient heaUnits shall Noise. Units shall All componmaintenancUnits shall All units witproper Air dAll unit shaAll units mconnectionsVisible indoncluded in Concealed which can bAnti corrosiAll units shaCooling coiupply air teemp, whicelected suhe unit PC

Ceiling MoThe unit shand DX-coisteel. The bcorners. Unit shall hhave four wEach unit sow gas lev

Ceiling MoUnit shall bsection & Dgalvanized

Associates

ts: be factory have DX cat transferhave Cen

have inlet nents of ce. have very th Factory distributionll be contro

mounted inss, and speoor units cost of unindoor uni

be controlleion treatmeall have adl and refriemperatur

chever is pply air tem

CB should h

ounted Casall be ceiliil section. body shall

have a extway supply shall have el detectio

ounted Dube suitable DX-coil sec

steel. The

assembledcoils with c.

ntrifugal fan

filters, whiUnits are

low noise.manufact

n. olled by eleside the ccial filters shall haveit by defauits shall haed with wirent for avodequate insigeration pre shall nomore. Co

mperaturehave 5 yea

ssette Typng mounteThe housbe light in

ternal attraair grilles high lift d

on system a

ctable Typfor ceiling

ction. The e unit shall

56

d, wired, pcopper tub

ns for ade

ch are ease easily a

ured Units

ectronic Exceiling shaif necessae wireless

ult. ave sensorreless rem

oiding corrosulation orparameterst be less tontractor s. ars of unco

pe Unit (Med type. Ting of the weight an

active panon sides arain pumpand very lo

pe Unit: g mounted

housing of have high

piped and tbes and bo

equate amo

sily cleanabaccessible

s, Grills sha

xpansion Vll have fary.

s remotes.

r mounted otes unles

osion of cor Lining to as shall be than 140C shall guar

onditional r

Multi-Flow he unit shaunit shall

nd shall be

el for suppand return ap, fresh airow operatin

type. The f unit shall

h static fan

ested. onded alum

ount of Ai

ble and repfor conn

all have au

Valves onlyns capable

. Price of

on supplyss specifiedoils. avoid conddesigned or 10C ab

rantee ins

replacemen

Type): all include be powde

e possible t

ply and reair grille in r intake prong sound.

unit shall be light wfor ductab

minum fins

r circulatio

placeable. ection, re

uto swing

y. e of susta

the same

y air grilles d.

densation. in such a

bove room side condi

nt warranty

pre-filter, fer coated gto suspend

eturn air. centre.

ovision (if

include preweight powdble arrange

s for highly

on and low

epairs and

feature for

aining duct

e shall be

/ diffusers

a way thatdew point

itions with

y.

fan sectiongalvanizedd from four

Unit shal

specified)

e filter, fander coatedement.

y

w

d

r

t

e

s

t t h

n d r

l

,

n d

Page 57: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

9.13 H T

sg

U 9.14. C U

sg

9.15. C A

c T

c- - - - -

-

9.16. U U T

m

- - - To

Tc

ijwani And A

High Wall MThe units ssection & Dgalvanized Unit shall h

Ceiling MoUnit shall bsection & Dgalvanized

Central ReA multi-funcontroller) sThe controlconsisting o

Tempe On/Off Indicat Select The co

by a nothe ind

The co& controutdooof the s

Unified OnUnified ON

The contromaximum 1

On / OffIndicatioSelect o

The controlof 1 km awa

The controlcontrolling

Associates

Mounted Ushall be hiDX-coil sec

steel. ave an attr

ounted Cobe suitable DX-coil sec

steel. It sh

emote Connctional mshall be suller shall beof max. 16 erature settf as a zoneion of operON of all o

ontroller shon polar 2 oor unit.

ontroller shrolling of a

or unit. All nsystem to i

n/Off Contr/ OFF con

ller shall b16 indoor u

f as a zoneon of operaone of 4 op

ller shall bay from ind

ler shall beof all abov

Units: gh wall m

ction. The

ractive ext

ncealed tyfor ceiling

ction. The hall be slim

ntroller (Oicroproces

upplied as ae able to cunits) or 1

ting for eace or individrating condoperation mall have wwire transm

all be integll above pnecessary integrate to

roller (Optntroller sha

be able to units) or 12

e or individation condiperation mo

e wired bydoor unit.

e integrateve parame

57

mounted typhousing of

ernal casin

ype units:g mounted

housing ofm and quite

ption if Spssor basedan optiona

control upto128 nos. ofch zone, oual unit. dition. modes for ide screenmission ca

grated to Bparameters

interface co the BAS

tion if Speall be suppl

control mi28 nos. of i

ual unit. ition of eacodes.

y a non-po

ed to BAS seters includ

pe. The uf unit shall

ng for supp

type. The f unit shall

e in operati

pecified ind centraliz

al accessoro min. 64 zf indoor unr group, or

each zonen liquid crysable to a di

BAS systems includingcards / unitSoftware.

ecified in Blied as an

nimum 2 gndoor unit

ch group.

olar 2 wire

system thrding start/

unit shall i be light w

ply and ret

unit shall be light won

n BOQ): zed controry. zones of 6

nits with ther indoor un

e.. stal displaystance of 1

m thru softwg start/ stopts should b

BOQ): optional ac

groups (eas with the

transmissi

ru softwarestop of ea

nclude preweight powd

urn air.

include preweight powd

oller (centr

64 group (ee followingnit.

y and shall1000m aw

ware for mp of each inbe supplied

ccessory.

ach group following f

ion cable t

e for monitoch indoor /

e-filter, fander coated

e filter, fander coated

ral remote

each group functions.

l be wired ay from

monitoring ndoor / d as a part

containingfunctions.

to distance

oring & / outdoor

n d

n d

e

p .

t

g

e

Page 58: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

us

9.17. C2csinMAa

9.18 E Flopth

10.1

10.2 10.2.1

10.2.2.

10.2.2.

ijwani And A

unit. All necsystem to i

Condensat25mm dia condensatesealed so tnsulation dMounting All indoor uanchor Fas

lectrical in

For Variablocation. Hphase powhese outdo AIR DISTR SCOPE

The scopeall sheet mgrilles, regand the ge

DUCT MA

RA Galvanisurface acertificatesat randomfor thickne

. GAAll ducts sfollowing t

.1 For

Associates

cessary intntegrate to

te: uPVC pip

e, from Evthat there

drain tray s

units shall steners.

nstallation

le RefrigerVAC Con

wer to outdoor units. P

RIBUTION

e of this semetal / alumgisters andeneral arra

ATERIALS

AW MATERizing shallrea and Ls. In additi

m by owneress and zin

AUGES, BRshall be fachickness,

r Ducts wi

terface caro the BAS

pes, 40mmvaporator is no watehall be pro

be mount

n:

rant flow stractor to oor units

Power / con

N

ction compminum duc diffusers.

angement s

RIALS be ClassLock Formion, if deemr’s site repnc coating

RACING Bctory fabricas indicate

ith externa

58

rds / units sSoftware.

m dia uPVUnit to drer leakageovided belo

ted with B

systems, pprovide s

and singlentrol cablin

prises suppcts, supply,All to be in

shown on t

s VII – lighming Qualmed necesresentativeat contract

BY SIZE OFcated from ed as below

al SP up to

should be

VC headerain point.

e. U-trap sow the Eva

Brackets, H

power will suitable dise phase pong along w

(AS PER

ply fabricat, installation accordanthe Drawin

ht coating ity prime ssary, same shall be tor's expen

F DUCTSgalvanizedw:

o 250 Pa (

supplied a

s & fitting The join

shall be paporator Un

Hangers et

be providestribution ower to all

with support

“SMACNA

tion, instalon, testing ance with thngs.

of zinc, nmaterial

mples of rasubject to

nse.

d steel / al

(ESP up to

as a part of

gs shall bents shall brovided. nit, if requi

tc. with p

ed near oupanel alonl indoor unts shall be

A” STAN

lation and and balancese specif

nominal 18along with

aw materiaapproval a

uminum of

o 25mmW

f the

e used fore properlyAdditionared.

proper size

utdoor unitng with 3-nits fed byincluded.

DARDS)

testing of cing of all fications

80gm/sq.mh mill testal, selectedand tested

f the

g)

r y l

e

t -y

m t d d

Page 59: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

10.3 10.4

10.5

a.

ijwani And A

RectanDucts GMaximuDuct Si

1–500501 –

751 –

901 –

1201 –

1501 –

1801 –

2101 –

*Distance as of mate

DUCT CO

All ductsconformin

a) Ducinsuindiare reqdimto eany

DAMPERS

Dampers: 16 G GSScontrol sh

Associates

ngular G. S. um ize

G

0 mm – 750

mm – 900

mm 1200

mm – 1500

mm – 1800

mm – 2100

mm above

of reinforcerial used f

ONSTRUCT

s shall bng to relev

cts so ideulated fromicated in s overall shuired and

mensions shensure thay gaps.

S

All duct dS construchall be sui

DGaug

e 26 26

24

24

22

20

20

18

cement/brafor joining o

TION

be fabricavant SMAC

entified onm outside chedule ofheet metal

indicatedhould be at all conne

dampers sction and titable for

59

PreDuct Sectio

Joi

C&S C&S

TD

TD

TD

TD

TD

TD

acing from of duct sec

ated andCNA code

n the Draas descr

f Quantitie dimensio in Sched

as per apprecting sect

shall be opight fittingthe locatio

essure 250on Lengthint Type

ConnectorConnector

F Flange

F Flange

F Flange

F Flange

F Flange

F Flange

each joint.ctions.

installedes.

awings sharibed in ths. Duct dins inclusiv

dule of quroved drawtions are d

pposed bla. The desi

on and serv

0 Pa h 1.2 m (4

r r

. Bracing m

d in wor

all be acohe section imensions ve of the aantities.

wings and cimensiona

ade louver ign, methovice requir

ft) Bracing Spacing

Nil Nil

Nil

Nil

Nil

JTR or ZEBAR

JTR or ZEBAR

JTR or ZEBAR

material to

rkmanlike

oustically “Insulatioshown on

acoustic linThe fabriccare shoul

ally matche

dampers od of hanred.

EE

EE

EE

be same

manner,

lined andn” and as

n drawingsning wherecated ductd be taken

ed to avoid

of robustdling and

,

d s , e t n d

t d

Page 60: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

10.6 S

SSex

a) R

resccoa

b) Skesp

DOCUAdo

a) B

Mexw

Esee

Uth

Dmsuwmsein

Fpebese

ijwani And A

SUPPLY A

Supply and Schedule ofxtruded alu

Rectangulaectangular chedule oonsultant /pproval f

Supply air ey-operatepecific app

MENTATIOAll ducts fabocumentat

Bill of mater

Measuremexternal sur

wise.

Each and eerial numbnsure spee

Unless othehe basis of

Ductwork shmeasuremeurface are

width and dmultiplying ection and

n a similar or taperederimeter, wetween laection sha

Associates

AND RETU

return air f Quantitieuminium se

r Diffuse diffusers

of quantit/ client. Thfrom CLIEdiffusers s

ed volumeplications, a

ON & MEAbricated antion viz: rial/Packin

ent sheet crface area

every duct ber, assignedy and pr

erwise spef centerline

hall be meents shall ea shall bedepth, inclwith the o adding upmanner.

d rectangulwhereas forge and sll be the ce

URN AIR D

diffusers ss. Aluminection as s

ers shall s with fluties Theshese shallNT for eacshall be eq control dand as pe

ASUREMEnd installed

g list for ev

covering eaalong with

piece to hned to it inroper site m

ecified, mee measurem

easured onbe taken be calculateuding the

overall lenp areas of

ar ducts, thor tapered mall diameenterline d

60

DIFFUSER

shall be asnium diffusspecified in

be extruush fixed se shall be procu

ch type of dquipped widampers, er requirem

ENTS FORd should b

very duct s

ach fabricah summary

ave a tag n the measmeasurem

easuremenments des

n the basisbefore app

ed by meacorner joi

gth from fall duct se

he averagecircular dueter shall istance be

RS / GRILL

shown onsers shall bn schedule

uded alumpattern fobe selecred only

diffuser. th fixed aand anti-s

ments of

R DUCTINGe accompa

section sup

ated duct py of extern

number, wsurement sent and ve

ts for ductcribed here

s of externplication oasuring theints, in theflange face

ections. Pl

e width anducts, the dbe adopte

etween the

LS

n the Drawbe powder e of quantit

minium coor differencted in c

after

air distributsmudge rischedule

G anied and

pplied.

piece shownal surface

which shousheet. Therification.

ting for theewith

al surface f the insul

e perimetee center oe to flangeenums sha

d depth shdiameter ofed, the lenflanges of

ings and incoated & mies.

nstruction,nt spacesconsultatio

obtaining

tion grids, ngs as reof quantiti

supported

wing dimen area of du

uld corresphe above s

e project s

area of dulation. Th

er comprisof each due face of all also be

hall be consf the sectiongth of tapf the duct s

ndicated inmade from

, square &s as pern with the written

removableequired ines.

d by proper

nsions anduct gauge-

pond to thesystem wil

shall be on

ucts. Ducthe externaing overalct sectioneach ductmeasured

sidered foron midwaypered ductsection.

n m

& r e n

e n

r

d -

e l

n

t l l , t d

r y t

Page 61: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

Fmce

TadovichintoN

b) Spe

I. Gcose

II. DVsh

III. L

flash

IV. F

penere

10.7 InsulatWITH laminatinner cValue 4in a rug Flexibproper into enties.

ijwani And A

or specialmeasuremeenterline. he quotedllowances,ouble nutsibration ihamber/ac

ndication, to complete

NOT be sep

pecial Itemerpendicul

Grilles and ontrol dameparately a

Diffusers - Volume conhall not be

inear diffusanges for hall be me

lexible coerpendiculecessary equisite le

FLEXIBLE

ed flexibleNFPA 90

tion of toucore, doub4.2, Greengged and d

le duct cflexible rig

nergy efficie

Associates

l pieces lient shall be

d unit rate, flanges as for suppisolator sccess panturning vane the duct iparately me

ms for Air Dlar to air flo

registers mpers shaaccounted

cross secntrol damp

e separately

sers - shamounting

easured wit

onnection lar to the mounting

ength of ca

E DUCT:

e duct shou0A & 90Bugh polyesle layer co

n guard cerdurable tri

connectionsght formingent. and S

ke bends,e identical

e for extend gasketsports, rubbsuspension

nel, splittenes, straignstallationeasured no

Distributionow, as iden

- width mll form pa.

ction area pers shall y accounte

all be measof linear dth ducting

- shall direction arrangem

anvas cloth

uld be UL B ANDSEAster whichore wrappertification odirectional

s should g brace conStrapping th

61

, tees, redto that des

ernal surfas for jointsber strip 5n where r damper

ghtening va as per theor paid for

n shall be mntified heremultiplied art of the

for air flowform part

ed.

sured by diffusers. Tas describ

be measof air flow

ment, flangeh.

181 CLASAL OF AI encapsul

ed in a muof fiberglaslly reinforc

be madennection ahe flexible

ducers, brscribed ab

ace of duc, nuts and 5mm thick

specifiewith qua

anes, and e specifica.

measured bewith: by heightunit rate f

w at dischof unit rat

cross-secThe supplybed earlier.

sured by w. Quotedes, nuts a

SS I AIR DR DIFFUSates steel

ultiple thickss wool mued metaliz

e as per Uallowing rig

duct conn

ranches anbove using

cts shall bolts, han

k betweened or readrant and

all other ations. The

by the cros

, excludinfor registe

harge areate for sup

ctional areay air plenum

their crod rates and bolts

UCT LISTSION CO helix wire

kness of fibust. , Reinfzed polyest

UL181 listght connectnections wi

nd collarsthe length

include algers and a

n duct andequired, d lever foaccessorieese access

ss-section

g flanges.ers and sh

a, excludinply air diff

as and sham for linea

oss sectioshall incland trea

ED AND LUNCIL we forms thberglass wforced andter jacket.

ting procetions for fleith flexible

, mode ofh along the

ll wastageangles withd supportinspection

or positiones requiredsories shal

area

. Volumehall not be

ng flangesfusers and

all excludear diffusers

onal arealude the

ated-for-fire

LABELLEDith double

he air tightwool with Rd sheathed

edure withexible ductduct strap

f e

e h , n n d l

e e

. d

e s

a e e

D e t

R d

h t p

Page 62: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

LIST OSl. No.1. 2. 3. 4. 5. 6.

7. 8. 9. 10.

11. 12. 13. 14 15. 16. 17. 18. 19.

ijwani And A

OF APPRO Pac Pro

Elec

Ven

GI S

Gril

MS

Con

Pow Nitr

for r

Flex

Gas

Adh

Vibr

Filte

Poly

Cen

Refr

Cas Wall

Associates

OVED MAKDetails

ckage / Duct

peller Fans

ctric Motors

ntilation AHU

Sheet

les/Diffuser

Dampers/Lo

ntrol Cables

wer Cable

rile rubber Inref pipe insu

xible Duct C

skets

hesives

ration Isolat

ers/Air Show

yethylene

ntrfugal / Axia

rigerant Pipe

sstte Units aMounted Sp

KES FOR Hs of the Itemtable units

s

U

r

ouvers

nsulationulation

Connection

tor

wers

for duct insu

al fan

es

nd plit AC Unit

62

HVAC EQms

D

C

C

S

S

C

Tr

G

IC

E

A

N

D

ulation

F

Car Hea

UIPMENT Manu

Daikin, Hitac

Crompton

Crompton / S

Suvidha / Ca

Sail/TATA/ J

Caryaire/Rav

ristar/ /Cher

Grandlay/Bat

CC/Polycab

urabatax/Ae

Airflow/Pyrog

eoprene rub

Fevicol / Su

Resistoflex

Dyna/Therm

Supreme/Tr

Flaxt/ PAF/ C

Rajco/Paras

rrier/Hitachiavy Indu./To

AND MATufacturer’s chi, Carrier

Siemens/Bh

ariyaire /Citi

indal

vistar//Dyna

rub

tra Henlay/K

eroflex/Tota

guard

bber

uperlon

x/Dunlop

madyne/Che

rocellene/Tot

Chakshu

smani

i/ Daikin/ Mioshiba/ Blue

TERIALS name

harat Bijlee

zen/Cherub

amic

Kalinga

aline

rub

taline

tsubishi estar

b

Page 63: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

S.NO.

PART-

1

PART-

1

2

3

4

5

6

[C]

[a]

[c]

ijwani And A

BILLS O

ITEM DES

I : AC MAC

Supply of Heavy Indrating wefBanking H

II : LOW SID

Installationcharge & electrical c

Removing A/C at nefilling compper item Ncomplete

Referigeraindoor to ounit with Kable/Havethick NitrMake. Phoand Bank'

25/32 mm - schedulefor water o

Misc. civil wof the sam

Providing, with M.S [Drawing s

LESS BUYBuy Back of

1.50TR wa

Existing Co

Note:

Associates

OF QUANTIT

BILLSSCRIPTION

CHINE

1.5 TR Hiwdustries/ Tof 1-1-18).

Hall]

DE WORK

n of IDU & Ocommission

cable for indo

and Reinstaew location plete as direNo 3] Shiftias directed

nt piping - iout door unit2.5 Sqmm ells/CEI makrite rubber iotograph of 's Engineer

Dia UPVC de 40 pipe, woutlet from ind

work like wae to the origi

Fabricate ancage for lock

shall be provi

Y BACK OF f following Old

all mounted S

opper Pipe/E

TIES FOR AIAT BANT

S OF QUA

wall split unitshiba/ Tran Machine s

DU of 1.50Ting etc. (Inc

oor to Out do

allation chargincluding cocted.[Entire ng includin [ For Bank

insulated 0.8t beyond 5 R3 Core copke. The coinsulated ofPiping and before Insta

drain pipe white in coloudoor unit.

all opening toinal finish as

nd Fixing M.king of outdoided to L1 Bi

OLD MATERd Existing item

Split A/C (Ind

Electric cable

63

R CONDITIOTWA BRANCNTITIES (

t Make: Carne/ Voltas/ Bshall have

TR/1.00TR cluding 5 meoor unit).

ges for existinonnection senew copper

ng indoor aking Hall)

80mm wall tRmt dist. Of pper flexible opper pipingf 'O' ClassIts Cross S

allation.

with insulatiour, joint pro

o pass ducts s per the site.

S stand foroor unit of Spdder).

RIAL m including w

door/Outdoo

e/Drain Pipe/

ONING WOCH, DIST. JUNot to be

rrier, HitachBlue Star (3

copper co

Hiwall split eter free ins

ng 1.50 TR Hrvicing, wasr piping andand outdoor

thicknees c1.0 / 1.5 TRcable of FR

g shall be is of K Flaxection Need

on of Dutronoperly glued

& pipes, pla.

r keeping outplit A/C. inclu

with removal

or Unit)

/ MS or Powd

RK OF STATUNAGADHe Filled by

hi, Daikin, M STAR, Inveondensor

unit with firssulated copp

High wall moshing of all u drain shall br with MS s

copper tube R / 2.00 TR HRLS type Fiinsulated wx/Armaflex/ d to send to

/Supreme/As with UPVC

astering and

tdoor unit of uding paintin

from existing

der Coated s

TE BANK OF

the Bidde

Mitsubishi erter BEE Unit [For

st oil & gas per tube &

unted split unit & gas be paid as stand etc

between Hiwall split nolex/R R

with 6 mm Superlon Architect

stral make adhesive

refinishing

Split A/C. ng

Premises

stands

F INDIA,

er) QUANTITY

6

6

6

75

65

1

12

2

1

UNIT

No

No.

No.

Mtr

Mtr

LOT

No.

NO

L.S

Page 64: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

Ar

r. Vijay Sah

1 2

3

4

5

6

7 8

ijwani And A

ALL RATES S

1 Year of tofor compreOnly 1 sing

Rate quote1.00 , 1.50

The StandaRefrigeranmachines deducted The Entire Project mo

Electrical C

The contratime of combe rectifieddeposit, or

Associates

SHOULD BE IN

otal Machineessor & Machgle order will

ed in the tend0 & 2.00 tonn

ard installatiot pipe,, Electshall be mand differenJob Shall be

ore particlular

Cable FRLS

actor will attemplain If thed by the Bankr any other m

NCLUDE OF AL

e unconditionhine PCB. W be placed fo

der should benes. star ratin

on charge fotrical Wiring easured andnce shall bee Excuted in ry with the F

Type ( Finole

nd to all defe contractor fak and the ex

money due on

64

LL TAXES EXCL

nal warranty Warranty shal

or both supp

e for 3 star, Ing for casset

or the high w[Copper Pipd standard

e paid] Total Co. Oalse Ceiling

ex/ KEI/ RR

ects noticed ails to attendpenditure incn to time.

LUDING GOOD

with 6 free sl be providedly & installat

Inverter ratin unit shall be

wall split A.C pe and Elect

Length for

rdination withand Electrica

Kable/Havel

during defecd to the defeccurred on thi

D AND SERVI

services and d by the suppion work.

ng machines e as per BEE

& casset unitric cable tor all the new

h the Other Aal work.

lls)

ct liability percts within 24 s account wi

CE TAX (GST)

5 year uncoplier.

with copper E 2018

it shall includotal length fw AC machi

Agencies Wo

riod. Within 2hours time t

ill be recover

nditional war

condenser u

de 5 meter Efor all new Aines shall b

orking on thi

24 hours fromthese defectsred from sec

rranty

unit for

Each of AC be

is

m the s will

curity

Page 65: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7
Page 66: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7
Page 67: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7
Page 68: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7
Page 69: PART CHNICAL BID...vijay sa ijwani &. engine pprova near st 80009 ph olution ocal he dabad-3 lf of sb wa bran supplie ry up t ct: hijwani associa ers,inte l valuer adium ci one. no7

DETAILS OF MS STAND WITH CAGE FOR OUTDOOR AC UNIT[1] 30 X 30 X 3 MM MS ANGLE [2] 20 X 3 MM MS FLAT

[3] STAND SIZE :Approx. Size 35” X 21” [4] MS CAGE : Approx. Size 35” X 15” X 24”HT.