Page 1: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

Newcastle Urban Renewal Strategy 201

Part six

Implementation

6.1 Implementation plan 202

Page 2: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

202 Newcastle Urban Renewal Strategy

OverviewTo achieve real change and realise the potential of the city centre, the initiatives already discussed will need to be implemented over time, by a number of stakeholders. Some initiatives will have more impact on their own or will be catalysts for others with significant flow-on effects.

Ultimately, renewal will rely on the co-operation of a range of stakeholders including State government, local government, the private sector and the community. The implementation timeframe will commence in the short-term, but will then look towards medium and long-term actions for delivery over the life of the plan.

Some initiatives will be implemented more readily than others. Planning-focused initiatives, such as amending the LEP and DCP as well as development and marketing of economic and transport related strategies, can commence and be delivered in the short-term. Delivery of physical improvements will be more gradual over a longer period of time. Some physical improvements are suited to being trialled in a temporary form to gauge their effectiveness, for example, the Hunter Street upgrade. Aspects of this include introduction of activity nodes and extra landscaping in small sections of Hunter Street and use of temporary materials to trial the Hunter Street cycleway. This approach has the benefit of allowing ideas to be tested, being lower in cost and not involving major works or changes to the existing street infrastructure.

The implementation framework groups the initiatives as follows:

1. planning framework amendments

2. physical improvements to the public domain

3. economic

4. transport-related.

The framework covers the strategic initiatives contained within this urban renewal strategy, along with an indication of the main agencies and

6.1 Implementation plan

organisations involved in delivery and timeframes divided into short (1 – 3 years), medium (3 – 8 years) and long term (more than 8 years).

TransportWhere Transport for NSW (TNSW) is nominated against an action in the plan, it is recommended that they consider and investigate the action further in their preparation of the NSW Long Term Transport Master Plan and any subsequent regional transport plan. These actions have been identified as being beneficial for and supporting urban renewal as part of this process. On this basis, the NSW Long Term Transport Master Plan should consider these actions, but, it may arrive at different conclusions that build on or differ from them.

Catalyst projectsThe following key initiatives will have significant short-term benefits as well as being catalysts to stimulate wider change in the city centre:

• expanding the university campus in the city centre

• revitalisation of Hunter Street Mall and adjacent major land holdings

• reshaping Hunter Street as a key city destination

• promoting enhanced connections across the rail corridor

• attracting more residents into the city centre

• promoting a higher mode shift to public transport.

The following diagram and series of maps show how implementation of the strategies and initiatives can catalyse renewal in the city centre over time. In particular, the commencement of temporary measures and commitment to catalyst projects will have a range of flow-on effects that lead to long terms gains.

Page 3: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

Newcastle Urban Renewal Strategy 203

Esta

blis

hing

the

fr

amew

ork

Sta

rtin

g th

e pr

oces

s

west end

Enha

ncin

g co

nnec

tions

civiceast endHunter Street

Putt

ing

in p

lace

te

mpo

rary

mea

sure

sC

atal

yst

proj

ects

Flow

on

effe

cts

Long

ter

m g

ains

Mix

ed u

se r

esid

entia

l de

velo

pmen

t

Plan

ning

fr

amew

ork

amen

dmen

ts

Hun

ter

Str

eet

tem

pora

ry

cycl

eway

Prom

otin

g pu

blic

and

ac

tive

tran

spor

t

Hun

ter

Str

eet

tem

pora

ry

activ

ity z

ones

Man

agin

g pa

rkin

g de

man

d

New

cast

le

econ

omic

st

rate

gyFu

ll lin

e su

perm

arke

t an

d di

scou

nt d

epar

tmen

t st

ore

in e

ast en

d

Impr

ove

conn

ectio

ns

at C

ivic

, Ea

st E

nd, an

d Pe

rkin

s Str

eet

Impr

ove

conn

ectio

ns a

t M

erew

ethe

r Str

eet

and

Cen

tena

ry R

oad

Esta

blis

h ne

w c

onne

ctio

n at

Ste

el S

tree

t

Esta

blis

h ne

w c

onne

ctio

n at

Wor

th P

lace

and

Cot

tage

C

reek

Hun

ter

Str

eet

upgr

ade

- ea

st e

nd - s

tage

1H

unte

r Str

eet

upgr

ade

-

civi

c - st

age

2H

unte

r Str

eet

upgr

ade

-

wes

t en

d - fin

al s

tage

Sch

ool o

f A

rts

rede

velo

pmen

t

Cro

wn

Str

eet

upgr

ade

Bolto

n Str

eet ca

rpar

k

rede

velo

pmen

t

Oce

an B

aths

ren

ovat

ion

Dev

onsh

ire S

tree

t up

grad

e

Com

mer

cial

dev

elop

men

ts

Form

er N

ewca

stle

Mus

eum

re

deve

lopm

ent

Bird

woo

d Pa

rk u

pgra

de

Red

evel

opm

ent of

maj

or la

nd-

hold

ings

in the

Mal

l - s

tage

1Red

evel

opm

ent of

maj

or la

nd-

hold

ings

in the

Mal

l - fin

al s

tage

s

Hun

ter

Str

eet

Mal

l upg

rade

Foot

brid

ge u

pgra

de

Att

ract

ing

mor

e re

side

nts

Lane

way

s up

grad

e

Whe

eler

Pla

ce a

nd C

ivic

Sta

tion

fore

cour

t up

grad

e

Civ

ic P

ark

upgr

ade

Empo

rium

red

evel

opm

ent

Sm

all m

ixed

use

re

deve

lopm

ents

Vic

toria

The

atre

ren

ovat

ion

New

cast

le U

nive

rsity

- c

ity

cam

pus

deve

lopm

ent

Stu

dent

hou

sing

Form

er S

tar

Hot

el

rede

velo

pmen

t

Cou

rts

relo

catio

n

Cou

rts

supp

ort

serv

ices

re

loca

tion

Cot

tage

Cre

ek u

pgra

de -

stag

e 1

Cot

tage

Cre

ek u

pgra

de -

stag

e 2

Bul

ky g

oods

Inte

rsec

tion

upgr

ades

Sto

res

site

red

evel

opm

ent -

stag

e 1

Sto

res

site

red

evel

opm

ent -

stag

e 2

Cyc

list

end-

of-t

rip

faci

litie

s

Hun

ter

Str

eet

Mal

l de-

clut

ter

and

prom

ote

as

even

ts s

pace

shor

t te

rmm

ediu

m t

erm

long

ter

m

Page 4: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

204 Newcastle Urban Renewal Strategy

West end bulky goods retail

Short-term measuresNewcastle 2015

1 - 3 years

Planning framework amendments increase in max FSR for mixed use development promoting more residents

Review carparking rates for heritage buildings

Newcastle economic strategy City centre branding and marketing strategy, cultural infrastructure action plan, and business improvement plan.

Wickham master plan review

new residentialWickham station relocation and termination of rail services west of Stewart Avenue, located adjacent to emerging CBD

Public transport mode shift more customers, integrated ticketing, peak clearways, bus priority at intersections

Manage parking demand car pooling, carshare scheme, review commuter carpark controls, workplace travel plans, behavioural change programs, cap car-parking, review tariffs, and reinvest in sustainable transport.

Page 5: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

Newcastle Urban Renewal Strategy 205

East end boutique retail destination, entertainment, leisure and residential. New full line supermarket and discount department store

Hunter Street Mall declutter, plan, and promote and use as key event space

Civic government, cultural and education activity hub

cyclist end-of-trip facilities

improve connectivity

uni campus

new residential

Planning framework amendments increase in max FSR for mixed use development promoting more residents

Hunter Street temporary measures cycleway, activity platforms, planter boxes, stencilling, Parking Day, plan and detail permanent upgrade

Page 6: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

206 Newcastle Urban Renewal Strategy

Medium-term measures

Wheeler Place and Civic forecourt upgrade Hunter Street crossing

Newcastle 2020

3 - 8 years

Cottage Creek Stage 1 and 2

remove 681 Hunter Street

Hunter Street permanent upgrade, footpath widening, bus stop upgrade, permanent cycleway, landscaping

Intersection upgrades

Page 7: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

Newcastle Urban Renewal Strategy 207

Hunter Street Mall permanent upgrade

Improve connection

Laneways upgrade

Intersection upgrades

Victoria Theatre

Crown Street upgrade

Page 8: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

208 Newcastle Urban Renewal Strategy

improve connection

Cottage Creek Stage 3 and 4

cyclist end-of-trip facilities

Birdwood Park upgrade

Devonshire Street

West end commercial core

new residential

Long-term measuresNewcastle 2025 - 2036

more than 8 years

Stores Place upgrade

Hunter Street permanent upgrade, footpath widening, bus stop upgrade, permanent cycleway, landscaping

Page 9: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

Newcastle Urban Renewal Strategy 209

10,000 additional jobs

6,000 additional dwellings

Page 10: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

210 Newcastle Urban Renewal Strategy

This

tabl

e us

es th

e fo

llow

ing

acro

nym

s to

refe

r to

agen

cies

and

ent

ities

: C

oN:

C

ity o

f New

cast

le

R

MS:

Roa

ds a

nd M

ariti

me

Ser

vice

s D

P&I:

D

epar

tmen

t of P

lann

ing

and

Infra

stru

ctur

e

TN

SW:

Tr

ansp

ort f

or N

ew S

outh

Wal

es

MSB

:

Min

e Su

bsid

ence

Boa

rd

U

oN:

U

nive

rsity

of N

ewca

stle

N

SWT&

I: N

ews

Sou

th W

ales

Tra

de a

nd In

vest

men

t

HD

C:

H

unte

r Dev

elop

men

t Cor

pora

tion

RD

A H

unte

r:

Reg

iona

l Dev

elop

men

t Aus

tralia

Hun

ter

Not

e: n

omin

ated

age

ncie

s w

ill ha

ve v

aryi

ng d

egre

es o

f inv

olve

men

t in

deliv

ery

of th

ese

initi

ativ

es. T

his

tabl

e sh

ows

a le

ad a

genc

y w

ith th

e m

ain

supp

ort a

genc

y in

bra

cket

s.

Tim

efra

me

Initi

ativ

e R

espo

nsib

ility

Sh

ort

Med

ium

Lo

ng

Plan

ning

fram

ewor

k am

endm

ents

Fina

lise

amen

dmen

ts to

the

New

cast

le L

EP

to fa

cilit

ate

and

supp

ort t

he re

new

al in

itiat

ives

D

P&

I (C

oN)

Prep

are

a co

nsol

idat

ed D

CP

inco

rpor

atin

g th

e pr

opos

ed a

men

dmen

ts in

clud

ing

the

addi

tion

of S

peci

al

Are

a co

ntro

ls, f

or e

xhib

ition

and

ado

ptio

n D

P&

I (C

oN)

Am

end

the

Civ

ic I

mpr

ovem

ent

Pla

n an

d se

ctio

n 94

A c

ontri

butio

ns p

lan

to i

nclu

de t

he a

men

ded

sche

dule

to fu

nd in

itiat

ives

D

P&

I (C

oN)

Rev

ise

the

Low

er H

unte

r Reg

iona

l Stra

tegy

to:

DP

&I

en

sure

the

prim

acy

of th

e ci

ty c

entre

is re

cogn

ised

and

stre

ngth

ened

re

flect

upd

ated

jobs

and

hou

sing

targ

ets

Rev

ise

City

of N

ewca

stle

pla

nnin

g do

cum

ents

to:

CoN

en

sure

the

prim

acy

of th

e ci

ty c

entre

is re

cogn

ised

and

stre

ngth

ened

en

sure

that

gro

wth

of c

entre

s ou

tsid

e of

the

city

cen

tre ta

kes

into

con

side

ratio

n th

e ec

onom

ic

impa

ct o

n th

e ci

ty c

entre

in

corp

orat

e pu

blic

dom

ain

upgr

ades

into

the

Pub

lic D

omai

n M

anua

l

Und

erta

ke d

etai

led

mas

ter p

lann

ing

of W

ickh

am to

det

erm

ine

the

suita

bilit

y of

the

zoni

ng, D

CP

publ

ic

thor

ough

fare

s an

d ot

her p

lann

ing

mea

sure

s C

oN

Inve

stig

ate

carp

arki

ng r

ates

for

non

-res

iden

tial

and

herit

age

build

ings

and

vis

itor

carp

arki

ng f

or

resi

dent

ial,

and

amen

d D

CP

acc

ordi

ngly

D

P&

I, (C

oN)

Impl

emen

t pl

anni

ng fr

amew

ork

amen

dmen

ts th

roug

h th

e de

velo

pmen

t ass

essm

ent p

roce

ss

CoN

O

ngoi

ng

Page 11: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

Newcastle Urban Renewal Strategy 211

Tim

efra

me

Initi

ativ

e R

espo

nsib

ility

Sh

ort

Med

ium

Lo

ng

Phys

ical

impr

ovem

ents

to th

e pu

blic

dom

ain

Iden

tify

and

purs

ue a

ltern

ativ

e fu

ndin

g so

urce

s (e

.g. g

rant

s) to

exp

edite

impl

emen

tatio

n of

bot

h te

mpo

rary

and

per

man

ent u

pgra

des

CoN

O

ngoi

ng

Incl

ude

the

reco

mm

ende

d ph

ysic

al i

mpr

ovem

ents

in

the

City

of

New

cast

le’s

for

war

d pl

anni

ng,

incl

udin

g its

cap

ital w

orks

pro

gram

C

oN

Ong

oing

Hun

ter S

tree

t Mal

l

Upg

rade

the

Hun

ter S

treet

Mal

l in

acco

rdan

ce w

ith J

MD

con

cept

des

igns

and

the

City

of N

ewca

stle

’s

Publ

ic D

omai

n M

anua

l: C

oN (R

ailc

orp)

re

mov

e m

arke

t stru

ctur

es a

nd fr

eest

andi

ng a

dver

tisem

ents

and

sig

ns a

s an

initi

al m

easu

re

CoN

es

tabl

ish

perm

anen

t upg

rade

s C

oN

up

grad

e th

e la

new

ay n

etw

ork

behi

nd th

e m

all

CoN

up

grad

e th

e pe

dest

rian

link

brid

ge to

the

wat

erfro

nt a

nd a

ssoc

iate

d w

orks

in th

e sq

uare

suc

h as

est

ablis

hing

law

n te

rrace

s C

oN (R

ailC

orp)

Whe

eler

Pla

ce a

nd C

ivic

Upg

rade

Whe

eler

Pla

ce a

nd C

ivic

in

acco

rdan

ce w

ith J

MD

con

cept

des

igns

and

Cou

ncil’

s Pu

blic

D

omai

n M

anua

l: C

oN

W

heel

er P

lace

C

oN

C

ivic

fore

cour

t C

oN

o

pain

ting

acro

ss fo

reco

urt l

oop

road

and

traf

fic is

land

to u

nify

spa

ce

CoN

o

inst

all t

empo

rary

sha

red

zone

C

oN

o

tem

pora

ry o

r per

man

ent c

losu

re o

f for

ecou

rt lo

op ro

ad

CoN

H

unte

r Stre

et c

ross

ing

CoN

o

cris

s-cr

oss

or h

oney

com

b pa

ttern

pai

ntin

g of

road

sur

face

C

oN

o

new

traf

fic li

ghts

opp

osite

thea

tre to

faci

litat

e pe

dest

rian

mov

emen

t C

oN

Page 12: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

212 Newcastle Urban Renewal Strategy

Tim

efra

me

Initi

ativ

e R

espo

nsib

ility

Sh

ort

Med

ium

Lo

ng

Cot

tage

Cre

ek C

orrid

or

Upg

rade

Cot

tage

Cre

ek i

n ac

cord

ance

with

JM

D c

once

pt d

esig

ns a

nd C

ounc

il’s

publ

ic d

omai

n m

anua

l: C

oN (l

ando

wne

r, H

DC

)

re

mov

e st

ruct

ure

at 6

81 H

unte

r Stre

et

CoN

(lan

dow

ner)

H

unte

r Stre

et to

rail

line

CoN

K

ing

Stre

et to

Par

ry S

treet

C

oN

H

unte

r Stre

et to

Kin

g S

treet

C

oN

R

ail c

orrid

or to

Hon

eysu

ckle

Driv

e C

oN (H

DC

)

H

oney

suck

le D

rive

to fo

resh

ore

CoN

(HD

C)

N

atio

nal P

ark

CoN

Upg

rade

Bird

woo

d Pa

rk in

acc

orda

nce

with

JM

D c

once

pt d

esig

ns a

nd C

ounc

il’s

publ

ic d

omai

n m

anua

l C

oN

Hun

ter S

tree

t upg

rade

Hun

ter S

treet

upg

rade

in a

ccor

danc

e w

ith J

MD

con

cept

des

igns

and

Cou

ncil’s

pub

lic d

omai

n m

anua

l: C

oN

Tem

pora

ry m

easu

res

U

nder

take

det

aile

d pl

anni

ng to

det

erm

ine

prio

rity

proj

ects

and

loca

tions

C

oN

C

omm

ence

impl

emen

tatio

n of

the

Hun

ter S

treet

upg

rade

with

tem

pora

ry w

orks

and

mat

eria

ls

in s

elec

ted

loca

tions

to tr

ial v

ario

us e

lem

ents

of t

he p

ropo

sed

upgr

ade:

C

oN

o

cycl

eway

, inc

ludi

ng s

tenc

illed

/col

oure

d as

phal

t and

bol

lard

s/se

para

tion

devi

ces

CoN

(RM

S)

o

activ

ity p

latfo

rms,

incl

udin

g pl

ante

r box

es a

nd s

eatin

g C

oN

o

land

scap

ing

and

trees

in p

lant

er b

oxes

at i

nter

vals

in th

e pa

rkin

g la

ne

CoN

o

road

clo

sure

to

faci

litat

e ev

ents

suc

h as

Nat

ure

Cap

itale

(on

ly a

pplic

able

to 1

or

2 la

nes)

C

oN

o

seas

onal

pro

gram

suc

h as

PA

RKi

ng D

ay

CoN

(Ren

ew N

ewca

stle

)

Page 13: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

Newcastle Urban Renewal Strategy 213

Tim

efra

me

Initi

ativ

eR

espo

nsib

ility

Shor

tM

ediu

mLo

ng

Per

man

ent m

easu

res

•E

ast e

nd b

etw

een

New

com

en S

treet

and

Pac

ific

Park

CoN

•E

ast e

nd b

etw

een

Per

kins

and

Dar

by S

treet

s, in

clud

ing

the

Cro

wn

Stre

et u

pgra

deC

oN

•C

ivic

bet

wee

n D

arby

and

Uni

on S

treet

sC

oN

•C

ivic

bet

wee

n U

nion

and

Ste

el S

treet

sC

oN

•D

evon

shire

Stre

et p

edes

trian

lane

way

CoN

•W

est e

nd b

etw

een

Ste

el S

treet

and

Ste

war

t Ave

nue

CoN

•W

est e

nd b

etw

een

Ste

war

t Ave

nue

and

Tudo

r Stre

et, i

nclu

ding

the

Sto

res

site

pub

lic d

omai

n up

grad

eC

oN

•U

pgra

de b

us s

tops

inc

ludi

ng l

ight

ing,

she

lter

and

impr

oved

sig

nage

with

pub

lic t

rans

port

info

rmat

ion

CoN

(New

cast

le B

uses

)

oE

ast e

nd

oC

ivic

oW

est e

nd

See

k fu

ndin

g th

roug

h gr

ants

pro

gram

s fo

r ear

lier i

mpl

emen

tatio

n of

initi

ativ

esC

oN

Page 14: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

214 Newcastle Urban Renewal Strategy

Tim

efra

me

Initi

ativ

eR

espo

nsib

ility

Shor

tM

ediu

mLo

ng

Econ

omic

initi

ativ

es

Sup

port

and

deliv

er th

e pa

rtial

relo

catio

n of

the

Uni

vers

ity o

f New

cast

le b

y m

ovin

g th

e fa

culti

es o

f B

usin

ess

and

Law

or o

ther

facu

lties

into

the

city

cen

treU

oN(C

oN,

Com

mon

wea

lth

Gov

ernm

ent,

NSW

G

over

nmen

t)

Pre

pare

a n

ew N

ewca

stle

Eco

nom

ic S

trate

gyfo

rthe

city

cen

tre, i

nclu

ding

:C

oN(N

SW T

&I,

HD

C,

RD

A H

unte

r, R

enew

N

ewca

stle

)

•a

com

preh

ensi

ve b

rand

ing

and

mar

ketin

g st

rate

gy th

at fo

cuse

s on

the

city

cen

tre a

s th

e pr

emie

r com

mer

cial

, ret

ail a

nd e

nter

tain

men

t cen

tre o

f the

Low

er H

unte

rC

oN(N

SW T

&I,

RD

A

Hun

ter)

•de

velo

pmen

t of a

targ

eted

dev

elop

men

t act

ion

plan

to re

cogn

ise

and

prom

ote

cultu

ral

infra

stru

ctur

e an

d cu

ltura

l ind

ustri

es a

nd th

e im

porta

nt ro

le th

ey p

lay

in th

e ci

ty c

entre

CoN

(NSW

T&

I-A

rts

NSW

, Ren

ew N

ewca

stle

)

•ap

poin

t a lo

cal b

usin

ess

coor

dina

tor a

nd d

evel

op a

Bus

ines

s Im

prov

emen

t Pla

n fo

r the

city

ce

ntre

CoN

(RD

A H

unte

r)

•pr

omot

eth

e H

oney

suck

le p

reci

nct a

s th

e pr

efer

red

loca

tion

for A

-gra

de o

ffice

dev

elop

men

tH

DC

(CoN

, NSW

T&

I)

•en

cour

age

and

prio

ritis

e ad

ditio

nal r

etai

l anc

hors

incl

udin

g a

full

line

supe

rmar

ket a

nd a

de

partm

ent s

tore

(or d

isco

unt d

epar

tmen

t sto

re),

pref

erab

ly in

the

east

end

C

oN(N

SW T

&I)

•pr

omot

eth

e ea

st e

nd a

s a

bout

ique

reta

il de

stin

atio

n, in

clud

ing

esta

blis

hing

Hun

ter S

treet

as

an ‘e

at s

treet

’ with

ext

ende

d ho

urs

into

the

even

ing

for n

ight

tim

e ac

tivat

ion,

and

und

erta

ke

plan

ning

for n

ew re

taile

rs in

the

Hun

ter S

treet

Mal

l

CoN

(NSW

T&

I-D

estin

atio

n N

SW)

•in

corp

orat

ing

Hun

ter

Stre

et M

all

as a

key

eve

nt s

pace

with

in b

road

er t

ouris

m a

nd e

vent

st

rate

gies

CoN

(NSW

T&

I-D

estin

atio

n N

SW)

•in

vest

igat

eop

portu

nitie

s fo

r bul

ky g

oods

reta

iling

in th

e w

est e

nd o

f the

city

cen

treC

oN (N

SW T

&I)

•de

fert

he p

aym

ent o

f sec

tion

94A

con

tribu

tions

for t

he c

ity c

entre

from

con

stru

ctio

n ce

rtific

ate

to o

ccup

atio

n ce

rtific

ate

(for a

five

year

tria

l per

iod)

CoN

•en

cour

age

addi

tiona

l res

iden

ts in

to th

e ci

ty c

entre

CoN

•su

ppor

t the

rest

orat

ion

of th

e V

icto

ria T

heat

re a

s a

perfo

rmin

g ar

ts v

enue

NSW

T&

I -A

rts N

SW,

(CoN

, lan

dow

ner)

Page 15: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

Newcastle Urban Renewal Strategy 215

Tim

efra

me

Initi

ativ

eR

espo

nsib

ility

Shor

tM

ediu

mLo

ng

•lim

it th

e ex

pans

ion

of o

ut o

f cen

tre re

tail

that

will

com

pete

with

the

city

cen

treC

oNO

ngoi

ng

•de

velo

p m

ore

deta

iled

guid

elin

es to

acc

ompa

ny th

e M

ine

Sub

side

nce

map

giv

ing

info

rmat

ion

abou

t mag

nitu

de o

f min

e w

orki

ngs

and

likel

y ex

tent

of g

rout

ing

MS

B

•de

velo

p gr

outin

g st

rate

gy fo

r key

dev

elop

men

t site

s or

blo

cks

MS

B (o

ther

sta

te

agen

cies

)

•an

y ot

her e

cono

mic

initi

ativ

es in

clud

ed in

par

t F

of th

e H

ill P

DA

repo

rtC

oN(N

SW T

&I,

HD

C)

Page 16: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

216 Newcastle Urban Renewal Strategy

Tim

efra

me

Initi

ativ

e R

espo

nsib

ility

Sh

ort

Med

ium

Lo

ng

Tran

spor

t and

acc

ess-

rela

ted

initi

ativ

es

Inve

stig

ate

the

prov

isio

n of

thre

e st

rate

gic

bus

corri

dors

pro

vidi

ng fa

st a

nd r

egul

ar s

ervi

ces

to e

nsur

e ef

ficie

nt jo

urne

y tim

es

TNS

W

Prom

ote

and

adve

rtise

ser

vice

s al

read

y of

fere

d an

d th

e ad

vant

ages

of p

ublic

tran

spor

t tra

vel

TNS

W (N

ewca

stle

Bus

es.

CoN

)

Intro

duce

int

egra

ted

ticke

ting

to p

rovi

de a

sim

ple,

con

veni

ent

way

to

pay

for

trave

l on

gov

ernm

ent

ferri

es, C

ityR

ail s

ervi

ces

and

buse

s an

d re

duce

ove

rall

jour

ney

times

, par

ticul

arly

boa

rdin

g on

bus

es

TNS

W

Inve

stig

ate

the

esta

blis

hmen

t of

pea

k cl

earw

ays

in t

he p

eak

dire

ctio

n to

allo

w f

or b

us la

nes,

giv

ing

publ

ic tr

ansp

ort a

mor

e ef

ficie

nt ro

ute:

TN

SW

(CoN

)

on

a te

mpo

rary

, tria

l bas

is

ba

sed

on re

sults

of t

rial,

impl

emen

t on

a pe

rman

ent b

asis

Inve

stig

ate

the

esta

blis

hmen

t of a

cyc

le e

nd-o

f-trip

faci

lity

in a

cen

tral l

ocat

ion

CoN

(priv

ate

sect

or)

Cat

er fo

r bo

th c

omm

uter

and

rec

reat

iona

l cyc

lists

with

the

crea

tion

of s

epar

ated

cyc

lew

ays

(Bat

hers

W

ay) a

s w

ell a

s on

-road

rout

es

CoN

Inve

stig

ate

the

impr

ovem

ent o

f ped

estri

an a

nd c

yclis

t con

nect

ivity

acr

oss

the

rail

line:

C

oN (T

NS

W)

up

grad

e of

exi

stin

g ca

r, pe

dest

rian

and

cycl

ist c

ross

ings

C

oN (T

NSW

)

co

nstru

ctin

g ne

w c

ross

ings

for p

edes

trian

s, c

yclis

ts a

nd c

ars

CoN

(TN

SW)

Inve

stig

ate

prio

ritis

atio

n of

ped

estri

an a

nd c

yclis

t mov

emen

t in

any

upgr

ades

to th

e w

ider

road

net

wor

k C

oN (T

NSW

, RM

S)

Ong

oing

Inve

stig

ate

pote

ntia

l for

bus

prio

rity

at k

ey in

ters

ectio

ns

TNS

W (C

oN)

Inve

stig

ate

intro

duct

ion

of a

bik

e sh

are

sche

me

CoN

Inve

stig

ate

impl

emen

tatio

n of

stra

tegi

c ro

ad u

pgra

des

in th

e fo

llow

ing

loca

tions

: C

oN

P

arry

Stre

et /

Ste

el S

treet

inte

rsec

tion

M

erew

ethe

r Stre

et /

Wor

ksho

p W

ay in

ters

ectio

n

P

arry

Stre

et /

Uni

on S

treet

inte

rsec

tion

H

oney

suck

le D

rive

near

Cot

tage

Cre

ek

Page 17: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

Newcastle Urban Renewal Strategy 217

Tim

efra

me

Initi

ativ

eR

espo

nsib

ility

Shor

tM

ediu

mLo

ng

•C

hurc

h St

reet

/ W

att S

treet

inte

rsec

tion

•H

anne

ll S

treet

/ H

oney

suck

le D

rive

Und

erta

ke e

duca

tion,

mar

ketin

g an

d pr

omot

ion

to r

aise

aw

aren

ess

thro

ugh

advo

cacy

to s

urro

undi

ng

busi

ness

es,

bran

ding

, im

prov

ed

publ

ic

reco

gniti

on

and

com

mun

icat

ion

thro

ugh

adve

rtisi

ng

and

com

mun

ity e

vent

s

TNSW

(New

cast

le B

uses

, C

oN)

Ong

oing

City

of

New

cast

leto

intro

duce

a st

aff

trave

l pla

n, p

rovi

de e

nd-o

f-trip

fac

ilitie

s an

d un

derta

ke r

egul

ar

trave

l sur

veys

to m

onito

r mod

e sh

iftfo

r the

ir ow

n st

aff

CoN

Incr

ease

unde

rsta

ndin

gof

city

use

rs t

hrou

gh r

esea

rch

to b

ette

r ap

prec

iate

mov

emen

t pa

ttern

s an

d es

tabl

ish

the

barri

ers

to b

ehav

iour

alch

ange

tha

t ex

ist

amon

gst

the

New

cast

le c

omm

unity

. C

onsi

der

crea

tion

of a

beh

avio

ural

chan

ge w

orki

ng p

arty

to

deve

lop

and

impl

emen

t a

beha

viou

ral

chan

ge

prog

ram

TNSW

(New

cast

le B

uses

, C

oN)

Inve

stig

ate

deve

lopi

ng a

wor

kpla

ce tr

avel

pla

n m

odel

TNSW

(CoN

)

Man

age

park

ing

dem

and

thro

ugh

an in

tegr

ated

sui

te o

f mea

sure

s:C

oN (T

NSW

)

•in

vest

igat

e su

ppor

ting

park

and

ride

alig

ned

with

freq

uent

or e

xpre

ss b

us s

ervi

ces

TNSW

(CoN

)

•im

plem

ent a

car

poo

ling

prog

ram

CoN

•in

vest

igat

e th

e in

trodu

ctio

n of

a c

ar s

hare

pro

gram

CoN

•im

plem

ent

a ca

r sh

are

prog

ram

an

d co

ncur

rent

re

duce

d ca

rpar

king

re

quire

men

ts

in

deve

lopm

ents

CoN

•ca

p ca

rpar

king

to 1

1,00

0 sp

aces

in th

e ci

ty c

entre

CoN

•co

nsid

er a

gra

dual

incr

ease

in lo

ng-s

tay

park

ing

tarif

fsC

oN

•co

nsid

er e

xpan

ding

com

mut

er c

arpa

rkin

g co

ntro

l to

are

as a

djoi

ning

the

city

cen

tre t

o di

scou

rage

com

mut

er c

arpa

rkin

g in

thos

e ar

eas

that

dis

adva

ntag

es re

side

nts

CoN

•co

nsid

er th

e us

e of

par

king

rev

enue

s to

inve

st in

initi

ativ

es th

at e

ncou

rage

mor

e su

stai

nabl

e fo

rms

of tr

ansp

ort s

uch

as c

ycle

way

sC

oN

•su

bseq

uent

to u

nder

taki

ng in

vest

igat

ions

, im

plem

ent f

inal

sui

te o

f mea

sure

sC

oN (T

NSW

)

Page 18: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

Abbreviations

City of Newcastle (CoN)

Department of Planning and Infrastructure (DP&I)

Hunter Development Corporation (HDC)

The State Environmental Planning Policy (Urban Renewal) 2010 (Urban Renewal SEPP)

Transport for NSW (TNSW)

Local Government Area (LGA)

Net lettable area (NLA)

Annual Exceedance Probability (AEP)

Flood Planning Level (FPL)

Australian Technology Park (ATP)

Business Improvement Plan (BIP)

Transport Management and Accessibility Plan (TMAP)

Local Environmental Plan (LEP)

EP&A Act

Floor Space Ratio (FSR)

Australian Height Datum (AHD)

Page 19: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

Newcastle Urban Renewal Strategy i

Page 20: Part six Implementation · The implementation framework groups the initiatives as follows: 1. planning framework amendments 2. physical improvements to the public domain 3. economic

Newcastle Urban Renewal Strategy