PARTICIPATION OF "Naftogaz Group" in the development of
WIND ENERGY IN UKRAINE 2017
«VUGLESYNTEZGAZ UKRAINE» AFFILIATED COMPANY
wind turbine
![Page 2: PARTICIPATION OF Naftogaz Group in the development of … · PARTICIPATION OF "Naftogaz Group" in the development of WIND ENERGY IN UKRAINE 2017 «VUGLESYNTEZGAZ UKRAINE» AFFILIATED](https://reader031.vdocuments.net/reader031/viewer/2022022115/5c76eabc09d3f2b0618c1cea/html5/thumbnails/2.jpg)
PROVIDES FOR THE
INTENSIVE DEVELOPMENT
OF RENEWABLE ENERGY
SOURCES
ENERGY STRATEGY OF UKRAINE
for the period up to 2035:
"Safety, energy efficiency, competitiveness“,
which was approved by the Ordinance
of Cabinet of Minister of Ukraine
№ 605-r dated August 18, 2017
![Page 3: PARTICIPATION OF Naftogaz Group in the development of … · PARTICIPATION OF "Naftogaz Group" in the development of WIND ENERGY IN UKRAINE 2017 «VUGLESYNTEZGAZ UKRAINE» AFFILIATED](https://reader031.vdocuments.net/reader031/viewer/2022022115/5c76eabc09d3f2b0618c1cea/html5/thumbnails/3.jpg)
SHARE OF RENEWABLE ENERGY
IN ENERGY STRATEGY OF UKRAINE - 2035
млн т н.е.
0,1
1
2
5
2015 р.
2020 р.
2025 р.
2035 р.
2030 р.
![Page 4: PARTICIPATION OF Naftogaz Group in the development of … · PARTICIPATION OF "Naftogaz Group" in the development of WIND ENERGY IN UKRAINE 2017 «VUGLESYNTEZGAZ UKRAINE» AFFILIATED](https://reader031.vdocuments.net/reader031/viewer/2022022115/5c76eabc09d3f2b0618c1cea/html5/thumbnails/4.jpg)
wind turbine
THE MAIN ACTIVITIES FOR THE
IMPLEMENTATION OF STRATEGIC
OBJECTIVES IN RES SECTOR
INCLUDE STABLE AND
PREDICTABLE POLICY AS
FOR STIMULATING THE
CONSTRUCTION OF SOLAR
AND WIND PLANTS
![Page 5: PARTICIPATION OF Naftogaz Group in the development of … · PARTICIPATION OF "Naftogaz Group" in the development of WIND ENERGY IN UKRAINE 2017 «VUGLESYNTEZGAZ UKRAINE» AFFILIATED](https://reader031.vdocuments.net/reader031/viewer/2022022115/5c76eabc09d3f2b0618c1cea/html5/thumbnails/5.jpg)
DEVELOPMENT OF WIND ENERGY BY OTHER OIL AND GAS
COMPANIES IN THE WORLD
2016: 3.0 GW
2020: 6.5 GW
2022: 1950 MW
United States
425 MW
2.259 MW 2009:
16,5 MW
4.8 GW
![Page 6: PARTICIPATION OF Naftogaz Group in the development of … · PARTICIPATION OF "Naftogaz Group" in the development of WIND ENERGY IN UKRAINE 2017 «VUGLESYNTEZGAZ UKRAINE» AFFILIATED](https://reader031.vdocuments.net/reader031/viewer/2022022115/5c76eabc09d3f2b0618c1cea/html5/thumbnails/6.jpg)
NAFTOGAZ GROUP IS CONSIDERING
various opportunities for further development, including entering new segments in accordance with global trends in energy sector, in particular
RENEWABLE ENERGY
![Page 7: PARTICIPATION OF Naftogaz Group in the development of … · PARTICIPATION OF "Naftogaz Group" in the development of WIND ENERGY IN UKRAINE 2017 «VUGLESYNTEZGAZ UKRAINE» AFFILIATED](https://reader031.vdocuments.net/reader031/viewer/2022022115/5c76eabc09d3f2b0618c1cea/html5/thumbnails/7.jpg)
WIND ENERGY OF UKRAINE IN THE STRATEGY OF “NAFTOGAZ GROUP” SMALL SCALE DEVELOPMENT
Small projects 10-20 MW - minimal capacity
to gain scale benefits
Сарех
26 mln dol.
Advantages
Insignificant Capex
Ability to gradually build capacity in RE
Expected reduction of CAPEX in the near future - possibility for implementation of large profitable projects
Disadvantages Low NPV due to small size
![Page 8: PARTICIPATION OF Naftogaz Group in the development of … · PARTICIPATION OF "Naftogaz Group" in the development of WIND ENERGY IN UKRAINE 2017 «VUGLESYNTEZGAZ UKRAINE» AFFILIATED](https://reader031.vdocuments.net/reader031/viewer/2022022115/5c76eabc09d3f2b0618c1cea/html5/thumbnails/8.jpg)
WIND ENERGY OF UKRAINE IN THE STRATEGY OF “NAFTOGAZ GROUP”
FULL-SCALE DEVELOPMENT
Construction of large wind plants - up to
200 mw each
Сарех 264 mln dol.
Advantages
Relatively high NPV
Disadvantages Relatively high САРЕХ
![Page 9: PARTICIPATION OF Naftogaz Group in the development of … · PARTICIPATION OF "Naftogaz Group" in the development of WIND ENERGY IN UKRAINE 2017 «VUGLESYNTEZGAZ UKRAINE» AFFILIATED](https://reader031.vdocuments.net/reader031/viewer/2022022115/5c76eabc09d3f2b0618c1cea/html5/thumbnails/9.jpg)
UKRAINE WIND MAP
ecosvit.net
![Page 10: PARTICIPATION OF Naftogaz Group in the development of … · PARTICIPATION OF "Naftogaz Group" in the development of WIND ENERGY IN UKRAINE 2017 «VUGLESYNTEZGAZ UKRAINE» AFFILIATED](https://reader031.vdocuments.net/reader031/viewer/2022022115/5c76eabc09d3f2b0618c1cea/html5/thumbnails/10.jpg)
NECESSARY COMPETENCIES NEEDED FOR THE IMPLEMENTATION
OF WIND ENERGY PROJECTS
Site selection, approvals obtaining
Interaction with regulator and stakeholders
Selection of contractors and subcontractors
Technology knowledge
Access to low-cost financing
Experience of project financing at the expense of international financial institutions
Attracting a strategic partner at the stage of business scaling
Capabilities in large-scale construction
Grid connection
Supply management
Experience in engaging EPC-contractors
Maintenance planning and execution
Production monitoring and performance diagnostics
Energy production forecasting
PROJECT DEVELOPMENT STRUCTURING AND FUNDING CONSTRUCTION OPERATIONAL ACTIVITY
![Page 11: PARTICIPATION OF Naftogaz Group in the development of … · PARTICIPATION OF "Naftogaz Group" in the development of WIND ENERGY IN UKRAINE 2017 «VUGLESYNTEZGAZ UKRAINE» AFFILIATED](https://reader031.vdocuments.net/reader031/viewer/2022022115/5c76eabc09d3f2b0618c1cea/html5/thumbnails/11.jpg)
NAFTOGAZ HAS
ALREADY HAD 90% of the competencies necessary
for the successful development
of wind energy business
![Page 12: PARTICIPATION OF Naftogaz Group in the development of … · PARTICIPATION OF "Naftogaz Group" in the development of WIND ENERGY IN UKRAINE 2017 «VUGLESYNTEZGAZ UKRAINE» AFFILIATED](https://reader031.vdocuments.net/reader031/viewer/2022022115/5c76eabc09d3f2b0618c1cea/html5/thumbnails/12.jpg)
PROBLEMATIC ISSUES OF UKRAINIAN WIND ENERGY DEVELOPMENT
APPROVAL FINANCING CONNECTION
Complexity of obtaining land plots for the construction of wind plants and
obtaining permits
Complexity of obtaining low-cost long funding
Complexity of document issuing. Excessive technical requirements
for connection specifications
![Page 13: PARTICIPATION OF Naftogaz Group in the development of … · PARTICIPATION OF "Naftogaz Group" in the development of WIND ENERGY IN UKRAINE 2017 «VUGLESYNTEZGAZ UKRAINE» AFFILIATED](https://reader031.vdocuments.net/reader031/viewer/2022022115/5c76eabc09d3f2b0618c1cea/html5/thumbnails/13.jpg)
6, Khreschatyk Str., Kyiv, 01601
+380 44 279 5384 +380 44 278 8537
Reporter – Yurii Trofymenko
+380 97 603 6337
«VUGLESYNTEZGAZ UKRAINE» AFFILIATED COMPANY