participatory planning for a sustainable rosengård

56
Participatory planning for a sustainable Rosengård 2012-05-29 Moa Björnson, Environment dept, City of Malmö

Upload: peripheria

Post on 18-Dec-2014

447 views

Category:

Technology


2 download

DESCRIPTION

Participatory planning for a sustainable Rosengård

TRANSCRIPT

Page 1: Participatory planning for a sustainable Rosengård

Participatory planning for a sustainable Rosengård

2012-05-29 Moa Björnson, Environment dept, City of Malmö

Page 2: Participatory planning for a sustainable Rosengård

Image of Malmö

Page 3: Participatory planning for a sustainable Rosengård

Image of Rosengård

Page 4: Participatory planning for a sustainable Rosengård
Page 5: Participatory planning for a sustainable Rosengård

Physical investments Sustainability Participation

How do we change the image?

Page 6: Participatory planning for a sustainable Rosengård

Physical change to support positive sustainable development

Page 7: Participatory planning for a sustainable Rosengård

“… through a strong local process, together with strategic physical improvements starting the process of building a sustainable city by creating new social spaces, business premises, workplaces and an enhanced public space…”

Page 8: Participatory planning for a sustainable Rosengård
Page 9: Participatory planning for a sustainable Rosengård

Rosengård• 23 000 inhabitants• 50% employment• infrastrucutral barriers• 3 km from the City center• 35% under 20 years old• 111 nationalities – 50 different languages• 86% - other etnical background thanswedish

Page 10: Participatory planning for a sustainable Rosengård

Sustainable Rosengård- investment projects

Overall aim: create a leadingdemonstration area for urban renewal projects in Sweden and Europe

Total Sustainable Rosengård12 measuresInvestment 1 100 mSEKExternal funding 90 mSEK

Focus is on climate change, but the programme contributes strongly to social and economic integration.

Rosengårdurban

pathway

Food centerUrban

farmingRenovation

school

Renovation ice rink

Water use in rental

apartmentsDensification

Sustainable travels

Renewable RosengårdCleantechProgram managementDialogues Evaluation

CR

Sustainable Hilda

Page 11: Participatory planning for a sustainable Rosengård

Some examples of what we are doing and how we are working…

Page 12: Participatory planning for a sustainable Rosengård

Sustainable Hilda

Energy efficiencyRenewable energy

Economically sustainable

Socially sustainableClimate coaches

Page 13: Participatory planning for a sustainable Rosengård

Densification Rosengård

Sketch from Swecos report.The total area in red. First stage in green.

Semi-detached housesBusiness/ServiceSelf-constructionBuilding school

Page 14: Participatory planning for a sustainable Rosengård

Renewable Rosengård

6 MW Wind turbinesUrban wind turbinesCooperative ownershipDesign of periurban wind turbines

Page 15: Participatory planning for a sustainable Rosengård

ClimateSMART food center & urban gardening

Food education according to the SMART-conceptSmall scale urban farming

Foto: Linnea Wettermark

Page 16: Participatory planning for a sustainable Rosengård

Rosengårds ice rink &Värner Rydén school

Foto: Leif Johansson

EnergyOutdoor environmentOutdoor education

EnergyOutdoor environment

Water

Page 17: Participatory planning for a sustainable Rosengård

Sustainable travelling

Rosengård’s stationBus lanes etc as preparation for rail transport

Page 18: Participatory planning for a sustainable Rosengård

Rental apartments Herrgården

Water usage

Page 19: Participatory planning for a sustainable Rosengård

Cleantech

TestbedMarketingBusiness dialogue

Expo

Page 20: Participatory planning for a sustainable Rosengård

Rosengård urban pathway

Meeting places and Activity areaYouth – Young womenLighting from renewable energyIdentity of the pathGreening

Page 21: Participatory planning for a sustainable Rosengård

Physical & Mental linkbetween Rosengård & the rest of Malmö

Page 22: Participatory planning for a sustainable Rosengård
Page 23: Participatory planning for a sustainable Rosengård
Page 24: Participatory planning for a sustainable Rosengård
Page 25: Participatory planning for a sustainable Rosengård
Page 26: Participatory planning for a sustainable Rosengård
Page 27: Participatory planning for a sustainable Rosengård
Page 28: Participatory planning for a sustainable Rosengård
Page 29: Participatory planning for a sustainable Rosengård

Starting a participative process…

Page 30: Participatory planning for a sustainable Rosengård

City light: Rosengård

Page 31: Participatory planning for a sustainable Rosengård
Page 32: Participatory planning for a sustainable Rosengård
Page 33: Participatory planning for a sustainable Rosengård
Page 34: Participatory planning for a sustainable Rosengård

1500 ideas from more than 1000 citizens

Page 35: Participatory planning for a sustainable Rosengård

Focus on 3 new meeting places

Page 36: Participatory planning for a sustainable Rosengård

Empowerment of young girls

Page 37: Participatory planning for a sustainable Rosengård

The activity areaFrom parking lot to activity area

Page 38: Participatory planning for a sustainable Rosengård

With the help from young girls…

Can girls in Rosengård become the driving forces of positive change?

Page 39: Participatory planning for a sustainable Rosengård

Methods

• School visits• Design workshops• Events• 13 internships• Full scale test events

www.malmo.se/aktivitetsytan

Page 40: Participatory planning for a sustainable Rosengård
Page 41: Participatory planning for a sustainable Rosengård
Page 42: Participatory planning for a sustainable Rosengård

Full scale test events during the design process

Page 43: Participatory planning for a sustainable Rosengård
Page 44: Participatory planning for a sustainable Rosengård
Page 45: Participatory planning for a sustainable Rosengård
Page 46: Participatory planning for a sustainable Rosengård
Page 47: Participatory planning for a sustainable Rosengård

”I’ve never experienced anythinglike it. That we girls could dosomething this big, I think it’sgreat. I don’t think boys wouldhave done the same thing. I thinkwe girls should be proud of ourselves…”

Page 48: Participatory planning for a sustainable Rosengård

Interview with one of the girls

• http://www.euronews.com/2012/01/26/malmo-shows-off-its-green-regeneration/

Page 49: Participatory planning for a sustainable Rosengård

Physical change as a result of the process

Page 50: Participatory planning for a sustainable Rosengård
Page 51: Participatory planning for a sustainable Rosengård
Page 52: Participatory planning for a sustainable Rosengård
Page 53: Participatory planning for a sustainable Rosengård

activity area in 2013

Page 54: Participatory planning for a sustainable Rosengård

… the process continues…

Page 55: Participatory planning for a sustainable Rosengård

Participation throughout the process

Page 56: Participatory planning for a sustainable Rosengård

Thank you!

moa.bjö[email protected]

www.malmo.se/hallbararosengard