The Passivhaus Approach to Part L Compliance Dec 2013 Green Build Week Aughey O'Flaherty Architects

Upload: archie-odonnell

Post on 10-Jun-2015

219 views

Category:

Design


1 download

DESCRIPTION

Integrated Energy is a Passivhaus and low energy technical design consultancy. We design renewables based heating and ventilation systems for high end Ultra low energy residences.

TRANSCRIPT

Page 1: Passivhaus and Part L Low Energy Building

The Passivhaus Approachto Part L Compliance

Dec 2013Green Build Week

Aughey O'Flaherty Architects

Page 2: Passivhaus and Part L Low Energy Building
Page 3: Passivhaus and Part L Low Energy Building

Where

Does the Energy

Go?1

Page 4: Passivhaus and Part L Low Energy Building
Page 5: Passivhaus and Part L Low Energy Building
Page 6: Passivhaus and Part L Low Energy Building
Page 7: Passivhaus and Part L Low Energy Building
Page 8: Passivhaus and Part L Low Energy Building
Page 9: Passivhaus and Part L Low Energy Building

a tale of two standards

V

Page 10: Passivhaus and Part L Low Energy Building

Detached house compliance

Page 11: Passivhaus and Part L Low Energy Building

16 Air tight and vapour tight

Plans

Page 12: Passivhaus and Part L Low Energy Building

DoHELG 2010 regulatory Impact Analysis

RIA Dwelling ID Proposed House Minimum Compliance

House type 2 storey Detached

Vent MHRV Hole in wall vents

Wall U Value 0.15 0.14

Floor U-Value 0.12 0.15

Roof U-Value 0.135 0.12

Airtightness 0.64 ach’s 5m³/hr/m²

Window U-Value 0.9 W/m2K 1.1 W/m²K

Y Value 0.01 W/M2K 0.06 W/m²K

Heat + power LPG Gas boiler Gas boiler

Renewables 7m2 vac tubes 6.5m² SHW

Heat demand 38kWh/m2 A2 55kWh/m2 A3

EPC 0.3 0.4

Page 13: Passivhaus and Part L Low Energy Building

40%

20%

Permitted Design Energy

Space heat demand

2005 Regs

2008 Regs

2011 Regs

Passivhaus

Page 14: Passivhaus and Part L Low Energy Building

A wine bottle

Space heat demand

2005 Regs

2008 Regs

2011 Regs

Passivhaus

7.5kWhFull of oil

Page 15: Passivhaus and Part L Low Energy Building

Space and hot water heating oil per m2

Space heat demand

2005 Regs

2008 Regs

2011 Regs

Passivhaus

Page 16: Passivhaus and Part L Low Energy Building
Page 17: Passivhaus and Part L Low Energy Building
Page 18: Passivhaus and Part L Low Energy Building
Page 19: Passivhaus and Part L Low Energy Building

Passivhaus

solutionsto achieve

Part L 2011 compliance 2

Page 20: Passivhaus and Part L Low Energy Building

02 Detail

Page 21: Passivhaus and Part L Low Energy Building

03 Air Barrier

Page 22: Passivhaus and Part L Low Energy Building

02 Analysis

Page 23: Passivhaus and Part L Low Energy Building

26 Quality + Workmanship

Work outDetails before Tender to getControl of budget and Programme

Page 24: Passivhaus and Part L Low Energy Building
Page 25: Passivhaus and Part L Low Energy Building
Page 26: Passivhaus and Part L Low Energy Building
Page 27: Passivhaus and Part L Low Energy Building

25 Boundary with existing build

Page 28: Passivhaus and Part L Low Energy Building
Page 29: Passivhaus and Part L Low Energy Building
Page 30: Passivhaus and Part L Low Energy Building
Page 31: Passivhaus and Part L Low Energy Building

18 paper is cheap

Page 32: Passivhaus and Part L Low Energy Building
Page 33: Passivhaus and Part L Low Energy Building
Page 34: Passivhaus and Part L Low Energy Building

Renovate

andExtend3

Page 35: Passivhaus and Part L Low Energy Building
Page 36: Passivhaus and Part L Low Energy Building

24 Fabric Design

Overview

Page 37: Passivhaus and Part L Low Energy Building
Page 38: Passivhaus and Part L Low Energy Building
Page 39: Passivhaus and Part L Low Energy Building
Page 40: Passivhaus and Part L Low Energy Building

20 EnerPHit Refurb

Plans

Page 41: Passivhaus and Part L Low Energy Building

Apartments4

Page 42: Passivhaus and Part L Low Energy Building
Page 43: Passivhaus and Part L Low Energy Building

Mechanical5

Page 44: Passivhaus and Part L Low Energy Building
Page 45: Passivhaus and Part L Low Energy Building
Page 46: Passivhaus and Part L Low Energy Building
Page 47: Passivhaus and Part L Low Energy Building

Passivhaus

Page 48: Passivhaus and Part L Low Energy Building

10 Services Coordination

Plans

Page 49: Passivhaus and Part L Low Energy Building

32 Services Coordination and Fire Protection

Supply

Extract

External

Page 50: Passivhaus and Part L Low Energy Building

33 M+E

Overview

Page 51: Passivhaus and Part L Low Energy Building

Thank You

Overview