pathway to your dream home - amazon s3 · home shingled & windows installed mechanical roughs...

1
Finalize Plan Framing Complete & Interior Selections Home Shingled & Windows Installed Mechanical Roughs Installed Electrical & Low-Voltage Walk Pre-Drywall Walk Cabinets, Doors & Trim Woodwork Complete Welcome Home! Exterior Brick &/Or Stone Finished Concrete & Flatwork Walk, Landscaping Meeting Flatwork Poured & Landscaping Installed Carpet Installed Final Touch-Ups Countertops Are Installed! Let’s Start Painting! Tile Is Set Drywall Installed & Textured Orientation Walk-Through, Verfication & Closing Construction Starts, Exterior Selection Meeting Final Readline Plan Meeting Q5 Custom Homes Pathway to Your Dream Home

Upload: others

Post on 16-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pathway to Your Dream Home - Amazon S3 · Home Shingled & Windows Installed Mechanical Roughs Installed Electrical & Low-Voltage Walk Pre-Drywall Walk Cabinets, Doors & Trim Woodwork

Finalize Plan

FramingComplete & Interior Selections

Home Shingled& Windows

Installed

Mechanical Roughs Installed

Electrical & Low-Voltage

Walk

Pre-Drywall Walk

Cabinets, Doors & Trim Woodwork Complete

Welcome Home!

Exterior Brick &/Or Stone

Finished

Concrete & Flatwork Walk, Landscaping

Meeting

Flatwork Poured &

Landscaping Installed

CarpetInstalled

Final Touch-Ups

Countertops Are Installed!

Let’s Start Painting!

Tile Is Set

Drywall Installed &Textured

OrientationWalk-Through, Verfication &

Closing

Construction Starts,Exterior Selection

Meeting

Final Readline

Plan Meeting

Q5 Custom HomesPathway to Your Dream Home