Dr.Eng. Trần Thị Kim Đăng
Highway Engineering 2
1. Introduction of Pavement2. Pavement Construction Materials
3. Pavement Construction Equipment
4. Unpaved Pavement Construction
5. Base and Sub-base Construction
6. Bitumen Treated Pavement Construction
7. Asphalt Mix Pavement Construction
8. Concrete Pavement Construction
9. Introduction of Pavement Maintenance
10.Road Damages and Causes
11.Road Test and Pavement Performance
12.Road Maintenance Works
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 2/56
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 3/56
Dr.Eng. Trần Thị Kim Đăng
Crushing and Screening Plant is an equipment to produce sound
crushed stone particles of good shape and in the sizes required for the
range of pavement making processes. It can be small scale, medium scale
and modern
Main parts of crushing and screening plant are crusher (jaw-crusher andgyratory crusher) and screens.
Crushers is an equipment to broken by crushing block stone to stone
particles. Crushing process includes primary and secondary/tertiary.
Primary stage uses jaw-crusher and following stages can use jaw, cone,
disc, gyratory, hammer or roller crushers depend nature of rocks.
Screens are used to distribute crushed stone particles in different size
required by range of pavement construction purposes
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 4/56
Dr.Eng. Trần Thị Kim Đăng
Small Crushing and Screening Plant is simple/half-motorizedequipment for local condition. It consists of a small jaw-crusher and
screens driven from a small engine through set of belts. The stone is
extracted from the quarry face and broken down by hand to be fed into the
crusher. It is collected from below the screens in wheel-barrows.
Medium Crushing and Screening Plan is motorized equipment consists
of at least two stages of crushing (primary and secondary with jaw-crusher
and gyratory crushers) and screens.
Modern Crushing and Screening Plan is motorized equipment consists
of full crushing process (primary/ secondary and tertiary) provides theneeded flexibility to alter crusher settings and screens so that the
quantities of stone of different sizes can be adjusted from time to time to
meet changes in demand
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 5/56
Dr.Eng. Trần Thị Kim Đăng
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 6/56
Dr.Eng. Trần Thị Kim Đăng
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 7/56
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 8/56Dr.Eng. Trần Thị Kim Đăng
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 9/56Dr.Eng. Trần Thị Kim Đăng
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 10/56
Dr.Eng. Trần Thị Kim Đăng
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 11/56
Dr.Eng. Trần Thị Kim Đăng
Pavement Construction Equipment
1. Crushing and Screening Plants
2. Mixing Plants
3. Transportation Equipment
4. Compaction Equipment
5. Machinery for Earthwork
6. Machinery for Construction of Aggregate Bases
7. Machinery for Construction of Bituminous Pavement
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 12/56
Dr.Eng. Trần Thị Kim Đăng
Asphalt M ixing Plant can be batch mixing plant and drum mix plant.Batch M ixing Plant is the facility which produce asphalt mix in separate
batches. The size of batch is controlled by the capacity of pug-mill, the mixing
chamber where heated aggregates and asphalt cement are mixed. Typical batch
quantities range from about 1.5 tons to 4.5 tons.
A bath mixing plant consists of aggregate dryer, burners, screens and hot bins,weigh hopper and asphalt bucket, pug-mill mixer, air quality control system
(primary dry collector and wet collector)
Drum Mix Plant is the facility which use drum mixer to dry and heat the
aggregate economically and continuously and to mix with asphalt cement. At the
discharge end of the drum, aggregates are coated uniformly at desiredtemperature.
A drum mixer consists of aggregate feeder, drum and burners.
Mixing process in the drum mixer includes drying and heating, asphalt cement
injection, mineral filler feeding.
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 13/56
Dr.Eng. Trần Thị Kim Đăng
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 14/56
Dr.Eng. Trần Thị Kim Đăng
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 15/56
Dr.Eng. Trần Thị Kim Đăng
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 16/56
Dr.Eng. Trần Thị Kim Đăng
Aggregate dryer is a pipe facility where aggregate from cold feed enters inopposite end from the burner and flows in opposite to the direction of the exhaust
gases.
The dryer is equipped with longitudinal flights which lift the aggregates and
cascade them through the hot burner gases.
Burners is the device who burns fuel provide the heat energy for evaporating thewater from aggregate and heating them to desired temperature.
Screens and Hot Bins – screens are vibrating and for rejecting over-size
aggregate and separate aggregate into desired sizes of coarse, medium coarse,
intermediate fine and fine. Hot bins are bins for storage the 4 sized aggregate
from the screening.Weight Hopper and Asphalt Bucket – The desired amount of materials from each
bin is weighted into the weigh hopper by suspending from scales. Asphalt cement
is pumped into a weigh bucket and suspended from the scales in the same time
with aggregate (in weight hopper)
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 17/56
Dr.Eng. Trần Thị Kim Đăng
Pug-mil l mixer –
is a twin shaft mixer designed to mix the materialsufficiently to coat the aggregate with asphalt cement.
Mixing time should be as short as possible to obtain uniform asphalt
coating on all aggregate particles. Excess mixing time tends to degrade the
aggregate and oxidize asphalt cement.
Mixing process consist of dry mixing and wet mixing. Dry mixing is for
blending aggregate before asphalt binder is added. Dry mixing time is
about from 2 to 5 seconds. Wet mixing is for asphalt cement coating. Wet
mixing is started when dry mixing is completed and asphalt cement is
dropped into pug-mill. The wet mixing can last from 25 to 45 secondsdepend on size of aggregate.
After mixing, asphalt mix is dropped into a truck or temporarily stored in
a surge or storage silo.
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 18/56
Dr.Eng. Trần Thị Kim Đăng
Air Quality Control System – is required for environment protection. The
air quality control system at asphalt mixing plant includes one or more of
the three types of dust collectors: primary dry collector; wet collector or
fabric filters (bag-houses)
Primary Dry Collector – can be knockout box or centrifugal collector. It
is placed immediately at the rear of dryer. The primary dry collectors are
between 65 and 80 percent efficient and normally used with wet
scrubbers. It is operated on the principle of aggregate particle weight.
Wet collector / scrubbers –
operates on the principle that airborne dust can be forced to drop out of the airstream by increasing the particle weight by
spraying it with small droplets of water.
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 19/56
Dr.Eng. Trần Thị Kim Đăng
1. Aggregate are dried, heated, sized, and stored-in-the hot holding bin, for
proportioning according to the mixture specified.
− Individual aggregates are proportioned from the cold bins onto a single
collector belt and sent to the dryer to be dried and heated
− The dried and heated materials flow into a bucket elevator to be carried to the
top of the batch tower and deposited onto sizing screens− Multiple screen decks separate the aggregate-into different sizes and direct
the fractionated aggregate into hot bins
1. Aggregate and binder mixing
− Aggregate in each hot bin is individually weighed into the aggregate weigh
hopper until the entire batch is weighed. Separately, asphalt is weighed inasphalt weigh bucket.
− Aggregates are dropped into pug-mill and bended together (dry-mix cycle)
− Asphalt is dropped into mixer and mixed with aggregate (wet-mix cycle)
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 20/56
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 21/56
Dr.Eng. Trần Thị Kim Đăng
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 22/56
Dr.Eng. Trần Thị Kim Đăng
Aggregate feed includes cold feed bins and conveyers (inclined chute or slinger
conveyors).
Drum M ixer – has specified ratio of length-to-diameter. Early drum mixers used the
same ratio of 4:1 as used in batch facility dryers. Recent drums has length-to-diameter
ratio of 5:1 and 6:1 or more, due to these facilities are used for asphalt recycling
materials (RAP mixing).
Drums equip with flights which are the metal elements welded or bolted to the inside
circumference that are designed to control movement of the aggregate as they pass
through the drum
Burners – are simply devices used to efficiently burn the fuel and thereby produce
heat for the drying process. There are two types of burners, forced air burner and
hybrid type.
Asphal t Cement I njection System – is pipe system equipped at the rear of the drum
F ines Feeder System – includes pneumatic conveyor to transport mineral filler from
tank truck to a vertical silo, a vane feeders equipped at the bottom of silo, a pipe for
transport filler to the drum mixer
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 23/56
Dr.Eng. Trần Thị Kim Đăng
1 - Aggregate Drying and Heating/ M ix ing
Aggregates from cold bins are delivered to the drum. The aggregate enters the drum and
begins to move down the inclined drum by gravity. Burning flame flows oppositely from
rear of drum to dry and heat aggregate. The time the aggregate spend in the drum (dwell
time) depends on the length of drum, rotational speed of the drum, angle of drum and the
aggregate size. Typical dwell times vary from 3 to 4 minute. The aggregate temperature
profile in the drum has three distinct: drying (heated to about 380
C); drying (heated toabout 80 – 90 0C) and heating (to required mixing temperature). Dry mixing is occurred in
this stage
2 – M ixing with binder
Asphalt cement is injected into drum through a pipe entering from the rear of the drum.
Rate of asphalt spraying is controlled for coating aggregate.
3 – M ineral fi ller mixing
Mineral filler is delivered by tank truck and conveyed pneumatically to a vertical storage
silo. The filler flows out of the silo by gravity into vane feeder at the bottom of silo, then
enter the delivery pipe for transport to drum mixer and mix with asphalt coated aggregate
before being dropped into the bottom of the drum
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 24/56
Dr.Eng. Trần Thị Kim Đăng
Pavement Construction Equipment
1. Crushing and Screening Plants
2. Mixing Plants
3. Transportation Equipment
4. Compaction Equipment
5. Machinery for Earthwork
6. Machinery for Construction of Aggregate Bases
7. Machinery for Construction of Bituminous Pavement
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 25/56
Dr.Eng. Trần Thị Kim Đăng
1 –
Transportation operations
Transportation portion of a road construction project involves the trucks used to haul the materials
from producer to site, and the auxiliary equipment and procedures used. The procedure can be
different with different work item. In case of asphalt mix construction, the procedure includes
loading hot mix into the truck, weighing and ticketing, protecting hot mix from cooling,
transporting to the job site, dumping into the paver hopper and returning the truck to hot mix plant
2 –
Transportation equipment
Vehicles used for road construction materials transportation are commonly End Dump Trucks. The
end of dump truck is capable of lifting and rotating the truck bed to discharge materials onto
roadway or spacing hopper
There are three classes of End Dump Truck: a single unit vehicle with either a tandem rear axle or
triple rear axle; or a tractor-semitrailer with tandems on the rear of both the tractor and semitrailer
Number of trucks needed for a road construction project is affected by the length of waiting times
for loading and unloading, the loading time, time to ticket and cover the material (on the truck), the
distance between production site and the laydown site, the average truck speed and also the output
of material producer (for example of asphalt mix plant capacity and the availability of storage
facilities).
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 26/56
Dr.Eng. Trần Thị Kim Đăng
The number of tr uck-hour s requi red for hauli ng the mater ial (assumed transport distance 5 km )Activity: Crushed Stone transportation
Quantity: 1200 m3 compacted
Material is taken from stockpile prepared at the crushing plant
Productivity of the excavator for crushed aggregate loading
Unit Quantity
Bucket size m3 0.96
Bucket fill factor (% of heaped bucket capacity) for gravel % 98
Average bucket payload (ABP = 0.96m3 x 98%) m3 0.9408
Estimated time cycle sec 12
No. of cycles per 60 min hour (NC = 60min x 5 cycles/min) Cycles 120
Time efficiency factor (TF = 45 min /60 min) 0.75
Productivity (loose measure), Pl = ABP x NC x TF m3/h 84.672
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 27/56
Dr.Eng. Trần Thị Kim Đăng
The number of tr uck-hour s requi red for hauli ng the mater ial (assumed transport distance 5 km )
Unit Qty
Volume of gravel transported in 1 truck (loose measure), Vl m3 9.00
Productivity of the excavator when loading trucks (loose
measure) m3/h 84.67
Time required to load one truck, 9m3/84.67m3/h h 0.11 Time for manoeuvring at borrow pit (4 min) h 0.07
Time at dump (4 min) h 0.07
Travel time in both directions, distance 5km, speed 30 km/h
(t=10km/30km/h) h 0.33
Total cycle time for one truck, Tc=0.11+0.07+0.07+0.33 h 0.57
Number of trips per truck per hour, Nt = 1/Tc No. 1.75
Number of trips per 45 min. hour Nt' = Nt x 45/60 No. 1.31
Volume hauled per truck per hour = Vl x Nt' m3/h 11.78
Total truck hours required for the job h 122.2
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 28/56
Dr.Eng. Trần Thị Kim Đăng
Segregation –
is problem which coarse particles is segregated from fine particlesduring loading and transporting. It impacts to material grading.
Using excavator for loading and dump truck for transporting are key factors to avoid
segregation, water or suitable product spraying into materials is one method used to
limit segregation.
While single dump loading produces segregation around all edges of the truck bed,multiple dump loading can minimize segregated area within the truck bed.
Protection dur ing haul – there should have methods to protect materials from loss
and/or quality reduction during haul from production site to laydown site. A
protective covering should be used to prevent loss of loose material during wind or
cooling of hot mix asphalt.
For asphalt mix transporting, the truck bed should be cleaned and coated with a
lubricant to prevent sticking. The covers for hot asphalt mix should lap over the sides
of the truck bed and be snugly tied down all along sides and rear of the truck bed.
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 29/56
Dr.Eng. Trần Thị Kim Đăng
Pavement Construction Equipment
1. Crushing and Screening Plants
2. Mixing Plants
3. Transportation Equipment
4. Compaction Equipment
5. Machinery for Earthwork
6. Machinery for Construction of Aggregate Bases
7. Machinery for Construction of Bituminous Pavement
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 30/56
Dr.Eng. Trần Thị Kim Đăng
TYPE OF COMPACTION EQUIPEMNT
Roller - grid roller; steel-wheeled roller; pneumatic-tired roller; vibratorysteel-wheeled roller
Compactor - hand rammer; vibrating rammer (vibrating plate compactor);
vibrating stick compactor
Steel – Wheeled Roll er – these rollers typically are of the tandem and three-wheel types
and come in variety of weights and configurations. Tandem steel-wheeled rollers havetwo axle with both drums in the same width. Many of these rollers have a single drive
drum to propel the machine. The drive drum is often larger than steering drum. This roller
is typically used as a breakdown roller during the initial part of rolling operation.
Pneumatic- Tir ed Rollers – can be called either rubber-tired roller with the tires designed
for kneading action. Typical configurations of pneumatic-tired rollers provide 4,5,6 or 7
tires on the front of the roller and 3,4,5 or 6 tires on the rear. PTR can be used in the breakdown or intermediate roller positions.
Vibratory Steel-Wheeled Roller – five types of vibrating rollers: Single drum – rigid
frame; Single drum – articulated frame; Double drum – rigid frame; Double drum – single
– articulated frame; Double drum – double articulated frame
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 31/56
Dr.Eng. Trần Thị Kim Đăng
KOMATSU JV100A VIBRATION ROLLER
1. Steering wheel2. Rear wheel
3. Scraper
4. Front wheel (vibratory roller)
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 32/56
Dr.Eng. Trần Thị Kim Đăng
TYPES OF MATERIALS AND
RECOMMENDED COMPACTORS
Types of Soil/ Compactors
S t e e l R o
l l e r
T i r e d R
o l l e r
T a m p i n
g R o l l e r
V i b r a t i o n R o l l e r
V i b r a t i o n C o m p a c t o r
R a m m e
r / T a m p e r
G r i d R o
l l e r
B u l l d o s e r
S w a m p
B u l l d o s e r
Rock xx xx xxx xx xx
Coarse grained sand xx xx xx
Sand, Sandy soil xxx xx xx xx xx xx xx
Clayey gravel, Cohesive soil xx xxx xx xxx
Soft clay xx xx xx
Asphalt Mix xxx xxx xx xx
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 33/56
Dr.Eng. Trần Thị Kim Đăng
Pavement Construction Equipment
1. Crushing and Screening Plants
2. Mixing Plants
3. Transportation Equipment
4. Compaction Equipment
5. Machinery for Earthwork
6. Machinery for Construction of Aggregate Bases
7. Machinery for Construction of Bituminous Pavement
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 34/56
Dr.Eng. Trần Thị Kim Đăng
ROLE AND ADVANTAGES OF USING
MACHINE FOR EARTHWORK
The roles of construction mechanization:
• Capacity to carry out big scale work
• Decreasing the construction cost
• Shortening the construction time
• To uniform the quality of construction
Advantages of mechanization :
•Ability to carry larger scale operations
• Reduce working time
• Encourage uniformity
• Establish larger operating unit
• Reduced manpower
• Relief from heavy manual or exhausting work
• Improve operating safety
Disadvantages of mechanization:
• Large capital needed for obtaining equipment
• Increase management work for equipment
• Need training on machines operation and management
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 35/56
Dr.Eng. Trần Thị Kim Đăng
EQUIPMENT SELECTION FOR EARTHWORK
Work Items Equipment Clearing Bulldozer, Rake dozes, Backhoe
Excavating Power shovel ( Backhoe, Draggling, Clamshell), Bulldozer,
Ripper, Rock breaker
Loading Power shovel (Backhoe, Draggling, Clamshell), Tractor
shovel
Excavating/Loading Power shovel (Backhoe, Draggling, Clamshell)
Excavating/Hauling Bulldozer, Scrape dozes, Scraper dozes
Hauling Bulldozer, Dumbslruck, Conveyer
Spreading and Grading Motor grader, bulldozer, Tire dozes
Compacting Tire roller, Steel roller, Vibration roller, Tamping roller,
Vibration compactor, Tamper, Bulldozer.Trenching Trencher, Backhoe
Aggregate Base/Subbase Motor grader/ Paver
Slope Finishing Backhoe, Motor grader
Rock Braking Drill, Rock Breaker
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 36/56
Dr.Eng. Trần Thị Kim Đăng
WORK TYPES AND EQUIPMENT COMBINATION
Work Items Equipment
Clearing/loading/ Hauling Bulldozer +Tractor shovel +Dump truck(or Backhoe)
Excavating/Loading/Hauling Bulldozer +Loading equipment +Dump truck
Excavating - Loading/Hauling -
Spreading
Scraper +Pusher
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 37/56
Dr.Eng. Trần Thị Kim Đăng
TYPES OF SOIL AND RECOMMENDED
CONSTRUCTION MACHINES
Types of Soil Equipments
Sand, Sandy soil Wheel type or crawler type tractor shovel for
loose soil
Power shovel Bulldozer for natural density
Clay, Cohesive soil Power shovel
Soft rock Bulldozer with ripper, Rock breaker
Hard rock Large size bulldozer with ripper, rock breaker
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 38/56
Dr.Eng. Trần Thị Kim Đăng
TYPICAL EARTHWORK MACHINE AND CRITERIA
Types of Equipment Major Criteria Bulldozer Normal Working Condition - 11,15 ,21, 32 (ton)
Swamp - 13, 16 (ton)
Bulldozer with ripper Normal Working Condition - 21, 32 (ton)
Scrape doze Normal Working Condition - 6.4 (m3)
Tractor-pulled scrapper 9, 12, 17 (m3)
Molor scraper Single engine - 16 (m3)
Backhoe (hydraulic type) Crawler - 0.35; 0.4; 0.6; 0.7 (m3)
Draggling and Crashed Mech. Crawler 0.8 (m3)
Hyd. Crawler 0.3, 0.6 (m3)
Tractor shovel Crawler 0.4, 1.8 (m3)
Wheel 1.0, 1.4, 2.3 (m3)
Dump truck 1, 10-11 (ton)
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 39/56
Dr.Eng. Trần Thị Kim Đăng
BULLDOZER - KOMATSU D65E
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 40/56
Dr.Eng. Trần Thị Kim Đăng
EXCAVATOR CATERPILLAR 31,I8
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 41/56
Dr.Eng. Trần Thị Kim Đăng
MITSUBISHI MG330 MOTOR GRADER
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 42/56
Dr.Eng. Trần Thị Kim Đăng
HAULING DISTANCE AND CONSTRUCTION
EQUIPMENT UNIT COST
D1 - Max. Advantageous Hauling Distance for bulldozer
to motor scraper.
D2: Max, Advantageous Hauling Distance for bulldozer
to Shovel Dump Truck
D3: Max. Advantageous Hauling Distance for Tractor-
drawn Scraper
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 43/56
Dr.Eng. Trần Thị Kim Đăng
CONSTRUCTION EQUIPMENT SELECTION
Equipment Optimum Hauling Distance
Bulldozer Less than ) 60 m
Scrape dozes 40-250 m
Tractor-drawn Scraper 60-400 m
Motor Scraper 200-1200 m
Shovel- Dump Truck more than 1000 m
Optimum haul ing distance:
Balance abili ty of construction machine :
Equipment Slope
Swamp Buildozer 40-45
Buildozer 35-40
Tractor-pulled scraper 15-25
Motor scraper =10
Dump Truck = 10
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 44/56
Dr.Eng. Trần Thị Kim Đăng
Pavement Construction Equipment
1. Crushing and Screening Plants
2. Mixing Plants
3. Transportation Equipment
4. Compaction Equipment
5. Machinery for Earthwork
6. Machinery for Construction of Aggregate Bases
7. Machinery for Construction of Bituminous Pavement
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 45/56
Dr.Eng. Trần Thị Kim Đăng
MACHINES USED FOR BASE/SUB-BASE
CONSTRUCTION
Base/Sub-base construction process
• Site preparation/ material preparation: re-compaction (rollers) / re-
grading (grader) – material production – crushing/screening plant
• Material transportation/ hauling – dump truck
• Material spreading/paving: graders/ paver
• Compacting: steel roller/ vibrating steel roller/ pneumatic tired
roller
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 46/56
Dr.Eng. Trần Thị Kim Đăng
Pavement Construction Equipment
1. Crushing and Screening Plants
2. Mixing Plants
3. Transportation Equipment
4. Compaction Equipment
5. Machinery for Earthwork
6. Machinery for Construction of Aggregate Bases
7. Machinery for Construction of Bituminous Pavement
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 47/56
Dr.Eng. Trần Thị Kim Đăng
MACHINES USED FOR BITUMINOUS PAVEMENT
Bitumen treatment pavement construction process
• Asphalt/ binder distributor
• Aggregate/chipping spreader
• Slurry mixer/spreader
• Compaction
Asphal t pavement construction process
•
Prime coat/ Tack coat• Asphalt mix paver
• Compaction
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 48/56
Dr.Eng. Trần Thị Kim Đăng
MACHINES USED FOR BITUMINOUS PAVEMENT
Asphalt distr ibutors:
- Pressur ized tank distr ibutor : an air compressor is used to generate a constant high air
pressure in the tank thereby delivering the binder at constant pressure to the spray bar(jets) at the rear of the machine. The jets under controlled pressure deliver a constant
volume ol binder in unit time and the rate of spread of binder is controlled by the
forward speed of the vehicle.
- Constant rate of spread distr ibutor: - similar with pressurized tank distributor with
metering pump driven front the main transmission of the vehicle through a multi-ratiogear box
- Constant volume binder distr ibutor: binder is delivered to the spray bar through
positive displacement pumps. The output binder can be adjusted. Spray width can be
adjusted by additional extensions to the spray bar with appropriate adjustments to the
pumps.
- Constant pressure binder distributor: use pumps to generate adequate pressure and this
pressure is controlled by a valve mounted in the spray bar which permits binder to
bypass the spray bar and return to the tank. Then constant pressure is maintained in the
spray bar. The rate of spread of binder is controlled by the forward speed of the machine.
MACHINES USED FOR BITUMINOUS PAVEMENT
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 49/56
Dr.Eng. Trần Thị Kim Đăng
MACHINES USED FOR BITUMINOUS PAVEMENT
Asphalt distr ibutors: - Constant Pressure Bitumen Distr ibutor
MACHINES USED FOR BITUMINOUS PAVEMENT
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 50/56
Dr.Eng. Trần Thị Kim Đăng
MACHINES USED FOR BITUMINOUS PAVEMENT
Chippings spreader:
The simplest chipping spreaders are tailgate attachments fitted to the
rear-of the trucks used to haul the chippings to the site. A further
elaboration involves the use of a wheeled hopper with a metering roller
which is pushed by the reversing truck with chippings loaded in thehopper.
Slur ry mixer and spreader/ micro paving :
Fine-graded aggregate is mixed with bitumen emulsion at ambient
temperatures to produce a slurry which can be spread over the surface
in a thin layer.
A MOBILE SLURRY MIXER AND SPREADER
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 51/56
Dr.Eng. Trần Thị Kim Đăng
A MOBILE SLURRY MIXER AND SPREADER
ASPHALT MIX PAVER
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 52/56
Dr.Eng. Trần Thị Kim Đăng
ASPHALT MIX PAVER
ASPHALT MIX PAVER
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 53/56
Dr.Eng. Trần Thị Kim Đăng
ASPHALT MIX PAVER
ASPHALT MIX PAVER
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 54/56
Dr.Eng. Trần Thị Kim Đăng
ASPHALT MIX PAVER
COMPONENTS OF ASPHALT MIX PAVER
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 55/56
Dr.Eng. Trần Thị Kim Đăng
COMPONENTS OF ASPHALT MIX PAVER
Hopper - The hopper is the area where the HMA is deposited by the hauling unit, pickupmachines, or material transfer device.
Hopper insert -The hopper insert is a metal bin inserted inside the paver hopper to
receive material from the truck to expand the hopper storage capacity by 50 to 70 percent
Push rollers - These rollers mounted on the front of the paver push on the hauling unit
tires as the HMA is being transfered from the hauling unit to the paver hopper.
Slat conveyer - The slat conveyer is the mechanism used to move tire HMA from the
hopper to the augers in front of the screed. The conveyor is connected at both ends to two
parallel chains that pull the mix from the hopper.
F low Control gates - These adjustable metal plates change the size of the opening at
hopper discharge used to control the amount of material flowing out of the hopper.
Tow point - This point near the center of the paver where the side arms are attached is a
pivoting connection that allows the side arms to rotate around this point.
COMPONENTS OF ASPHALT MIX PAVER
8/13/2019 Pavement Construction Equipment
http://slidepdf.com/reader/full/pavement-construction-equipment 56/56
COMPONENTS OF ASPHALT MIX PAVER
Side arms - The side arms connect the screed to the tow point on the tractor and are
responsible for towing the screed.
Auger - The augers receive the material from the slat conveyers, moving it transversely
and uniformly across the full width of the screed.
Screed - The screed is the most important component of the asphalt paver. It is
essentially a wide flat piece of heated steel that knocks down and smooth out the mass of
material placed in front of it by the augers. In doing so, it places the material to the
proper grade cross slope, and texture and provides initial compaction of the HMA. The
use of screed extension allows paving widths wider than the basic screed provides.
Depth-Screws . These manually operated screw mechanism change the angle of the
screed plate as it passes through the HMA material, allowing more or less material to pass under the creed. The careful control of .this angle, also known as angle of attack,
precisely controls the thickness of the mat being placed.