What do we do withmeasurements?
Frank Bouman
Pavement management at Rijkswaterstaat
17 October 2019
1
Rijkswaterstaat
2
Content
ERPUG 2019
• Rijkswaterstaat, mission
• Roads, the network
• Measurements
• Pavement Management System
• Programming
• Execution
Rijkswaterstaat
ERPUG 20193
Rijkswaterstaat’s area of management
Rijkswaterstaat is in charge of three national infrastructure networks
Rijkswaterstaat
4
Rijkswaterstaat Main Highways Network
Rijkswaterstaat’s mission to perform traffic management
• to have an active and nationwide control of traffic flows
• a national coordination of road constructions
• to provide actual and reliable traffic data
• to develop innovative and practical traffic systems(pilots with the market and other public highways authorities)
ERPUG 2019
Rijkswaterstaat
5
The network, quantities
ERPUG 2019
• Pavements: 3.100 kms motorway
– 6.200 km one direction / 15.000 km lanes
– 1.260 km sliproads
– approx 110km rush hour lanes
• Structures: 6.000 (also on mainwaterways)
– 2.843 viaducts on highways
– 767 moveable and fixed bridges on highways
– 24 tunnels
– 33 ecoducts
• DTM (6 control centres, 108 DRIPS, 2.000 cameras)
• Area control
– winter ice, roadside and restplace management, lights, signage, guidingrails, noise barriers …
Rijkswaterstaat
6
The network, pavements
ERPUG 2019
• Wearing courses– 90+% porous asphalt,
• porous 0/16, porousTW 4/8, porousTW 2/6
– 10-% AC,SMA, others
• Distresses:– 85% stone loss or ravelling/fretting
– 10% cracking
– 3% rutting and unevenness
– 2% skid resistance
• Financing– ± 200 M€ yearly (SLA RWS-Ministry)
Rijkswaterstaat
7
Measurement techniques (annual monitoring)
ERPUG 2019
• LCMS
• Ravelling (RWS model PA)
• Cracking (Pavemetrics model + RWS)
• Evenness (RWS model)
Rijkswaterstaat
8
Measurement techniques 2
Skid resistance - SWF
ERPUG 2019
Rijkswaterstaat
9
Intervention levels (100m1 lane)
• Ravelling : >25% (medium (11-20%) or severe (>20%)stone loss)
• Cracking : >30% (cracking 10-20mm width)
• Rutting : >=18mm
• Longitudinal unevenness : >=IRI 3,5
• Skid resistance : <0,51 (at 80km/h)
ERPUG 2019
Rijkswaterstaat
10
Maintenance prediction
ERPUG 2019
• One safety level for all
but uniform norms have different outcomes– less traffic and load - longer service life time
– more traffic and load - shorter service life time
• Maintenance condition dependent
based on yearly measurements and inspections– too early results in capital loss
– too late is unsafe and more expensive
• Noise reducing surface layers combined with
carriageway wide maintenance
Rijkswaterstaat
11
PMS – IVON2
ERPUG 2019
• Network level
• Five types of distress• Average service life (11/17 , 9/13)• Traffic load• Climate• Soil
• Maintenance strategy• Min/max length projects• Optimisation rules• Last year’s outcome
Rijkswaterstaat
12
PMS – IVON2
ERPUG 2019
Rijkswaterstaat
13
PMS - results
ERPUG 2019
• 10 years ahead expected maintenance• 5 + 5 (measurements + key figures)
• Lanes and carriageways• Projects (road,lane,from, to)• Indicative measures
• Replace 5cm, 2,5cm• Open Emulsion Sand Asphalt mixture • Rejuvenate
• Budgets
• Several levels of detail (district, regional, national)
Rijkswaterstaat
14
PMS - results
ERPUG 2019
Maps• Short term 1-2 yrs• Mid term 3-5 yrs• Long term 5-10 yrs
Total measures/year-n: ~1.300 locations-length: 0,1 – 7 km-€: approx 200 M€
Rijkswaterstaat
15
Programming and procurement
• Programming
– Combinations of works on pavement, structures, DTM
– Taking into account:
• our neighbours (municipalities, provinces;
• events (Floriade, festivals, etc.).
• Procurement
ERPUG 2019
Rijkswaterstaat
16
Thank you