pbn airspace concept workshop reviewreview internet: pin:
TRANSCRIPT
PBN Airspace Concept
Workshop
Review
INTERNET: pin:
Review of Workshop
2
✈ 10 day PBN Airspace Design Workshop
✈ ICAO Doc 9992: PBN in Airspace Design
✈ Plan, Design, Validate, Implement
✈ 17 steps✈ Integration of ICAO Doc 9931 & 9993: CDO and CCO
✈ ICAO Circ 330: Civil / Miitary Cooperation in ATM
✈ Designed routes and airspace in TMA
✈ “Centerville”: Civil / Military: Conditional Routes - CDR 1, 2, 3 ✈ Routes designed for dual airports
✈ Phuket / Krabi
✈ Enroute design and multi-TMA integration practice
✈ Southeast Asia
Questions Asked
3REF: PANS OPS 8168, VOL2, SECTION III, Appendix to Chapter 5
PATH TERMINATOR CODING RULES
Questions Asked
4REF: PANS OPS 8168, VOL2, SECTION III, Appendix to Chapter 5
PATH TERMINATOR CODING RULES
Discussion Points
✈Build it and they will come
✈Who benefits – keep current or change to new
✈Mixed mode is a common occurrence today
✈Ongoing and refresher training
✈Future improvements
✈Route spacing
✈Curved simultaneous approaches to multiple rwys
✈ Implementation challenges
5
Course Survey Form:
http://goo.gl/AyzkhW
Contact Information
✈ Instructors:
✈Survey: http://goo.gl/AyzkhW
FINI