pbn airspace concept workshop reviewreview internet: pin:

8
PBN Airspace Concept Workshop Review INTERNET: pin:

Upload: oswald-may

Post on 29-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PBN Airspace Concept Workshop ReviewReview INTERNET: pin:

PBN Airspace Concept

Workshop

Review

INTERNET: pin:

Page 2: PBN Airspace Concept Workshop ReviewReview INTERNET: pin:

Review of Workshop

2

✈ 10 day PBN Airspace Design Workshop

✈ ICAO Doc 9992: PBN in Airspace Design

✈ Plan, Design, Validate, Implement

✈ 17 steps✈ Integration of ICAO Doc 9931 & 9993: CDO and CCO

✈ ICAO Circ 330: Civil / Miitary Cooperation in ATM

✈ Designed routes and airspace in TMA

✈ “Centerville”: Civil / Military: Conditional Routes - CDR 1, 2, 3 ✈ Routes designed for dual airports

✈ Phuket / Krabi

✈ Enroute design and multi-TMA integration practice

✈ Southeast Asia

Page 3: PBN Airspace Concept Workshop ReviewReview INTERNET: pin:

Questions Asked

3REF: PANS OPS 8168, VOL2, SECTION III, Appendix to Chapter 5

PATH TERMINATOR CODING RULES

Page 4: PBN Airspace Concept Workshop ReviewReview INTERNET: pin:

Questions Asked

4REF: PANS OPS 8168, VOL2, SECTION III, Appendix to Chapter 5

PATH TERMINATOR CODING RULES

Page 5: PBN Airspace Concept Workshop ReviewReview INTERNET: pin:

Discussion Points

✈Build it and they will come

✈Who benefits – keep current or change to new

✈Mixed mode is a common occurrence today

✈Ongoing and refresher training

✈Future improvements

✈Route spacing

✈Curved simultaneous approaches to multiple rwys

✈ Implementation challenges

5

Page 6: PBN Airspace Concept Workshop ReviewReview INTERNET: pin:

Course Survey Form:

http://goo.gl/AyzkhW

Page 8: PBN Airspace Concept Workshop ReviewReview INTERNET: pin:

FINI