    Review of Regulations PCAR Part 9

    Thisreportaimstopresentanevaluationoftheregulatoryrequirementsanditsapplicationtothe

    establishmentofaQualitySystemandManagementofanAOCinthePhilippines.

    Quality System: A Simultaneous NEED and a MUST

    SimplifyingPCAR9.2.2.3,anoperatormusthaveaQualitySystemforthefollowingfunction:

    MONITORCOMPLIANCEWITHPROCEDURES(approved,required,andusedbytheoperatoraswell)

    TO ENSURE SAFE OPERATION OF AIRCRAFT

    Thisisbasedonthefirstsectionasshowninthefollowingreference.

    Ref: PCAR 9.2.2.3.(a

    Tofurtherjustify,thephrasesafeoperationofaircraft initsfullestsenseelaboratesalready

    thataircraftcannotbeoperatedsafelyif itisfirst,notairworthy.Thereforeitwillbetheobjectiveof the

    AOCsQualitySystemtoMONITORthatrequiredMaintenanceServicesarebeingdoneontheaircraftin

    accordance withapprovedmanualsandrequirements(i.e.MCM,AMM,AMP,ADs)whichresulttoan

    airworthyfleet.

    Ontheaspectofoperations,theQualitySystemalsoMONITORStheGroundOps,FlightOps

    InflightSvcs,andallotherprocessesbeingdonepriorto,during,andaftereachflighttomakesurethatalltheserespectivedepartments,personnel,andserviceprovidersoftheAOCfollowtheirprocedures

    and policies as granted approvalby theAuthority. These collectivecomplianceefforts result tosafe

    operations.

    SafeOperations+AirworthyFleet=Regulatory-CompliantAOC

    =QualityAirTransportationfromAOC

    =Happycustomers(passengers)

    =Successful Airline

    ThisiswhatCAAPbasicallywants.Noincidents,nooverruns,nodelaysandcancellations(as

    farascontrollablefactorsareconcerned),nonegativeremarksfrompassengersandcomplaints,no

    malpractice,noviolationofpoliciesandprocedures,andlastly,noaccident.

    Howdoesthisstart?AQualitySystemsMONITORINGisledbyaQualityManager(inourcase

    theQSSDirector)whodirectlyreportstotheAccountableManager(SirMikeShau).

    1

  • 7/25/2019 PCAR Part 9 Evaluation - An AOC's Quality System

    2/5

    PAGE OF 5

    The process is simple. The Qua. Mgr designs his feedback system (reporting) and may

    coordinatewith the Acc. Mgr to ensure corrective action is implemented if ever one of the AOCs

    branchesfailtodelivercompliance.

    Shownnextisthewholereference.Ref: PCAR 9.2.2.3

    Tostrengthen further,section(b)highlightswhat theQualitySystemmust equip itselfwith: its

    Quality Assurance Program. ThisiswhattheQualitySystemwilluseincarryingoutitsMONITORINGo

    compliance. Procedureswith thismust bedesigned strongly toprovide due verification that all the

    AOCs elements discussed in the previous page are compliant to all applicable standards and

    requirements. In addition to necessary Corrective Actions, Preventive Actions shall also aid in

    maintainingthequalityofeveryaspectwhichmighthavefailed,toensurerecoveryandcontinuityin

    compliance.

    Theremainingsections aresimplereinforcementstosection(a)asfarastheQualitySystems

    objectiveisconcerned.Section(e)maynotbeapplicablesinceoneDirectorcaneffectivelysufficeas

    theQualityManagerwhile(f)isnotapplicablealsosinceCebgocertainlyhasnoAMOapproval.

    Quality System Reiterated: A Redundancy DUE TO 9.4.1.2 Maintenance Responsibility

    The Quality System is again highlighted in PCAR 9.4.1.16, because of the Maintenance

    Responsibility(PCAR9.4.1.2)ofanAOCinmaintainingtheairworthinessofitsfleet.TheQualitySystem

    basesitsMONITORINGoftheAOCsAircraftMaintenanceRequirementsby verifying compliance with

    the principles ofthisSubpart(thecatch:hastobein accordance with straightforwardImplementing

    StandardsPCARIS9.2.2.32.0)

    2

  • 7/25/2019 PCAR Part 9 Evaluation - An AOC's Quality System

    3/5

    PAGE OF 5

    Shownnextarethereferences.Ref: PCAR 9.4.1.16

    Ref: PCAR IS 9.2.2.3 2.0 (a

    Sub-contracting Quality Assurance: Is it ALLOWED?

    Yes,aspertheprovisionsofPCARIS9.2.2.34.0,theCarrierhastheoptiontoavailofthird-party

    auditors inproviding the servicesand actions required to fulfill the objective of the Quality System

    Referenceisshownstraightforwardbelow.

    Ref: PCAR IS 9.2.2.3 4.0

    3

  • 7/25/2019 PCAR Part 9 Evaluation - An AOC's Quality System

    4/5

    PAGE OF 5

    Thisisalsosupportedby PCARIS9.2.2.33.5,statingthat theQualitySystemofanAOCcan

    availofAuditorsbelongingtoaseparateQualitySystemofanotherorganization(external)aslongas

    theAuthoritysrequirementsofthecriteriaaresatisfied.

    Ref: PCAR IS 9.2.2.3 3.5

    As faras sub-contractingQualityAuditors tosatisfyPCAR9.2.2.3, anoperatorsQualitySystem

    shouldstilladheretoitscoreobjective.Thus,byavailingofexternalauditorstoundertaketheactivities

    neededforQualityAssurance,theQualitySystem sresponsibilitywillalwaysremainwithitsimilarto

    CebgosEngineeringandManagementteamsaccountabilitytoitsMaintenanceResponsibilitiestothe

    AuthorityevenifA+/SIAEC/SIAEPfailsintheirdeliverables.Thisisshowninthenextstatementand

    reference,PCAR9.2.2.3IS6.3.4

    THEOPERATORCARRIESULTIMATE RESPONSIBILITYfortheQUALITY SYSTEM,

    whateverarrangementsmaybemadeifsub-contractingQualityAssuranceservicesisconcerned.

    Ref: PCAR IS 9.2.2.3 6.3

    4

  • 7/25/2019 PCAR Part 9 Evaluation - An AOC's Quality System

    5/5

    PAGE OF 5

    Itisalsointerestingtonotethatthissub-contractingmayalsobedoneinparallelwithsub

    contractingmaintenanceserviceswith anAMO.PCAR9.4.1.5supports sub-contractingmaintenance

    requirementsofanAMOtoenabletheOperatorincomplyingwithitsresponsibilitiesthroughawritten

    maintenance contractagreement between them.Though ashighlighted in this subpart, theQuality

    function supportwhichmay be included intheagreement,impliesthatpersonnelcan also be sub

    contracted from the AMOtosustain/ensurefunctioningoftheOperatorsQuality System.

    Ref: PCAR 9.4.1.5

    5