KOCHI KOTTANAD BANGALORE MANGALORE PIPELINE PROJECT (PHASE- I) JOB PROCEDURE FOR PLAIN CEMENT CONCRETE PROCEDURE NO: JPL/KKBMPL/CIVIL/06 REV 01 CLIENT : GAIL (INDIA) LIMITED CONSULTANT : MECON LIMITED CONTRACTOR : JAIHIND PROJECTS LIMITED JPL MECON MECON /GAIL PREPARED BY CHECKED BY REVIEWED BY APPROVED BY SIGNATURE NAME Plain Cement Concrete DOCUMENT NO. REV Page 1 of 7 JPL/KKBMPL/CIVIL/06 01

Upload: sachein-anand

Post on 03-Dec-2015

215 views

Category:

Documents


2 download

DESCRIPTION

Pcc Procedure

TRANSCRIPT

Page 1: Pcc Procedure

KOCHI KOTTANAD BANGALORE MANGALORE PIPELINE PROJECT(PHASE- I)

JOB PROCEDURE FOR

PLAIN CEMENT CONCRETE

PROCEDURE NO: JPL/KKBMPL/CIVIL/06 REV 01

CLIENT : GAIL (INDIA) LIMITED

CONSULTANT : MECON LIMITED

CONTRACTOR : JAIHIND PROJECTS LIMITED

JPL MECON MECON /GAIL

PREPARED BY CHECKED BY REVIEWED BY APPROVED BY

SIGNATURE

NAME

DATE

Plain Cement Concrete DOCUMENT NO. REV Page 1 of 5 JPL/KKBMPL/CIVIL/06 01

Page 2: Pcc Procedure

TABLE OF CONTENTS

1. PURPOSE 3

2. SCOPE 3

3. RESPONSIBILITIES 3

4. MATERIAL/ EQUIPMENT FOR CONSTRUCTION 4

5. PROCEDURE 4

6. REFERENCE 4

7. RECORDS 5

Plain Cement Concrete DOCUMENT NO. REV Page 2 of 5 JPL/KKBMPL/CIVIL/06 01

Page 3: Pcc Procedure

1. PURPOSE:

The purpose of this procedure is for supervision of all P.C.C. works and to ensure that the proper quality control is exercised at site.

2. SCOPE:

This procedure covers supervision and methods of record keeping for all concreting works as per procedure& specification.

3. RESPONSIBILITIES:

Civil Engineer:

Shall report to the Resident Construction Manager and shall be responsible for preparation of work schedule addressing specific issues and characteristics of each spread.

Overall control and safety management and for the implementation of procedure and supervises the activity.

Generation of reports during the activity.

Explaining all other persons involved in erection and installation of the detailed operations to be done during the activity.

Preparing list of materials, machine and activity along with class and make and got approved from engineer in charge.

QC engineer:

Reports to site QA/QC In-Charge

Ensures proper implementation of this procedure.

Checks & verifies the activity.

Verifies & countersigns reports.

HSE Officers:

Shall reports to Resident Construction Manager/Project Manager administratively and to HO

For technical matters and shall be responsible for Implementation of all safety requirements during operations

Ensuring that the communication system is working properly and that emergency equipment is in place

Plain Cement Concrete DOCUMENT NO. REV Page 3 of 5 JPL/KKBMPL/CIVIL/06 01

Page 4: Pcc Procedure

4. MATERIALS / EQUIPMENT FOR CONCRETE:

1. Cement

2. Fine Aggregate

3. Coarse Aggregate

4. Clean Water and measuring bucket.

5. Mixture Machine – Drum size with hopper and weight batcher

6. Slump Cone

5. PROCEDURE:

1. Based on the design of structure the grades of concrete shall be predefined for different structures.

2. Proportioning of ingredients of concrete shall be made by only by the nominal mix.

3. The cement used shall normally be 43/53 Grade Ordinary Portland cement conforming to IS: 8112. Rapid Hardening Portland Cement conforming to IS: 8041, Low Heat Cement conforming to IS: 269, Supersulphated Cement conforming to IS: 6909 etc may be used as required if permitted by Client. The cement content shall be as per mix design or as specified in specification.

4. Coarse Aggregate of sizes ranging between 4.75 mm and 12 mm will be termed as coarse aggregate and conforming to IS: 383

5. Fine Aggregate smaller than 4.75 mm and within the grading limits and other requirement set in IS: 383 shall be used.

6. Water used for concrete shall be clean and free from oil, acid, alkali, organic matter or other harmful mater.

7. As per the construction programme the required concrete ingredients shall be estimated and procured well in advance. The source of materials should be the same with which the design mix has been carried out.

8. Concrete ingredients shall be tested and the results shall be confirmed with IS codes and specification and get approved.

Plain Cement Concrete DOCUMENT NO. REV Page 4 of 5 JPL/KKBMPL/CIVIL/06 01

Page 5: Pcc Procedure

9. Work instruction for mixing, transporting and placing of concrete shall be prepared as per the requirement of contract Specification..

10. Testing of materials and concrete shall be done as per standard norms..

11. De shuttering and curing shall be done as per tender specification and standard engineering practice

5. REFERENCE:

a) MECON Specification Volume IIIA of IV & Vol. IA of IVb) ISI 269 Indian Standard Specification for Ordinary and Low Heat Portland

Cement

c) IS: 383 Indian Standard Specifications for Course and Fine Aggregates for Natural Sources for Concrete.

d) IS: 455 Indian Standard Specifications for Portland Slag Cement.

e) IS: 456 Indian Standard Codes of Practice for Plain and Reinforced Concrete.

f) Latest Indian Standard Specification and Codes of Practice

g) IS:12330 for Sulphate resistant cement

6. RECORDS

a) Test reports of ingredients ( cement, fine aggregate, course aggregate and water)b) Pour cards

c) Inspection Test Plan for Plain

d) Cement Stock Register

e) Material Reconciliation Statement

NOTE: In case of any conflict between the requirements of this procedure and that of above referred specification then requirements of MECON specification shall govern.

Plain Cement Concrete DOCUMENT NO. REV Page 5 of 5 JPL/KKBMPL/CIVIL/06 01