PCM Strescon Overseas Saudi Arabia
3
PCM Strescon Group operates 3 sleeper factories in India at:
• New Jalpaiguri, West Bengal, N.F.Rly • Chamagram, Malda, West Bengal, E.Rly• Silchar, Assam,N.F.Rly
Various types of PSC Sleepers are manufactured and supplied to Indian Railway and Industry customers for the last two decades:
• Broad Gauge• Narrow Gauge• Dual Gauge• Turnouts / Crossing and various special sleepers
PCM Strescon Group companies follow stringent Quality Control Systems as laid down by RDSO for all its production units.
Introduction
PCM Strescon Overseas Saudi Arabia
4
1 INTRODUCTION
2 CUSTOMER REQUIREMENTS - SAUDI ARABIA
3 ORGANISATION CHART - SAUDI ARABIA
4 PRODUCTION UNITS
5 QUALITY CONTROL
6 SUMMARY
PCM Strescon Overseas Saudi Arabia
5
On behalf of the Public Investment Fund, Saudi Arabia Railway (SAR) tendered three projects for installation of approx. 1.800 km of Heavy Haul (32.5 T Axle Load) Railway line in the North East part of the Kingdom Against stiff competition from renowned global manufacturers of PSC Sleepers, PCM Strescon was awarded contract to manufacture and supply 13,00,000 nos of Concrete Sleepers for the Project segment CTW 100 and 15,00,000 nos of Concrete Sleepers for the Project segment CTW 300
The Contracts stipulated:
• Use of Pandrol fastening system FC 1600• Ultimate concrete strength 75 Mpa (40 Mpa release strength)• 32,5 tons axle load (heavy haul)• 160 km/h operation speed
CLIENT REQUIREMENTS - SAUDI ARABIA
PCM Strescon Overseas Saudi Arabia
6
1 INTRODUCTION
2 COSTUMER REQUIREMENTS - SAUDI ARABIA
3 ORGANISATION CHART - SAUDI ARABIA
4 PRODUCTION UNITS
5 QUALITY CONTROL
6 SUMMARY
PCM Strescon Overseas Saudi Arabia
ORGANIZATION CHART
PCM Strescon Overseas Saudi Arabia
Document Controller
Chief AccountantProcurement In-charge
Sleeper Factory CTW300
Sleeper Factory CTW100
Office Manager
7
AdministrationProductionQuality Control AdministrationProductionQuality Control
8
1 INTRODUCTION
2 CUSTOMER REQUIREMENTS - SAUDI ARABIA
3 ORGANISATION CHART - SAUDI ARABIA
4 PRODUCTION UNITS
5 QUALITY CONTROL
6 SUMMARY
PCM Strescon Overseas Saudi Arabia
10
CTW100 Hatifa, Eastern Province, KSA at present
PCM Strescon Overseas Branch Riyadh, Saudi Arabia
PCM Strescon Overseas Saudi Arabia
Components of the world‘s largest Production Units
Batching Plants
Cooling/HeatingPlants
Insert Fixing System
Production Machines
MOST POWERFULPRODUCTION UNIT
Production Team
Moulds
Italy
India
India
India / KSA
KSA
India / Australia / UK / Germany
12
Performance figures
Sleepers supplied
Monthly Production Rate
Highest Production Rate
Monthly Rejection Rate
Lowest Rejection Rate
Job completed
PCM Strescon Overseas Saudi Arabia
CTW100
1,251,216
85.000 – 90.000
85,117 (March 10)
0,80
0,63
September 2010
CTW300
1,363,256
95.000 – 100.000
100.400 (March 10)
0,95
0,88
October 2010
Total KSA
2,614.472
185.000 +
186.656
0,91
0,83
13
1 INTRODUCTION
2 CLIENT REQUIREMENTS -SAUDI ARABIA
3 ORGANISATION CHART - SAUDI ARABIA
4 PRODUCTION UNITS
5 QUALITY CONTROL
6 SUMMARY
PCM Strescon Overseas Saudi Arabia
14
Quality Control parameter
Concrete Strength for Cutting
Wire tension
Concrete temperature development
Static load test
Bond development test
Shoulder position
Visual inspection
Aggregates
PCM Strescon Overseas Saudi Arabia
Tolerances /Requirements
40 MPA (cylinder)
72 KN
32 / 40 / 60 degrees
301 KN
330 KN load – 0,025 mm
+/- 1,00 mm
Damages deeper than 1,5 mm
According to AREMA standards
Frequency
Daily each line
Randomly, daily 2-3 lines
Hourly for every line
Every 200 sleepers
Every 2000 sleepers
Every sleeper 4 reading
Every sleeper
Twice per week
15
1 INTRODUCTION
2 CLIENT REQUIREMENTS - SAUDI ARABIA
3 ORGANISATION CHART - SAUDI ARABIA
4 PRODUCTION UNITS
5 QUALITY CONTROL
6 SUMMARY
PCM Strescon Overseas Saudi Arabia
16
Summary
PCM Strescon Overseas Saudi Arabia
PCM Strescon Overseas established the world’s largest concrete sleeper production units in Saudi Arabia to deliver more 2,8 Million sleepers for the North/South Railway Line under following conditions:
1.Plants set up in remote desert under harsh desert conditions with temperatures exceeding 55o C in the summer and (-) 7o C in the winter
2. 30 – 35 days of sandstorms per year3.No public water and electricity supply or other infrastructure available near the plants
Highest Quality standards and Production output in spite of the harsh conditions mentioned above. PCM Strescon is now ready to offer its world class experience and expertise in manufacturing concrete sleepers globally to various prestigious Railway Projects. All our sleepers conform to the most stringent international norms.