pcs facilities traceability | pipeline week 2016
TRANSCRIPT
![Page 1: PCS Facilities Traceability | Pipeline Week 2016](https://reader036.vdocuments.net/reader036/viewer/2022070523/58ed78911a28ab14198b456d/html5/thumbnails/1.jpg)
Facilities Traceability
Brett Vogt, P.E.Project Consulting Services, Inc.
Mind the Gap Between As-Built Redline Drawings and Documentation
![Page 2: PCS Facilities Traceability | Pipeline Week 2016](https://reader036.vdocuments.net/reader036/viewer/2022070523/58ed78911a28ab14198b456d/html5/thumbnails/2.jpg)
Ever Seen This?
![Page 3: PCS Facilities Traceability | Pipeline Week 2016](https://reader036.vdocuments.net/reader036/viewer/2022070523/58ed78911a28ab14198b456d/html5/thumbnails/3.jpg)
Can you read it all?
![Page 4: PCS Facilities Traceability | Pipeline Week 2016](https://reader036.vdocuments.net/reader036/viewer/2022070523/58ed78911a28ab14198b456d/html5/thumbnails/4.jpg)
Problems• 49 CFR 192 and 49 CFR 195 require asset-level
traceability for pipelines and pipeline-related facilities
• Redlines are the only as-built deliverables with traceability data for facilities
• Redlines are prone to illegible data, and sometimes incompleteness or inaccuracy
• Systems to ensure data is traceable, verifiable, and complete are inefficient
![Page 5: PCS Facilities Traceability | Pipeline Week 2016](https://reader036.vdocuments.net/reader036/viewer/2022070523/58ed78911a28ab14198b456d/html5/thumbnails/5.jpg)
A Data Problem• 49 CFR 192 and 49 CFR 195 require asset-level
traceability for pipelines and pipeline-related facilities
• Redlines are the only as-built deliverables with traceability data for facilities
• Redlines are prone to illegible data, and sometimes incompleteness or inaccuracy
• Systems to ensure data is traceable, verifiable, and complete are inefficient
Data Standards
Final Data Set
Data Collection
Data Validation
![Page 6: PCS Facilities Traceability | Pipeline Week 2016](https://reader036.vdocuments.net/reader036/viewer/2022070523/58ed78911a28ab14198b456d/html5/thumbnails/6.jpg)
What it looks like
![Page 7: PCS Facilities Traceability | Pipeline Week 2016](https://reader036.vdocuments.net/reader036/viewer/2022070523/58ed78911a28ab14198b456d/html5/thumbnails/7.jpg)
Engaging Stakeholders
• Highlight the standards: – “reliable, traceable, verifiable, complete”
• Explore how technology can make existing systems more robust
• Customize processes to projects• Agree on a standard data collection
process
![Page 8: PCS Facilities Traceability | Pipeline Week 2016](https://reader036.vdocuments.net/reader036/viewer/2022070523/58ed78911a28ab14198b456d/html5/thumbnails/8.jpg)
Data Collection
• Provide P&IDs and ISOs specifically created for traceability to be completed on a tablet or laptop
• Inspectors complete the traceability P&IDs and ISOs on the tablet or laptop
• Completed P&IDs and ISOs submitted to a central repository
![Page 9: PCS Facilities Traceability | Pipeline Week 2016](https://reader036.vdocuments.net/reader036/viewer/2022070523/58ed78911a28ab14198b456d/html5/thumbnails/9.jpg)
Data Validation
• Validate data entered on P&IDs and ISOs versus data from documentation– Algorithm looking for gaps in traceability
against documents in an EDMS• Flag discrepancies and report immediately
– Correct discrepancies on as-built reports– Find missing documentation
![Page 10: PCS Facilities Traceability | Pipeline Week 2016](https://reader036.vdocuments.net/reader036/viewer/2022070523/58ed78911a28ab14198b456d/html5/thumbnails/10.jpg)
The Deliverable• Close gaps discovered in Data Validation
phase• Build an interactive “job book” with report
hierarchy:– Facility map– P&IDs– ISOs
• Link to key traceability documentation for all components
• “Job book” can be searched with keywords
![Page 11: PCS Facilities Traceability | Pipeline Week 2016](https://reader036.vdocuments.net/reader036/viewer/2022070523/58ed78911a28ab14198b456d/html5/thumbnails/11.jpg)
Demonstration
![Page 12: PCS Facilities Traceability | Pipeline Week 2016](https://reader036.vdocuments.net/reader036/viewer/2022070523/58ed78911a28ab14198b456d/html5/thumbnails/12.jpg)
Lessons Learned• Complete traceability is possible in a facility
– Requires engagement for filling in gaps found in the validation and reporting process
• Technology adoption is always a challenge, and experience managing field personnel is critical to build trust
• Be able to support inspectors that do not embrace the system during transition
![Page 13: PCS Facilities Traceability | Pipeline Week 2016](https://reader036.vdocuments.net/reader036/viewer/2022070523/58ed78911a28ab14198b456d/html5/thumbnails/13.jpg)
Conclusion• Asset-level traceability is required on
pipeline facilities• Plan for traceability in facilities• Introduce the end goals and any necessary
technology as early as possible• Complete traceability is possible in facilities
by combining planning, technology, and communication to the entire project team