Page 1: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 2: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of

(Amount in Rs.)

Particulars Chilla Tiloth Ramganga Khatima Chibro Khodri Dhakrani Dhalipur Kulhal MB-II

Capacity(MW) 144 90 198 41.4 240 120 33.75 51 30 304

Land - - - - - - - - - 12,700,532

Building 1,847 1,154 2,539 531 3,078 1,539 433 654 385 1,520

Major civil works - - - - - - - - - 74,904

Plant & Machinery (1,289,391) 52,870 2,056,899 (39,011) 10,351,652 2,478,147 53,560 80,936 47,609 1,483,106

Vehicles (65,687) 63,056 (90,319) (18,885) 66,952 33,476 9,415 14,227 8,369 (26,256)

Furniture & Fixtures 92,469 67,126 830,443 26,585 1,583,182 310,649 94,431 142,695 83,938 117,612

Office Equipment 460,363 211,816 500,670 185,551 1,224,669 265,741 74,740 112,940 66,435 380,800

Total (800,399) 396,022 3,300,232 154,771 13,229,533 3,089,552 232,578 351,452 206,736 14,732,218

2011-12 (LHPs with apportionment)

Page 3: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of

(Amount in Rs.)

Particulars Chilla Tiloth RamgangaKhatima Chibro Khodri Dhakrani Dhalipur Kulhal MB-II

Capacity(MW) 144 90 198 41.4 240 120 33.75 51 30 304

Land - - - - - - - - - 68,529,191

Building 139,120 308,083 191,290 39,997 231,867 115,934 32,606 49,272 28,983 4,616,083

Major civil works - - - - - - - - - 20,638,499

Plant & Machinery (33,883) 10,037,879 634,409 (9,741) 452,361 1,953,768 108,823 164,444 96,732 (212,948)

Vehicles 118,269 70,793 155,745 32,565 521,658 260,829 73,358 110,852 65,207 993,159

Furniture & Fixtures 125,410 196,192 172,439 36,055 512,085 122,275 34,390 51,967 30,569 7,471,551

Office Equipment (151,675) (71,397) (208,554) (43,607) 13,149 (6,429) 3,453 5,218 3,070 (110,680)

Total 197,241 10,541,551 945,329 55,269 1,731,121 2,446,377 252,631 381,753 224,561 101,924,854

2012-13 (LHPs with apportionment)

Page 4: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 5: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of

(Amount in Rs.)

Particulars Chilla Tiloth Kalagarh Lohiyahead Chibro Khodri Dhakrani Dhalipur Kulhal MB-II, Dharasu

Capacity(MW) 144 90 198 41.4 240 120 33.75 51 30 304

PAYMENT 2011-12 15993240.50 15689858.56 25288110.44 6445957.62 24631643.17 12086708.58 5196148.98 7851958.47 4618799.10 12609500.10

PAYMENT 2012-13 0.00 0.00 0.00 0.00 200231.55 208992.00 0.00 0.00 0.00 0.00

IMPACT OF ARREAR OF VI TH PAY COMMISSION FOR THE FY 2011-12 AND FY 2012-13 ( LHP with apportionment)

Page 6: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 7: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 8: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 9: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 10: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 11: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 12: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 13: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 14: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 15: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 16: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 17: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 18: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 19: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 20: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 21: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 22: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 23: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 24: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 25: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 26: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 27: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 28: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 29: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 30: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 31: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 32: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 33: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 34: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 35: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 36: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 37: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 38: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of

Chilla HEP November 2013 Page 1

Chapter 1. Annual Report on Technical Performance of Kulhal HEP

1.1 Overview

1.1.1 The petitioner in compliance of the Regulations 12 and 13 of UERC (Terms and

Conditions for determination of Tariff) Regulations, 2011 is providing

information with regard to the operational performance related to technical

parameters of Kulhal Hydro Power Station.

1.1.2 The information provided in this chapter relates to actual and expected

performance in FY 2011-12, FY 2012-13, FY 2013-14 and FY 2014-15. The

operational parameters considered are:

(a) Gross generation

(b) Auxiliary consumption and Transformation losses

(c) Plant Availability factor (PAF)

1.2 Power Station Description

1.2.1.1 The Kulhal Power Station with an installed capacity of 30 MW (3X10 MW) is

located on the downstream of the Asan Barrage at a distance of 4.0 km on the

power channel which takes off from the Asan Barrage. The Power Station was

commissioned in the year 1975. The surface Power Station comprising 3 units

of 10 MW each with Kaplan turbines is located on the power channel which

terminates in 39.2 m wide and 6.9 m deep fore bay. There are three 30 m long

and 4.5 m dia. steel lined penstocks, one for each unit. In case of tripping of

machines full discharge gets bye-passed through a 21m wide gated bye pass

channel. The water from the tail race flows towards Khara Power Station in UP.

The Kulhal Power Station is a low head scheme located on power channel with

a design head of 18 m and design discharge of 198 cum.

1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled

with synchronous generator. The turbine output is 10.4 MW for a rated net

head of 18 m. The generators are designed for a nominal output of 11.1 MVA

with lagging power factor of 0.9 and class “B” insulation.

Page 39: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of

Chilla HEP November 2013 Page 2

1.2.1.3 This Power Station was commissioned in the year 1975. Due to continuous

operations of machines for past 38 years, efficiency of machines has

substantially decreased and availability of machines has been adversely

affected even in spite of best and timely maintenance and adoption of effective

operational strategy.

1.2.2 Salient features of the Power Station are provided in form F 2.3 of this petition.

1.3 Energy Generation

1.3.1 The actual Gross and Net Energy generated in FY2012 and FY2013 is given in

the table below:

Table 1:- Actual Generation

Particulars Norms 2011-12 2012-13

Design Energy /Actual

Generation (MU)

153.91

157.84

158.08

Auxiliary Cons. 0.2% 0.3% 0.3%

Transformation/ other

losses and

consumption (%)

0.5 % (Tr.

losses)

2.5% 2.1%

Net Saleable Energy

(MU)

152.83 153.48

154.28

1.3.2 The Gross and Net Energy expected to be generated in FY 2014 and FY 2015 is

given in the table below:

Page 40: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of

Chilla HEP November 2013 Page 3

Table 2:- Expected Generation

Particulars Norms 2013-14

(Estimated)

2014-15

(Projected)

Design Energy /

Actual Generation

(MU)

153.91

157.65 146.54

Auxiliary Cons.

and

Transformation

losses (%)

0.7% 2.44% 2.44%

Net Saleable

Energy (MU)

152.83 157.16 145.964

1.3.3 From the above table it is evident that gross generation in the FY 2013-14 is

expected to be more than the design energy of the Power Station but it is

expected to be less than DE in 2014-15.

1.3.4 The auxiliary and transformation losses in FY 2013-14 are expected to be more

than the normative level. The steps are being taken to reduce the auxiliary

and transformation losses in FY 2014-15.

1.4 Plant Availability Factor

1.4.1 The recovery of the Annual Fixed Charges is dependent on the Plant

Availability achieved by the Power Station. The principle for recovery of fixed

charges on the basis of the availability achieved by the plant has been

introduced by the Hon’ble Commission by its regulations UERC (Terms and

Conditions for Determination of tariff) Regulations, 2011 from the FY 2013-14.

The petitioner has started computing this factor as per the provisions of the

above regulations from the current year i.e. 2013-14.

Page 41: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of

Chilla HEP November 2013 Page 4

Table 3:- Plant Availability Factor

Particulars Norms 2011-12 2012-13 2013-14

(Expected)

2014-15

(Projected)

NAPAF / PAFM

(%)

65

NA

NA

75

75

Planned Outages

(Hrs)

NA 2942 2598 286* -

Forced Outages

(Hrs)

NA 53 410 4* -

*Upto September 2013

1.4.2 Kulhal Hydro Power Station is likely to achieve the normative plant availability

factor determined by the Hon’ble Commission for the FY 2013-14 and FY

2014-15 as well. The Power Station has consistently maintained machine

availability.

1.4.3 The Power Station suffered forced outages in FY 2013-14 due to oil leakage

from Generator Transformer of Unit no. 1. The Petitioner for the FY 20014-15

would lay emphasis on preventive and planned maintenance for better power

station availability.

Page 42: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 43: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of

Additional Capitalization Data for F.Y. 2013-14 and 2014-15 of Kulhal Power Station

Sl.No. Head Description of work Addnl. Capn.

For

F.Y 2013-14

(In Crores)

Addnl.

Capn.

For

F.Y 2014-

15

(In

Crores)

Need/ Urgency of Capex How the Capex will have

improvement in

performance of plant/life

enhancement

Justification of

Cos/rate

1 Land 0 0

2 Building 0 0

3 Major Civil

Work

0 0

4 Plant &

Machinery

0 0

4.1 Supply, Installation,

Testing & Commissioning

of 250 KVA Silent DG Set

for Kulhal Power House

0.175 0 Diesel Gen Set is essential to restore the

auxiliary supply of power house during black

out situation.

It will avoid the possibility

of damage of auxiliaries on

account of supply failure.

Rates are taken

from the lowest

bidder quoted

against tender for

this work.

4.2 Procurement of one no.

500 KVA, 11/0.4 kv

transformer.

0 0.10 3 no UAT, 2 no. SAT and 2 no.

11KV/0.4KV Transformers are installed at

Kulhal Power House. There is no transformer

as spare. It is essential to procure one

transformer as spare to meet out the supply

during breakdown of any one transformer.

It will ensure the regular

supply to auxiliaries of

Power House and Colony.

Rates are taken

from market

survey.

4.3 Supply & Installation of

CCTV

0 0.12 To keep eye at various locations of Kulhal

Power House. Thus for ensuring safety of

Nigam Property , it is proposed for Supply,

Installation, Testing & Commissioning of

CCTVs at Kulhal Power House

By proper monitoring of

various locations of power

house through CCTVs,

safety against theft and

terrorist activity and other

operational benefits may be

obtained. Thus

performance of man and

machine will improve.

Approximately

Page 44: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of

4.4 Supply and installation of

centralized CO2 system.

0 0.40 To protect the generators from fire hazard. Fire at early stage could be

identified by installing

Smoke Detectors & Alarm

System. It will prevent the

generator from fire.

Approximately

4.5 Supply and installation of

HT XLPE insulated Single

core armoured power

cable.

0 0.40 At Kulhal Power House the generated

terminal voltage is 6.6KV. Existing cables in

two m/c’s has outlived its normative life. The

IR values of the existing cables are very low

and it gets heated when full capacity power

is generated. It is proposed to procure HT

XLPE insulated Single core armoured power

cable to carry the power from generator to

the generator transformer.

Procurement of HT XLPE

insulated Single core

armoured power cable is

essential to transmit power

from generator to the

generator transformer. .

Excess heat generated

through the cables lead to

loss of energy, which

results in high

transformation loss.

Approximately

Total of 4 0.175 1.02

5 Vehicles 0 0

6 Furniture and

fixtures

Procurement of furniture

for guest house Kulhal.

0 0.10 Most of the furniture available at guest house

Kulhal are more than 20 years old and have

outlived their normative life thus need

replacement

Essential Approximately

7 Office

Equipment

7.1 Procurement of

computers/laptops &

printers for EE(M&G)

office and Kulhal power

House

0 0.02 For replacement of old and un-repairable

computers and printers

Essential Approximately

Total of 7 0 0.02

Grand Total 0.175 1.14

(Nrapendra Kumar) EXECUTIVE ENGINEER

Page 45: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of
Page 46: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of

ADDITIONAL CAPEX FOR RMU OF EXISTING PROJECTS

1. Khatima (3 X 13.4 MW)

Need / Urgency of Capex: Khatima HEP was commissioned in 1955 and has already completed its ‘useful life’ of 35 years. Also presently, the machines at Khatima HEP are not able to achieve its full load of 13.8 MW In order to restore the capacity and life extension of the Project additional capital is required for extensive RMU of the Project. As per the DPR for RMU of the Khatima HEP the total cost of the Project is Rs. 256.77 Crore (with IDC) and Rs. 215.83 Crore (without IDC) approved by Board. How the Capex will have improvement in Performance of Plant / life enhancement: After employment of additional capital for extensive RMU of Khatima most of the outlived component shall be replaced with new component which will ensure the life extension of the Project along with restoration of the Capacity. Justification of Cost / Rate: Cost estimate for RMU of Khatima Power station has been prepared on the basis of budgetary offer from M/s ANDRITZ Hydro Pvt. Ltd. and M/s GO GOAL Hydro which are leading manufacturers in the field of Hydro Power.

2. Ramganga (3 X 66 MW)

*against 15% advance if contract is awarded in FY 2014-15.

Need / Urgency of Capex: Ramganga HEP was commissioned in 1977 and has already completed its ‘useful life’ of 35 years. Also presently, the machines at Ramganga HEP are not able to achieve its full load of 66 MW and maximum of 55 MW could be achieved. In order to restore the capacity and life extension of the Project additional capital is required for extensive RMU of the Project. As per the DPR for RMU of the Ramganga HEP the total cost of the Project is Rs. 454.41 Crore (with IDC) and Rs. 360.21 Crore (without IDC) approved by Board.

FY2013-14 FY 2014-15

Apr- Sept (Actual)

Oct-Mar (Anticipated)

Apr-Mar (Anticipated)

5.42 46.58 110

FY2013-14 FY 2014-15

Apr- Sept Oct-Mar (Anticipated)

Apr-Mar (Anticipated)

0 0 50.25*

Page 47: (Amount in Rs.) - UERC & Tariff...(Amount in Rs.) Particulars Chilla ... with synchronous generator. The turbine output is 10.4 MW for a rated net ... with lagging power factor of

How the Capex will have improvement in Performance of Plant / life enhancement: After employment of additional capital for extensive RMU of Ramganga most of the outlived component shall be replaced with new component which will ensure the life extension of the Project along with restoration of the Capacity. Justification of Cost / Rate: Cost estimate for RMU of Ramganga Power station has been prepared on the basis of budgetary offer from M/s ANDRITZ Hydro Pvt. Ltd. which is one of the leading manufacturer in the field of Hydro Power.

3. Kulhal (3X10 MW)

FY2013-14 FY 2014-15

Apr- Sept Oct-Mar (Anticipated)

Apr-Mar (Anticipated)

0 0 12*

*against 10% advance if contract is awarded in FY 2014-15.

Need / Urgency of Capex: Kulhal HEP was commissioned in 1975 and has already completed its ‘useful life’ of 35 years. In order to restore the capacity and life extension of the Project additional capital is required for extensive RMU of the Project. As per the DPR for RMU of the Kulhal HEP the total cost of the Project is Rs. 118.72 Crore (with IDC) and Rs. 115.44 Crore (without IDC) approved by Board. How the Capex will have improvement in Performance of Plant / life enhancement: After employment of additional capital for extensive RMU of Kulhal most of the outlived component shall be replaced with new component which will ensure the life extension of the Project along with restoration of the Capacity. Justification of Cost / Rate: Cost estimate for RMU of Kulhal Power station has been prepared by M/s Lahmeyer International.