pdo norm storage facilities
DESCRIPTION
PDO NORM Storage Facilities. Ahmed Al-Sabahi Corporate Environmental Advisor. PDO NORM Storage Facilities. PDO Has two Storage facilities: Zualayah Storage area Bahja Storage Facility. Storage of Radioactive Materials SP-1170. - PowerPoint PPT PresentationTRANSCRIPT
PDO NORM Storage FacilitiesPDO NORM Storage Facilities
Ahmed Al-SabahiAhmed Al-Sabahi
Corporate Environmental AdvisorCorporate Environmental Advisor
PDO NORM Storage FacilitiesPDO NORM Storage Facilities
PDO Has two Storage facilities:PDO Has two Storage facilities:Zualayah Storage areaZualayah Storage areaBahja Storage FacilityBahja Storage Facility
Storage of Radioactive Materials Storage of Radioactive Materials SP-1170SP-1170
All NORM contaminated items or materials must be taken All NORM contaminated items or materials must be taken to the PDO designated storage site in Zauliyah as soon to the PDO designated storage site in Zauliyah as soon as reasonably practicable. The NORM storage area as reasonably practicable. The NORM storage area must comply with the following:must comply with the following:– The NORM storage areas must be protected with proper fencing The NORM storage areas must be protected with proper fencing
and security so that uncontrolled entry is not possible.and security so that uncontrolled entry is not possible.– There must be proper signage (pictorial and written in English There must be proper signage (pictorial and written in English
and Arabic) around the fence so that the hazards are understood and Arabic) around the fence so that the hazards are understood by everybody.by everybody.
– A contour of dose rates for the site shall be available through the A contour of dose rates for the site shall be available through the supervisor. supervisor.
– People who are given access to the site are briefed on the People who are given access to the site are briefed on the location of hazards.location of hazards.
– The key for access to the site must only be issued to authorised The key for access to the site must only be issued to authorised personnel and must be signed out and back into the custodian’s personnel and must be signed out and back into the custodian’s control.control.
– The dose rate outside atThe dose rate outside at the fence of the fence of the storage facility shall not the storage facility shall not exceed 2.5exceed 2.5 1 1 Sv/hr.Sv/hr.
Zauliyah Storage FacilityZauliyah Storage Facility
In 1994 a pig sample from Hasirah – Zauliyah In 1994 a pig sample from Hasirah – Zauliyah line was found to have radioactive reading line was found to have radioactive reading above background level above background level comprehensive survey for Naturally occurring comprehensive survey for Naturally occurring radioactive material (NORM) was conducted in radioactive material (NORM) was conducted in Zauliyah station Zauliyah station high contamination reading were observed and high contamination reading were observed and materials.materials.This discovery lead to have a NORM storage This discovery lead to have a NORM storage area in Zauliyah. area in Zauliyah.
What we are storing in ZualiyahWhat we are storing in Zualiyah
TubularsTubulars
Contaminated Sludge ( in Drums).Contaminated Sludge ( in Drums).
X-Mass treesX-Mass trees
CablesCables
Scrap metalsScrap metals
The NORM radioactive material prior to being placed in The NORM radioactive material prior to being placed in the storage were cemented and solidified, in thick the storage were cemented and solidified, in thick numbered steel drums and transferred to an enclosed, numbered steel drums and transferred to an enclosed,
top open wall (10L*15W*1.5Htop open wall (10L*15W*1.5H) )
Zauliyah NORM Storage Yard
10” -Zualiyah- Sahmah line
6” Sahmah -Zualiyah line
8” Hasirah -Zualiyah line
Drainage pit
TANKMAIN GATE
Contaminated tubulars- Total number-2675End capped and parts that are rusted covered with polyethylene
Water disposal line
NORM Storage Yard
Some of the drums in the StorageSome of the drums in the Storage
Contaminated tubular from Zauliyah –5Contaminated tubular from Zauliyah –5
Present NORM Storage FacilityPresent NORM Storage Facility
AD Hoc facility set up in ZauliyaAD Hoc facility set up in ZauliyaDoes not meet required standards or Does not meet required standards or specificationsspecificationsLicensed but threat of license revocation Licensed but threat of license revocation exists due to standards breaches.exists due to standards breaches.Increasing quantities have increased dose Increasing quantities have increased dose rate to dangerous levelsrate to dangerous levelsRAC (Radiation Advisory Committee RAC (Radiation Advisory Committee Approved Setting up permanent facilityApproved Setting up permanent facility
LEKHWAIR
HASIRAH- ZAULIYAH LINE-CONTAMINATED LINE
= 60 c/s
NORM TRACES
NORM AREA
Oil pi pel in e
Gas pi pe lin e
LE G E N D
NORM TRACES
NORM AREA
MAFNORM CONTAMINATION = 0 c/sDose rate = <0.10Sv/hRADON in Gas = 61 Bq/m3
NORM CONTAMINATION =10 c/sDose Rate= 0.11-0.29Sv/hRADON in Gas= 66Bq/m3
NORM CONTAMINATION
= 60 c/sDose Rate= 0.22-0.27Sv/hRADON in Gas= 435Bq/m3
NORM CONTAMINATION
= 0 c/sDose Rate= <0.12Sv/hRADON in Gas= 407Bq/m3
NORM CONTAMINATION
= 60 c/sDose Rate= 0.25-0.50Sv/hRADON in Gas= 107Bq/m3
NORM CONTAMINATION = 0 c/sDOSE RATE = <0.12mSv/hRADON IN GAS = 260Bq/m3
NORM CONTAMINATION
= 20 c/sDOSE RATE = 0.12-0.15Sv/hRADON IN GAS = 43Bq/m3
NORM CONTAMINATION \
= 15 c/sDOSE RATE= 0.12Sv/hRADON IN GAS= 46Bq/m3
NORM CONTAMINATION = 30 c/sDose Rate= <0.18-0.24Sv/hRADON in Gas = 53 Bq/m3
NORM CONTAMINATION= 20 c/sDose Rate = 0.12-0.25Sv/hRADON in Gas - N/D
NORM CONTAMINATION
= 0 c/sDOSE RATE = <0.12Sv/hRADON IN GAS= 47Bq/m3
NORM CONTAMINATION= 400 c/sDose Rate = <0.33-0.47Sv/hLKH-128L=660 Bq/gLPS-T-2612=260Bq/g
NORM CONTAMINATION = 20 c/sDOSE RATE = 0.12-0.25Sv/hRADON IN GAS - 66
NORM CONTAMINATION= 0 c/sDOSE RATE= <0.12 Sv/hRADON IN GAS - 86Bq/M3
NORM CONTAMINATION = 18c/sDOSE RATE = 0.19-0.25mSv/hRADON IN GAS =317 Bq/M3
NORM CONTAMINATION
= 2500 c/sDOSE RATE = 1.99-2.40mSv/h
RADON IN GAS -44Bq/M3 ZL-5 =592 Bq/g
NORM CONTAMINATION
= 20 c/sDOSE RATE= 0.15-0.20mSv/h
NORM CONTAMINATION = 60 c/sDOSE RATE = 0.15-0.18Sv/h
NORM CONTAMINATION= 0 c/sDOSE RATE = <0.12 Sv/hRADON in Gas= 430Bq/m3
NORM DESIGNATED AREA-PDO
G.NORTH
QALN-ALARM
AL-GHUBARA
ANZAUZ
WAFRA
SUWAIHATSAYYALA
ZAULIYAHHASIRAH
LAST UP DATED ON 24/02/99 - Compiled and prepared by RASHID AL-ZAKWANI-TKL2B Interior-Radiation-Focal-point
WAFRA-10 = 1110Bq/g
Specifications.
NORM contamination- reading 3 times the back-ground on the contamination meter is a NORM trace or NORM suspect area.-
NORM area - Area confirmed to have materials with quantitative radioactive level of more than 100 Bq/g
Dose rate-Accepted limit is below 2.5Sv/h PPE should be used when dose rate is above 7.5Sv/h.
Contamination reading are back-ground subtracted
Note-NORM traces area,procedures must be followed
c/s-counts/seconds
Bq/g -Becquerel/ grams
Bq/m3-Becquel/ cubic meter
Sv/h - Sievart/hour
BAHJA
DHULAIMA
Mazoon
FAHUD
NATIH
YIBAL
AL HUWAISAH
MUSALLIM
TAWF DAHM
SAIHNUHAYDA
SAIH RAWL
MABROUK
BARIK
MUKHAIZNASADAD
NIMR
AMIN SIMSIM
AMAL
AL BURJ
MARMUL
RAHABTHULEILAT
QAHARIR
Issues Due to Lack of NORM Issues Due to Lack of NORM StorageStorage
Many Tanks cleaning delayedMany Tanks cleaning delayed
Mounting Inventory of NORM materialsMounting Inventory of NORM materials
Non compliance to HSE-MS or ISO-14001Non compliance to HSE-MS or ISO-14001
Potentially serious HSE risksPotentially serious HSE risks
Present NORM InventoryPresent NORM Inventory
Expected drums = 7000-8000Expected drums = 7000-8000
Down hole equipments = 40 – 50 pieces (about Down hole equipments = 40 – 50 pieces (about 4 meters length)4 meters length)
Tubing’s (3/4”) = 20000 pieces.Tubing’s (3/4”) = 20000 pieces.
Pipes = 50 pieces (different sizes and lengths).Pipes = 50 pieces (different sizes and lengths).
X- Mass trees = 10 pieces.X- Mass trees = 10 pieces.
Cables ( down hole work) = 3000mCables ( down hole work) = 3000m
Suspected NORM Sludge = 1500m³Suspected NORM Sludge = 1500m³
NORM StrategyNORM Strategy
Storage Facilities in Bahja as per SP-1170Storage Facilities in Bahja as per SP-1170
MRME constructing NORM disposal MRME constructing NORM disposal facility in 2 yearsfacility in 2 years
Operation of facility to be managed by Operation of facility to be managed by Waste Management ContractorWaste Management Contractor
Storage Facility DetailsStorage Facility DetailsTotal Area – 400m x 400mTotal Area – 400m x 400mAll the area should be linedAll the area should be linedTemporary storage for the incoming sludgeTemporary storage for the incoming sludgeToiletsToiletsEquipment & PPE StoreEquipment & PPE StoreDrummed sludge only - (50 m x 25 m x 0.4 m Drummed sludge only - (50 m x 25 m x 0.4 m area)area)Contaminated equipment (tubulars, esp’s) - (50 m Contaminated equipment (tubulars, esp’s) - (50 m x 25 m area)x 25 m area)Scrap material/metals (50 m x 25 m area)Scrap material/metals (50 m x 25 m area)Dedicated concrete pits for storage of liquid/bulk Dedicated concrete pits for storage of liquid/bulk sludge from tanks (100m*100m*1m)sludge from tanks (100m*100m*1m)
NORM facility
Rest Room & Toilet
Scrap metal50m x 25m
Drum storage50m x 25m
400 m
400 m
Entrance
gate
* Concrete pad100 m x 50 m
Tublars50m x 25m
2 PitsSludge Storage100m*10m*1m depth Source Pit
Note:- * Not decided yet due to change in design basis. CSM32 to advise
Project PhasesProject PhasesPhase 1 project started in June & was completed in August Phase 1 project started in June & was completed in August 2004 as per agreed plan.2004 as per agreed plan.– Preparation of the sitePreparation of the site– Fencing of the siteFencing of the site
Phase 2 under construction and target completion Dec.’04.Phase 2 under construction and target completion Dec.’04.– Two HDPE lined pits being builtTwo HDPE lined pits being built– Tubular AreaTubular Area– Metal AreaMetal Area– Drum YardDrum Yard– Source PitSource Pit– ToiletsToilets
Phase3 will be mid June 2005 and it will includePhase3 will be mid June 2005 and it will include
– for additional 4 pits & decontamination areafor additional 4 pits & decontamination area– Initiate development of decontamination facilityInitiate development of decontamination facility– Determine and agree on long term disposal options Determine and agree on long term disposal options
for NORMfor NORM– Tender out the design for the decontamination Tender out the design for the decontamination
facilityfacility
1st PIT
2nd PIT
TUBALAR AREA
METAL AREA
DRUMS YARD
SOURCE PIT
Rest RoomRest Room