peanut summary @ nagoya 2006/12/08 m. komatsu. scanning trials feb. 2006 : bl039,040,041,050,052,060...
TRANSCRIPT
Scanning trials• Feb. 2006 : BL039,040,041,050,052,060
– PL1 and 2 scanned with S-UTS prototype. – SFT matching has done. But we faced alignment problem by
corner for Scan Back with plate changer system.
• March 2006 : BL112,118,BF021– PL1 and 2 scanned with S-UTS prototype as same as previous
trial.– X-ray mark alignment perfectly work!
• Special thanks to Gina and Byron
• June, July 2006 : SFT prediction by UTS scanning– PL1 and 2 was scanned based on SFT predictions.– S-UTS was not available due to fabrication of new track
recognition hardware.
March trial• X-ray guided alignment
• S-UTS scanning with limited angular acceptance <0.15
• SFT matching has done– BL118 = 799 tracks, BL112 = 506 tracks and
BF021 = 402 tracks– Select interesting events by SFT eye check.
• 14 triggers and 15 tracks selected.
– 3 neutrino interactions located
PEANUT BL118 history• @Fermilab
– Brick assemble : Nov./25/2005– Beam exposure : Nov./25/2005-Feb./28/2006– X-ray marking : Mar./15/2006– De-packing : Mar./16/2006
• @Nagoya– Arrival from Fermilab : Mar./20/2006– Develop : Mar./20/2006– Doublet film scan : Mar./21 (20hour by S-UTS)– CS emulation by SFT matching : Mar./22– Track follow trial : Mar./22– Location trial : Mar./23
X-ray exposure @ Fermilab• We brought X-ray exposure bench to Fermilab
X-ray generator
X-ray slit 50m wide
PEANUT brick
X-ray slit
CS emulation (SFT matching)• S-UTS(UTS unit) scanning
– tan()<0.15, 100cm2 x 2 film = 20hour– matched tracks are tagged in 2mm, 40mrad
mm
mm
rad
rad
Scanning using X-ray
X-ray
Brick Intersection of two planes (X-ray) defines a reference line in the Brick.
Reference PointReference Point
X-ray
Scan Back ResultEvent Selectio
ncategory
SFT matching at pl01-02 SFT Matchingat pl03
Scan BackResult
Note
dx dy dtx dty dtx dty
BL118-0082
Multi -359.8 -220.9 0.0034 -0.0151 -0.0078
0.0050 Penetrated
BL118-0092
Multi 28.0 425.2 -0.0054 -0.0103 0.0125 0.0035 Stop at pl45 Neutrino Int. Cand.
BL118-0344
Multi -30.6 -1409.8
0.0166 0.0295 0.0209 -0.0194
Penetrated
BL118-0784
Multi -1910.0
364.7 -0.0104 0.0050 -0.0257
0.0182 Penetrated
BL118-1105
Multi -285.2 -195.9 0.0068 -0.0015 -0.0124
0.0129 Stop at pl37 Neutrino Int. Cand.
BF021-0084
Multi -529.6 1548.1 -0.0198 -0.0025 -0.0040
0.0300 Penetrated
BF021-0093
Kink 320.4 1428.3 -0.0028 -0.0239 -0.0144
-0.0052
Penetrated Kink
BF021-0138
Kink 206.5 884.1 -0.0006 0.0026 0.0018 0.0021 Penetrated Kink
BF021-0283
Multi 166.1 -71.5 -0.0122 -0.0116 -0.0080
0.0120 Penetrated
BF021-0490
Multi -725.3 -23.0 -0.0122 -0.0003 -0.0110
0.0100 Penetrated
Measured at pl02
1st
2nd
Fukuda
Scan Back Result ( continued )
Event Selectioncategory
SFT matching at pl01-02 SFT Matchingat pl03
Scan BackResult
Note
dx dy dtx dty dtx dty
BL112-0224BL112-0271
Multi -168.8-1169.6
1398.3-380.3
0.0284-0.0234
0.00560.0077
-0.02560.0000
0.01570.0006
PenetratedPenetrated
same event
BL112-0486
Multi -298.1 -156.6 0.0088 0.0001 -0.0113
0.0191 Penetrated
BL112-0635
Multi -370.0 -816.4 0.0014 0.0039 -0.0147
0.0113 Stop at pl43 Neutrino Int. Cand.
BL112-0700
Multi -652.1 573.9 0.0134 0.0084 -0.0019
0.0172 Penetrated
3rd
Event BL118-0092
SB track
SB track
SB track
Looking SFT hits , two tracks are exist.(-0.043, 0.028) =(#1,#0) SB track(-0.408,-0.449) =(#2,#1)
01
324
0
12
2(2,1)
0(0,1)1(1,0)Pb
Pb
2nd 15/May/2006
Event BL112-0635
Looking SFT hits Surely interaction but too many hits. (0.123,0.048) =(#0,#1) SB track
0
2
SB track
SB track
1(0,2)Pb
Pb
3rd 17/May/2006
SFT based UTS trial• BL118
– 428 tracks are selected for UTS scanning.• Require multi 3D tracks trigger.
– 124 tracks found by UTS.– 50 triggers are selected by SFT eye check.
• Plate changer based scan back was applied for 50 candidate tracks– 18 tracks stopped in BL118 brick.
• These are sent to vertex confirmation process.
Stop Event list (06,7/4)
BL112 78 94019 pl43 BL118 47 193723 pl45 BL118 64 78092 pl37 BL118 64 116018 pl26 BL118 65 17307 pl23 BL118 66 16200 pl16 BL118 74 2872 pl37 BL118 77 116741 pl14 BL118 62 64681 pl06 BL118 70 45922 pl23
Interaction in emulsion layer
Stopped plate Run Event
VTX confirmationsample in this time
We have another 8 stop tracks, not summarized in this slides
Process of Vertex confirmation
① Pick up stop Event② General scan at stopped plate③ Pick up partner track candidates④ Virtual erasing⑤ Parent search ← not yet tried in this report⑥ Penetrate check⑦ Follow down⑧ SFT matching (only PEANUT)
78 94019
X projection
Y projection
U projection
Stop at pl06
edge out at pl16
Stop at pl06
edge out at pl15
Scan back track
Summary• Limited angle scan < 0.15 (Feb. 2006)
– BL039,040,041,050,052,060– Brick-SFT matching performed
• Limited angle scan < 0.15 (Mar. 2006)– BL112,118,BF021 (100cm2 scan)– 15 trk(14 trigger) selected by SFT eye check– 3 interactions and 2 kinks confirmed in bricks
• UTS based predicted scan (June,July 2006)– BL112,118– Multi 3D track triggers for UTS scanning( CHORUS like ).
• 124 tracks found and 50 tracks are selected by SFT eye check to follow up by Plate Changer System.
– 5 confirmed(Multi track) int. and 12 stops.
• Full angle scanning with SUTS (Oct. -> ) – BL040,BL052,BL064,BF021– Under study. (Pilot scan back, 1 multi track event is seen in BF02
1)