Pecha Kucha is a presentation style in which 20 slides are shown for 20 seconds each (six minutes and 40 seconds in total). Compassites held Pecha Kucha session as team activity. This session talks of Business Continuity Plan and Disaster Recovery Plan. *All company names, product names, logos, images included in this presentation may be registered trademarks or service marks of their respective owners. No copyright violation intended on images sourced from Google searches.

TRANSCRIPT

Page 1: Pecha Kuch - BCP & DRP - By Balasubramanian P

Copyright © 2012

Welcome to Compassites!

www.compassitesinc.comCopyright © 2005 - 2013 Compassites

Page 2: Pecha Kuch - BCP & DRP - By Balasubramanian P

Copyright © 2012

Pecha Kucha Session

OnBCP and DRP

www.compassitesinc.comCopyright © 2005 - 2013 Compassites

Page 3: Pecha Kuch - BCP & DRP - By Balasubramanian P

01

I n t r o d u c ti o n t o B C P & D R P

b y B a l a s u b r a m a n i a n . P

Page 4: Pecha Kuch - BCP & DRP - By Balasubramanian P

02

Outline

1. Why discuss this topic now?2. What BCP & DR addresses?3. Broad BCP objectives4. Availability & Downtime chart5. Phases of Continuity Planning6. Need for BCP “Governance”

Page 5: Pecha Kuch - BCP & DRP - By Balasubramanian P

03

BCP addresses

Defines a process to preserve critical business functions in the face of a disaster

Continuation of critical business processes when a disaster destroys data processing capabilities

Preparation, testing and maintenance of specific actions to recover normal processing (the BCP)

Page 6: Pecha Kuch - BCP & DRP - By Balasubramanian P

03

DRP addresses

Disasters are defined in terms of…

If it harms critical business processes, it may be a disaster

how long can the business stand the pain?

Probability of occurrence

Page 7: Pecha Kuch - BCP & DRP - By Balasubramanian P

03

Disasters Classifications

Disasters – natural, man-made Natural: Fire, flood, hurricane,

tornado, earthquake, volcanoes

Man-made: Plane crashes, vandalism, terrorism, riots, sabotage, loss of personnel,etc.

Anything that diminishes or destroys normal data processing capabilities

Page 8: Pecha Kuch - BCP & DRP - By Balasubramanian P

04

Page 9: Pecha Kuch - BCP & DRP - By Balasubramanian P

03

High Level BCP objectives High Avai labi l i ty Confi denti al ity Integrity

Page 10: Pecha Kuch - BCP & DRP - By Balasubramanian P

03

Low Level BCP objectives Create, document, test, and update a plan

that will address:• Timely recovery• Minimize loss• Meet legal and

regulatory requirements

Page 11: Pecha Kuch - BCP & DRP - By Balasubramanian P

03

High Availability & Downtime chart

Availability % Downtime per year Downtime per month* Downtime per week

90% ("one nine") 36.5 days 72 hours 16.8 hours

95% 18.25 days 36 hours 8.4 hours

97% 10.96 days 21.6 hours 5.04 hours

98% 7.30 days 14.4 hours 3.36 hours

99% ("two nines") 3.65 days 7.20 hours 1.68 hours

99.5% 1.83 days 3.60 hours 50.4 minutes

99.8% 17.52 hours 86.23 minutes 20.16 minutes

99.9% ("three nines") 8.76 hours 43.8 minutes 10.1 minutes

99.95% 4.38 hours 21.56 minutes 5.04 minutes

99.99% ("four nines") 52.56 minutes 4.32 minutes 1.01 minutes

99.995% 26.28 minutes 2.16 minutes 30.24 seconds

99.999% ("five nines") 5.26 minutes 25.9 seconds 6.05 seconds

99.9999% ("six nines") 31.5 seconds 2.59 seconds 0.605 seconds

99.99999% ("seven nines") 3.15 seconds 0.259 seconds 0.0605 seconds

Page 12: Pecha Kuch - BCP & DRP - By Balasubramanian P

03

Phases of Continuity Planning

Page 13: Pecha Kuch - BCP & DRP - By Balasubramanian P

03

Phase I - Project management & initiation

Establish need (risk analysis) Get management support Establish team (functional,

technical, BCC – Business Continuity Coordinator)

Create work plan (scope, goals, methods, timeline)

Initial report to management Obtain management approval

to proceed

Page 14: Pecha Kuch - BCP & DRP - By Balasubramanian P

03

Phase 2 - Business Impact Analysis (BIA)

Obtaining formal agreement with senior management on the MTD (Maximum Tolerable Downtime) for each time-critical business resource

Analyze information Identify time-critical business functions Assign MTDs Rank critical business functions by MTDs Report recovery options (effort & price) Obtain management approval

Page 15: Pecha Kuch - BCP & DRP - By Balasubramanian P

03

Phase 3 - Recovery strategiesRecovery strategies are based on MTDs, Predefined and Management-approved

Technical recovery strategies based on subscription service sites• Hot – fully equipped• Warm – missing key components• Cold – empty data center• Mirror – full redundancy• Mobile – trailer full of computers

Technical recovery strategies based on Data • Backups of data and applications• Off-site vs. on-site storage of media• How fast can data be recovered?• How much data can you lose?• Security of off-site backup media• Types of backups (full, incremental, differential, etc.)

Page 16: Pecha Kuch - BCP & DRP - By Balasubramanian P

03

Phase 4 - BCP development / implementation

Sample plan phases• Initial disaster response• Resume critical business ops• Resume non-critical business ops• Restoration (return to primary site)• Interacting with external groups (customers,

media, emergency responders)

Page 17: Pecha Kuch - BCP & DRP - By Balasubramanian P

03

Phase 5 - BCP final phase

Testing Maintenance Awareness Training

Page 18: Pecha Kuch - BCP & DRP - By Balasubramanian P

03

Phase 5 - BCP final phase - Testing

Until it’s tested, you don’t have a plan

Kinds of testing• Structured walk-through• Checklist• Simulation• Parallel • Full interruption

Page 19: Pecha Kuch - BCP & DRP - By Balasubramanian P

03

Phase 5 - BCP final phase - Maintenance

Fix problems found in testing Implement change management Audit and address audit findings Annual review of plan Build plan into organization

Page 20: Pecha Kuch - BCP & DRP - By Balasubramanian P

03

Phase 5 - BCP final phase - Training

BCP team is probably the DR team BCP training must be on-going BCP training needs to be part of

the standard on-boarding and part of the corporate culture

Page 21: Pecha Kuch - BCP & DRP - By Balasubramanian P

03

To RECAP why BCP “Governance”?

Establishing policy by determining how the institution will manage and control identified risks;

Allocating knowledgeable personnel to implement BCP Sufficient financial resources to properly implement the BCP; Ensuring that the BCP is reviewed and approved at least annually; Ensuring employees are trained and aware of their roles in the

implementation of the BCP; Reviewing the BCP testing program and test results on a regular basis;

and Ensuring the BCP is continually updated to reflect the current operating

environment.

The organization’s senior management team is responsible for overseeing the BCP process, which includes:

Page 22: Pecha Kuch - BCP & DRP - By Balasubramanian P

THANK YOU

30

“We all have ability. The difference is how we use it.”- Grammy Award winner Stevie Wonder

(An American singer/songwriter/multi-instrumentalist but BLIND SINCE BIRTH)

Page 23: Pecha Kuch - BCP & DRP - By Balasubramanian P

Thank You