peel coastal groundwater allocation plan methods report · peel coastal groundwater allocation plan...

68
Securing Western Australia’s water future Peel Coastal groundwater allocation plan methods report Background information and description of the methods used to set allocation limits for aquifers in the Peel Coastal groundwater allocation plan October 2015

Upload: trinhdang

Post on 06-Jun-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Securing Western Australia’s water future

Peel Coastal groundwater allocation plan methods report

Background information and description of the methods used to set allocation limits

for aquifers in the Peel Coastal groundwater allocation plan

October 2015

Page 2: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set
Page 3: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan

Methods report

Background information and description of the

methods used to set allocation limits for aquifers in

the Peel Coastal groundwater allocation plan

Securing Western Australia’s water future

Department of Water

Water Resource Allocation and Planning Report series

Report no. 61

October 2015

Page 4: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Department of Water

168 St Georges Terrace

Perth Western Australia 6000

Telephone +61 8 6364 7600

Facsimile +61 8 6364 7601

National Relay Service 13 36 77

www.water.wa.gov.au

© Government of Western Australia

October 2015

This work is copyright. You may download, display, print and reproduce this material in unaltered form

only (retaining this notice) for your personal, non-commercial use or use within your organisation.

Apart from any use as permitted under the Copyright Act 1968, all other rights are reserved. Requests

and inquiries concerning reproduction and rights should be addressed to the Department of Water.

ISSN (online) 2204-9991

ISBN (online) 978-1-925174-92-2

Acknowledgements

The Department of Water would like to acknowledge the following project team and board members

for their contribution to this report: Michelle Antao, Leon Brouwer, John Connolly, Ben Drew, Melissa

Gaikhorst, Tim Grose, Carey Johnston, Scott Macaulay, Sandie McHugh, Rebecca Palandri, Patrick

Ridley, and Susan Worley.

For more information about this report contact:

Kwinana Peel regional office

107 Breakwater Parade Marine Operations Centre Mandurah WA 6210

Telephone: (08) 9550 4222

Email: [email protected]

Disclaimer

This document has been published by the Department of Water. Any representation, statement,

opinion or advice expressed or implied in this publication is made in good faith and on the basis that

the Department of Water and its employees are not liable for any damage or loss whatsoever which

may occur as a result of action taken or not taken, as the case may be in respect of any

representation, statement, opinion or advice referred to herein. Professional advice should be

obtained before applying the information contained in this document to particular circumstances.

This publication is available at our website <www.water.wa.gov.au> or for those with special needs it can be made available in alternative formats such as audio, large print, or Braille.

Page 5: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

iii Department of Water

Contents Summary ...................................................................................................................... i

1 Introduction.............................................................................................................. 1

1.1 Peel Coastal plan area ....................................................................................................... 1

1.2 Our process for allocation planning and resource management ....................................... 3

2 Part A: Assessing information ................................................................................. 5

2.1 Understanding the water resource ..................................................................................... 6

2.2 Aquifer trends ................................................................................................................... 12

2.3 Climate and rainfall ........................................................................................................... 14

2.4 Calculating aquifer recharge............................................................................................. 16

2.5 Water to remain in the aquifers ........................................................................................ 17

2.6 Social and cultural water values ....................................................................................... 23

2.7 Demand for water ............................................................................................................. 23

3 Part B: Setting plan objectives and allocation limits .............................................. 26

3.1 Setting objectives.............................................................................................................. 27

3.2 Setting allocation limits ..................................................................................................... 29

4 Part C: Defining the management approach ......................................................... 43

4.1 Water licensing in the plan area ....................................................................................... 44

4.2 Monitoring and evaluation program .................................................................................. 46

Appendix A - Determining the volume of water to be set aside for exempt stock and domestic use ......................................................................................................... 47

Glossary .................................................................................................................... 54

References ................................................................................................................ 56

Figures

Figure 1: Peel Coastal groundwater allocation plan area ...................................... 2 Figure 2: The Department of Water’s standard water allocation planning process

(Department of Water 2011) ................................................................... 3

Figure 3: Peel Coastal plan area subarea boundaries and resource shapes ........ 7 Figure 4: Groundwater recharge, discharge and throughflow in the Superficial

aquifer (after Commander 1988) ............................................................ 9 Figure 5: Geomorphology and Superficial aquifer flow system ............................ 10 Figure 6: Monitoring bores in the Peel Coastal plan area .................................... 13

Figure 7: Historical rainfall and projected rainfall for wet, mid and dry scenarios at the Bureau of Meteorology site Mandurah Park 9572 .......................... 15

Figure 8: Groundwater hydrograph for Lake Clifton B2 (Ref. no. 61319130) in the Coastal subarea 1979-2014 ................................................................. 16

Figure 9: Schematic diagram of saltwater intrusion ............................................. 18 Figure 10 Groundwater-dependent ecosystems of the Peel Coastal plan area .... 20

Page 6: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

iv Department of Water

Tables

Table 1: Report alignment with the allocation planning process ........................... 4 Table 2: Aquifer descriptions for the Peel Coastal plan area ................................ 6 Table 3: Reference groundwater levels for monitoring sites in the Peel Coastal

plan area .............................................................................................. 22

Table 4: Total licensed water entitlements categorised by use in the Peel Coastal plan area (Superficial and Leederville aquifers) July 2014 ...... 24

Table 5: Exempt domestic use estimates for the Peel Coastal plan area (Superficial aquifer) .............................................................................. 24

Table 6: Developing the resource objectives and water management framework for the Peel Coastal plan area .............................................................. 28

Table 7: Allocation limits for the Superficial aquifer (by subarea) in the Peel Coastal plan area ................................................................................. 32

Table 8: Allocation limits for the Leederville aquifer (by subarea) in the Peel Coastal plan area ................................................................................. 40

Table 9: The intent of the local licensing policies ............................................... 45

Page 7: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water i

Summary

What is this report?

This report explains how the Department of Water developed the allocation limits for

each of the 14 groundwater resources covered by the Peel Coastal groundwater

allocation plan (Department of Water 2015a). This companion document to the

allocation plan provides further detail on the hydrogeological, environmental, cultural

and social information available for the aquifers of the plan area, and on the decision-

making process.

The allocation plan details the allocation limits, water licensing arrangements and

resource monitoring specific to the plan area.

What does this report include?

This report is split into three main chapters which follow the department’s water

allocation planning process for plan development set out in Water allocation planning

in Western Australia: a guide to our process (Department of Water 2011):

Chapter 2 – Stage A: describes the information used in refining the precision of the allocation limits, particularly our current understanding of the groundwater resource, including current use of water and future demands.

Chapter 3 – Stage B: outlines how we set the management and resource objectives and the methodology for making the allocation limit decisions.

Chapter 4 – Stage C: describes the role of policy and licence conditions in local resource management and the broader water management approach to support the use of the allocation limits in the plan.

The following reports also supported the planning process and provide key reference

material for groundwater management in and adjacent to the plan area:

Peel Coastal groundwater area: Groundwater-dependent ecosystems report, (Department of Water 2015b)

Rockingham-Stakehill groundwater management plan (Department of Water 2007a)

South West groundwater areas allocation plan (Department of Water 2009a)

Draft Perth-Peel Regional water plan 2010-2030 (Department of Water 2009b)

Murray groundwater allocation plan (Department of Water 2012).

Further information on the plan area can be obtained by contacting the Kwinana Peel

regional office, or from the technical documents listed in the references section of this

report

Page 8: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set
Page 9: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 1

1 Introduction

This report explains how the Department of Water developed the allocation limits for

each of the 14 groundwater resources included in the Peel Coastal groundwater

allocation plan (Department of Water 2015a).

This report is designed to be read in conjunction with the Peel Coastal groundwater

allocation plan (Department of Water 2015a). The References section of this

document list further reading available on the plan area.

1.1 Peel Coastal plan area

The plan area extends along the Swan Coastal Plain from the northern surrounds of

Mandurah (approximately 70 km south of Perth) to Myalup (Figure 1) and covers

approximately 380 km². Most of the plan area is within the local government

boundaries of the City of Mandurah and the Shire of Waroona.

The Peel Coastal plan area consists of seven subareas (see Figure 1):

Coastal

Colburra Downs

Falcon

Island Point

Lake Clifton

Mandurah

Whitehills

Allocation plans have been developed for the areas adjacent to the Peel Coastal plan

area. These include the Murray, Rockingham-Stakehill and South West groundwater

allocation plans (Figure 1).

Page 10: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

2 Department of Water

Figure 1: Peel Coastal groundwater allocation plan area

Page 11: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 3

1.2 Our process for allocation planning and resource management

The Peel Coastal groundwater allocation plan (Department of Water 2015a) was

developed using the department’s process for water allocation plans: Water

allocation planning in Western Australia: a guide to our process (Department of

Water 2011) (Figure 2).

Figure 2: The Department of Water’s standard water allocation planning process

(Department of Water 2011)

This report is set out to follow the three stages of plan development and provides the

information and methodology used to complete each stage (see Table 1). Each stage

corresponds to a chapter in this report:

Page 12: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

4 Department of Water

Table 1: Report alignment with the allocation planning process

Chapter 2 - Stage A:

Investigate and

assess the water

resource

Assess the area’s hydrogeology (sections 2.1-2.5)

Consider the ecological, economic and social values (sections 2.6 and 2.7)

Assess the level of water use and future water demands (Section 2.8)

Chapter 3 - Stage B:

Set management

objectives and

allocation limits for

the resource

Set resource objectives (Section 3.1)

Consider allocation options (Section 3.2)

Set allocation limits (Section 3.2)

Chapter 4 - Stage C:

Define the

management

approach for the

resource

Identify the water licensing approach to meet plan outcomes and objectives (Section 4.1)

Identify any specific local licensing policies required other than state-wide policies (Section 4.2)

Develop a monitoring and evaluation process to monitor performance against specific resource objectives (sections 4.3 and 4.4)

Page 13: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 5

2 Part A: Assessing information

In Part A of the allocation planning process, we assess:

the hydrogeology of the resource

how much water needs to be left in the system (environmental water)

current water use and future demand for groundwater.

This information is used to set objectives, allocation limits and define the water

licensing approach for the plan area.

Key points from this section:

The key groundwater resources in the plan area are the freshwater lens of the

Superficial aquifer, and the marginal to brackish component of the Leederville

aquifer.

The drying climate experienced in the south-west of Western Australia since

the 1980s has reduced groundwater recharge in the plan area. This trend is

projected to continue.

Groundwater resources and their dependent values are at risk from movement

of the seawater interface, acid sulphate soils, declines in water levels and

reductions in freshwater through flow.

There are high-value environmental features in the plan area which are

groundwater-dependent, such as Lake Clifton (Ramsar) and the Peel-

Yalgorup wetland chain.

Future land planning does not indicate significant change in water demand up

to 2030.

Page 14: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

6 Department of Water

2.1 Understanding the water resource

There are three aquifers present in the plan area. In order of increasing depth, these

are the Superficial and Leederville aquifers, and the Cattamarra Coal Measures. The

resource boundaries for the Superficial and Leederville aquifers are shown in

Figure 3 and their properties are summarised in Table 2.

The Cattamarra Coal Measures also exist in the plan area, however due to their

salinity (brackish to saline), depth (>290m) and subsequent low demand are not

covered here or in the allocation plan.

Table 2: Aquifer descriptions for the Peel Coastal plan area

Aquifer Description

Superficial Extends across whole plan area (regional formations).

Shallow, unconfined aquifer, that is easily accessible.

Thin lens of fresh water floats above saline water.

Freshwater recharge is primarily through direct rainfall infiltration.

The thin, freshwater lens is high susceptible to saline intrusion from the ocean, estuary and underlying water.

Generally this aquifer is in hydraulic connection with the underlying Leederville aquifer, except where the confining Osborne Formation is present and forms an aquiclude.

Formations include Tamala Limestone, Safety Bay Sands and Bassendean Sand (known collectively as the Superficial aquifer).

Supports groundwater-dependent ecosystems through access to the watertable or freshwater throughflow.

Leederville Major regional confined aquifer which extends outside the Peel Coastal plan area.

Recharge conditions vary, due to localised hydrogeology.

Freshwater leakage generally occurs from the overlying Superficial aquifer, and in some areas aquifer throughflow occurs.

In the Falcon subarea the abstraction in the Leederville aquifer is believed to induce saline recharge from the Peel Inlet.

In the Colburra Downs subarea recharge throughflow is likely to be from the adjoining Murray groundwater area.

The aquifer is vulnerable to saline intrusion in most subareas.

Page 15: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 7

Figure 3: Peel Coastal plan area subarea boundaries and resource shapes

Page 16: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

8 Department of Water

Conceptual hydrogeology of the Superficial aquifer

The Superficial aquifer is an unconfined, stratigraphically complex, multilayered

aquifer consisting mainly of porous Tamala Limestone which is generally in hydraulic

connection with the underlying Leederville aquifer. It occurs at shallow depths with a

maximum saturated thickness of 25 m.

The Superficial aquifer forms a significant and extensively exploited aquifer. It occurs

at shallow depth and is readily available. Individual bore yields range from

500-2000 kL/day in the Bassendean Sand formation to more than 5000 kL/day in the

karstic Tamala Limestone formation.

The conceptual hydrogeology for the Superficial aquifer is generally consistent

across the subareas, consisting of a layer of fresh water overlying denser, saline

water, with the weight of the fresh water depressing the underlying saline

groundwater. As this freshwater layer is reduced (e.g. by pumping or reduced

recharge), its weight is reduced and the underlying saline water rises. This has the

effect of buffering the overall water level in the bore and makes monitoring water

levels an unreliable means of monitoring the health of the resource. As a result of

this, the resource is also at risk of saline upconing when over-abstraction occurs at a

local scale.

Figures 4 and 5 illustrate local groundwater recharge and flow paths for the

Superficial aquifer in the plan area.

The Superficial aquifer supports groundwater-dependent ecosystems such as lakes,

wetlands, terrestrial vegetation and rare Thrombolite communities. These

ecosystems rely on either access to the watertable or freshwater throughflow and

discharge. For more information on groundwater-dependent ecosystems in the plan

area, see Section 2.6 or refer to the Peel Coastal plan area: Groundwater-dependent

ecosystems report (Department of Water 2015).

Groundwater flow and discharge

Groundwater flow in the Superficial is complex in the plan area (Figure 5).

Groundwater discharges to low-lying areas (groundwater sinks) from local

groundwater mounds and divides (e.g. Lake Clifton and Lake Preston). Groundwater

also flows towards the Indian Ocean, the Peel Inlet and the Harvey Estuary, and the

Serpentine and Harvey rivers. In addition, discharge occurs through evaporation,

transpiration and leakage to underlying aquifers.

Page 17: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 9

Figure 4: Groundwater recharge, discharge and throughflow in the Superficial

aquifer (after Commander 1988)

Recharge

The Superficial aquifer is recharged directly by rainfall, with a large proportion of

infiltration lost to evapotranspiration (CSIRO 2009). Recharge rates vary across the

plan area as a result of variation in lithology, vegetation, depth to watertable and

topographic gradient. Groundwater recharge is highest in sparsely vegetated coastal

dunes and where the land has been cleared for agriculture. Groundwater recharge is

lowest in dense Eucalyptus woodlands (e.g. Tuart forest).

Inflow to the Superficial aquifer occurs locally by upward leakage from the underlying

Leederville aquifer along the coast where there are increasing hydraulic heads with

depth and no confining beds between the Superficial and Leederville aquifers.

Page 18: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

10 Department of Water

The Water Corporation infiltrates treated

wastewater into the Superficial aquifer at

three wastewater treatment plants (WWTPs)

in the plan area: Gordon Road WWTP in the

Mandurah subarea, Halls Head WWTP in

the Falcon subarea and Caddadup WWTP

in the Falcon subarea. This recharge

supports some localised abstraction, as well

as preventing seawater intrusion in the

Falcon subarea.

Groundwater quality

The salinity of groundwater in the Superficial

aquifer ranges from less than 250 mg/L to

64 000 mg/L adjacent to Lake Preston.

Fresh water is found overlying deeper saline

groundwater (this stratification happens due

to differences in density).

Saline groundwater occurs in the lower part

of the Superficial aquifer across a large part

of the plan area and some discharge areas

(Figure 4). Hypersaline groundwater is

found adjacent to and below Lake Preston.

The coastal lakes are groundwater sinks

and are commonly saline to hypersaline due

to evaporative concentration of dissolved

salts. However, rainfall and groundwater

throughflow contribute some fresh water to

the system.

Figure 5: Geomorphology and Superficial aquifer flow system

Page 19: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 11

Conceptual hydrogeology of the Leederville aquifer

The Leederville aquifer is a major, regionally confined aquifer, with a thickness of

about 140 m in the Mandurah subarea and up to 180 m south of Lake Clifton. It

extends outside of the plan area. The Leederville aquifer forms a significant

groundwater resource with bore yields of up to 1500 kL/day.

It is a multilayered, groundwater flow system consisting of interbedded sandstone,

siltstone and shale. In some subareas, a sandy, green marker bed divides the

Leederville aquifer. Above this marker bed, water quality is marginal. Below the

marker bed, the groundwater is marginal to brackish, and its salinity increases with

depth. This is due to the influence of the Peel Inlet and Harvey Estuary.

Current abstraction from the Leederville aquifer is relatively small compared to the

Superficial aquifer. Groundwater abstraction should be managed carefully to prevent

any lateral movement of saline water and upconing of the deeper saline groundwater.

Groundwater flow

Groundwater in the Leederville aquifer flows westerly and eventually discharges

offshore into the Indian Ocean. Onshore, some groundwater in the Leederville

aquifer discharges into the Superficial aquifer where the Kardinya Shale Member is

absent and where there is increasing head with depth and upward hydraulic

gradients.

Recharge

The Leederville aquifer is mainly recharged at the foot of the Darling Range, outside

the plan area, where it is in direct hydraulic contact and connection with the

Superficial aquifer and where there is downward hydraulic gradient.

There is limited data available on the hydrogeology and groundwater recharge

mechanisms of the Leederville aquifer in the plan area. Recent drilling indicates that

the geology is quite variable. The results of drilling carried out in 2012 by the

Department of Water are expected to further improve our knowledge of the

Leederville aquifer in the plan area. An interpretation of the results is expected to be

published in 2016.

Where the groundwater recharge intake areas for the Leederville aquifer are overlain

by the Peel Inlet and Harvey Estuary, recharge into the existing freshwater resource

is saline. The time frame for the resulting decline in water quality is unknown and will

need to be managed carefully.

Groundwater quality

The salinity of water drawn from most production bores in the Leederville aquifer is

greater than 1000 mg/L TDS. The salinity of the Leederville aquifer increases with

depth. Salinity is lowest in the shallower sections of the Leederville aquifer where

recharge occurs. Where the aquifer lies beneath the Peel Inlet and Harvey Estuary,

salinity is increasing.

Page 20: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

12 Department of Water

Resource and subarea boundaries

Both the Superficial and Leederville aquifers exist across the entire plan area.

Subarea boundaries separate the aquifer into individual resources for licensing

purposes and reflect groundwater flow systems as discretely as possible to allow

area-specific management strategies.

Further detail on the hydrogeology of the plan area may be found in:

Groundwater yields in south-west Western Australia: A report to the Australian Government from the CSIRO South West Western Australia sustainable yields project (CSIRO 2009)

Hydrogeology and groundwater resources of the Perth region, Western Australia (Davidson 1995)

REG75- A tool for estimating mean annual flow for the South West of Western Australia (Department of Water 2007b)

Climate change, water demand and water availability scenarios to 2030: Perth-Peel water plan background paper (Department of Water 2009c).

2.2 Aquifer trends

Groundwater monitoring and measurement data is available from 29 departmental

bores across the Peel Coastal plan area (Figure 6). The majority of the monitoring

bores are screened in the Superficial aquifer. Assessment of the water level trends

from groundwater hydrographs is a key consideration in setting allocation limits.

Groundwater trends in the Superficial aquifer

Analysis of the hydrographs shows that groundwater levels experienced a small,

long-term decline in most subareas. The decline is generally less than 1 m over the

last 30 years. Exceptions to this trend in individual hydrographs can be explained by

local factors such as relatively high abstraction, infiltration of treated wastewater into

the watertable or buffering from the close proximity to both the Indian Ocean and the

Peel Inlet. Coastal buffering suppresses any large response in groundwater levels to

abstraction or rainfall declines.

Individual trends for the different resources are described in Table 7 in Section 3.2.

Links to our Water Information Reporting website are also provided.

Page 21: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 13

Figure 6: Monitoring bores in the Peel Coastal plan area

Page 22: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

14 Department of Water

Groundwater trends in the confined aquifers

There is limited evidence to assess pressure-head trends in the Leederville aquifer

across the entire plan area. However, there are a small number of bores in the

Mandurah subarea that indicate that trends follow the regional declining pressure-

heads observed across the Swan Coastal Plain (search for monitoring site AM67A

(Ref no. 61415005) at http://wir.water.wa.gov.au. This is likely to be a result of

groundwater abstraction and reduced recharge, not just in the plan area but from

recharge zones to the east.

No long-term monitoring data was available at the time of plan development for the

Leederville aquifer south of Mandurah.

In 2012, two new monitoring bores were installed in the Island Point and Whitehills

subareas as part of the department’s State Groundwater Investigation Program to

address the limited information available. Data from these bores will improve our

knowledge of the southern Leederville aquifer. The Murray-Peel Groundwater

Investigation Bore Completion Report is in preparation and due for publishing in 2016

by the Department of Water.

2.3 Climate and rainfall

We have continued to observe significant reductions in rainfall across the southwest

of Western Australia since the mid-1970s. This is affecting surface water run-off and

groundwater recharge and means that it is a critical factor in our water planning. It is

likely that the climate will continue to dry over the life of the plan.

We use the most update-to-date climate modelling from the Intergovernmental Panel

on Climate Change to project future rainfall across the state (Department of Water,

2015c).

The department’s projections (Figure 7) indicate that by 2020 the long-term average

annual rainfall for Mandurah, which was 845 mm/yr over the baseline period of 1961

to 1990, will decline by 2.5, 5.8 and 8.9 per cent under a wet, mid and dry scenario

respectively, and by 2030 by 3.4, 9 and 13.6 per cent.

The climate has been particularly dry over the last decade. It is characterised by

declines in both mean annual and autumn-winter rainfall, with an associated decline

in the number of rainfall events per year that result in significant runoff, and also a

rise in average annual temperature (Charles et al. 2010).

Page 23: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 15

The future scenarios are calculated relative to a 1961-1990 baseline, so the climate trends are plotted using 1990

as the starting year.

Figure 7: Historical rainfall and projected rainfall for wet, mid and dry scenarios at

the Bureau of Meteorology site Mandurah Park 9572

Effect of reduced rainfall on aquifer recharge

Reduced rainfall makes a significant difference to groundwater recharge and water levels in the plan area. In addition to affecting the amount of water we are able to make available for licensing into the future, reduced recharge has and will continue to increase the risks of:

movement of the seawater interface

exposure of acid-sulfate soils

declines in water levels support wetlands and vegetation

reductions in freshwater through flow that support thrombolite communities.

Hydrographs from the Superficial aquifer in the plan area indicate that the decline in rainfall experienced since the mid-1970s has significantly contributed to the slow, gradual declines in groundwater levels.

A hydrograph from the Coastal subarea is presented below (Lake Clifton B2, ref. no.

61319130; Figure 8). This bore is located in an area with minimal abstraction and the

midline, around which seasonal variation in water level occurs, drops approximately

0.3 m over approximately 18 years.

400

500

600

700

800

900

1000

1100

1960 1970 1980 1990 2000 2010 2020 2030

An

nu

al r

ain

fall

(mm

)

Year

Historical annualrainfall30yr moving average

Future dry climatetrendFuture median climatetrendFuture wet climatetrendDriest projected year

Mandurah Park 9572

Page 24: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

16 Department of Water

Figure 8: Groundwater hydrograph for Lake Clifton B2 (Ref. no. 61319130) in the

Coastal subarea 1979-2014

Accounting for drying climate in our allocation decisions

Accounting for the continued decline in future rainfall when we set allocation limits

helps to ensure an ongoing reliable groundwater supply for water users and

minimises the risks to the environment. Section 3.2 describes in detail how we did

this.

We will also continue to monitor how the drying climate is affecting groundwater

resources through the monitoring and plan evaluation program outlined in the plan.

Where necessary we will adapt our management over time.

2.4 Calculating aquifer recharge

Historical groundwater data in the plan area is limited and made our assessment of

recharge volumes and a sustainable yield difficult. A number of recharge estimation

methods were trialled, however no approach could be applied consistently across the

whole plan area. Similarly, due to the inconsistent spread of data, application of a

numerical groundwater model for the purposes of recharge and yield calculations

was not seen as practical or beneficial given the monitoring information available.

To deliver an effective result, we used a risk-based approach for setting allocation

limits. Further explanation of why and how this was carried out is outlined in Section

3.2.

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

Gro

un

dw

ate

r le

vel (m

AH

D)

Year

Page 25: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 17

2.5 Water to remain in the aquifers

When setting allocation limits, we ensure that water remains in the aquifer to protect

the long-term viability of the aquifer for use and to support groundwater-dependent

ecosystems.

In the plan area there are risks from over-abstraction to water levels, as well as water

quality. Over time, water quality (particularly in the Superficial aquifer) is likely to

pose a greater risk to users and groundwater dependent ecosystems. This is

because although water levels will be held relatively stable by the proximity to the

ocean and the estuary, water quality can still change dramatically through landward

movement of the seawater interface and localised saline upconing.

Seawater interface

The seawater interface is the boundary between the fresh water throughflow of the

aquifer and the denser, saline water of the ocean (Figure 9). Over-abstraction from

areas near the coast and declining rainfall and recharge will increase the draw of

saline water into the freshwater aquifer.

Over-abstraction and declining rainfall and recharge will also cause landward

movement of the saline waters from the Peel-Harvey Estuary.

This risk of this occurring is considered in the process to set allocation limits

described in Section 3.2.

Page 26: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

18 Department of Water

Figure 9: Schematic diagram of saltwater intrusion

Page 27: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 19

Saline upconing

In the plan area there are unique areas of coastal hydrogeology where the freshwater

portion of the Superficial aquifer is underlain by saline water. Localised intrusion from

underlying saline water up through the aquifer can occur if abstraction is too high.

We considered the risk of saline upconing occurring when setting allocation limits,

but more importantly when outlining how water is abstracted locally. Local licensing

policies relating to the spacing and rate of abstraction are outlined in Section 4.3 of

the plan.

Groundwater-dependent ecosystems

In administering the Rights in Water and Irrigation Act 1914, the Department of Water

provides for both the sustainable use and development of water resources, and the

protection of ecosystems associated with water resources.

Under the Environmental water provisions policy for Western Australia (Water and

Rivers Commission 2000), we commit to undertake allocation planning in a way that

protects key groundwater-dependent environmental values, given they are vulnerable

to changes in the quantity or quality of groundwater.

Many of the natural values in the plan area are dependent on groundwater – lakes,

wetlands and priority terrestrial vegetation complexes that are situated on or near

shallow groundwater, or rely on groundwater discharge (Figure 10). Many of the

vegetation complexes of the area are now of regional significance, given widespread

clearing on the Swan Coastal Plain.

The Yalgorup National Park and the Ramsar-listed Peel-Yalgorup wetland system

cover a large portion of the plan area. These are regionally and internationally

significant natural features and make up one of the largest coastal reserves in

Western Australia.

Because of the reserves, the plan area supports a diverse range of flora and fauna

species including a number of regionally, nationally and internationally threatened

species. Of these, the living thromobolite community found in Lake Clifton is of

particular importance.

Page 28: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

20 Department of Water

Figure 10 Groundwater-dependent ecosystems of the Peel Coastal plan area

Page 29: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 21

Environmental assessment

Peel Coastal groundwater allocation plan: Groundwater-dependent ecosystems

report (Department of Water 2015b) describes the biophysical setting of the Peel

Coastal plan area, and the ecological values of each subarea.

The report assesses information on groundwater-dependent ecosystems by:

mapping areas of potential groundwater dependence

identifying environmental values likely to be associated with the Superficial aquifer based on their occurrence on shallow groundwater

establishing the significance of those values at local, state and national levels.

In the report we combined vegetation and wetland mapping with depth-to-

groundwater data to identify sites where groundwater-dependent ecosystems occur.

The mapping shows where groundwater-dependent ecosystems rely on the

Superficial aquifer and sites where groundwater is discharged into the lakes.

We used the information in this report to assess the risks to groundwater-dependent

ecosystems from abstraction, to set allocation limits and to develop local licensing

policies.

Further information on groundwater-dependent ecosystems in the Peel Coastal plan

area can be found in:

Swan Coastal Plain South Draft Management Plan (Department of Parks and

Wildlife 2014)

Environmental Protection Authority Bulletin 864 - Final Criteria for

Environmental Acceptability for Land Use proposals within the Catchment of

Lake Clifton (Environmental Protection Authority 1997).

Minimum groundwater reference levels

We describe ecological water requirements, in the form of minimum groundwater

reference levels, for selected sites in the plan area (Table 3). These levels allowed us

to assess the risks to groundwater-dependent ecosystems associated with

abstraction and to set allocation limits. They will also form the basis of an adaptive

monitoring and management framework. It is expected that ecosystems can tolerate

some change to average minimums but still remain at a low level of risk.

The reference levels were developed by selecting representative sites using wetland

and vegetation mapping, and analysis of aerial photography which showed the

wetlands of high conservation value and areas of terrestrial vegetation.

Generic ecological water requirements, in the form of maximum drawdown and rate

of change criteria, were then established for each site. We used long-term

groundwater monitoring data and published information on vegetation response to

groundwater drawdown to develop these minimum levels.

We have identified that some additional work is required to ensure that reference

levels and our monitoring program are effective in managing the groundwater

Page 30: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

22 Department of Water

resource (see actions 3 and 4 in Table 4 of the plan). This applies to sites at Lake

Clifton, Lake Preston and Martin’s Tank that require groundwater discharge to

maintain Thrombolite communities. In these instances, water quality monitoring and

criteria will need to be put in place. Monitoring groundwater levels alone in these

instances will not be sufficient because as mentioned previously water quality may

change significantly without any change in water levels.

Table 3: Reference groundwater levels for monitoring sites in the Peel Coastal

plan area

Resource

objective

Subarea Monitoring

bore

Ecological value Reference

groundwater levels

Groundwater levels are sufficient to minimise risks to groundwater-dependant ecosystems

Mandurah T630 61410026

Remnant groundwater-dependent vegetation

Groundwater level above 0.13 m AHD

Island Point

YSH4

61319530 Riparian vegetation

Currently collecting data for determination of level

HS62C

61330103

Riparian vegetation and Environmental protection policy wetland

Groundwater level above 0.01 m AHD

Coastal

Lake Clifton C2 61319137

Riparian vegetation Groundwater level above −0.45 m AHD

Lake Clifton B2 61319130

Riparian vegetation Groundwater level above −0.26 m AHD

Maintain sufficient groundwater discharge into Lake Clifton, Lake Preston and Martin’s Tank

Island Point

Y2-4B

61319508

Throughflow to Lake Clifton

Groundwater level above −0.05 m AHD

YSH4

61319530

Discharge into Lake Clifton

Baseline

Coastal

Lake Clifton C2 61319137

Discharge into Martin’s Tank Lake

Groundwater level above −0.45 m AHD

Lake Clifton B2

61319130

Discharge into Lake Preston

Groundwater level above −0.26 m AHD

Our commitment to ongoing monitoring and evaluation of these values is presented in Chapter 5 of the plan.

Page 31: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 23

2.6 Social and cultural water values

The Environmental water provisions policy for Western Australia (Water and Rivers

Commission 2000) identifies the following as the social values that require

consideration in planning:

Aboriginal cultural values

Australian heritage values

recreational and tourism pursuits

landscape and aesthetic aspects

educational and scientific aspects.

Social values relate to water found in its natural place, not water consumed for social

benefit (Beckwith 2009).

Although specific studies to describe or quantify the social values associated with

groundwater were not completed as part of developing the plan, some clear

assumptions can be made. Wetlands and natural areas found in the plan area – in

particular those associated with Yalgorup National Park and other conservation

reserves – provide valuable tourism assets, prized recreational areas, and sites of

both Aboriginal cultural and Australian heritage significance (Department of Water

2009b, Department of Parks and Wildlife 2014).

Given that most of these are dependent on groundwater, ensuring that we regulate

and manage abstraction appropriately will deliver significant social and cultural

outcomes.

2.7 Demand for water

We take into account both current and future demand for groundwater when setting

allocation limits. Section 3.2 describes how we did this in the plan area.

Current groundwater use

Land use in the northern part of the plan area – in and around Mandurah – is

primarily urban, with groundwater used to irrigate public open space, sporting

grounds and domestic gardens. Groundwater use in the south supports small-scale

agriculture, horticulture, plantations and domestic gardens. The volume of licensed

water used by different land uses is summarised in Table 4.

Household potable water supplies in Mandurah and surrounding areas are provided

by Water Corporation’s Integrated Water Supply Scheme. Water for the scheme

comes from a combination of surface water dams, groundwater from outside of the

plan area, desalination and recycled water. A small volume of groundwater (20 000

kL/yr) is licensed to Water Corporation from the Leederville aquifer in the Coastal

subarea to supply drinking water to Preston Beach.

Page 32: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

24 Department of Water

Water use across the plan area is highest in the Mandurah and Falcon subareas with

licensed entitlements totalling ~4 698 000 kL/yr accounting for 87 per cent of the total

licensed entitlements of the plan area (5 389 175 kL/yr). The remaining five subareas

total 711 000 kL/yr in licensed entitlements.

Stock, garden and domestic bore use (exempt from licensing) is also particularly high

in this plan area (5 379 000 kL/yr), accounting for almost half of all groundwater use.

Exempt use includes backyard garden bores for urban blocks, as well as traditional

stock and domestic allocations for larger ‘lifestyle lots’ and properties south of Falcon

which do not have access to scheme water supply. Table 5 identifies the estimated

volume of exempt use in each Superficial resource. The method used for calculating

these estimates is presented in Appendix A.

Table 4: Total licensed water entitlements categorised by use in the Peel

Coastal plan area (Superficial and Leederville aquifers) July 2014

Usage category Total licensed entitlement volume (kL/yr)

Percentage of total entitlement volume (%)

Agriculture 858 700 16

Public drinking water scheme supply (reserve)

20 000 0.4

Licensed stock and domestic 125 130 2

Commercial and institutional 205 563 4

Industry and power generation 44 300 1

Parks, gardens and recreation 4 155 482 77

TOTAL 5 389 175 100

Table 5: Exempt domestic use estimates for the Peel Coastal plan area

(Superficial aquifer)

Subarea Estimated

exempt use (kL/yr)

Mandurah 2 628 000

Falcon 1 667 000

Whitehills 243 000

Island Point 283 000

Lake Clifton 355 000

Coastal 133 000

Colburra Downs 70 000

TOTAL 5 379 000

Page 33: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 25

Future groundwater use

The Peel Coastal groundwater allocation plan (Department of Water 2015) aligns

water allocation planning with land use planning to ensure that future water needs

are able to be met, while also protecting the resource and its dependent values.

We used the following planning documents to estimate likely future groundwater use:

Directions 2031 and beyond (Western Australian Planning Commission 2010)

Outer metropolitan Perth and Peel sub-regional strategy (draft) (Western

Australian Planning Commission and Department of Planning 2010)

Overall, groundwater needs for the plan area are not expected to increase

significantly over the next 10 years. An estimated 268 ha of new urban areas have

been identified in the plan area. Most of this is in the Mandurah and Dawesville

areas. We have projected that water needs for public open space in these areas will

be approximately 200 000 kL/yr.

Local structure plans for the area indicate some rezoning of rural areas south of

Mandurah, but a substantial increase in groundwater requirement is not anticipated.

The draft Southern Mandurah Rural Structure plan (City of Mandurah 2013) indicates

that it is likely that exempt-from-licensing groundwater demand may increase by

approximately 47 000 kL/yr.

Section 3.2 describes how we considered these estimates of future use when setting

allocation limits.

Page 34: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

26 Department of Water

3 Part B: Setting plan objectives and allocation limits

In Part B of the allocation planning process we:

set objectives for our management of the area

outline the methodology selected

assess allocation options

decide allocation limits.

Key points for this section:

We developed measurable resource objectives to achieve the plan outcomes, which are to:

- support the water needs of current and future land uses in the Peel Region

- protect valuable ecosystems dependent on groundwater, including those of

the Peel–Yalgorup wetland system, from any adverse effects of groundwater

abstraction

- encourage water trading and the use of alternative water sources.

A risk-based approach was used to set allocation limits and consider the needs of competing consumptive use and in-situ demands for water in a drying climate.

In setting the allocation limits we used the following to inform our decisions:

our understanding of groundwater-dependent ecosystems, significant environmental assets and social values

trends in groundwater levels and assessment of the risk of taking more, less or the same volume of water

current licensed and exempt-from-licensing water use

future demand for water based on land use planning

stakeholder feedback.

Page 35: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 27

3.1 Setting objectives

In administering the Rights in Water and Irrigation Act 1914, the Department of Water

provides for both the sustainable use and development of water resources, and the

protection of ecosystems associated with water resources.

The process of setting allocation limits, developing licensing approaches and

policies, and setting up our monitoring and evaluation program are guided by the

outcomes and resource objectives described below. They will also continue to inform

our management as we implement the plan.

Outcomes

We aim to support achievement of the plan outcomes by implementing the water

resource management described in the plan. The outcomes for the Peel Coastal

groundwater allocation plan are to:

support the water needs of current and future land uses in the Peel Region

protect valuable ecosystems dependent on groundwater, including those of the Peel-Yalgorup wetland system, from impacts of abstraction

encourage water trading and the use of alternative water sources.

Resource objectives

To support the plan outcomes, our management is directed towards meeting specific

water resource objectives. Water resource objectives must be measurable and relate

directly to maintaining, increasing, improving, restoring, reducing or decreasing

surface water flow, groundwater levels or water quality. They are measurable, so that

progress against them can be assessed during regular plan evaluations.

Resource objectives for the plan area and the factors considered in setting them are

summarised in Table 6.

Page 36: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

28 Department of Water

Table 6: Developing the resource objectives and water management framework

for the Peel Coastal plan area

Resource objective Main factors considered in developing the resource objective

1. Abstraction does not cause the seawater interface to move inland

Preventing significant seawater intrusion into the aquifer as a result of abstraction will contribute to maintaining the reliability of freshwater supply for existing users and the environment.

Groundwater users and any groundwater-dependent ecosystems located along the coast are likely to be adversely impacted if the seawater interface moves further inland.

There is some natural saltwater intrusion expected associated with declining rainfall and groundwater recharge climate, however the trend is slow.

2. Saltwater up-coning does not affect other users

Preventing local saltwater upconing as a result of abstraction will contribute to maintaining the reliability of freshwater supply for existing users, their neighbours and the environment.

If the freshwater portion of the aquifers becomes saline it will limit what the resource can be used for into the future and adversely affect groundwater-dependent ecosystems.

3. Groundwater levels are sufficient to minimise risks to groundwater-dependant ecosystems

The Peel Coastal plan area contains many highly valued ecosystems that depend on groundwater. The department is responsible for minimising the risk to groundwater-dependent ecosystems, where abstraction occurs.

We expect that groundwater-dependent ecosystems will undergo natural changes over time as a result of declining rainfall and this may include changes to groundwater levels in the Superficial aquifer. However, we aim to minimise this risk through our allocation limits, licensing and ongoing monitoring and evaluation.

4. Fresh groundwater discharge into Lake Clifton, Lake Preston and Martin’s Tank is sufficient to minimise further risk to dependent ecological values

Lake Clifton, Lake Preston and Martin’s Tank are all highly valued environmental assets which require annual fresh groundwater discharge to maintain their ecological state (see Peel Coastal groundwater allocation plan: Groundwater-dependent ecosystems report, Department of Water 2015b for more information). Freshwater discharge is particularly important for Thrombolite communities.

We expect that groundwater-dependent ecosystems will undergo natural changes over time as a result of declining rainfall and this may include changes to how much freshwater is discharged at these sites. We aim to minimise this risk in how we manage groundwater in the plan area.

Page 37: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 29

3.2 Setting allocation limits

What is an allocation limit?

An allocation limit is the annual volume of water set aside from a water resource for

consumptive use. Allocation limits are the main tool that the Department of Water

uses to ensure sustainable take and security of supply at the resource scale. The

limit does not include water allocated to remain in the aquifer.

The allocation limit decision represents a balance between current and future

groundwater use, and the amount of water that needs to be retained in the aquifer for

environmental and resource-protection purposes.

Selecting the best method to set allocation limits

Due to the relatively low use of groundwater (compared to other areas of the state)

the department does not have an extensive monitoring program across the plan area.

As a result, the high level of data needed to support quantitative methods for setting

allocation limits, such as a numerical model, was not available.

Additionally, the risks that are evident from the drying climate across the whole of the

south-west of the state, suggest that an update to allocation limits in the plan area

could not be postponed until more information was available. Additional work would

have delayed the plan and delayed the actions we have now taken.

Therefore, as in other areas of the state with limited monitoring data, we used a risk-

based approach to set allocation limits. This typically involves understanding how

water use (current and future) could impact on the resource and determining whether

more or less water can be allocated while still achieving the plan’s outcomes and

objectives.

How we set allocation limits in the Superficial aquifer

Allocation limits have generally been set at the current level of use (current

entitlements plus the estimate of exempt-from-licensing use) for Superficial resources

in the plan area. There are two exceptions; Colburra Downs and Island Point. In

Colburra Downs there are no licence entitlements, so the allocation limit has been set

at the estimated level of exempt use. In Island Point, there may be some small future

increase in exempt use as a result of subdivisions, so we have added an additional

45 600 kL/yr to current entitlements and estimated exempt use to set the allocation

limit.

The key factors that support the decision to set allocation limits at the current level of

use in the Superficial resources are outlined below:

1. Our assessment of current and future groundwater level trends shows that

there is a slow decline across the plan area that will continue with the drying

climate. This means that allowing additional water to be allocated would

increase the risk of not meeting the plan’s outcomes and resource objectives.

Page 38: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

30 Department of Water

2. The unique coastal geography of the plan area, in particular its proximity to

both the ocean and estuarine environments, means that the groundwater

resources are extremely susceptible to declines in water quality from saline

intrusion and upconing. Allowing additional water to be allocated would put

further pressure on maintaining water quality. The drying climate means that

there is already a long-term risk of the seawater interface and saline water

from the estuary moving landward and reducing water quality.

3. The high-value environmental, social and cultural assets in the area, namely

Yalgorup National Park, the Peel-Yalgorup wetland system and the rare

Thrombolite communities of Lake Clifton, are susceptible to reductions in both

water level and water quality. These are already under threat from

urbanisation, climate change and the changes we have already observed to

the groundwater resource. Allowing additional water to be allocated would put

additional risk on already stressed systems that are highly valued and deliver

significant community benefits.

With likely continued declines in rainfall and recharge, allowing the allocation of additional water would place an unacceptable level of risk on these values. Table 7 below includes an indication of localised risk to significant environmental values.

4. The ability of future water use, primarily for irrigating public open space, to be

met by alternatives sources, instead of through additional groundwater

entitlements was a major consideration when setting allocation limits. Although

local groundwater is typically the lowest cost option for public open space, the

department expects future water needs to be met by:

a. Trading or transferring from existing users or reaching agreement to

use an existing entitlement.

b. Alternative water sources such as treated wastewater, sub-surface

drainage or managed aquifer recharge.

Setting allocations limits at the level of current use is critical as a

signal/incentive for water users to investigate and drive improvements in

efficiency and to develop alternative water sources. Given that there are

already examples of treated wastewater being used in Mandurah (Gordon

Road, Caddadup and Halls Head wastewater treatment plants infiltrate around

5 GL of treated wastewater per year) and that volumes available in the future

are likely to increase, this is a reasonable option. We will work with proponents

to explore and facilitate all alternative water source options.

We also considered the option of reducing entitlements below current use in order to

reduce risks to water levels, water quality and groundwater-dependent ecosystems.

This was not considered a reasonable approach at this time given the current

reliance on groundwater in the area. This may be reconsidered in the future if there is

clear evidence of increasing impacts to users or groundwater-dependent values from

declining water levels or water quality, and if alternative sources are accessible.

Page 39: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 31

Table 7 below provides the rationale for the allocation limit decision in each individual

Superficial resource.

Page 40: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Table 7: Allocation limits for the Superficial aquifer (by subarea) in the Peel Coastal plan area

Resource (subarea and aquifer)

Previous allocation limit (kL)

New allocation limit (kL)

Risk assessment and allocation limit decision

Mandurah - Superficial

5 000 000 4 653 729

1. Groundwater trend assessment

Measurement data (hydrographs) indicate a slow, decline (less than 1 m) in water levels over the last 30 years (search for Lake Thomson T581 (Ref no. 61410048) and T580A (Ref no. 61410723) at http://wir.water.wa.gov.au).

Trend likely to continue due to continued declines in rainfall but may be buffered by proximity to the coast.

Localised increases in water levels due to wastewater infiltration.

Groundwater levels well above reference groundwater levels (Figure 17, Department of Water 2015b).

2. Current and future use

Most water is used for public open space.

High domestic exempt use (exempt use was previously not accounted for).

Structure plans indicate some land use change. Public open space may require up to 200 000 kL/yr for future developments.

3. Allocation limit decision

Reduced to entitlements plus exempt estimates.

Current level of allocation poses an acceptable risk to groundwater-dependent ecosystems in the Mandurah subarea. Any further groundwater abstraction would increase the risk of decline in water quality from seawater intrusion and potentially impact existing users (such as high value public open space and domestic/garden supplies).

Water levels and water quality already under increasing risk from projected declines in rainfall and recharge.

Significant opportunities for alternative sources to meet future water needs, potentially utilising Water Corporation’s Gordon Road wastewater treatment plant.

Page 41: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Resource (subarea and aquifer)

Previous allocation limit (kL)

New allocation limit (kL)

Risk assessment and allocation limit decision

Falcon – Superficial

1 800 000 2 321 923

1. Groundwater trend assessment

No water level measurement data was available for the Falcon subarea, however we have assumed groundwater level conditions are similar to those experienced in the Mandurah area because of the similarities in abstraction volumes and land use.

Trend likely to continue due to continued abstraction and declines in rainfall but may be buffered by location between the coast and the estuary.

2. Current and future use

Most water is used for public open space.

High domestic exempt use (exempt use was previously not accounted for).

Structure plans indicate the subarea is mostly developed, and that there will be little or no change in land use and water demand.

3. Allocation limit decision

Reduced to current entitlements plus exempt estimates.

No future demand increase and further groundwater abstraction would significantly increase the risk of decline in water quality from seawater intrusion due to the location of this subarea between the ocean and the estuary. Reductions in water quality would likely impact existing users (high value public open space).

Water levels and water quality already under increasing risk from projected declines in rainfall and recharge.

Significant opportunities for alternative sources to meet future water needs, potentially utilising the Water Corporation’s Halls Head and Caddadup wastewater treatment plants.

Page 42: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Resource (subarea and aquifer)

Previous allocation limit (kL)

New allocation limit (kL)

Risk assessment and allocation limit decision

Whitehills – Superficial

200 000 335 909

1. Groundwater trend assessment

Groundwater hydrographs indicate that water levels are generally stable over the last 30 years (search for Lake Clifton A5 (Ref No. 61319128) at http://wir.water.wa.gov.au) likely to be due to the location between the estuary and the ocean and the very low use.

2. Current and future use

Mostly undeveloped area with some small urban/rural areas to the east.

Yalgorup National Park contains valuable natural assets that are groundwater-dependent.

Structure plans for the subarea do not indicate significant land use change or significant amounts of further development, indicating that demand for water is unlikely to change.

3. Allocation limit decision

Set at current entitlements plus exempt estimates.

Limited access to alternative sources available at this time but future increases in demand unlikely.

Water quality already under increasing risk from projected declines in rainfall and recharge.

Current stable groundwater level trends pose minimal local risk to groundwater-dependent vegetation in Yalgorup National Park.

Page 43: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Resource (subarea and aquifer)

Previous allocation limit (kL)

New allocation limit (kL)

Risk assessment and allocation limit decision

Island Point – Superficial

1 600 000 568 375

1. Groundwater trend assessment

Groundwater hydrographs indicate a slow decline (less than 1 m) in water levels over the last 30 years particularly in the southern parts of the subarea (search for Harvey Shallow NS62B (Ref No. 61330102) at http://wir.water.wa.gov.au).

Water levels are more stable in the north of the subarea due to the location between the estuary and the ocean (search for Harvey Shallow NS62B (Ref No. 61330102) at http://wir.water.wa.gov.au).

Trend likely to continue due to continued declines in rainfall but may be buffered by location between the coast and the estuary.

Water levels have fallen below reference levels (for groundwater-dependent ecosystems and groundwater throughflow) in low rainfall years only. Average water levels are above reference levels.

2. Current and future use

Generally undeveloped with some semi-rural properties with some small urban development (on estuary side of subarea).

Relatively high exempt use (exempt use was previously not accounted).

City of Mandurah’s Draft Southern Structure plan proposed some future rezoning of semi-rural blocks with an estimated additional exempt water use component of 45 600 kL/yr.

3. Allocation limit decision

Reduced to current entitlements plus current and future exempt estimates.

Drying climate poses a risk to high-value groundwater-dependent ecosystems to the west and downstream of groundwater flow of the subarea, including vegetation and wetlands in Yalgorup National Park and Thrombolite communities in Lake Clifton.

Minor additional future demand, but limited access to alternative sources available at this time.

Water levels and water quality already under increasing risk from projected declines in rainfall and recharge.

Page 44: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Resource (subarea and aquifer)

Previous allocation limit (kL)

New allocation limit (kL)

Risk assessment and allocation limit decision

Lake Clifton – Superficial

3 000 000 661 440

1. Groundwater trend assessment

Groundwater hydrographs indicate a decline in water levels of less than 1 m over the last 30 years (search for Harvey Shallow HS63B (Ref No. 61319133) at http://wir.water.wa.gov.au).

Trend likely to continue due to continued declines in rainfall.

2. Current and future use

Small-scale agriculture and horticulture with licensed use.

Relatively high exempt use (exempt use was previously not accounted for).

Some pine plantations present.

Structure plans for the subarea do not indicate land use change, indicating that demand for water is unlikely to increase.

3. Allocation limit decision

Reduce to current entitlements plus exempt estimates.

Drying climate poses a risk to high-value groundwater-dependent ecosystems to the west and downstream of groundwater flow in the subarea. This includes vegetation and wetlands in Yalgorup National Park and Thrombolite communities in Lake Clifton. The location of Superficial aquifer monitoring in this subarea limited our ability to set groundwater reference levels and quantify the risks.

No additional future demand and limited access to alternative sources available at this time.

Water levels and water quality already under increasing risk from projected declines in rainfall and recharge.

Page 45: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Resource (subarea and aquifer)

Previous allocation limit (kL)

New allocation limit (kL)

Risk assessment and allocation limit decision

Coastal – Superficial

4 100 000 192 550

1. Groundwater trend assessment

The hydrographs indicate a slight decline in groundwater levels (less than 1 m) over last 30 years (search for Lake Clifton B2 (Ref No. 61319130) at http://wir.water.wa.gov.au).

Trend likely to continue due to continued declines in rainfall but may be buffered by proximity to coast.

Water levels have only fallen below groundwater reference levels (for groundwater-dependent ecosystems and groundwater throughflow) in low rainfall years only. Average water levels are well above the reference levels.

2. Current and future use

Mostly undeveloped area with some small urban/rural areas to the east.

Yalgorup National Park contains valuable natural assets that are groundwater-dependent.

Preston Beach townsite (but doesn’t access the Superficial resource).

No expectation of land development other than the Preston Beach townsite. The demand for water in the townsite will be supplied from outside the subarea (scheme water).

3. Allocation limit decision

Reduce to current entitlements plus exempt estimates.

Drying climate poses a risk to groundwater-dependent ecosystems in the Yalgorup National Park as well as to water quality from landward movement of seawater.

No additional future demand.

Water levels and water quality already under increasing risk from projected declines in rainfall and recharge.

Page 46: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Resource (subarea and aquifer)

Previous allocation limit (kL)

New allocation limit (kL)

Risk assessment and allocation limit decision

Colburra Downs –

Superficial 1 600 000 70 000

1. Groundwater trend assessment

Hydrographs indicate a slow steady decline of less than 1 m in groundwater levels (search for Harvey Shallow HS63A (Ref no. 61330104) at http://wir.water.wa.gov.au).

Trend likely to continue due to continued declines in rainfall and possible regional abstraction influence.

Water quality is poorer than elsewhere in the plan area with increased risk of saline upconing.

2. Current and future use

There are no licensed entitlements, or demand, in this subarea, the allocation limit reflects only exempt use estimates.

Structure plans for the subarea do not indicate any future development.

3. Allocation limit decision

Reduce to estimates of exempt use

No future demand.

Water levels and water quality already under increasing risk from projected declines in rainfall and recharge.

Total 17 300 000 8 803 926

NOTE: Applications received before 8 July 2014 are considered current land use and are included in the allocation limits of the Peel Coastal plan area. When we receive applications after 8 July 2014 within fully allocated aquifers, we formally contact proponents to let them know that water is not available and it is likely that their application will be refused.

Page 47: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

39 Department of Water

How we set allocation limits in the Leederville aquifer

As with the Superficial resources, allocation limits for Leederville resources in the

Mandurah, Falcon and Coastal subareas have been set at the current level of use

(note that there is no exempt use from the Leederville aquifer in the plan area).

The key factors in setting allocation limits in these three Leederville resources are

outlined below:

1. Despite there being limited local monitoring information in the Leederville aquifer,

it can be inferred from available data and regional information that pressure-

heads are falling at a significant rate, in most cases more dramatically than in the

Superficial aquifer. Additional abstraction would increase the risk of seawater

intrusion into the aquifer and likely impact on its existing users.

2. Recharge to the Leederville aquifer is mostly from the Superficial aquifer and

additional abstraction would also impact on water levels, water quality and high-

value groundwater-dependent ecosystems in the Superficial aquifer.

3. In the Falcon subarea, the Leederville aquifer is recharged with saline estuarine

water from the Peel Inlet. This means that the freshwater resource is non-

renewable. Additional abstraction of the fresh water from this resource would

directly impact on current users. In addition to the allocation limit being set at the

current level of use, when a licence is relinquished or cancelled the associated

volumes of water will not be made available.

4. As described for the Superficial aquifer, potential new water demands in the

Mandurah and Falcon subareas are primarily for public open space and can

reasonably be met via trading, transfers, agreement with existing users and the

use of alternative sources such as treated wastewater.

For the remaining Leederville resources, allocation limits have been set at zero as

there is no current use and no future demand identified through land use planning

processes.

Table 8 summarises allocation limits for Leederville resources in the plan area.

Page 48: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 40

Table 8: Allocation limits for the Leederville aquifer (by subarea) in the Peel Coastal plan area

Subarea Previous

allocation limit (kL)

New allocation limit (current use) (kL)

Risk based approach to allocation limit

Mandurah 1 000 000 802 100

Set at current entitlements

Some Department of Water groundwater level monitoring.

No salinity monitoring.

Limited licensee monitoring data.

Limited information available on impacts of abstraction.

Risks of saline intrusion and impacts to current license entitlements.

Falcon 2 200 000 1 606 420

Set at current entitlements

No Department of Water monitoring data.

Limited licensee monitoring data.

Recharged from estuary.

Risks of saline intrusion and impacts to current license entitlements.

Non-renewable resource.

Island Point 10 000 0

Set a 0 kL

No current demand and unlikely to be future demand

No monitoring data.

Risk of saline intrusion.

Whitehills 110 000 0

Set a 0 kL

No current demand and unlikely to be future demand

Limited Department of Water monitoring data.

Risk of saline intrusion.

Page 49: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

41 Department of Water

Subarea Previous

allocation limit (kL)

New allocation limit (current use) (kL)

Risk based approach to allocation limit

Lake Clifton 10 000 0

Set a 0 kL

No current demand and unlikely to be future demand.

Limited Department of Water monitoring data.

Risk of saline intrusion.

Coastal 100 000 20 000

Set at current entitlements

Allocation is licensed to the Water Corporation for the Preston Beach public water supply.

Limited licensee monitoring data.

Risk of saline intrusion and potential impacts to lake system.

Colburra Downs 10 000 0

Set a 0 kL

No current demand and unlikely to be future demand.

No monitoring data.

Risk of saline intrusion.

TOTAL 3 440 000 2 430 020

Page 50: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 42

Summary of allocation limits decisions

The decision-making process outlined above has resulted in allocation limits being

reduced by a total of approximately 9.5 GL/yr in the Peel Coastal plan area. As

explained, this is primarily due to the fact that current allocation limits were set in

1989 when climate change was not a major consideration (Water Authority 1989).

Importantly these allocation limit decisions will trigger improved water use efficiency

measures, encourage trading and promote investment in alternative water source

options.

Why have some allocation limits increased?

Allocation limits for the Whitehills and Falcon Superficial resources increased when

compared to the previous allocation limits because we have included exempt use

estimates in the allocation limit for the first time. This does not make more water

available for use but instead ensures we have accounted for all current use.

Page 51: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

43 Department of Water

4 Part C: Defining the management approach

In Part C of the allocation planning process, we define the management approach in

meeting the outcomes and objectives of the plan.

Much of this information is adequately explained in chapters 4, 5 and 6 of the

allocation plan, so only a summary is presented here.

Key points from this section:

The department has put in place a suite of management arrangements that complement our allocation limit decisions.

The water licensing approach described in Chapter 4 will ensure there are improvements to water use efficiency, will facilitate water trading and result in the progressive development of alternative water sources.

The local licensing rules set out in Chapter 4 of the plan are designed to:

- protect the integrity of the resource and the groundwater-dependent environment, where this may be impacted upon by licensed abstraction

- prevent licensees from impacting upon each other’s ability to take groundwater in accordance with a licence.

The monitoring and evaluation programs detailed in chapters 5 and 6 of the plan have been developed to support adaptive management of groundwater resources in the plan area.

Page 52: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 44

4.1 Water licensing in the plan area

A water licence issued under the provisions of the Rights in Water and Irrigation Act

1914 provides legal and secure access to water. Water allocation plans set out how

we will assess licence applications, set licence conditions and manage licences on

an ongoing basis. By doing this, allocation plans provide clear guidance to

proponents and provide justification for our decisions.

Chapter 4 of the allocation plan outlines our water licensing approach and local

licensing policies.

Water licensing approach

The water licensing approach described in Section 4.2 of the allocation plan focuses

primarily on how proponents can meet their water demands in fully allocated

resources. Given that allocation limits have been set at the current level of use, there

is no additional groundwater available for licensing.

As a result, we have provided positions on the following issues in the plan:

Water use efficiency – improving how water is used is one way that

proponents may be able to access additional water. It may also make water

available for trading.

Water trading and transfer – we will apply Operational policy 5.13: Water

entitlement transactions for Western Australia (Department of Water 2010).

Alternative water sources – given that no additional groundwater is available

into the future, we are committed to working with proponents to identify

potential alternative sources as part of implementing the plan and meeting

future demand projections.

The department recommends the use of our Guideline for the approval of non-

drinking water systems in Western Australia: Urban Developments to provide

information about considerations and approvals for possible alternative water

sources.

For potential managed aquifer recharge projects we have developed

Operational policy 1.01: Managed aquifer recharge in Western Australia to

provide information on the considerations and licensing requirements of these

schemes.

Local licensing policies

Local licensing policies outlined in Section 4.3 of the plan are required to address

resource management issues where they are not addressed by state-wide policy.

They are designed to help us achieve the outcomes and resource objectives in the

plan.

Page 53: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

45 Department of Water

As there is no additional water available in the plan area, local licensing policies will

be applied if water does become available through the relinquishment of licensed

volumes, from departmental recouping activities, when a licence is renewed or if

monitoring of the water resource indicates there is a need to amend a licence.

Table 9 describes the intent of each local licensing policy.

Table 9: The intent of the local licensing policies

Local licensing policy

Intent of local licensing policy

Licence assessment:

Assessing the impacts of a proposal on groundwater-dependent environmental values and water quality

The intent of this policy is to identify any potential impacts to the environment or the groundwater resource through the assessment phase of the licensing process. Identifying the potential impacts early ensures that they are adequately considered and addressed before a licence is issued (where water is available).

Before we can assess the impacts of the proposal, the proponent will need to clearly demonstrate how they will prevent or manage the effect of their proposal on:

a) significant wetlands

b) acid-sulfate soils

c) local saltwater upconing

d) the landward movement of the seawater interface.

Each proponent will be provided with direction on what we require to complete our assessment of the licence application by the regional office.

The department applies a consistent approach to assessing the potential impacts of a licence application on groundwater-dependent ecosystems across the state. Further details on assessing groundwater-dependent ecosystems in the Peel Coastal plan area can be found in the Peel Coastal plan area: Groundwater-dependent ecosystems report (Department of Water 2015b).

Managing impacts:

Managing impacts on groundwater-dependent environmental values

Managing impacts on water quality

Licences requiring operating strategies

Amending licences if impacts on groundwater-dependent environmental values or water quality are observed

The intent of these policies is to minimise and prevent impacts for existing and new licences.

Existing groundwater abstraction that could impact on groundwater-dependent ecosystems and/or groundwater quality may be amended by the department. Amendments may include:

relocation of production bores, including new or replacement bores

change to the rate of abstraction (volume drawn over time)

requirements to install and measure groundwater levels in local monitoring bores

requirements to sample and measure water quality

restricted abstraction (e.g. timing, rate of abstraction)

relocation of production bores

requirement to install and measure groundwater levels in local monitoring bores to identify if the changes to abstraction or location of the draw was effective.

Any proposal to amend a licence will be discussed with the licensee and follow the standard process applied by the department across the state.

Page 54: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 46

Local licensing policy

Intent of local licensing policy

Metering: Requirements for metering

Meters are the most accurate tool for measuring the volume of water abstracted from a bore. The additional metering requirements for this policy are designed to understand use in urban areas, particularly linking local groundwater use with groundwater levels (cumulative impacts on the resource).

The additional need for a meter on a bore abstracting from the Leederville aquifer in the Falcon subarea is to track the amount of groundwater abstracted in this non-renewable resource. If too much is abstracted then the resource is likely to become saline.

4.2 Monitoring and evaluation program

Through monitoring groundwater resources, we will understand how the aquifers

perform over time in response to abstraction and changes in groundwater recharge.

This will help us assess how well the allocation limits, licensing approach and local

licensing policies described above are helping us to meet the plan’s outcomes and

resource objectives.

Critically, it will inform our adaptive management approach in the plan area.

Chapter 5 of the plan details the monitoring we will carry out and the performance

indicators we will use to assess how well we are meeting the specific resource

objectives of the plan. The monitoring program will also be important in

understanding how the declining rainfall is affecting groundwater resources, and how

ecological values are responding.

As we have noted in this document and the plan itself, some improvements need to

be made to the monitoring program, particularly to include appropriate water quality

monitoring. We will be actioning this as part of implementing the plan (refer to Table

4 in Chapter 6 for a list of actions to implement the plan).

Chapter 6 outlines how we will implement and evaluate the plan. Evaluation is part of

the department’s adaptive management approach and assists us to continually

improve our management of water resources. It is applied to all allocation plans

across the state.

We will regularly evaluate whether the plan outcomes and resource objectives are

being delivered through implementation of the plan, and make this information

publicly available in evaluation statements at least every three years.

Page 55: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

47 Department of Water

Appendix A - Determining the volume of water to be set aside for exempt stock and domestic use

The allocation limit is the volume of water set aside for use, including use that is

exempt from licensing. Water available for licensing is determined by subtracting the

estimated volume of water taken for exempt purposes from the allocation limit.

Groundwater abstraction is exempt from licensing if the bore and its use complies

with the current by-laws and exemption orders under the Rights in Water and

Irrigation Act 1914 and the Water Agencies (Powers) Act 1984. This includes water

used for:

stock1, domestic and garden use2

firefighting

short-term dewatering3

monitoring purposes.

In the Peel Coastal plan area, exempt use is generally for stock, domestic and

garden use from the watertable aquifer. As this water is required on a continual basis

it must be accounted for in portioning available groundwater for allocation. All other

exempt uses are not continuously required and do not need to be accounted for on a

permanent basis.

Information used to estimate exempt use

Exempt water use in the Peel Coastal plan area was estimated using the following

information:

Cadastral information including lot zoning, size, tenure and number of blocks obtained from the departments’ GIS database, supplied by the Department for Planning.

Departmental knowledge of exempt water use in the area.

Recent departmental investigations into the incidence of bores and their water use in the Perth metropolitan area.

Water use factors for domestic bore use sourced from Strategic policy 2.03 – managing unlicensed groundwater use (Department of Water 2009d).

1 To water cattle or other stock, other than those being raised under intensive conditions (see Section 21 (4) of

the Rights in Water and Irrigation Act 1914 for the definition of intensive)

2 Lawn or garden that does not exceed 0.2 ha (2000 m

2)

3 Refer to definitions of exempt dewatering within the Rights in Water and Irrigation Exemption (Section 26C)

(Dewatering) Order 2010

Page 56: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 48

Comparison with licensed water use in the Peel Coastal plan area where a proportion of the use on the licence is assigned as stock, domestic and/or garden purposes.

Scheme water supply locations.

Assumptions

Estimating exempt use (stock, domestic and garden use) requires several

assumptions when calculating the volume of water required to account for this use.

The assumptions used were:

All exempt use is abstracted from the Superficial aquifer (watertable aquifer).

All exempt use that is not taken from the Superficial aquifer is licensed.

Eligible exempt users are found only on freehold, privately held residential

land.

Exempt users in subareas subject to watering restrictions will comply with the

three-day per week watering roster.

Exempt users in predominantly residential subareas will use water in a similar

way to users of backyard bores in the Perth metropolitan area.

The information gathered to estimate exempt use is a snapshot in time, and

does not take into account any predicted increase or decrease in exempt use

across the plan area.

Any future refinements to the allocation limits will need to undertake additional

investigations into exempt use to identify and account for any changes.

The assumptions used to determine the estimated exempt use in the Peel Coastal

plan area for each land planning type is described in Table A1 below. The values

presented in Table A1 are taken from Strategic policy 2.03 – managing unlicensed

groundwater use, with amendments listed as marked.

Page 57: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

49 Department of Water

Table A1: Estimated water use by cadastral block size in the Peel Coastal plan

area

Category Land size

(m2)

Estimated water use (kL/yr)

Estimated incidence of bore use (%)

Small urban blocks Under 500 405^ or 800 5

Large urban blocks 500-999 405^ or 800 25*

Semi-rural properties 1000-5000 1000 50

Rural holdings Over 5000 1500# 80

^ 405 kL/yr is the amount specified by the domestic bore metering project, which varies from the previously specified amount of 800 kL/yr, following the introduction of watering day restrictions. The subareas of Mandurah, Falcon and Whitehills were estimated using the 405 kL/yr figure, where the remainder utilised the 800 kL/yr estimate as they are outside the restriction zone.

* Bore incidence was altered from the previous figure of 30 per cent, following the 2011 Perth-Mandurah region domestic bore review (Stone, unpublished) which indicates that in recent years the rate of domestic bore ownership in urban premises dropped, resulting in a new estimate of 25 per cent.

# Incorporates a component for internal household requirements (150 kL), as these properties do not access scheme water. This volume also is sufficient to water approximately 2000 m

2 of lawns and gardens and

supply small amounts of stock water. This also assumes that rainwater tanks are not used for in-house purposes.

Methodology

To determine the estimated volume of exempt use the following steps were taken:

Steps Notes

1. Collect data on the number of blocks, block size, zoning, land use and tenure for each subarea in the plan area. Filter data by subarea.

Exempt use was allocated only to freehold, privately held land for residential purposes. Properties held by commercial interests or public bodies, as well as vacant land for domestic purposes, were removed.

Properties identified as strata or triplex/quadruplex were also removed from the database as these were unlikely to have individual garden bores. Duplex premises remain within the ‘small urban blocks’ category.

2. Determine the volume of licensed entitlements for each subarea where use on the licence was assigned as stock, domestic, fire fighting or garden purposes, and cross check with the rural estimate in Table A1.

The average exempt use figure was determined by reviewing existing licenses that contained a stock and domestic proportion

4

compared with the estimate of exempt use for rural premises in Strategic policy 2.03. The average use for stock and domestic purposes by licensed users in the plan area was 2096 kL/yr.

Where stock, garden and domestic entitlements are included on a licence the property was removed from the subarea estimate calculations in Table A2 to avoid double-counting. The number of licensed premises and the total of the licensed stock, garden and domestic entitlements in a subarea is listed in Table A4.

4 A licensing example is where an agricultural user’s licence also contains a stock and domestic proportion, for a

domestic dwelling present on the same property.

Page 58: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 50

Steps Notes

3. Apply the assumptions from Table A1 to the data collected from step 1 and 2 (see tables A2 and A3).

An estimate of 405 kL/yr per bore was adopted for the small and large urban blocks in the Mandurah, Falcon and Whitehills subareas. The original 800 kL/yr/bore set in Strategic policy 2.03 was reduced to factor in the influence of restrictions on domestic bore watering to three days a week, and publicity on responsible bore use. For the remaining subareas the 800 kL/yr/bore estimate was retained as they are outside of the Perth to Mandurah watering restriction zone.

The original Strategic policy 2.03 estimate of 1000 kL/yr/bore for semi-rural blocks under 0.5 ha was retained for all subareas as scheme water supply is restricted in some subareas, particularly for larger block sizes.

Users of groundwater for stock and domestic use are likely to be exempt from watering restrictions where scheme water availability is restricted. A map of piped scheme water locations was used to identify that the subareas of Island Point and Coastal, although partly covered by the restriction zone, are highly likely to be supplied by exempt use as there is no scheme connection available. The small and large urban blocks in the Whitehills subarea are largely connected to scheme so the 405 kL/yr estimate was used in this area as it is in the restriction zone.

4. Round the calculated estimate of exempt use to the nearest 1000 kL/yr to get the final estimated volume of exempt use.

5. Confirm with licensing staff that the estimates provided are robust and correlate with local knowledge of stock and domestic use.

Page 59: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Calculations

Table A2: Calculating the estimated volume of exempt use in the Peel Coastal plan area

Subarea Block type Number of blocks* Estimated percentage of

blocks with exempt bores (%)

Indicative use (kL/yr) Estimated volume of

stock and domestic use (kL/yr)

Island point

Small urban 0 5 800 0

Large urban 0 25 800 0

Semi-rural 1 50 1000 500

Rural 235* 80 1500 282 000

Subtotal 282 500

Whitehills

Small urban 0 5 405 0

Large urban 104 25 405 10 530

Semi-rural 101 50 1000 50 500

Rural 152* 80 1500 182 400

Subtotal 243 430

Lake Clifton

Small urban 0 5 800 0

Large urban 0 25 800 0

Semi-rural 0 50 1000 0

Rural 296* 80 1500 355 200

Subtotal 355 200

Falcon

Small urban 322 5 405 6 520

Large urban 6511 25 405 659 239

Semi-rural 1875 50 1000 937 500

Rural 53* 80 1500 63 600

Subtotal 1 666 859

Page 60: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Subarea Block type Number of blocks* Estimated percentage of

blocks with exempt bores (%)

Indicative use (kL/yr) Estimated volume of

stock and domestic use (kL/yr)

Mandurah

Small urban 807.66^ 5 405 16 355

Large urban 10 873.8^ 25 405 1 100 972

Semi-rural 1857 50 1000 928 500

Rural 485* 80 1500 582 000

Subtotal 2 627 827

Coastal

Small urban 0 5 800 0

Large urban 264 25 800 52 800

Semi-rural 16 50 1000 8000

Rural 60* 80 1500 72 000

Subtotal 132 800

Colburra Downs

Small urban 1 5 800 40

Large urban 2 25 800 400

Semi-rural 3 50 1000 1 500

Rural 57 80 1500 68 400

Subtotal 70 340

Peel Coastal plan area total: 5 378 956

*See Table A4 below for the number of properties removed from the rural calculations in this table, due to premises being already licensed for stock, garden and domestic use. These are removed to avoid double-counting of stock, garden and domestic use,

^Mandurah subarea, due to its size and number of cadastral listings, was calculated differently to the other subareas. As listings in the small and large urban categories are

listed multiple times because of the number of owners of each property, and Falcon subarea also showed this duplication with approximately 37 per cent of listings duplicated in these categories. As a result we filtered the data from Mandurah subarea with the same percentage of duplicate properties from Falcon subarea (37 per cent) and removed them from the database.

Page 61: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 53

Table A3: Final estimate volume of exempt use for Peel Coastal plan area

Subarea Final estimated volume of exempt use (kL/yr*)

Island Point 283 000

Whitehills 243 000

Lake Clifton 355 000

Falcon 1 667 000

Mandurah 2 628 000

Coastal 133 000

Colburra Downs 70 000

TOTAL 5 379 000

Table A4: Groundwater licensees with stock, garden and domestic component* on

their licence, by subarea

Subarea Number of properties with licensed^ stock, garden and domestic use in

the Superficial aquifer

Volume licensed for stock, garden and domestic use in the Superficial

aquifer (kL/yr^)

Island Point 12 18 050

Whitehills 5 9 500

Lake Clifton 16 42 830

Falcon 2 2 500

Mandurah 6 16 000

Coastal 3 2 050

Colburra Downs

0 0

TOTAL 44 90 930

* Licences that contain a stock, domestic and garden usage component within their groundwater licence.

^ Licensed use for the Peel Coastal plan area was collected from the department’s licensing database. These figures were correct as at 11 January 2012.

Page 62: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

54 Department of Water

Glossary

The terms that are used the most in reference to water resource management of the

Peel Coastal plan area are listed below.

Abstraction Withdrawal of water from any surface water or groundwater

source of supply.

Allocation limit Annual volume of water set aside for use from a water

resource.

Consumptive use Water used for consumptive purposes considered as a private

benefit including irrigation, industry, urban and stock and

domestic use.

Ecological values The natural ecological processes occurring within water-

dependent ecosystems and the biodiversity of these systems.

Ecological water

requirement

The water regime needed to maintain the current ecological

values (including assets, functions and processes) of water-

dependent ecosystems consistent with the objectives of an

ecological water requirements study.

Environmental

protection policy

wetlands

Wetlands deemed to be of high conservation value under the

Environmental Protection Act (1986).

Fit-for-purpose

water

Water that is of suitable quality for the intended end purpose. It

implies that the quality is not higher than needed.

Groundwater area The boundaries proclaimed under the Rights in Water and

Irrigation Act 1914 and used for water allocation planning and

management.

Groundwater-

dependent

ecosystem

An ecosystem that is at least partially dependent on

groundwater for its existence and health.

Groundwater-

dependent social

value

An in-situ quality, attribute or use associated with a

groundwater resource (or dependent on a groundwater

resource) that is important for public benefit, welfare, state or

health.

Licence (or

licensed

entitlement)

A formal permit which entitles the licence holder to take water

from a watercourse, wetland or underground source under the

Rights in Water and Irrigation Act 1914.

Page 63: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 55

Ramsar-listed

wetland

Wetlands recognised as internationally significant and

registered on the list of Convention of Wetlands of Importance

(Ramsar 1971).

Reference

groundwater level

A groundwater level that triggers management actions or

responses to be implemented so that the risk of abstraction

having an adverse effect on the water resource and dependent

values is reduced.

Reliability The frequency with which a water licence holder can obtain

their full licensed volume.

Seawater or

saltwater intrusion

The inland or up-gradient intrusion of salt water into a layer of

fresh groundwater, from the sea or from the edges of the

aquifer.

Saltwater

upconing

The upward movement of saline water caused from excessive

pumping, affecting fresh groundwater resources above.

Subarea A subdivision, within a surface or groundwater area, defined to

better manage water allocation. Subarea boundaries are not

proclaimed and can therefore be amended without being

gazetted.

Water reserve An area proclaimed under the Metropolitan Water Supply,

Sewerage and Drainage Act 1909 or Country Areas Water

Supply Act 1947 to protect water used for public drinking water

supply.

Shortened forms

AHD Australian height datum

CSIRO Commonwealth Scientific and Industrial Research Organisation

TDS Total dissolved solids

Volumes of water

One litre 1 litre 1 litre (L)

One thousand litres 1000 litres 1 kilolitre (kL)

One million litres 1 000 000 litres 1 Megalitre (ML)

One thousand million litres 1 000 000 000 litres 1 Gigalitre (GL)

Page 64: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

56 Department of Water

References

Barr, AD 2003, Investigation of the Water Balance of Lake Clifton. Client report to the

Western Australian Department of Conservation and Land Management January

2003, CSIRO

Beckwith, JA 2009, The social values of South West water resources, Beckwith

Environmental Planning, Perth.

Charles SP, Silberstein R, Teng J, Fu G, Hodgson G, Gabrovsek C, Crute J, Chiew

FHS, Smith IN, Kirono DGC, Bathols JM, Li LT, Yang A, Donohue RJ, Marvanek

SP, McVicar TR, Van Niel TG and Cai W, 2010, Climate analyses for south-west

Western Australia; a report to the Australian Government from the CSIRO

South-West Western Australia Sustainable Yields Project, CSIRO, n.p.

City of Mandurah 2013, Southern Mandurah Rural Structure plan (draft), City of

Mandurah, Western Australia.

Commander DP 1988, Geology and hydrogeology of the Superficial formations and

coastal lakes between Harvey and Leschenault Inlets (Lake Clifton Project),

Geological Survey Western Australia, Professional Papers, Report 23,

Geological Survey of Western Australia, Perth

CSIRO 2009, Groundwater yields in south-west Western Australia, A report to the

Australian Government from the CSIRO South West Western Australia

sustainable yields project, CSIRO Water for a Healthy Country Flagship, n.p.

Davidson WA 1995, Hydrogeology and groundwater resources of the Perth region,

Geological Survey of Western Australia, Perth, Western Australia.

Department of Parks and Wildlife 2014, Swan Coastal Plain South draft management plan 2014, Government of Western Australia, Perth.

Department of Planning and Western Australian Planning Commission 2010, Outer

metropolitan Perth and Peel sub-regional strategy (Draft), Government of

Western Australia, Perth.

Department of Water 2005, State groundwater investigation, Government of Western

Australia, Perth, viewed 25 May 2015, http://www.water.wa.gov.au/planning-for-

the-future/finding-water/groundwater-investigations/state-groundwater-

investigation-program

——2007a, Rockingham-Stakehill groundwater management plan, Government of

Western Australia, Perth.

——2007b, REG75- A tool for estimating mean annual flow for the South West of

Western Australia, Government of Western Australia, Perth.

——2009a, South West groundwater areas allocation plan, Government of Western

Australia, Perth.

——2009b, Draft Perth-Peel Regional water plan 2010-2030, Government of

Western Australia, Perth.

Page 65: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

Department of Water 57

——2009c, Climate change, water demand and water availability scenarios to 2030:

Perth-Peel water plan background paper, Government of Western Australia,

Perth.

——2011, Water allocation planning in Western Australia: a guide to our process, Government of Western Australia, Perth.

——2012, Murray groundwater allocation plan, Government of Western Australia,

Perth.

——2015a, Peel Coastal groundwater allocation plan, Government of Western

Australia, Perth

——2015b, Peel Coastal plan area: Groundwater-dependent ecosystems report,

Government of Western Australia, Perth.

——2015c, Selection of future climate projections for Western Australia, Water

Science Technical Series, report no. 72, Government of Western Australia,

Perth.

——in prep., Murray-Peel Groundwater Investigation Bore Completion Report, a draft

report currently in preparation, Hydrogeological record series, Government of

Western Australia, Perth.

Environmental Protection Authority 1997, EPA Bulletin 864 - Final Criteria for

Environmental Acceptability for Land Use proposals within the Catchment of

Lake Clifton, Government of Western Australia, Perth.

Johnson, S.L., Commander, D. P., O’Boy, C.A. and Lindsay, R. P., 2005,

Groundwater investigation program in Western Australia (2005 to 2020),

Department of Environment, Hydrogeological Record Series, Report HG10,

Perth.

Ramsar 1971, Ramsar Convention on Wetlands, Ramsar, Iran.

Stone, R., 2011, Perth-Mandurah region domestic bore review, Unpublished report

for the Department of Water, Perth.

Water and Rivers Commission 2000, Environmental water provisions policy for

Western Australia, Government of Western Australia, Perth.

Water Authority 1989, South West Coastal groundwater area groundwater

management review, report no. WG 84, Government of Western Australia,

Perth.

Western Australian Planning Commission 2010, Directions 2031 and beyond,

Government of Western Australia, Perth.

Western Australian Planning Commission and Department of Planning 2010, Outer

metropolitan Perth and Peel sub-regional strategy (draft), Government of

Western Australia, Perth.

Page 66: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Peel Coastal groundwater allocation plan: methods report

58 Department of Water

Legislation

Government of Western Australia 1914, Rights in Water and Irrigation Act 1914,

Western Australia, Perth.

——1914, Rights in Water and Irrigation Exemption (Dewatering) (section 26C)

Order 2010, Western Australia, Perth.

Policy

Department of Water 2009d, Strategic policy 2.03 – managing unlicensed

groundwater use, Government of Western Australia, Perth.

——2010, Operational policy 5.13 Water entitlement transactions for Western Australia, DWPF 5.13, Department of Water, Perth.

Page 67: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set
Page 68: Peel Coastal groundwater allocation plan methods report · Peel Coastal groundwater allocation plan Methods report Background information and description of the methods used to set

Department of Water168 St Georges Terrace, Perth, Western Australia

PO Box K822 Perth Western Australia 6842Phone: 08 6364 7600

Fax: 08 6364 7601www.water.wa.gov.au

6590 0 1015