peel & gladstone road reconstruction - toronto · city of toronto accessibility design...

13
toronto.ca/peelgladstone What will I learn from this drop-in event? Project Background » Purpose of the Road Reconstruction ...2–3 » Summary of Event #1 ... 4 » Dufferin Jog Elimination ... 5 » General Area Improvements ... 6 » Local Area Cycling Facilities ... 7 Project Design » New Road Design Policies ... 8 – 9 » Option A ...10 » Option A Cross-Sections ... 11 » Option B (Preferred Option) ... 12 » Option B Cross-Sections ... 13 Project Communications » Next Steps ... 14 We value your input! Paper Feedback Form: Please provide and return your comments either tonight at this event or mail it back to us before December 13, 2019 Online Feedback Form: If you need more time to review the project information, the presentation materials will be posted on toronto.ca/peelgladstone . An online feedback form will also be available. All materials will be posted tomorrow. Peel & Gladstone Road Reconstruction Public Drop-In Event #2 December 2, 2019

Upload: others

Post on 25-Aug-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Peel & Gladstone Road Reconstruction - Toronto · CITY OF TORONTO ACCESSIBILITY DESIGN GUIDELINES Diversity Our Strength AUGUST 2017 Schollen & Company Inc. Urban Forest Innovations

toronto.ca/peelgladstone

What will I learn from this drop-in event?

Project Background

» Purpose of the Road Reconstruction ...2 – 3 » Summary of Event #1 ... 4 » Dufferin Jog Elimination ... 5 » General Area Improvements ... 6 » Local Area Cycling Facilities ... 7

Project Design

» New Road Design Policies ... 8 – 9» Option A ...10 » Option A Cross-Sections ... 11 » Option B (Preferred Option) ... 12 » Option B Cross-Sections ... 13

Project Communications

» Next Steps ... 14

We value your input!

• Paper Feedback Form: Please provide and return your comments either tonight at this event or mail it back to us before December 13, 2019

• Online Feedback Form: If you need more time to review the project information, the presentation materials will be posted on toronto.ca/peelgladstone . An online feedback form will also be available. All materials will be posted tomorrow.

Peel & Gladstone Road Reconstruction

Public Drop-In Event #2 December 2, 2019

Page 2: Peel & Gladstone Road Reconstruction - Toronto · CITY OF TORONTO ACCESSIBILITY DESIGN GUIDELINES Diversity Our Strength AUGUST 2017 Schollen & Company Inc. Urban Forest Innovations

toronto.ca/peelgladstone 2

Project Background

Purpose of the Road Reconstruction

Gladstone Ave. at Queen St. W. (looking north)

What is the purpose of this project?

• Traffic volumes on Peel Ave. and Gladstone Ave. have significantly decreased since the Dufferin Jog Elimination was constructed in 2011 (because the project eliminated the need for vehicles to travel along Peel Ave. and Gladstone Ave. to get to Queen St. W.)

• The road reconstruction will redesign Peel Ave. and Gladstone Ave. (from Queen St. W. to Argyle St.) to improve transportation options for residents and visitors by creating a more inviting environment for walking and cycling and providing lay-by parking

How will this improve my community?

• Enhance safety and accessibility

• Promote healthy and active living

• Improve transportation options for residents and visitors

• Connect to existing pedestrian and cycling network

• Create a more vibrant place for people to live, work and play

Page 3: Peel & Gladstone Road Reconstruction - Toronto · CITY OF TORONTO ACCESSIBILITY DESIGN GUIDELINES Diversity Our Strength AUGUST 2017 Schollen & Company Inc. Urban Forest Innovations

toronto.ca/peelgladstone 3

Project Background

Purpose of the Road Reconstruction (cont’d)

Why is this project happening now?

• Peel Ave. and Gladstone Ave. were last reconstructed 70 years ago in 1949

• The lifespan of a road is usually around 50– 70 years, at which time, the road needs to be reconstructed (including replacement of the asphalt road surface and concrete base)

• Since construction of the Dufferin Jog Elimination in 2011, traffic volumes have significantly decreased on Peel Ave. and Gladstone Ave.

• The upcoming road reconstruction is a great opportunity to revise the road layout, improve mobility options and safety for all users, provide more green features and enhance the pedestrian realm

• A construction project was completed in 2011 to create a continuous connection of Dufferin St. under the railway corridor

• After this project was completed, Peel Ave. and Gladstone Ave. no longer needed to accommodate through traffic from Dufferin St.

• The resulting decrease in traffic volumes on these roads enables a reduction in road pavement width and designation to a local street. Peel Ave. and Gladstone (from Queen St. W. to Peel Ave.) have already been designated as local roads

Construction of Peel Ave. & Gladstone Ave., 1949 Look through the Dufferin underpass. 2019

Page 4: Peel & Gladstone Road Reconstruction - Toronto · CITY OF TORONTO ACCESSIBILITY DESIGN GUIDELINES Diversity Our Strength AUGUST 2017 Schollen & Company Inc. Urban Forest Innovations

toronto.ca/peelgladstone 4

• In April 2019, the City of Toronto brought forward a proposal to convert Peel Ave. and Gladstone Ave. from a 2-way operation to a 1-way operation for motor vehicle traffic, based on the Peel-Gladstone Reconstruction Environmental Assessment (EA) study approved in 2010

• The proposal included wider sidewalks, contra-flow bike lanes and green street features (trees, grass boulevards, permeable pavers, etc.)

Project Background

Summary of Event #1

Plan of the original recommendations from the EA

Feedback from the Public Drop-In Event #1 was mixed

Support for:

• Street trees

• Planters

• Wider sidewalks

• Traffic calming

• Bicycle lanes

Concerns about:

• Traffic circulation throughout the neighbourhood

• Creation of three parallel 1-way streets in the westbound direction (Peel Ave., Alma Ave. and Waterloo Ave.)

• Motor vehicles making a left turn to exit Peel Ave. at Dufferin St. without a traffic light

• Minowan Miikan Ln. in the northbound direction directing traffic onto Peel Ave.

Page 5: Peel & Gladstone Road Reconstruction - Toronto · CITY OF TORONTO ACCESSIBILITY DESIGN GUIDELINES Diversity Our Strength AUGUST 2017 Schollen & Company Inc. Urban Forest Innovations

toronto.ca/peelgladstone 5

The area is experiencing a period of great change and becoming a mixed-use community with condominiums, affordable housing, live / work units, galleries, retail and new park spaces

Changes include:

• Expansion of local cycling network

• New developments (440 Dufferin St., 2, 8, 20 Gladstone Ave. and 11 Peel Ave.) in the Gladstone Ave. and Peel Ave. area

• Major public infrastructure projects such as the rail corridor bridge over Dufferin St. (Metrolinx work) and multi-use trail construction

• Future construction of the West Toronto Railpath extension and associated connections

Project Background

General Area Improvements

ARGYLE

WEST TORONTO

RAILPATH EXTENSION

BRO

CK

Dundas St. W.

Duf

ferin

St.

Dov

erco

urt

Rd.

Queen St. W.

Peel

Alma

WaterlooFlorence

Gla

dsto

ne

Legend

Bike Lanes

Quiet Street Cycling Route

Proposed Quiet Street Cycling Route

Proposed Major Multi-Use Path

Roadway Bridge

New developments

Page 6: Peel & Gladstone Road Reconstruction - Toronto · CITY OF TORONTO ACCESSIBILITY DESIGN GUIDELINES Diversity Our Strength AUGUST 2017 Schollen & Company Inc. Urban Forest Innovations

toronto.ca/peelgladstone 6

• 2015 – 2016: Contra-flow bike lanes and sharrows were installed on Argyle St. and Florence St.

• 2017: Contra-flow bike lanes and sharrows were installed on Gladstone Ave. (Argyle St. to Waterloo Ave.) and Waterloo Ave. (Gladstone Ave. to Dufferin St.)

• 2018: A bikepath was installed on Dufferin St. to provide a connection between Waterloo Ave. and Florence St.

• Accommodation of two-way cycling facilities (contra-flow bike lanes and sharrow pavement markings) on Gladstone Ave. between Peel Ave. and Argyle St. will complete the cycling network in the area

Dufferin Bike Path

Waterloo Contra-flow

Project Background

Local Area Cycling Network

ARGYLE

WEST TORONTO

RAILPATH EXTENSION

BRO

CK

Dundas St. W.

Duf

ferin

St.

Dov

erco

urt

Rd.

Queen St. W.

Peel

Alma

WaterlooFlorence

Gla

dsto

ne

Legend

Bike Lanes

Quiet Street Cycling Route

Proposed Quiet Street Cycling Route

Proposed Major Multi-Use Path

Roadway Bridge

Page 7: Peel & Gladstone Road Reconstruction - Toronto · CITY OF TORONTO ACCESSIBILITY DESIGN GUIDELINES Diversity Our Strength AUGUST 2017 Schollen & Company Inc. Urban Forest Innovations

Project Design

7toronto.ca/peelgladstone

Project Design

New Road Design Initiatives

The City has a number of new initiatives in place that improve the design of streets for all road users. These new designs include enhanced focus on:

• safety for vulnerable road users

• mobility for all ages

• accessibility for everyone

• sustainability

• street beautification and creation of inviting streetscapes

New Initiatives include:

Accessibility

Guide to facilitate better design for those with different mobility needs.

Complete Streets

Complete Streets are streets that are designed to be safe for all users: people who walk, bicycle, take transit or drive and people of varying ages and levels of ability. They also consider other uses like sidewalk cafés, street furniture, street trees, utilities and stormwater management.

Green Streets

Green Streets is a new approach to increase the functionality of City streets to help manage stormwater (rain and melted snow), improve air quality, increase biodiversity and enhance and beautify the public realm. A Green Street incorporates green infrastructure which includes elements such as street trees, green walls and low impact stormwater management infrastructure.

TORONTOCOMPLETESTREETSGUIDELINESMAKING STREETS FOR PEOPLE, PLACEMAKING AND PROSPERITY.

CITY OF TORONTO ACCESSIBILITY DESIGN GUIDELINES

Diversity Our Strength

AUGUST 2017

Schollen & Company Inc.Urban Forest InnovationsTMIGDPM

TORONTOGREEN STREETSTECHNICALGUIDELINESVersion 1.0

Page 8: Peel & Gladstone Road Reconstruction - Toronto · CITY OF TORONTO ACCESSIBILITY DESIGN GUIDELINES Diversity Our Strength AUGUST 2017 Schollen & Company Inc. Urban Forest Innovations

8toronto.ca/peelgladstone

Project Design

New Road Design Initiatives (cont’d)

TransformTO

Unanimously approved by City Council in July 2017, TransformTO lays out a set of long-term, low-carbon goals and strategies to reduce local greenhouse gas emissions and improve our health, grow our economy and improve social equity. Under TransformTO, 75% of trips under 5 km are walked or cycled by 2050.

Vision Zero

Vision Zero is a five-year (2017 – 2021) action plan focused on eliminating traffic-related fatalities and serious injuries on Toronto’s streets. The Plan addresses safety for the most vulnerable users of our transportation system – pedestrians, school children, older adults and cyclists.

Walking Strategy

The Toronto Walking Strategy was adopted to make Toronto a great walking city including policy, infrastructure and programming to create a rich culture of walking in Toronto.

2017-2021 | TORONTO’S ROAD SAFETY PLAN

Climate Action for a Healthy, Equitable, and

Prosperous Toronto

2050 Pathway to a Low-Carbon Toronto Report 2: Highlights of the City of Toronto Staff Report April 2017

Page 9: Peel & Gladstone Road Reconstruction - Toronto · CITY OF TORONTO ACCESSIBILITY DESIGN GUIDELINES Diversity Our Strength AUGUST 2017 Schollen & Company Inc. Urban Forest Innovations

9toronto.ca/peelgladstone

MINOWAN MIIKAN LANE

MIN

OW

AN

MIIK

AN

LAN

E

Project Design

Option A

Creation of boulevard area adjacent to the Gladstone Hotel

Opportunity for permeable unit pavers

A contra-flow bicycle lane is proposed for Gladstone Ave. between Peel Ave. and Argyle St.

Adding a one-way bicycle lane, in the opposite direction to the one-way vehicular travel lane, allows cyclists to use streets that are quieter, instead of a busy arterial road

3-way stop

Loading zone

Traffic island to direct vehicles westbound

Accessible pedestrian crossings with reduced pedestrian crossing distance and tactile plates

Up to 22 on-street parking spaces and potential to use permeable pavers on lay-by parking

Location of future Pessoa Park, which will have a stairway connection up to the West Toronto Railpath extension

New boulevard space for potential of up to

50 street trees

Opportunity for a recycled rubber permeable surface

Shared Travel Lanes or sharrows are road markings that are used to indicate a shared environment for bicycles and motor vehicles

Opportunity for stormwater runoff captured from street

Wider boulevards in existing commercial frontage areas for

potential street furniture (i.e. bike rings, garbage bins,

public notice boards, benches), tree planting and soil cells

Option A includes two-way motor vehicle traffic on Peel Ave. and Gladstone Ave. from Queen St. W. to Peel Ave. (cyclists and cars would share the lane), wider sidewalks, potential of up to ±50 street trees, on-street lay-by parking and green street features.

Photos are for illustration purposes only.

Shared travel lanes or sharrows are road markings that are used to indicate a shared environment for

bicycles and motor vehicles

Page 10: Peel & Gladstone Road Reconstruction - Toronto · CITY OF TORONTO ACCESSIBILITY DESIGN GUIDELINES Diversity Our Strength AUGUST 2017 Schollen & Company Inc. Urban Forest Innovations

10toronto.ca/peelgladstone

Project Design

Option A Cross-Sections

Gladstone Ave.Queen St. W. to Minowan Miikan Ln. (looking north)

Gladstone Ave.Minowan Miikan Ln. to Peel Ave. (looking north)

Peel Ave.Gladstone Ave. to Dufferin St. (looking west)

* These cross-sections were created using Streetmix and is used under the Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) license.

** Road dimensions may be subject to change pending detailed design.

N

Queen St. W.

Peel Ave.

Argyle St.

Gla

dsto

ne A

ve.

Duf

feri

n S

t.

Min

owan

M

iikan

Ln.

N

Queen St. W.

Peel Ave.

Argyle St.

Gla

dsto

ne A

ve.

Duf

feri

n S

t.

Min

owan

M

iikan

Ln.

N

Queen St. W.

Peel Ave.

Argyle St.

Gla

dsto

ne A

ve.

Duf

feri

n S

t.

Min

owan

M

iikan

Ln.

Page 11: Peel & Gladstone Road Reconstruction - Toronto · CITY OF TORONTO ACCESSIBILITY DESIGN GUIDELINES Diversity Our Strength AUGUST 2017 Schollen & Company Inc. Urban Forest Innovations

11toronto.ca/peelgladstone

Project Design

Option B (Preferred Option)

MINOWAN MIIKAN LANE

MIN

OW

AN

MIIK

AN

LAN

E3-way stop

Accessible pedestrian crossings with reduced pedestrian crossing distance and tactile plates

Creation of boulevard area adjacent to the Gladstone Hotel

±22 on-street parking spaces and potential to

use permeable pavers on lay-by parking

Location of future Pessoa Park, which will have a stairway connection up to the West Toronto Railpath extension

Opportunity for recycled rubber permeable surface

Bicycle lanes can be recognized by the diamond symbol next to the lane line. This means that the lane is reserved for the use of cyclists only

Opportunity for permeable unit pavers

Existing commercial frontage areas for potential street furniture (i.e. bike rings, garbage bins, public notice boards, benches)

±25 street trees with soil cells

Loading zone

Shared travel lanes or sharrows are road markings that are used to indicate a shared environment for

bicycles and motor vehicles

Option B includes two-way motor vehicle traffic on Peel Ave. and Gladstone Avenue from Queen St. W. to Peel Ave., bike lanes, wider sidewalks, potential of ±25 street trees (to be confirmed in detail design), on-street lay-by parking and some green street features, but not as many as Option A.

Photos are for illustration purposes only.

A contra-flow bicycle lane is proposed for Gladstone Ave. between Peel Ave. and Argyle St.

Adding a one-way bicycle lane, in the opposite direction to the one-way vehicular travel lane, allows cyclists to use streets that are quieter, instead of a busy arterial road

Page 12: Peel & Gladstone Road Reconstruction - Toronto · CITY OF TORONTO ACCESSIBILITY DESIGN GUIDELINES Diversity Our Strength AUGUST 2017 Schollen & Company Inc. Urban Forest Innovations

12toronto.ca/peelgladstone

Project Design

Option B (Preferred Option) Cross-Sections

Gladstone Ave.Queen St. W. to Minowan Miikan Ln. (looking north)

Gladstone Ave.Minowan Miikan Ln. to Peel Ave. (looking north)

Peel Ave.Gladstone Ave. to Dufferin St. (looking west)

* These cross-sections were created using Streetmix and is used under the Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) license.

** Road dimensions may be subject to change pending detailed design.

N

Queen St. W.

Peel Ave.

Argyle St.

Gla

dsto

ne A

ve.

Duf

feri

n S

t.

Min

owan

M

iikan

Ln.

N

Queen St. W.

Peel Ave.

Argyle St.

Gla

dsto

ne A

ve.

Duf

feri

n S

t.

Min

owan

M

iikan

Ln.

N

Queen St. W.

Peel Ave.

Argyle St.

Gla

dsto

ne A

ve.

Duf

feri

n S

t.

Min

owan

M

iikan

Ln.

Page 13: Peel & Gladstone Road Reconstruction - Toronto · CITY OF TORONTO ACCESSIBILITY DESIGN GUIDELINES Diversity Our Strength AUGUST 2017 Schollen & Company Inc. Urban Forest Innovations

Project Communications

13toronto.ca/peelgladstone

Project Communications

Next Steps

Step

1S

tep 2

Step

3

• Submit your feedback on this project to the City by December 13, 2019, using the:

» Paper Feedback Form provided at this event, or » Online Feedback Form at toronto.ca/peelgladstone

• City staff will continue to finalize detailed design and will report on the feedback we have received

• Sign up for the project mailing list by contacting the Public Consultation Unit (contact details below)

• By subscribing, you will stay informed about what’s happening, what’s next and what progress has been made during construction

• Construction planned for 2021 pending finalization of detailed design

• Pre-Construction Notices will be issued approximately two months in advance of work commencing

• Construction Notices will be mailed to you 2 − 3 weeks in advance of work commencing

Contact us

If you have any questions or concerns, feel free to contact:

Elysia Leung Senior Public Consultation Coordinator Public Consultation Unit, City of Toronto [email protected] 416-392-6505