Contributed to Reaching PEMEX’s Total Maximum Peak Production Level of 2,295,000 bopd for the Cantarell Field.
Client: PEMEX Exploracion y Produccion (PEP)
Location: Bay of Campeche, Gulf of Mexico
Scope: Engineering (Detailed Design). Procurement, Construction, Fabrication, Instal-lation, Commissioning, Hook-up, Installation
Status: Completed 2003
Details:• The project encompasses the detail engineering design, procurement services,
cosntruction, hook-up, and commissioning of the AKAL-B complex for PEP, located in the Bay of Campeche, Mexico.
• This mega EPIC oil and gas project includes:
– Production platform
– Booster compression platform
– High-pressure compression platform
– Three bridge support platforms
– Two flare platforms
– Nine bridge platforms
• Facilities include three major platforms; three minor platforms; two flare platforms; and nine bridges.
• Includes over 140,000 HP of power-driven DLE (Dry Low Emission) gas turbines
• Four generators with enough energy to supply power for 2,300 homes
• Production capacity: 367,000 bopd and 664 mmscfd
• Total weight: 30,000 tonnes
• Topside weight: 22,216 tonnes
• Tripods weight: 699 tonnes
Continued on following page
Cantarell EPC-22
Bay of Campeche, Gulf of Mexico
Contributed to Reaching PEMEX’s Total Maximum Peak Production Level of 2,295,000 bopd for the Cantarell Field.
Client: PEMEX Exploracion y Produccion (PEP)
Location: Bay of Campeche, Gulf of Mexico
Scope: Engineering (Detailed Design). Procurement, Construction, Fabrication, Instal-lation, Commissioning, Hook-up, Installation
Status: Completed 2003
Details:• Flare stacks/deck weight: 455 tonnes
• Jacket weight: 7,508 tonnes
• Piling weight: 11,065 tonnes
• Pile length: 6.3 km (if laid end-to-end)
• Bridges weight: 2.978 tonnes
• Estimated length of welds required to assemble the steel: 724.2 km
Highlights:• An environmentally-sensitive program with implementation of a sour water stripper
and an oxygenation-cooling system for the produced water
• Peak Manpower 303
• 1,700,000 work-hours
Cantarell EPC-1
Bay of Campeche, Gulf of Mexico