penan pre school project progress report
TRANSCRIPT
-
8/8/2019 Penan Pre School Project Progress Report
1/18
1
Penan Pre-School ProjectProgress Report
As at 21 November 2010
-
8/8/2019 Penan Pre School Project Progress Report
2/18
2
Penan Pre-School Project Progress Report
Teachers
201010
The two Penans teachers had started their training inKuching, Sarawak since October, 2010. The training is to
equip the teachers with skills so that they would teacheffectively and professionally.
-
8/8/2019 Penan Pre School Project Progress Report
3/18
3
Penans teachers in a trainingsessions
-
8/8/2019 Penan Pre School Project Progress Report
4/18
4
Penan Pre-School Project Progress Report
Schools
1. Long Itam
estimated : 60 students
2. Long Pakan
estimated : 50 students
-
8/8/2019 Penan Pre School Project Progress Report
5/18
5
Long Item Pre-School building exterior. The Long Item villagers contributed to
building this building entirely from their own expenses and efforts.
We only support them with petrol for their chainsaws and nails.
-
8/8/2019 Penan Pre School Project Progress Report
6/18
6
201113Long
Item5
Three of the 5 years old children from Long
Item who will be attending the pre-school on
3rd January 2011.
-
8/8/2019 Penan Pre School Project Progress Report
7/18
7
Long Item
3400
Villagers of Long Item
showing the interior of the
pre-school. Note that there
is no ceiling and some small
amount (RM3-400) are
given to each village to
purchase plywood as
ceiling. Otherwise, the
interior is too hot.
-
8/8/2019 Penan Pre School Project Progress Report
8/18
8
Another view of the Pre-Schoolinterior. We also supported the
buying of floor-mate as seen
here.
-
8/8/2019 Penan Pre School Project Progress Report
9/18
9
Crossing the river to reach Long Item village
-
8/8/2019 Penan Pre School Project Progress Report
10/18
10
Another exterior view of Long Item Pre School fully packed
to show that the building is strong enough.
-
8/8/2019 Penan Pre School Project Progress Report
11/18
11
Some of the students who will be attending
the Long Item Pre-School.
-
8/8/2019 Penan Pre School Project Progress Report
12/18
12
Long Pakan
Exterior view of the Long Pakan Pre-School building, built entirely by the villagers as their
contribution to the Pre-School. Again, we just provided the petrol for chainsaw to cut woods
and nails. Request had been made for this building to have window openings.
-
8/8/2019 Penan Pre School Project Progress Report
13/18
13
Long ItemLong PakanLong Pakan
Long Pakan Headman (3rd from left standing behind children), Long Item teacher (2nd from
left), Long Pakan teacher (2nd right), Long Pakan Pre-School VillageCommittee members
and some children standing behind first batch of the pre-school materials supplied..
-
8/8/2019 Penan Pre School Project Progress Report
14/18
14
Long PakanLong Item
Interior of Long Pakan Pre-School building, with tables and chairs. Just like Long Item,
money for plywood as ceiling had been provided and the floor-mate was also provided.
-
8/8/2019 Penan Pre School Project Progress Report
15/18
15
Long Pakan
Long Pakan Village Pre-School Committee members with the two pre-school
teachers sitting in the middle..
-
8/8/2019 Penan Pre School Project Progress Report
16/18
16
Another view of the interior of Long Pakan Pre-School as villagers showed the
school building..
-
8/8/2019 Penan Pre School Project Progress Report
17/18
17
Penan Pre-School Project Progress Report
RM55,000
Estimated expenses for the two years pre-school project isRM55,000
-
8/8/2019 Penan Pre School Project Progress Report
18/18
18
Penan Pre-School Project Progress Report
20101121
RM53,503
The Contributions that the project has collected is RM53,503.
84
Total Donors (as individual or group) that contributed for this
project are 84