PENETRON SYSTEM IN SENTOSA ISLAND, SINGAPORE
Penetron range of products continues to dominate the Singapore’s scene providing durable and
watertight structures not only in the mainland and also in “Sentosa Island…….”
(1) THE COAST AT SENTOSA COVE
13,500 CUBIC METER OF CONCRETE CASTED WITH PENETRON ADMIXTURE
This premier condominium was completed in 2007 and sitting on the longest coastal stretch of
Sentosa Cove providing both the panoramic vista of the South China Sea and the enchanting
waterways or all its 249 units including a total of 41 private berths.
PROJECT DETAILS:
DEVELOPER: HO BEE GROUP
ARCHITECTS: ARCHITECTS 61 PTE LTD
CIVIL & STRUCTURE ENGINEER: ARUP SINGAPORE PTE LTD
CONTRACTOR: KIM SENG HENG ENGINEERING CONSTRUCTION PTE LTD
PRODUCTS USED: PENETRON ADMIXTURE & PENESEAL PRO
(2) SEASCAPE AT SENTOSA COVE
13,000 CUBIC METER OF CONCRETE USING PENETRON ADMIXTURE
After the successful completion of The Coast development, Penetron range of products was again
chosen to provide a durable and watertight structures in Seascape, a 151 units of private and
exclusive resort living which was completed in 2008.
Besides its unrivalled, spectacular waterfront location, Seascape is within minutes from the Universal
Studios Singapore, The Marine Life Park and Casino, which form part of Resorts World at Sentosa;
the biggest shopping mall VivoCity; Orchard Road Shopping Belt and the Central Business District.
PROJECT DETAILS:
DEVELOPER: HO BEE GROUP
ARCHITECTS: ARCHITECTS 61 PTE LTD
CIVIL & STRUCTURE ENGINEER: ARUP SINGAPORE PTE LTD
CONTRACTOR: KIM SENG HENG ENGINEERING CONSTRUCTION PTE LTD
PRODUCTS USED: PENETRON ADMIXTURE, PENEBAR SW 55 & PENESEAL PRO
(3) THE MARINA COLLECTION
10,600 CUBIC METER OF CONCRETE USED IN THIS DEVELOPMENT, THE MARINA COLLECTION
Completed in 2009, some 10,600 cubic meter of concrete were dosed with our Penetron Admixture,
and thus providing yet another watertight structures in The Marina Collection development.
The Marina Collection offers 124 exclusive, spacious and utterly luxurious units with 40 private
berths on a beautiful waterfront setting.
PROJECT DETAILS:
DEVELOPER: LIPPO MARINA COLLECTION PTE LTD
ARCHITECTS: ARCHITECTS 61 PTE LTD
CIVIL & STRUCTURE ENGINEER: MSE CONSULTANTS
CONTRACTOR: KIM SENG HENG ENGINEERING CONSTRUCTION PTE LTD
PRODUCTS USED: PENETRON ADMIXTURE AND PENEBAR SW 55
.
(4) ONE DEGREE 15 MARINA CLUB
4,600 CUBIC METER OF CONCRETE
CASTED WITH PENETRON
ADMIXTURE
This development was completed earlier, undertaken by the same contractor, ONE°15 Marina Club
which offers world‐class marina facilities was completed in 2005.
PROJECT DETAILS:
DEVELOPER: SUTL MARINA DEVELOPMENT PTE LTD
ARCHITECTS: MAPS DESIGN STUDIO
CIVIL & STRUCTURE ENGINEER: RONNIE & KOH
CONTRACTOR: KIM SENG HENG ENGINEERING CONSTRUCTION PTE LTD
PRODUCTS USED: PENETRON ADMIXTURE
(5) THE BERTH BY THE COVE
6,400 cubic meter of concrete casted with Penetron Admixture
Together with ONE°15 Marina Club, The Berth by the Cove, a waterfront condominium had also chosen Penetron Admixture as its main waterproofing product to protect its structures.
There are 200 lavishly appointed two‐, three‐, and four‐bedroom apartments, as well as luxury penthouses which create a relaxed atmosphere ideal for waterfront living.
PROJECT DETAILS:
DEVELOPER: HO BEE GROUP
ARCHITECTS: AXIS ARCHITECTS PLANNERS
CIVIL & STRUCTURE ENGINEER: ARUP SINGAPORE PTE LTD
CONTRACTOR: KIM SENG HENG ENGINEERING CONSTRUCTION PTE LTD
PRODUCTS USED: PENETRON ADMIXTURE
(6) W RESIDENCES @ SENTOSA COVE
10,500 CUBIC METER OF CONCRETE CASTED WITH PENETRON ADMIXTURE WITH 7,600
METER RUN OF PENEBAR SW55
24,000 SQUARE METER OF CONCRETE USING PENESEAL PRO
Completed in 2009, The Residences at W Singapore ‐ Sentosa Cove had some 10,500 cubic meter of
concrete protected by Penetron Admixture and 24,000 square meter of concrete in the super‐
structure level waterproofed with Peneseal Pro.
PROJECT DETAILS:
DEVELOPER: CITYVIEW PLACE HOLDING PTE LTD (SUBSIDIARY OF CITY DEVELOPMENT)
ARCHITECTS: AXIS ARCHITECTS PLANNERS
CIVIL & STRUCTURE ENGINEER: KTP CONSULTANTS
CONTRACTOR: DRAGAGES SINGAPORE
PRODUCTS USED: PENETRON ADMIXTURE, PENEBAR SW55 AND PENESEAL PRO
(7) W HOTEL @ SENTOSA COVE
(COMPLETED: 2010)
3,800 CUBIC METER OF CONCRETE WITH PENETRON ADMIXTURE WITH 2,800 METER RUN OF
PENEBAR SW 55
A year later, in 2010, The W Hotel @ Sentosa Cove was completed, and again, Penetron Admixture
was the choice and indeed, a right choice.
PROJECT DETAILS:
DEVELOPER: CITYVIEW PLACE HOLDING PTE LTD (SUBSIDIARY OF CITY DEVELOPMENT)
ARCHITECTS: AXIS ARCHITECTS PLANNERS
CIVIL & STRUCTURE ENGINEER: KTP CONSULTANTS
CONTRACTOR: SSANGYONG ENGRG, CONST.
PRODUCTS USED: PENETRON ADMIXTURE AND PENEBAR SW55
(8) QUAYSIDE ISLE AT SENTOSA COVE (ON‐GOING)
To‐date, some 4,500 cubic meter of concrete were casted with Penetron Admixture along with 1,300
meter run of Penebar SW 55
This development comprises of a two‐storey mall with a basement besides the W Hotel.
PROJECT DETAILS:
DEVELOPER: CITYVIEW PLACE HOLDING PTE LTD (SUBSIDIARY OF CITY DEVELOPMENT)
ARCHITECTS: AXIS ARCHITECTS PLANNERS
CIVIL & STRUCTURE ENGINEER: KTP CONSULTANTS
CONTRACTOR: SSANGYONG ENGRG, CONST.
PRODUCTS USED: PENETRON ADMIXTURE AND PENEBAR SW55