Mechanical Joint Butt Fusion Joint Electro Fusion Joint Push the pin POLYETHYLENE PIPE JOINTING SYSTEM PT. RUSLI VINILON PT. RUSLI VINILON SAKTI SAKTI By. Edward

Upload: arham-hamid

Post on 16-Apr-2017

2.012 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Penyambungan pipa pe

Mechanical JointButt Fusion JointElectro Fusion Joint

Push the pin

POLYETHYLENE PIPE JOINTING SYSTEM

PT. RUSLI VINILON SAKTIPT. RUSLI VINILON SAKTIBy. Edward

Page 2: Penyambungan pipa pe
Page 3: Penyambungan pipa pe

Component of a typical Compression Fitting

Body

Locking Nut

Clinching ring

Rubber ‘O’ ring

Page 4: Penyambungan pipa pe

Cut the pipe at an angle 90 To the length of pipe with a proper pipe cutter.Clean the burr at the pipe end

ASSEMBLY PROCEDURES

Page 5: Penyambungan pipa pe

Insert the locking nut follow by clinching ring

ASSEMBLY PROCEDURES

Page 6: Penyambungan pipa pe

Feed the 0-ring on the pipe end

ASSEMBLY PROCEDURES

Page 7: Penyambungan pipa pe

Push along the pipe axis to the body of the fitting

ASSEMBLY PROCEDURES

Page 8: Penyambungan pipa pe

The locking nut can be tightly fastened by hand maximum up to size 32 mm in diameter, it is advisable to use a strap wrench or other proper tools.

ASSEMBLY PROCEDURES

Page 9: Penyambungan pipa pe

To ensure the fitting is fully fastened, ascertain that the locking nut exceed the last thread of the body

ASSEMBLY PROCEDURESClick here

Page 10: Penyambungan pipa pe
Page 11: Penyambungan pipa pe
Page 12: Penyambungan pipa pe

PT. RUSLI VINILON SAKTI

Principles of butt fusion joint

Principles regarding to PTt Diagram

P r o c e d u r e s

I n f l u e n c e s

Preparation for fusion

M a c h I n e

I n s t a l l a t I o n

Butt Fusion Fittings

Page 13: Penyambungan pipa pe

Principles of butt fusion joint

finished fusion pipe pipe

heater plate

pipepipe

Click here

Page 14: Penyambungan pipa pe

Equalisation pressure

pressure(N/mm²)

0,01

Equalisation time Heating time

Heating pressure

Fusion and cooling and pressure

Fusion and cooling time

time

Principles regarding to PTt diagramClick here

Page 15: Penyambungan pipa pe

Butt fusion procedure

Planing process

Page 16: Penyambungan pipa pe

Cutting process

Butt fusion procedure

Page 17: Penyambungan pipa pe

Cutting process

Butt fusion procedure

Page 18: Penyambungan pipa pe

Cutting process

Butt fusion procedure

Page 19: Penyambungan pipa pe

Cutting process

Butt fusion procedure

Page 20: Penyambungan pipa pe

Cutting process

Butt fusion procedure

Page 21: Penyambungan pipa pe

Cutting process

Butt fusion procedure

Page 22: Penyambungan pipa pe

Cutting process

Butt fusion procedure

Page 23: Penyambungan pipa pe

Cutting process

Butt fusion procedure

Page 24: Penyambungan pipa pe

Butt fusion procedure

Page 25: Penyambungan pipa pe

Butt fusion procedure

Page 26: Penyambungan pipa pe

Butt fusion procedure

Page 27: Penyambungan pipa pe

Butt fusion procedure

Page 28: Penyambungan pipa pe

Equalisation process

Butt fusion procedure

Page 29: Penyambungan pipa pe

Equalisation process

Butt fusion procedure

Page 30: Penyambungan pipa pe

Equalisation process

Butt fusion procedure

Page 31: Penyambungan pipa pe

Equalisation process

Equalisation time

Heating time

Heating pressure

Butt fusion procedure

Page 32: Penyambungan pipa pe

Equalisation process

Equalisation time

Heating time

Heating pressure

Butt fusion procedure

Page 33: Penyambungan pipa pe

Equalisation time

Heating time

Heating pressure

Heating process

Butt fusion procedure

Page 34: Penyambungan pipa pe

Change over process

Butt fusion procedure

Page 35: Penyambungan pipa pe

Change over process

Butt fusion procedure

Page 36: Penyambungan pipa pe

Change over process

Butt fusion procedure

Page 37: Penyambungan pipa pe

Change over process

Butt fusion procedure

Page 38: Penyambungan pipa pe

Change over process

Butt fusion procedure

Page 39: Penyambungan pipa pe

Dwelling process

Fusion and cooling pressure

Dwelling time

Fusion and cooling time

Butt fusion procedure

Page 40: Penyambungan pipa pe

Fusion process

Fusion and cooling pressure

Dwelling time

Fusion and cooling time

Butt fusion procedure

Page 41: Penyambungan pipa pe

Cooling processFusion and cooling pressure

Dwelling time

Fusion and cooling time

Butt fusion procedure

Page 42: Penyambungan pipa pe

Positioning

Jointing and cooling

Alignment and heating

Jointing check

Butt fusion procedure

Page 43: Penyambungan pipa pe

Equalisation pressure

pressure(N/mm²)

0,01

Equalisation time Heating time

Heating pressure

Fusion and cooling and pressure

Fusion and cooling time

time

0,15

Change-over time

Dwelling time

Pressure / Time diagramClick here

Page 44: Penyambungan pipa pe

Butt fusion influences

Main parameters

Pressure P

Temperature T

Time t

Human factor

Fusion joint strength

Secondary parameters

Equalization pressureHeating pressureFusion and cooling pressure

Temperature of the heater plate Ambient temperature

Heating, equalisation, change over, fusion and cooling time

Pipe storage and handling, cutting, facing, pipe support, cleaning, alignment check, machine maintenance

Click here

Page 45: Penyambungan pipa pe

Preparation for fusion• components to be fused have to have the same wall thickness

• PE 80 and PE 100 with same wall thicknesses can be fused. But the pipe system then can only be used with the lower pressure rating of PE 80.

e

d de

= SDR

incorrect

correct

Page 46: Penyambungan pipa pe

Preparation for fusion

• it is important to plane immediatly before the fusion process• pipe and fitting have to be aligned and any gap should be less than

0.5 mm• misalignment of the pipe must be less than 10% of the wall

thickness

max. wall offset: 10% of wallthickness

max. gap: 0,5 mm

Page 47: Penyambungan pipa pe

• the fusion area should be protected against weather conditions such as sun, wind, rain, snow, ect.

• equal temperature level at the pipe ends

• working area temperatures from 5° to 40° C

• close pipe ends against ambient influences e.g. wind

Preparation for fusion

Page 48: Penyambungan pipa pe

• set welding temperature at temperature control

• check temperature at the heater plate

• clean heater plate always with lint free tissue before every fusion

• set fusion force according to operating manual

set value min. max.

PP 210°C 200°C 220°CPE 210°C 200°C 220°CPVDF 240°C 232°C 248°C

Preparation for fusion

Page 49: Penyambungan pipa pe

Pipe outside diameter 90 110 125 140 160 180 200 225 250 280 315Wall thickness mm 8.2 10 11.4 12.7 14.6 16.4 18.2 20.5 22.8 25.5 28.7Fusion surface mm2

2107 3141 4068 5078 6669 8429 10394 13170 16273 20387 25812S 5 Equalization / fusion pressure Bar 6 9 12 15 20 25 31 39 48 60 76

Bead height mm 1.5 1.5 1.5 2.0 2.0 2.0 2.0 2.5 2.5 2.5 3.0SDR 11 Heating pressure Bar 1 1 2 2 3 3 4 5 6 8 10

Heat soak time sec 82 100 114 127 146 164 182 205 228 255 287Change-over time sec 6 7 8 8 9 9 10 10 11 12 13Pressure build-up time sec 6 7 8 8 9 10 11 12 13 14 15Cooling time min 11 14 15 17 19 21 23 26 28 31 35

Heating Element butt fusion of HD-PETime / Pressure table according to DVS 2207 / 1

• Equalisation and fusion pressures from operating manual

Example fusion table

Page 50: Penyambungan pipa pe

• German Association of Welding Technology (DVS)

• guidelines of DVS 2207

• double bead has to be regular and visible over the whole circumference

K

fusion quality control

GuidelinesClick here

Page 51: Penyambungan pipa pe

Plastic Welding Technology

With high product quality standard

Page 52: Penyambungan pipa pe

Machine types, DELTA 160

Pipe Diameter 40 mm up to 160 mm

Page 53: Penyambungan pipa pe

Machine types, DELTA 250

Pipe Diameter 75mm up to 250 mm

Page 54: Penyambungan pipa pe

Machine types, DELTA 315

Pipe Diameter 90 mm up to 315 mm

Page 55: Penyambungan pipa pe

Machine types, DELTA 500Click here

Pipe Diameter 200 mm up to 500 mm

Page 56: Penyambungan pipa pe
Page 57: Penyambungan pipa pe

• INJECTION MOULDINGINJECTION MOULDING

• SDR 11 until SDR 17SDR 11 until SDR 17

• Diameter 63 mm up to diameter Diameter 63 mm up to diameter 500 mm500 mm

• PE 100PE 100

BUTT FUSION FITTING

Page 58: Penyambungan pipa pe

Click here BUTT FUSION FITTING

SEGMENTED FITTING * PE 100

* diameter 40 mm up to 500 mm

* SDR 11 until SDR 21

Page 59: Penyambungan pipa pe
Page 60: Penyambungan pipa pe
Page 61: Penyambungan pipa pe
Page 62: Penyambungan pipa pe
Page 63: Penyambungan pipa pe
Page 64: Penyambungan pipa pe
Page 65: Penyambungan pipa pe
Page 66: Penyambungan pipa pe
Page 67: Penyambungan pipa pe
Page 68: Penyambungan pipa pe
Page 69: Penyambungan pipa pe
Page 70: Penyambungan pipa pe
Page 71: Penyambungan pipa pe
Page 72: Penyambungan pipa pe
Page 73: Penyambungan pipa pe
Page 74: Penyambungan pipa pe
Page 75: Penyambungan pipa pe
Page 76: Penyambungan pipa pe
Page 77: Penyambungan pipa pe
Page 78: Penyambungan pipa pe
Page 79: Penyambungan pipa pe
Page 80: Penyambungan pipa pe
Page 81: Penyambungan pipa pe
Page 82: Penyambungan pipa pe

Click here

Page 83: Penyambungan pipa pe
Page 84: Penyambungan pipa pe

• Main parameters Subordinate parameters

PressureFitting tolerancesPipe tolerancesFusion zone design of the fittingShrinkage behaviour of the fitting

Temperature Initial temperatureSupplied energy

Time

Human Factors

Fusion joint strength

Heating timeCooling time

Maintenance of machinesPipe preparation

PE pipe joints (electrofusion)

Page 85: Penyambungan pipa pe

Fitting identificationPE 100/SDR

Fusion indicator

4 mm terminal

Integrated pipefixation

Centre stop(removable)

Cold centrezone

Smoothfusion surfaces

Optimisedmarginalzones

Structuredsurface

Electro Fusion Coupler

Page 86: Penyambungan pipa pe

melt indicator protection hood

conical entrance

fusion zone(dynamic thread)

cold zone centre stop

winding preform

“Mage Mate”connection

d 4 mm pin terminal

Technical Features

Page 87: Penyambungan pipa pe

Modern electro fusion fitting

Page 88: Penyambungan pipa pe
Page 89: Penyambungan pipa pe

Screw cap orElectro fusioncap

360° rotatableoutlet

Large tappingdiameter

One top saddle formany applications

Heating wire not in contact withmedium; optimized fusion zone

PE 100

4 mm pin

Extra-longfusion outlet

Integrated cutter,leaktight in end position

Electro Fusion Tapping saddles

Page 90: Penyambungan pipa pe

Printing of joint data

Page 91: Penyambungan pipa pe

How do you overcome this problem?

Page 92: Penyambungan pipa pe

Tapping tools designed for use with PE

Page 93: Penyambungan pipa pe

Many possibilities...

Page 94: Penyambungan pipa pe

Manufacturer

Info. for manual fusion

Traceabilitybar code

Fitting can be fused with pipes SDR 9 -11

Cooling time in minutes Recycling symbol

Magnetic card no.

Serial no..

Fusion code

Product symbol

Product symbolTrade name

Page 95: Penyambungan pipa pe

ELECTRO FUSION EQUIPMENT

Polyweld Manual

Polyweld 2230

Page 96: Penyambungan pipa pe

ELECTRO FUSION EQUIPMENT

Page 97: Penyambungan pipa pe
Page 98: Penyambungan pipa pe
Page 99: Penyambungan pipa pe

Quality of fusion joint

Page 100: Penyambungan pipa pe

We are your preferred partner for high quality PE piping system

Page 101: Penyambungan pipa pe