perencanaan dan penjadwalan distribusi batubara di...
TRANSCRIPT
73
DAFTAR PUSTAKA
Bhaskar, B., Yadav, A. S., Bhadoria, R. S., 2013, Transportation System of Coal
Distribution: A Fuzzy Logic Approach using MATLAB, Corona Journal
of Science and Technology, Vol. 2, No. III, pp. 20-30.
Bilgen, B. & Ozkarahan, I., 2007, A Mixed-Integer Linear Programming Model for
Bulk Grain Blending and Shipping, International Journal of Production
Economics 107, pp. 555-571.
Bozarth, C. B. & Handfield, R. B., 2006, Introduction to Operations and Supply
Chain Management, Prentice Hall, New Jersey.
Bundesanstalt fur Geowissenschaften und Rohstoffe – Federal Institute for
Geosciences and Natural Resources (BGR), 2009, Reserves, Resources
and Availability of Energy Resources – Annual Report 2009.
Central Electricity Authority Ministry of Power India (CEA), 2014, Executive
Summary – Power Sector 2014.
Chen, W., Wu, T. H., Huang, K. I., 1995, Optimal Scheduling Plan for A Coal
Shipment Problem: An Efficient Approach. Computers ind. Engineering,
Vol. 29, No. 1-4,pp. 489-493.
Chopra, S. & Meindl, P., 2001, Supply Chain Management: Strategy, Planning and
Operation, Pearson Education, New Jersey.
Dobler, D. W., 1990, Purchasing and Supply Management, McGraw-Hill, New
York.
El-Wakil, M. M., 1985,Powerplant Technology, McGraw-Hill Book Company,
Singapore.
Elliott-Shircore, T. I. & Steele, P. T., 1985, Procurement Positioning Overview:
Purchasing and Supply Management.
Energitoday, 2004, http://www.energitoday.com/2014/09/15/sukhyar-80-produksi-
batubara-nasional-untuk-ekspor/, diakses pada tanggal 17 Oktober 2014.
Johannes, J., 2010, Studi Permodelan Transportasi Laut untuk Memenuhi
Kebutuhan Batubara pada PLTU 2 X 15 MW di Desa Waai Pulau Ambon,
Institut Teknologi Sepuluh Nopember, Surabaya.
Perencanaan dan Penjadwalan Distribusi Batubara di Pembangkit Listrik Tenaga UapPAULUS BUDI KURNIAWANUniversitas Gadjah Mada, 2015 | Diunduh dari http://etd.repository.ugm.ac.id/
74
Kementerian Energi dan Sumber Daya Mineral Republik Indonesia, 2005, Anatomi
Sumber Daya Batubara serta Asumsi Pemanfaatan untuk PLTU di
Indonesia.
Kementerian Energi dan Sumber Daya Mineral Republik Indonesia, 2011, Tata
Cara Penetapan Besaran Biaya Penyesuaian Harga Patokan Batubara.
Kementerian Energi dan Sumber Daya Mineral Republik Indonesia, 2014, Harga
Batubara Acuan & Harga Patokan Batubara Bulan Maret 2014.
Kementerian Perhubungan Republik Indonesia, 2008, Peta Sebaran Pelabuhan
Indonesia.
Kompas, 2008, Membenahi Perusahaan Listrik Negara,
http://lipsus.kompas.com/grammyawards/read/2008/01/10/19315174/Me
mbenahi.Perusahaan.Listrik.Negara, diakses pada tanggal 12 Agustus
2014.
Kumar, S. A. & Suresh, M., 2008, Production and Operations Management, New
Age International Publishers, New Delhi.
Lieberman, G. J. & Hillier, F. S., 1967, Introduction to Operations Research,
McGraw-Hill, New York.
Petromindo, 2005, Indonesian Coal Book 2004-2005.
PT. Adaro Indonesia, 2013, Investor Presentation 2013.
PT. Bukit Asam, 2013, Annual Report 2013.
PT. Harum Energy, 2013, Annual Report 2013.
PT. Indo Tambangraya Megah, 2013, Annual Report 2013.
PT. Kaltim Prima Coal, 2012, Sustainability Report 2012.
PT. Pembangkitan Jawa-Bali, 2014, Batubara, System Unloading & Gangguan
Pembongkarannya.
PT. Perusahaan Listrik Negara, 2013, Rencana Usaha Penyediaan Tenaga Listrik
2013-2022.
PT. Perusahaan Listrik Negara, 2014, Statistik PLN 2013.
Quayle, M., 2006, Purchasing and Supply Chain Management: Strategies and
Realities, IRM Press, London.
Perencanaan dan Penjadwalan Distribusi Batubara di Pembangkit Listrik Tenaga UapPAULUS BUDI KURNIAWANUniversitas Gadjah Mada, 2015 | Diunduh dari http://etd.repository.ugm.ac.id/
75
Shih, L.-H., 1997, Planning of Fuel Coal Imports Using a Mixed Integer
Programming Model, International Journal of Production Economics 51,
pp. 243-249.
Shih, L.-H. & Huarng, F.-H., 1994, Integer Programming Model for Scheduling
Coal Shipment: A Case Study, Journal of Chinese Institute of Industrial
Engineering 11(2), 61.
Slack, N., Chambers, S., Johnston, R., 2013, Operations Management 7th Edition,
Pearson Education, Harlow.
Tempo, 2007, PLN Kekurangan Pasokan Batubara,
http://tempo.co.id/hg/ekbis/2007/03/09/brk,20070309-95168,id.html,
diakses pada tanggal 12 Agustus 2014.
U.S. Energy Information Administration, 2013, International Energy Statistics
2012,http://www.eia.gov/cfapps/ipdbproject/IEDIndex3.cfm?tid=1&pid=
7&aid=1, diakses pada tanggal 12 Agustus 2014.
Winston, W. L., 1994, Introduction to Operation Research: Applications and
Algorithms, Duxbury Press, USA.
Wu, T.-H., Huang, K-I., Chen, W., 1995, Optimal Scheduling Plan for A Coal
Shipment Problem: An Efficient Approach, Computers ind. Engineering
Vol. 2, No. 1-4, pp. 489-493.
Yucekaya, A., 2013, Managing Fuel Coal Supply Chains with Multiple Objectives
and Multimode Transportation,Engineering Management Journal, Vol.
25, No. 1, pp. 58-70.
Yucekaya, A., 2013, Cost Minimizing Coal Logistics for Power Plants Considering
Transportation Constraints. Journal of Traffic and Logistics Engineering,
Vol. 1, No. 2,pp. 22-127.
Perencanaan dan Penjadwalan Distribusi Batubara di Pembangkit Listrik Tenaga UapPAULUS BUDI KURNIAWANUniversitas Gadjah Mada, 2015 | Diunduh dari http://etd.repository.ugm.ac.id/