period run coordinator shift guide

9
Period Run Coordinator Shift Guide Updated on 26.03.2010 1 PRC Guide

Upload: daphne

Post on 25-Feb-2016

41 views

Category:

Documents


0 download

DESCRIPTION

Period Run Coordinator Shift Guide. Updated on 26.03.2010. Before your period starts. you are registered at CERN, have access rights to the ACR (and cafeteria), and wear a CERN cell phone you have sufficient overlap with previous PRC get familiar with the experiment and its systems - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Period  Run  Coordinator Shift Guide

PRC Guide 1

Period Run CoordinatorShift Guide

Updated on 26.03.2010

Page 2: Period  Run  Coordinator Shift Guide

PRC Guide 2

• you are registered at CERN, have access rights to the ACR (and cafeteria), and wear a CERN cell phone• you have sufficient overlap with previous PRC

• get familiar with the experiment and its systems• grasp the style of the (short) daily meeting• learn about book-keeping (minutes, runs, etc)• attend a 14:00 LPC meeting in CCC

• you get keys for PRC office• you decide if you wish to be ‘coffee coordinator’ well in advance• if you are too tired, ask the RC for a break

Before your period starts

Page 3: Period  Run  Coordinator Shift Guide

PRC Guide 3

• detector subsystems and their coordinators• DCS, DSS, handshakes, alarms, RP veto, SLIMOS duties, access formalities (access issues are TC matters!)

• ECS: runs, partitions, locks• Accumulated data, beam intensities, etc• CTP: configuration, trigger clusters, trigger classes• Filling schemes, machine jargon (see list of LHC acronyms on RC website)• communication with CCC• communication with RC, SL, SRC, and shifters

Get use to…

Page 4: Period  Run  Coordinator Shift Guide

PRC Guide 4

ALICE

How are you embedded in RC

SL

ECS/DAQ SRCSRCSRCSRC

DCS OfflineHLT

CCC

Piquets

RC

PRC

DQM

Page 5: Period  Run  Coordinator Shift Guide

PRC Guide 5

• attend the daily LPC meeting in 874-1-011 (CCC) at 08:30 (working days) and 09:00 (weekend) report to SR• collect information from and inform SRC• chair the daily RC meeting at 17:30 • write and send daily RC minutes (post it in eLogbook, too)• keep planning and statistics files up-to-date and post them on the web• you may attend the trigger meeting. Useful links at http://aliceinfo.cern.ch/static/trigger/doc/index.html

• attend weekly LPC meeting on Monday at 14:00. Material can be found at http://indico.cern.ch/categoryDisplay.py?categId=1607

Tasks I

Page 6: Period  Run  Coordinator Shift Guide

PRC Guide 6

• be present in ACR major part of the day and evening shifts

• keep track on subsystem and machine status (LHC websites). Transfer information to SRC

• setup and ensure, with SL, accomplishment of running plan

• check and ensure that data-taking is going according to plan

• communicate fluidly with SLs

• replace SL if necessary

• mind for a pleasant working atmosphere in ACR and WRs

Tasks II

Page 7: Period  Run  Coordinator Shift Guide

PRC Guide 7

Location of shifters in ACR

Page 8: Period  Run  Coordinator Shift Guide

PRC Guide 8

ACR ALICE control room ACT ALICE configuration toolCCC CERN Control CenterDCS Detector Control SystemECS Experiment Control SystemERP Early Run PartitionFSM Finite State MachineLPC LHC Program CoordinatorRPE Radiation Protection ExpertRC Run CoordinationSL Shift LeaderSLIMOS Shift Leader In Matters of SafetySMS Shift management SystemSOR Start of RunSRC Subsystem Run Coordinator

TDI Beam Absorber for Injection (Internal)TED Beam Absorber for Injection (External)UX25 Main underground cavernWR Working Room

List of acronyms

Page 9: Period  Run  Coordinator Shift Guide

PRC Guide 9

• ALICE RChttp://aliceinfo.cern.ch/Collaboration/Run_Coordination/Run09/

• LPChttp://lpc.web.cern.ch/lpc/

• LHC projecthttp://lhc-commissioning.web.cern.ch/lhc-commissioning/

•…

Useful websites