personal rapid transit fort carson community sustainability
TRANSCRIPT
What is PRT?What is PRT? Example SystemsExample Systems VisualizationVisualization PRT CharacteristicsPRT Characteristics Comparison with Other SystemsComparison with Other Systems Video/AnimationVideo/Animation
Outline
Planning - is PRT appropriate? Simulations Alternatives analyses (layouts & systems) Benefit/cost analyses
Engineering Station & guideway design System operation
Procurement choose the best vendor
Planning - is PRT appropriate? Simulations Alternatives analyses (layouts & systems) Benefit/cost analyses
Engineering Station & guideway design System operation
Procurement choose the best vendor
Independent ConsultantIndependent Consultant
PRT Consulting, Inc.
Direct origin to destination serviceDirect origin to destination service No need to transfer or stopNo need to transfer or stop
Small vehiclesSmall vehicles Service on demand – not scheduledService on demand – not scheduled Fully automated vehicles (T-Pods)Fully automated vehicles (T-Pods)
What is Personal Rapid Transit (PRT)?
T-Pods may be captive to a guidewayT-Pods may be captive to a guideway Small guideways – elevated, at grade or Small guideways – elevated, at grade or
undergroundunderground T-Pods can use all guideways and stations on a T-Pods can use all guideways and stations on a
fully connected networkfully connected network
What is Personal Rapid Transit (PRT)?
Suspended (JPods)Suspended (JPods)
Open Guideway (ULTra)Open Guideway (ULTra)
Captive Bogey (Postech)Captive Bogey (Postech)
What is Personal Rapid Transit (PRT)?
Vehicles carry 4 – 20 passengersVehicles carry 4 – 20 passengers Max. speed = 25mphMax. speed = 25mph Capacity up to 2,500pphpdCapacity up to 2,500pphpd Vendor is 2getthere Vendor is 2getthere http://www.2getthere.euhttp://www.2getthere.eu Operating since 1997Operating since 1997
2getthere
2,650 lb gross weight2,650 lb gross weight 4 passengers4 passengers 25 mph25 mph 2KW continuous 2KW continuous
battery powerbattery power www.atsltd.co.ukwww.atsltd.co.uk
The ULTra system
T-Pod FeaturesT-Pod Features
Elevated guideway costs similar to footbridgeElevated guideway costs similar to footbridge 6ft U-shaped guideway6ft U-shaped guideway Capacity similar to freeway laneCapacity similar to freeway lane
Infrastructure features
In operation since In operation since 19751975
15 second headways15 second headways 5,000 pphpd 5,000 pphpd Intermediate stations Intermediate stations
are bypassedare bypassed 98.5% availability98.5% availability
(Transit LOS A)(Transit LOS A)
Credit: John Bell
Morgantown
Speeds up to 30mphSpeeds up to 30mph 10% maximum gradient10% maximum gradient Capital cost ($126M) overran budgetCapital cost ($126M) overran budget Operating cost $3.3M/year ($1.50/passenger, Operating cost $3.3M/year ($1.50/passenger,
$0.94/passenger mile)$0.94/passenger mile) 2 additional stations2 additional stations
being plannedbeing planned
Morgantown
Comparative Visualization
Personal Rapid Transitand
Conventional Transit
Comparative Visualization
Personal Rapid Transitand
Conventional Transit
DestinationStation 1Station 2Station 3Station 4
Personal Rapid TransitPersonal Rapid Transit Conventional TransitConventional Transit
DestinationStation 1Station 2Station 3Station 4
Personal Rapid TransitPersonal Rapid Transit Conventional TransitConventional Transit
DestinationStation 1Station 2Station 3Station 4
Personal Rapid TransitPersonal Rapid Transit Conventional TransitConventional Transit
DestinationStation 1Station 2Station 3Station 4
Personal Rapid TransitPersonal Rapid Transit Conventional TransitConventional Transit
DestinationStation 1Station 2Station 3Station 4
Personal Rapid TransitPersonal Rapid Transit Conventional TransitConventional Transit
40% of shuttle bus at Heathrow40% of shuttle bus at Heathrow 67% of shuttle bus at DIA67% of shuttle bus at DIA 45% of APM at DIA45% of APM at DIA 15min. Time savings at Morgantown15min. Time savings at Morgantown Results from no waiting and non-stop travel, not Results from no waiting and non-stop travel, not
speedspeed
Trip Time
One way trafficOne way traffic Lower maximum speedsLower maximum speeds Separated from other traffic and pedestriansSeparated from other traffic and pedestrians Crowding (a potential security vulnerability) is Crowding (a potential security vulnerability) is
avoidedavoided 110 million injury-free passenger miles at 110 million injury-free passenger miles at
Morgantown (regular transit would have injured Morgantown (regular transit would have injured over 100)over 100)
Safety and Security
0 1000 2000 3000 4000 5000 6000
Amtrack
Bus Transit
Personal Truck
Commercial Air
Auto
Rail Transit
Commuter Rail
Motorcycle
Vanpool
ULTra
Skyweb Express
BTU/ Passenger Mile
Energy Use
US$5 – 15 million per one-way mile completeUS$5 – 15 million per one-way mile complete Two-way is less than doubleTwo-way is less than double
Probable Capital Costs
Compared PRT withCompared PRT with Conventional Transit (Light Rail, Bus)Conventional Transit (Light Rail, Bus) AutomobileAutomobile
GoodGood OKOK BadBad
Comparison Study
TransitTransit CarCar PRTPRT
New technologyNew technology
Trip TimeTrip Time
Cost per passengerCost per passenger
On-demand 24/7On-demand 24/7
TransfersTransfers
Seated travelSeated travel
PrivatePrivate
Non-stopNon-stop
Vehicle waits for Vehicle waits for passengerpassenger
More like a car than a bus
Comparison Study
TransitTransit CarCar PRTPRT
ADA compliantADA compliant
Safe and secureSafe and secure
User friendlyUser friendly
Snow & iceSnow & ice
Minimal walkingMinimal walking
Environmentally friendlyEnvironmentally friendly
Energy efficientEnergy efficient
Visually appealingVisually appealing
Operate inside buildingsOperate inside buildings
Comparison Study
First Class Transit