perspectives of the offshore wind energy development in russian eez, kaliningrad oblast v. sivkov,...
TRANSCRIPT
Perspectives of the offshore wind energy development in
Russian EEZ, Kaliningrad
Oblast
V. Sivkov, D. Dorokhov, M. Chestnova, B. Zatoplyaev, O. Pichuzhkina, N. GolenkoAtlantic Branch, P.P. Shirshov Institute of Oceanology RAS
Palanga, December 2007
Wind park location
Final map
Bathymetry combined with topography
Wind speed at 100 m height
Surface geology map
Fishery intensity
Habitats: birds period migration
Habitats: birds wintering
Habitats: biocenosis ground invertebrates
Evaluations of hydrothermodynamic effect of the sea wind park
• Qualitative and quantitative evaluations of changes in hydrodynamic and thermodynamic parameters owing to influence of the sea wind park has been done.
• Method of numerical simulation on the base of the Princeton Ocean Model (POM) was use.
17 17.5 18 18.5 19 19.5 20 20.5 21
Longitude, deg.
54.4
54.6
54.8
55
55.2
55.4
55.6
55.8
Latit
ude,
deg
Temperature transects at various weather conditions
0 10 20 30
-60
-50
-40
-30
-20
-10
0
turbulent kinetic energy q2
Turbulent kinetic energy
H EAT FLU X = 200 W att/m **2
East W IN D = 8 m /s
H EAT FLU X
East W IN D
H EAT FLU X = 400 W att/m **2
East W IN D = 1 m /s
HEAT FLUX
W est W IND = 8 m /s
H EAT FLU X
W est W IN D
Influence of the wind park as the source of turbulence can be considerable and it will effect
on oxygen and biogenic distribution.
19.6 19.8 20 20.2 20.4 20.6 20.8 21
Долгота, град.
54.9
54.95
55
55.05
55.1
55.15
55.2
55.25
55.3
55.35
55.4
Ши
рота
, гра
д.
1.51.722.22.533.544.555.566.5789101112131414.515
19.6 19.8 20 20.2 20.4 20.6 20.8 21
Долгота, град.
54.9
54.95
55
55.05
55.1
55.15
55.2
55.25
55.3
55.35
55.4
Ши
рота
, гра
д.
C
Surface current velocity without influence of wind sea park (left picture) and with turbulence generated by wind sea park (right picture)
Simulation was performed with North wind of 8 m/s
Influence of the wind park on horizontal velocity components and on salinity is insignificant.
Nature protection legislation
EIA and ecological assessment
EIA procedure promotes decision making on realization of planned activity taking into account:
• possible adverse effects and environmental consequences;
• public opinion;• working out measures of
decreasing and prevention of effects
EIA
EIA is carried out in few steps. 1. Preliminary assessments for
requirements specification development of EIA.
2. Requirements specification making.
3. EIA investigations.4. Preparation of preliminary EIA.5. Public discussions.
State ecological assessment
Under requirements of Federal Act “On ecological assessment” state ecological assessment is carried out on federal level objects and objects of regional level.
Wind energy sea objects are the subjects of ecological assessment of federal level.
Public ecological assessment
Is organized, financed and carried out by initiative of citizens, non-governmental organizations, local self-government agencies.
State assessment of project documentation
Under Town-planning code of RF project documentation of capital construction objects and results of engineering investigations have to be under state assessment including:
• Sanitary-and-epidemiologic;• Ecological;• Industrial, fire and other safeties
Is financed by Customer.
Energy Legislation
Federal Law No. 250-FZ of 4 November 2007
On Amendments to Legislative Acts of the Russian Federation
Concerning Measures for the Reorganization of the Unified Energy System of Russia
Renewable Energy Sources include solar energy; wind energy; hydraulic energy (e.g. wastewater’s); tidal energy; wave energy; geothermal energy; low-potential heat energy of the earth, air, water; biomass, (specially grown trees and industrial and consumer wastes); biogas, landfill and coal mine gas.
Article 3. Definition of the basic concepts:…………………………………..
Article 21. …..
1. Functions of the Government of the Russian Federation:
to support:
• the use of renewable energy sources and stimulate the use of energy-efficient technologies, as provided by the Budget Code of the Russian Federation;
Article 21. …..
1. Functions of the Government of the Russian Federation:
• to approve:
the criteria of granting subsidies from the Federal Budget to compensate the cost of technological connection to the grid for generation devices with installed capacity of not more than 25 MW.
COMING SOON
•Economical feasibility study;
•Survey report;
•EIA report.
COMING NOT SOON
Full, stable, agreeable to all requirements law and by-laws on
energy politics in RF
Thanks for attention