InfrastructureProjectsPERU

Last update September, 2020

Page 2: PERU - rubio.pe

Milestone 1:Award

Page 3: PERU - rubio.pe

HYDROCARBONS

Masification Of The Use Of Natural Gas - Distribution Of Natural Gas Through A Network Of Pipelines In The Regions Of Apurímac, Ayacucho, Huancavelica, Junín, Cusco, Puno And Ucayali

(USD 200 Million)

The Project consists of the implementation of the indispensable infrastructure to provide the Natural Gas Distribution Service for the diverse users, in the regions of Apurímac, Ayacucho, Huancavelica, Junín, Cusco, Puno and Ucayali. The minimum infrastructure to be implemented, as part of the concession, in each city will be: (i) Main Reception and Regulation Station; (ii) High Pressure Steel Network; (iii) District Regulation Stations; and (iv) Medium Pressure Polyethylene Network.

Integrated Gas Transportation System, South Zone

(Investment amount to be defined)

The project is framed within the energy policy called “Energy Security” and includes a natural gas and natural gas liquids transport system, which will provide security of supply to the users of the National Interconnected Electric System (SEIN) and to the users of natural gas (NG) and natural gas liquids (LNG); as well as to provide coverage of NG and LNG supply for the users of the main cities of the southern area of Peru: Cusco, Apurimac, Puno, Arequipa, Moquegua and Tacna, and the “Southern Peru Energy Node in Mollendo and Ilo” (Puerto Bravo and Ilo Thermal Power Plants, respectively).

Status: The estimated award is expected during the 1st semester 2021.

Status: The estimated award is expected during the 3rd quarter 2020.

TRANSACTION

Page 4: PERU - rubio.pe

RAILWAYS

Huancayo - Huancavelica Railway

(USD 232 Million)

The project consists on the rehabilitation and improvement of the Huancayo – Huancavelica railroad, it comprises he design, finance, works execution, acquisition of rolling stock materials, operation and maintenance.

ELECTRICITY

138 KV Puerto Maldonado - Iberia Transmission Line and 20/60/23 KV of 100 MVA Valle del Chira Substation

(USD 50,613,27 Million)

The purpose of the transmission line, of simple circuit and 160 km in length, is to supply electricity to the city of Iberia, as well as the population and industrial loads of the zone, with energy coming from the National Interconnected Electric Grid (SEIN, by its acronym in Spanish). As part of the project, the Puerto Maldonado substation must be expanded, to complete the connection cells of the existing transformer and to install the exit bay of the Puerto Maldonado-Iberia line. Likewise, the project aims to provide relatability to the energy provision in the department of Piura.

Relevant dates:

• The Payment of the Participation Right may be made until January 29, 2021.

• The Presentation of the Qualification Application of the interested bidders will be received until February 3, 2021.

• The Qualification Announcement will be made on March 2nd, 2021.

• The presentation offers and the awarding of the project is estimated for April 07, 2021.

Status: The estimated award is expected during the 2nd quarter 2021.

Status: The estimated award is expected during the 4th quarter 2020.

Page 5: PERU - rubio.pe

ELECTRICITY

500 KV Piura Nueva Frontera Substation Transmission Line

(USD 163,502,301.00 Million)

Interconnection Project of the electrical systems of Peru and Ecuador. It comprises the construction of a 500 kV Transmission Line of simple circuit with an approximate length of 263.2 km, which will begin its trajectory in the substation Piura Nueva 500 kV and will culminate in the border point with Ecuador. The project also includes the expansion of the Piura Nueva substation.

ROADS

Longitudinal de la Sierra Road - Tranch IV

(USD 280 Million)

The project consists on the rehabilitation and upgrade works of 117 km of roads, the regular initial maintenance of 280 km of roads and the operation and continuous maintenance of 970 km of roads in order to conserve the highway at established levels of service.

STRUCTURE

Status: The estimated award is expected during the 2nd quarter 2021. Call for Tenders Date: 2nd semester 2020.

Status: The estimated call for tenders is expected during the 2nd semester of 2020.

Page 6: PERU - rubio.pe

HEALTH

Two new hospitals: Piura and Chimbote (ESSALUD)

(USD 254 Million)

The projects consist of the design, construction, equipment, operation and maintenance of supplementary services (gray coats) of Highly Specialized Hospitals for the Social Security System of Peru (ESSALUD); one will be located in the department of Piura.

SANITATION AND WATER SYSTEM

Puerto Maldonado’s new wastewater treatment plant

(USD 58 Million)

The project will consist in the financing, construction, operation and maintenance of a wastewater installation in Puerto Maldonado.

Headwaters and pipeline works for Lima’s potable water supply

(USD 60 Million)

The project consists on the Design, financing, construction, operation and maintenance of the following new works: (i) Expansion of Pomacocha and Huallacocha Bajo reservoirs (to 90 MMC), (ii) Captchment channels (12 km), (iii) Trans-Andean tunnel (10 km), (iv) Huachipa II Water Treatment Plant (5m3/s), (v) Additional reservoirs (137,000 m3), (vi) South branch line (40 km) inc. 7 reservoirs, and (vii) Interconnecting Lines (90 km). Includes the O&M of the following existing facilities: (i) Huachipa water up-take, (ii) Huachipa I Plant (5 m3 /s), and (iii) North branch line (27 km) incl. 4 reservoirs.

Status: The estimated award is expected during the 2nd quarter 2021. Call for Tenders Date: 1st quarter 2021.

Status: The estimated award is expected during the 2nd quarter 2021. Call for Tenders Date: 1st quarter 2021.

Status: The estimated award is expected during the 2nd quarter 2021. Call for Tenders Date: 4th quarter 2020.

Page 7: PERU - rubio.pe

Ancon Industrial Park

(USD 650 Million)

The project comprises of the construction of a Industrial Park in Ancon, Lima. The modality is Asset Transfer and has a deadline of 30 years.

ELECTRICITY

220/60 KV Chincha nueva substation and 220/60 KV Nazca nueva substation

(USD 39,793,000.00 Million)

This project aims to provide a connection to strengthen the energy supply in the region of Ica. The project includes the implementation of the main facilities and equipment of the 220/60 kV Chincha Nueva substation and 220/60 kV Nazca Nueva substation

Relevant dates:

• The Payment of the Participation Right will be possible until October 13, 2020.

• The Presentation of the Qualification Application of the interested bidders will be received until October 16, 2020.

• The Qualification Announcement will be made on October 30, 2020.

• The Presentation of offers and the awarding of the project will be made on November 30, 2020.

Status: The estimated award is expected during the 4th quarter 2020.

Status: Direct Award: 1st semester 2021.Estimated call for Tenders Date: 2nd semester 2020.

FORMULATION

PRODUCTION

Page 8: PERU - rubio.pe

COMMUNICATIONS

Radio spectrum bands: (I) 1 750 – 1 780 MHZ and 2 150 – 2 180 MHZ; and (II) 2 300 -2 330 MHZ

(USD 291 Million)

The project consists on the expand nationwide the development of mobile broadband systems in the country, for technologies such as 4G, 5G, or higher. The AWS-3 and 2.3 GHz bands will offer better coverage characteristics and greater data capacity.

Status: The estimated award is expected during the 2nd quarter 2021. Call for Tender Date: 4th Quarter 2020.

Page 9: PERU - rubio.pe

Milestone 2:Interest Declaration

Page 10: PERU - rubio.pe

ROADS

Peripheral ring road

(estimated USD 2,049 Million)

The project comprises of the construction of a highway of approximately 33.2 km between Elmer Faucett Avenue, Canta Callao Avenue and Circunvalacion Avenue.

EDUCATION

High-performance schools: Coar Center Region

(USD 60 Million)

The project will consist of the construction, implementation, maintenance and operation of 4 high- performance schools (COAR) in the regions of Junín, Pasco, Huancavelica and Cusco.

Status: Direct Award: 2nd quarter 2021. Competitive Scenario: 4th quarter 2021. Estimated Interest Declaration Date: 4th quarter 2020.

Status: Direct Award: 2nd quarter 2021.Competitive Scenario: 4th quarter 2021. Estimated Interest Declaration Date: 4th quarter 2020.

STRUCTURE

Page 11: PERU - rubio.pe

MINING

Algarrobo mining Project

(USD 350 Million)

The project will consist of the exploration, mining operation through an underground mine and processing a mineralized deposit located in the mining concessions Tambo Grande N° 4, Tambo Grande N° 5, Tambo Grande N° 9 and Tambo Grande N° 10, which form “El Algarrobo Project”.

EDUCATION

Schools at risk: Villa María del Triunfo

(USD 72 Million)

The project is located in the Villa María del Triunfo district, Lima, and would consist on the construction, implementation, maintenance and operation of the complementary services in the Educational Public Centers of five schools at risk, which are located on Villa María del Triunfo.

Status: Direct Award: 2nd semester 2021.Competitive Scenario: 2022. Estimated Interest Declaration Date: 2nd quarter 2021.

Status: Direct Award: 2nd quarter 2021.Competitive Scenario: 4th quarter 2021. Estimated Interest Declaration Date: 4th quarter 2020.

FORMULATION

Page 12: PERU - rubio.pe

Schools at risk: Lima Metropolitana

(USD 227 Million)

The project is located in the Villa El Salvador and San Juan de Miraflores district, Lima, and would consist on the construction, implementation, maintenance and operation of the complementary services in the Educational Public Centers of five schools at risk, which are located on Villa El Salvador and San Juan de Miraflores.

Schools at risk: Ate and San Juan de Lurigancho

(USD 148 Million)

The purpose of the project is the construction, equipment, operation of the complementary services and maintenance of the infrastructure, furniture, and equipment for educational institutions at risk in the districts of Ate and San Juan de Lurigancho in Lima.

Schools at risk: Comas - San Martin de Porre

(USD 95 Million)

The purpose of the project is the construction, equipment, operation of the complementary services and maintenance of the infrastructure, furniture, and equipment for educational institutions at risk in the districts of Comas and San Martin de Porres.

SANITATION AND WATER SYSTEM

New wastewater treatment plant for Huancayo, El Tambo and Chilca

(USD 165 Million)

The project consists in the construction of a new treatment plant of 80,700 m3/h capacity, the installation of 4 stations for water pumping among other infrastructure.

Status: Direct Award: 2nd semester 2021.Competitive Scenario: 2022. Estimated Interest Declaration Date: 2nd quarter 2021.

Status: Direct Award: 2nd semester 2021.Competitive Scenario: 2022. Estimated Interest Declaration Date: 2nd quarter 2021.

Status: Direct Award: 2nd semester 2021.Competitive Scenario: 2022. Estimated Interest Declaration Date: 2nd quarter 2021.

Status: Direct Award: 2nd semester 2021.Competitive Scenario: 1st semester 2022. Estimated Interest Declaration Date: 2nd quarter 2021.

Page 13: PERU - rubio.pe

If you need further information,

contact us

Page 14: PERU - rubio.pe

Milagros MaravíPartnerAdministrative and Regulatory Practice [email protected](+51) 999 497 257

Andrés Kuan-VengPartnerCorporate and Finance Practice [email protected](+51) 997 552 266

Carlos ArataPartnerCorporate and Finance Practice [email protected](+51) 951 029 069

Daniela García BelaundePartnerNatural Resources: Energy Practice [email protected](+51) 998 698 479

Franco SoriaPartnerReal Estate, Land Remediation and Land [email protected](+51) 995 065 425

Page 15: PERU - rubio.pe