petron corporate presentation

Upload: sivuonline

Post on 02-Jun-2018

309 views

Category:

Documents


1 download

TRANSCRIPT

  • 8/10/2019 Petron Corporate Presentation

    1/46

    tron

    In touch with tomorrow

  • 8/10/2019 Petron Corporate Presentation

    2/46

    Petron

    Operational Presence

    Petron Petron

    Petron

  • 8/10/2019 Petron Corporate Presentation

    3/46

    Petron

    Organization

    Petron Emirates Contracting & Manufacturing Co. L.L.C. Dubai, United Arab Emirates

    Established in the Middle East in 1983

    Civil, Mechanical, Electrical, Instrumentation and Painting Works

    ISO 9000 Company with ASME U, U2, S and R Stamp

    Has 4 large Fabrication Yards across the U.A.E.

    Total fabrication capacity is 2500 to 3000 tons

    Petron Gulf L.L.C. Sultanate of Oman Started Operations in Oman in 2007

    ISO 9000 Company for EPC, Fabrication C M E & I Works

    ASME U, S and R Stamp

    New Fabrication Facilities in Sohar over 60,000 sqm

    State of Art of Technology for Pressure Vessels, Tanks, Piping & Structural Fabrication

    Large Construction Projects in Steel, Aluminum, Power, Oil & Gas Industries

    Petron Saudi Industrial Co. L.L.C. Saudi Arabia

    Started Operations in 2011

  • 8/10/2019 Petron Corporate Presentation

    4/46

    Petron

    Founders

    Mr. Ramesh Shankar AmbekarManaging Director

    An Engineering graduate and business Entrepreneur from India.

    More than 4 decades of experience in the Construction field.

    Founded Petron Engineering Construction Ltd., Mumbai

    Chairman of Petron Group of Companies

    Mr. Apurba BhattacharyaDirector (Operations)

    Started as Project Engineer with Petron in Mumbai in 1978.

    Solely responsible for all projects of Petron, India in Dubai.

    Established Petron, Dubai in 1992 and became a Board Member.

    Since 1992, responsible for the overall operations of Petron, Dubai.

  • 8/10/2019 Petron Corporate Presentation

    5/46

    Petron

    Some of our major clients

  • 8/10/2019 Petron Corporate Presentation

    6/46

    Petron

    Expertise

    FABRICATION

    MECHANICAL

    CONSTRUCTION

    ELECTRICAL&

    INSTRUMENTATION

    CIVIL CONSTRUCTION ENGINEERING, PROCUREMENT &

    CONSTRUCTION

  • 8/10/2019 Petron Corporate Presentation

    7/46

  • 8/10/2019 Petron Corporate Presentation

    8/46

    Petron

    Sector Presence

    FABRICATIONMECHANICAL

    CONSTRUCTION

    ELECTRICAL

    &

    INSTRUMENTATION

    CIVIL

    CONSTRUCTION

    ENGINEERING,

    PROCUREMENT &

    CONSTRUCTION

    POWER SECTOR

    OIL & GAS SECTOR

    ALUMINIUM

    SECTOR

    REFINERY/

    PETROCHEMICAL/

    FERTILIZER

    SECTOR

    STEEL SECTOR

    CEMENT SECTOR

    FOOD SECTOR

  • 8/10/2019 Petron Corporate Presentation

    9/46

    Petron

    People Strength

    TOTAL MANPOWER

    -

    500

    1,000

    1,500

    2,000

    2,500

    2007 2008 2009 2010 2011 May-12

    184

    602

    858

    1,9822,146

    2,437

  • 8/10/2019 Petron Corporate Presentation

    10/46

    Petron

    People Strength

    TOTAL NATIONAL STAFF

    -

    100

    200

    300

    400

    500

    600

    700

    800

    2007 2008 2009 2010 2011 May-12

    70

    212

    292

    521

    602

    723

  • 8/10/2019 Petron Corporate Presentation

    11/46

    Petron

    H.S.E. Policy

  • 8/10/2019 Petron Corporate Presentation

    12/46

  • 8/10/2019 Petron Corporate Presentation

    13/46

    Petron

    Certifications

  • 8/10/2019 Petron Corporate Presentation

    14/46

    Petron

    Certifications

  • 8/10/2019 Petron Corporate Presentation

    15/46

    Petron

    Projects

  • 8/10/2019 Petron Corporate Presentation

    16/46

    Petron

    Projects

    SUR INDEPENDENT POWER PLANT

    Client Name DAEWOO ENGINEERING & CONSTRUCTION

    Project Name SUR INDEPENDENT POWER PLANT PROJECT

    Scope of Work Mechanical Construction for 2000 MW

    Combined Cycle Power Station

    Package A for Early Power

    5 x Siemens VG 94.3A Gas Turbines

    5 x HRSGs

    Balance of Plant

    Contract Value USD 30 Million

    Contract Duration 18 Months

    Peak Manpower 1,500

  • 8/10/2019 Petron Corporate Presentation

    17/46

  • 8/10/2019 Petron Corporate Presentation

    18/46

    Petron

    Projects

    BARKA III INDEPENDENT POWER PLANT

    Client Name GS ENGINEERING & CONSTRUCTION CORP.

    Project Name BARKA III INDEPENDENT POWER PLANT PROJECT

    Scope of Work Mechanical and Piping For 750 MW

    Combined Cycle Power Station

    2 x Siemens VG 94.3A Gas Turbines

    2 x HRSGs

    1 x 300 MW Steam Turbine

    Contract Value USD 10 Million

    Contract Duration 16 Months

    Peak Manpower 450

  • 8/10/2019 Petron Corporate Presentation

    19/46

  • 8/10/2019 Petron Corporate Presentation

    20/46

    Petron

    Projects

    BARKA III INDEPENDENT POWER PLANT

    j

  • 8/10/2019 Petron Corporate Presentation

    21/46

    Petron

    Projects

    BARKA III INDEPENDENT POWER PLANT

  • 8/10/2019 Petron Corporate Presentation

    22/46

    P j

  • 8/10/2019 Petron Corporate Presentation

    23/46

    Petron

    Projects

    VALE OMAN PELLETIZING COMPANY LLC

    P j

  • 8/10/2019 Petron Corporate Presentation

    24/46

    Petron

    Projects

    VALE OMAN PELLETIZING COMPANY LLC

    P j t

  • 8/10/2019 Petron Corporate Presentation

    25/46

    Petron

    Projects

    VALE OMAN PELLETIZING COMPANY LLC

    P j t

  • 8/10/2019 Petron Corporate Presentation

    26/46

    Petron

    Projects

    SHADEED IRON AND STEEL L.L.C.

    Owner Name JINDAL-SHADEED IRON & STEEL LLC

    Client Name DOUGLAS OHI LLC

    Project Name DRI Steel Plant

    Scope of Work Supply, Fabrication and Erection of Material Handling System

    Contract Value USD 14 Million

    Contract Duration 14 Months

    Peak Manpower 650

    P j t

  • 8/10/2019 Petron Corporate Presentation

    27/46

    Petron

    Projects

    SHADEED IRON AND STEEL L.L.C.

    P j t

  • 8/10/2019 Petron Corporate Presentation

    28/46

    Petron

    Projects

    SHADEED IRON AND STEEL L.L.C.

  • 8/10/2019 Petron Corporate Presentation

    29/46

    Projects

  • 8/10/2019 Petron Corporate Presentation

    30/46

    Petron

    Projects

    SOHAR ALUMINIUM L.L.C.

    Client Name Solios France Bechtel

    Project Name SOHAR ALUMINUM SMELTER PROJECT

    Scope of Work Supply Fabrication and Erection of GTC 1 & 2

    (Gas Treatment) and FTC (Fume Treatment)

    Contract Value USD 21 Million

    Contract Duration 16 Months

    Peak Manpower 750

    Projects

  • 8/10/2019 Petron Corporate Presentation

    31/46

    Petron

    Projects

    SOHAR ALUMINIUM L.L.C.

    Erection of Stack for GTC (Height 60M, Weight 170 MT) Erection of Cooling, Tower, Rising Duct & Stack for FTC

    Projects

  • 8/10/2019 Petron Corporate Presentation

    32/46

    Petron

    Projects

    SOHAR ALUMINIUM L.L.C.

    Erection of FTC with the associated Mechanical equipment's + Piping

    Projects

  • 8/10/2019 Petron Corporate Presentation

    33/46

    Petron

    Projects

    SOHAR ALUMINIUM L.L.C.

    Erection of Gas Collector Duct for GTC

    Erection of Alumina Silos for FTC

    Projects

  • 8/10/2019 Petron Corporate Presentation

    34/46

    Petron

    Projects

    SOME MAJOR JOBS EXECUTED

    Sr. CLIENT NAME PROJECT NAME SCOPE OF WORK

    1SOLIOS ENVIRONMENT SAFRANCE

    SOHAR ALUMIIUMSMELTER PROJECT

    ERECTION OF GAS TREATMENT CENTRE 1 AND 2 ANDFUME TREATMENT CENTRE

    2 DOUGHLAS OHIMATERIAL HANDLINGSYSTEM

    SUPPLY, FABRICATION & ERECTION OF STRUCTURALSTEEL WORKS, ERECTION OF CONVEYOR SYSTEM,ELECTRICAL & INSTRUMENTATION WORKS

    3 ARABIAN INDUSTRIES PDO FAHUD ERECTION OF 5 NOS. TANKS

    4 SOHAR ALUMINIUMSOHAR ALUMINIUMSMELTER PROJECT

    SERVICE CONTRACT FOR CIVIL, MECHANICAL,ELECTRICAL & INSTRUMENTATION WORKS

    5 AES BARKA BARKA POWER &DESALINATION PLANT

    SHUTDOWN & MAINTENANCE WORKS

    6PETROLEUM POLYMER CO.L.L.C. - SNF GROUP

    PDO MARMULPOLYMER FLOODINGPROJECT

    MECHANICAL ERECTION WORKS

    7OMAN REFINERIES &PETROCHEMICALSCOMPANY

    SOHAR REFINERY SHUTDOWN PROJECT (PROJECT & ENGINEERING)

    Facility

  • 8/10/2019 Petron Corporate Presentation

    35/46

    Petron

    Facility

    FABRICATION SHOP AT SOHAR, OMAN

    Facility

  • 8/10/2019 Petron Corporate Presentation

    36/46

    Petron

    Facility

    FABRICATION SHOP AT SOHAR, OMAN

    HIGH QUALITY FABRICATION

    WORK ON CARBONSTEEL, STAINLESS STEEL SS

    316, 304, DUPLEXSS, INCOALLOY 825, 625 ETC.

    WELDING ON P 11, P 22, P 91ETC.

    CNC PROFILE CUTTING INCOMPLICATED SHAPES

    AUTOMATED CNC LINE FORSTRUCTURAL STEEL

    FABRICATION INCLUDINGBLASTING & PRIMER

    APPLICATION

    ENVIRONMENT FRIENDLYGARNET BASED SURFACE

    PREPARATION & PAINTINGSYSTEMS

    HUGE MATERIAL HANDLINGOVER DINENSION EQUIPMENT

    FABRICATION

    INHOUSE DESIGN FACILITIESFOR STATIC EQUIPMENTDESIGN & STRUCTURAL

    DESIGN

    STRENGTHS

    Facility

  • 8/10/2019 Petron Corporate Presentation

    37/46

    Petron

    Facility

    Location Sohar Industrial Estate Phase V

    Total Area 60,000 square meters

    Covered Fab Area 2,400 square meters

    Open Fab Area 40,000 square meters

    Handling Cranes a. EOT 5 tons and 10 tons

    b. Gantry 15 tons 140 meters span

    c. Tower Crane 12.5 tons 60 meters span

    Fabrication Equipment Rolling Machine 25 mm thick capacity

    CNC Bending Machine

    CNC Profile Cutting Plasma & Gas

    Lathe, Drilling, Shearing Machines etc

    Blasting & Painting Fully covered, Ventilated Blasting and Painting Sheds

    FABRICATION SHOP AT SOHAR, OMAN

    Facility

  • 8/10/2019 Petron Corporate Presentation

    38/46

    Petron

    Facility

    FABRICATION SHOP AT SOHAR, OMAN

    Facility

  • 8/10/2019 Petron Corporate Presentation

    39/46

    Petron

    Facility

    FABRICATION SHOP AT SOHAR, OMAN

    Facility

  • 8/10/2019 Petron Corporate Presentation

    40/46

    Petron

    Facility

    FABRICATION SHOP AT SOHAR, OMAN

    Facility

  • 8/10/2019 Petron Corporate Presentation

    41/46

    Petron

    Facility

    FABRICATION SHOP AT SOHAR, OMAN

  • 8/10/2019 Petron Corporate Presentation

    42/46

    Facility

  • 8/10/2019 Petron Corporate Presentation

    43/46

    Petron

    Facility

    WORKSHOP MACHINERIES

    Sr. MACHINERY DESCRIPTION QUANTITY

    1 4 ROLLS, HYDRAULIC PRE-PINCHING TYPE PLATE ROLLING MACHINE 3000 X 25 MM 1

    2 HYDAULIC PRESS BRAKE 300 TONS X 3000 MM WIDE 1

    3 HYDRAULIC SHEARING MACHINE 3000 MM WIDE X 16 MM THICK 1

    4 RADIAL DRILLING MACHINE 50 MM DIA X 1650 MM RADIUS 1

    5 LATHE MACHINE CC 3000 MM X 400 MM SWING RADIUS 1

    6 RECTIFIER WELDING MACHINES 120

    7 MIG WELDING MACHINES 5

    8 DIESEL GENERATOR WELDING SETS 400 AMPS 8

    9 DIESEL POWER GENERATORS 250 KVA 1

    10 DIESEL POWER GENERATORS 140 KVA 1

    11 DIESEL POWER GENERATORS 110 KVA 1

    12 PUG CUTTING MACHINES 5

    13 PIPE THREADING MACHINES 5

    14 MAGNETIC DRILLING MACHINE 10

    15 PLASMA CUTTING MACHINE 2

    16 CNC PROFILE CUTTING MACHINES OXY FUEL & PLASMA CUTTING 1

    17 TANK SAW CIR-SEAM & LONG-SEAM WELDING MACHINES 2

    18 STRUCTURAL & PIPE ROLLING MACHINES 1

    19 VARIOUS MATERIAL HANDLING & ERECTION TOOLS & TACKLES LOT

  • 8/10/2019 Petron Corporate Presentation

    44/46

  • 8/10/2019 Petron Corporate Presentation

    45/46

  • 8/10/2019 Petron Corporate Presentation

    46/46

    tron

    Petron Gulf LLC

    PO Box 1297, Al Athaiba, Postal Code 130

    Sultanate of Oman

    Tel No +968 24595071

    Fax No +968 24595075

    Email [email protected]

    Web www.petrongulf.com