petter Øgland presentation of thesis oslo, november 27th 2013

20
Mechanism Design for Total Quality Management: Using the Bootstrap Algorithm for Changing the Control Game Petter Øgland Presentation of thesis Oslo, November 27th 2013

Upload: kiora

Post on 12-Jan-2016

27 views

Category:

Documents


0 download

DESCRIPTION

Mechanism Design for Total Quality Management: Using the Bootstrap Algorithm for Changing the Control Game. Petter Øgland Presentation of thesis Oslo, November 27th 2013. Tightly coupled complex systems in crisis: Climate, finance, technology. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Petter Øgland Presentation of thesis Oslo, November 27th 2013

Mechanism Design for Total Quality Management: Using the Bootstrap

Algorithm for Changing the Control GamePetter Øgland

Presentation of thesisOslo, November 27th 2013

Page 3: Petter Øgland Presentation of thesis Oslo, November 27th 2013

Control crisis and control revolution drives evolution of information society

Total Quality Management (TQM) is the applicationof SYSTEMS THINKING to organisation and management

Page 4: Petter Øgland Presentation of thesis Oslo, November 27th 2013

80% TQM implementation failure

Explanation: ”FAKE TQM”The TQM standards industry (ISO 9000, CMM, etc)creates a global network of organised hypocrisy

What to do: ”REAL TQM”The organisation must break loose of ’false consciousness’ and liberate itself from the oppression of the hypocrisy

Page 7: Petter Øgland Presentation of thesis Oslo, November 27th 2013

Thinking about the Bootstrap Algorithm (BA) as a Monopoly strategy

Start withsimple, cheap, flexible solutionsmall network of users that may benefit significantly from improved communication with each other onlysimple practicesnon-critical practicesmotivated usersknowledgeable users1.Repeat as long as possible: Enrol more users2.Find and implement more innovative use; go to 13.Use solution in more critical cases; go to 14.Use solution in more complex cases; go to 15.Improve the solution so new tasks can be supported; go to 1

Hanseth & Aanestad (2003)

Page 8: Petter Øgland Presentation of thesis Oslo, November 27th 2013

RH: The BA is an optimal mechanism design for implementing TQM

• RH1: The BA can be implemented and managed in a state of statistical control

• RH2: The response to the BA treatment is performance measurable by TQM assessments

• RH3: The BA is optimal for implementing TQM in complex environments

Page 9: Petter Øgland Presentation of thesis Oslo, November 27th 2013

Canonical Action Research (CAR)

• The research process was not originally designed as CAR, but CAR is useful for explaining how things were done

• Twenty years of TQM implementation by trying to bootstrap the information infrastructure

• Three cycles (DNMI + NTAX + NTAX/UiO)

Page 10: Petter Øgland Presentation of thesis Oslo, November 27th 2013

First cycle 1992-99: Det Norske Meteorologiske Institutt (DNMI)

• Diagnosis: Complexity made project management based on water-fall model unsuccessful in developing Climate Database (KLIBAS)

• Treatment: Complex adaptive systems (CAS) was used to define a BA that proved successful for developing and improving KLIBAS in the context of TQM implementation

• Outcome: Formulation of BA and experience from using it

Page 11: Petter Øgland Presentation of thesis Oslo, November 27th 2013

Second cycle 1999-2005: Skatteetaten (NTAX)

• Diagnosis: Strong elements of “fake TQM” in a world of bureaucracy, politics and complexity

• Treatment: The BA approach developed at DNMI was able to change “fake TQM” into “real TQM” but ultimately failed

• Outcome: Need to investigate why the “what gets measured gets done” idea, as used in the BA design, did not give expected results

Page 12: Petter Øgland Presentation of thesis Oslo, November 27th 2013

Third cycle 2006-2011: Collaborating with UiO for creating change at NTAX

• Diagnosis: The “what gets measured gets done” idea did not work among COBOL programmers at NTAX as there was lack of management commitment to TQM

• Treatment: Improve the audit process by being more specific in the formulation of the audit game, which helped, but in the end the process failed

• Outcome: The importance of having game theoretic representations of the social theories used when studying BA through action research

Page 13: Petter Øgland Presentation of thesis Oslo, November 27th 2013

BA stability hypothesis (RH1)

0

5

10

15

20

Improvement projects Process centreUpper Control Limit Lower Control Limit

THIRD CYCLEFIRST CYCLE SECOND CYCLE

Page 14: Petter Øgland Presentation of thesis Oslo, November 27th 2013

BA impact hypothesis (RH2)• By understanding the QMS

information infrastructure dynamics as Monopoly, the impact of the BA depends on how well it works as a Monopoly strategy

• Property trading: Hamlet game, Pac-Man game, “what gets measured gets done” game, self-protection game

• Property development: Deconstruction game

Page 15: Petter Øgland Presentation of thesis Oslo, November 27th 2013

BA optimality hypothesis (RH3)• The BA can be

interpreted as an optimal Monopoly strategy as optimality is a relationship between the BA and the mathematical structure of the problem (Albertos & Mareels, 2010, p. 270)

• The BA design used in the study was not optimal, but redesigning it with each failed cycle made it continually better

By following optimal strategy it should takeabout 25 years to implement TQM at NTAX?

0100200300400500600700800900

1000

19

90

19

94

19

98

20

02

20

06

20

10

20

14

20

18

20

22

EFQM scoreLogistic regression curve

Page 18: Petter Øgland Presentation of thesis Oslo, November 27th 2013

Contribution to knowledge 3:Use of game theory in action research

1. Diagnosis:Phenomenological attitude

3. Testing of treatment : Positivist attitude

2. Finding a treatment : Mathematical analysis of the game model

Page 20: Petter Øgland Presentation of thesis Oslo, November 27th 2013

The BA is important

• It should be more well-known• It should be subject for further research

Understanding the world as a complex system

Using the BA as control strategy