STDSPFI E S - V - E N G L 1785 71b1i5q'4 00004b0 30b
PFI Standard ES-4 (Revised 1985)
(Reaffirmed March 1999)
HYDROSTATIC TESTING OF FABRICATED PIPING
Prepared by
Pipe Fabrication Institute Engineering Committee
All PFI Standards are advisory only. There is no agreement to adhere to any PFI Standard and their use by anyone is entirely voluntary.
Copyright by
PIPE FABRICATION INSTITUTE Dedicnted to Teclinicnl Advnnceiiieiits niid Stniidni.dimiion i i i
ilre Pipe Fnbricniion Iiiditsii-~
Sirice 1913 USA CANADA
PMB 323 61 I Peiinsjfvni7in Aveiiire SE
655. 3 P d rive. sirite 201 Lachine. Qiceùec
Wnsliing/oii. DC 20003 H8T3G6 WEB SITE
I r i t p : / / ~ ~ ~ ~ i ~ ~ ~ . p ~ - i n s t i / i c t e . org
COPYRIGHT Pipe Fabrication InstituteLicensed by Information Handling ServicesCOPYRIGHT Pipe Fabrication InstituteLicensed by Information Handling Services
STDmPFI ES-4-ENGL Il785
PFI Standard ES-4 (Revised 1985)
(Reaffirmed March 1999)
HYDROSTATIC TESTING OF FABRICATED PIPING
1. Scope 1.1 To establish a standard for hydrostatic testing of
fabricated piping.
all low-pressure filling lines and other appurtenances, that should not be subjected to the test pressures, have been disconnected or isolated by valves or other suitable means.
2. Time of Tests 4.4 Following the application of the test pressure, examination for leakage shall be made of all joints and connections. 2.1 Hydrostatic testing of fabricated piping assemblies
is usually accomplished after installation when the completed system is tested. Testing of sub- assemblies in the fabricator’s shop may be 5. Test Pressure Requirements necessary when the completed system is designed andior supported so that it cannot be filled with water or when the system cannot be readily dried and traces of the test medium cannot be tolerated in the system. In any case, piping assemblies are hydrostatically tested in the shop only when so specified in the contract documents.
5.1 The assembly shall be subjected to a hydrostatic test pressure not less than 1.5 times the design pressure or as specified by the applicable code.
5.2 The hydrostatic test pressure shall not exceed the maximum allowable test pressure of any non- isolated component in the assembly.
3. Preparation for Testing 5.3 The hydrostatic test pressure shall be maintained
3.1 All joints, including welds, shall be left uninsulated and exposed for examination during the test.
for a minimum total time of ten minutes or as specified.
3.2 All openings should be sealed using plugs, blind 6. Pressure Test Gages 6.1 Pressure test gages used in pressure testing shall be flanges, weld caps, or other suitable material which
can be readily and completely removed after completion of the test.
indicating pressure gages and shall be connected directly, where possible, to the component.
3.3 Means shall be provided to isolate the assembly being tested from the fill piping and pump by using a valve, suitable for the test pressure, and located as close to the assembly as possible.
4. Testing Procedure
being filled. 4.1 Assemblies shall be purged of air pockets while
4.2 Water, at the temperature and chemical content of the available source, shall normally be used for the hydrostatic test fluid. Any special requirements as to chemical content of the water, the use of other test mediums andor temperature shall be so specified in the contract documents.
4.3 The test equipment shall be examined before pressure is applied to ensure that it is tight and that
6.2 Pressure gages used in testing shall preferably have dials graduated over a range of about double the intended maximum test pressure, but in no case shall the rage be less than 1-112 nor more than 4 times the test pressure.
6.3 Pressure gages shall be calibrated prior to use.
7. Acceptance Standards 7.1 If no indication of leakage is observed, the
assembly is considered acceptable.
7.2 If any leakage is observed, its location shall be marked. The assembly shall then be depressurized and the leaks repaired. After repairs have been made, the assembly shall be retested.
2
COPYRIGHT Pipe Fabrication InstituteLicensed by Information Handling ServicesCOPYRIGHT Pipe Fabrication InstituteLicensed by Information Handling Services
PFI Standard ES-4 (Revised 1985)
(Reaffirmed March 1999)
8. Records 8. I A record of each hydrostatic test shall be made.
These records shall include:
A. Date of Test B. Identification of Fabricated Piping
Assemblies Tested C. Test Medium Used D. Test Pressure and Holding Time E. Signatures of the Company’s Inspector and
the Authorized Inspector and Customer’s Inspector when applicable.
8.2 These records need not be retained after completion of the project unless required by Code or contract.
COPYRIGHT Pipe Fabrication InstituteLicensed by Information Handling ServicesCOPYRIGHT Pipe Fabrication InstituteLicensed by Information Handling Services
CHARTER MEMBERS
ACCORD PIPE FABRICATORS, INC.
AIR CONDITIONING COMPANY, INC.
FLO-RITE, INC.
GEM INDUSTRIAL, INC. HPI CONSTRUCTION CO., INC.
IDEAL WELDERS, LTD.
IVOR J. LEE, INC.
JOHN E. GREEN COMPANY
J. F. AHERN CO.
J. H. KELLY LLC
J. S. MC KINNEY, INC.
KINETIC SYSTEMS, INC.
M & M WELDING AND FABRICATORS, INC.
MC ABEE CONSTRUCTION, INC.
MC CARL'S, INC.
MECHANICAL INCORPORATED
MID STATES PIPE FABRICATING, INC.
MURPHY COMPANY NARDE1 FABRICATORS, LTD.
NEWMECH COMPANIES, INC.
PHILLIPS, GETSCHOW COMPANY
PIPING SYSTEMS, INC.
S. A. COMUNALE COMPANY, INC. S&D / OSTERFELD MECHANICAL CONTRACTORS
SCOTT CO. O F CALIFORNIA SPECIALTY PIPING CORPORATION TEAM INDUSTRIES, INC.
W. J. O'NEIL COMPANY
Jamaica,
Glendale,
Riviera Beach,
Walbridge, Huntington,
Delta,
Masury, Highland Park,
Fond du Lac,
Longview,
Freeport,
Santa Clara,
Gaithersburg,
Tuscaloosa,
Beaver Falls,
Freeport,
EI Dorado,
St. Louis,
Calgary,
St. Paul,
Oconto Falls,
New London,
Barberton, Dayton,
San Leandro, Davisville, Kaukauna,
Livonia,
New York
California
Florida
Ohio
West Virginia
British Columbia (Canada)
Ohio
Michigan
Wisconsin
Washington
Texas California
Maryland
Alabama
Pcnnsylvania Illinois
Arkansas
Missouri
Alberta (Canada)
Minnesota
Wisconsin Wisconsin
Ohio
Ohio
California West Virginia Wisconsin
Michigan
A current index of the latest revised ES Standards, Technical Bulletins and Safety Training Guideline is available from the Pipe Fabrication Institute.
PFI Safety Training Guideline, Standards and Technical Bulletins are published to serve proven needs of the pipe fabricating industry at the design level and in actual shop operations. Hence, such needs are continually considered and reviewed by the Engineering Committee of the Pipe Fabrication Institute to provide recommended procedures, which have been demonstrated by collective experiences to fulfill requirements in a manner for Code compliance. However, as the PFI Standards are for minimum requirements the designer or fabricator always has the option of specifying supplementary conditions in the form of requirements beyond the scope of the PFI publications.
COPYRIGHT Pipe Fabrication InstituteLicensed by Information Handling ServicesCOPYRIGHT Pipe Fabrication InstituteLicensed by Information Handling Services