PRODUCTIVITY IMPROVEMENT IN MANUFACTURING DIVISION OF SHEET METAL INDUSTRY Guided by : Dr. Gukan Rajaram KANNAN P Roll No : 13MM09 E-mail : [email protected] Mobile No : 9500254280 PROJECT WORK REVIEW : Phase 2 TITLE Department of mechanical Engineering Dr.DRK- Prof.NGK- Prof.VVA ME : LM- 4SEM 13ML7 2 1 P S G T E C H

Upload: kannan-paramasivan

Post on 15-Apr-2017

195 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PG Thesis Presentation

PRODUCTIVITY IMPROVEMENT IN MANUFACTURING DIVISION OF SHEET METAL INDUSTRY

Guided by : Dr. Gukan Rajaram

KANNAN P

Roll No : 13MM09

E-mail : [email protected]

Mobile No : 9500254280

PROJECT WORK REVIEW : Phase 2 TITLE

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 1 P S G T E CH

Page 2: PG Thesis Presentation

LITERATURE REVIEW

IMPROVING PRODUCTIVITY OF MANUFACTURING DIVISION USING LEAN CONCEPTS AND DEVELOPMENT OF MATERIAL GRAVITY FEEDER

• Productivity improvement is achieved by optimizing the layout.

• Distance travelled by the material in the Proposed layout is compared with current

layout.

• Simulation of current and proposed layout is done by using Witness software to

identify the efficiency of each layout

PROJECT WORK REVIEW : Phase 2 LITERATURE REVIEW

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 2 P S G T E CH

Page 3: PG Thesis Presentation

OBJECTIVES

• To achieve reduction in material movement distance for Gilbargo’s CE Carrier

assembly by 20%.

• To identify new spaces for Drilling station and Paint touch up station in powder

coating area instead of the packing area.

• To increase the utilization of resource by availing the suitable scrap sheets for

Punching operation.

• To introduce Multi hoist-Electrically operated overhead crane to load/unload

the part into pre-treatment process to reduce the waiting time

PROJECT WORK REVIEW : Phase 2 OBJECTIVE

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 3 P S G T E CH

Page 4: PG Thesis Presentation

METHODOLOGYPROJECT WORK REVIEW : Phase 2 METHODOLOGY

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 4 P S G T E CH

Implementation and Follow-up phase

Proposed Layout

Analysis of results

Comparison of Layouts

Estimation of Performance

Simulation study

Redesigning of Layout

Problem identification

Collection of Data and Time study

Plant study

Page 5: PG Thesis Presentation

CATIA DIAGRAM OF PRODUCT

PROJECT WORK REVIEW : Phase 2 CATIA DIAGRAM OF PRODUCT

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 5 P S G T E CH

Page 6: PG Thesis Presentation

PRODUCT DETAIL

• Product name - CE Carrier Assembly• Customer - Gilbargo• Demand

• Average demand - 450 products• Lead time to delivery - 15 days• Application - Fuel dispensing pump

PROJECT WORK REVIEW : Phase 2 PRODUCT DETAIL

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 6 P S G T E CH

S.No Product name Demand

1 Aug2014 480

1 Oct2014 400

2 Dec2014 400

3 Jan2015 520

Page 7: PG Thesis Presentation

PROCESS MAP

PROJECT WORK REVIEW : Phase 2 DETAILED PROCESS MAP

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 7 P S G T E CH

Punching Part removal Filing

DeburringWelding/ fabrication

Pre-treatment

Powder coating Drilling Assembly/packing

Page 8: PG Thesis Presentation

TIME STUDY

PROJECT WORK REVIEW : Phase 2 TIME STUDY

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 8 P S G T E CH

DETAILS OF TIME STUDY

operation

numberMachine type

Number of

operators

Number of

component

Loading &

unloading time

(s)

Value added

time per compone

nt

Total cycle time per compone

nt (s)

setup time cycle time allowance inventory

Material movement distance

1 Punching 1 1 70 850 920 54000 22

2 Part removal 2 6 40 200 240 0 2550 382.5 2932.5 10

3 Filling 2 6 50 27 77 0 600 90 690 11.1

4 Deburring 2 6 80 62 142 180 480 72 732 10

5 Pressing 2 6 50 150 200 300 1110 166.5 1576.5 14.3

6 Welding 6 6 100 600 700 1200 2700 405 4305 84.1

7 Pre-Treatment 3 12 720 3000 3720 4200 5400 810 10410 54.5

8 Powder coating 5 6 100 2000 2100 1600 6480 972 9052 81.3

9 Drilling 1 6 120 40 160 120 10500 1575 12195 35.4

10 Inspection 2 6 40 100 140 60 720 108 888 16

Page 9: PG Thesis Presentation

CURRENT LAYOUTPROJECT WORK REVIEW : Phase 2 CURRENT LAYOUT

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 9 P S G T E CH

Page 10: PG Thesis Presentation

PROJECT WORK REVIEW : Phase 2 MATERIAL MOVEMENT

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 10 P S G T E CH

MATERIAL MOVEMENT

Page 11: PG Thesis Presentation

PROJECT WORK REVIEW : Phase 2 CSVSM

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 11 P S G T E CH

CURRENT STATE VALUE STREAM MAPPING

Page 12: PG Thesis Presentation

PROJECT WORK REVIEW : Phase 2 PROPOSED LAYOUT

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 12 P S G T E CH

PROPOSED LAYOUT

Page 13: PG Thesis Presentation

DISTANCE TRAVELED BY OPERATOR WITH MHS

S.NO StationDistance traveled

with MHS (m)

Distance traveled without MHS

(m)

Distance traveled

in conveyor

(m)

1 Punching 0.73

2 Part removal 0.6

3 Filing

4 Deburring 2.45

5 Pressing 3.75

6 Welding 23.5

7 Pre-treatment 0.23 7.32

8 Powder coating 4.54 34.88

9 Drilling 7.55

10 Inspection 0.6

11 Assembly /packaging 0.83

DISTANCE CALCULATION FOR CURRENT LAYOUT

PROJECT WORK REVIEW : Phase 2 DISTANCE CALCULATION

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 13 P S G T E CH

DISTANCE TRAVELED BY MATERIAL

S.NO Station Distance traveled with MHS (ft)

Distance traveled without MHS (ft)

1 Punching 14 8

2 Part removal 10

3 Filing 11.1

4 Deburring 3 7

5 Pressing 14.4 0

6 Welding 62.8 21.3

7 Pre-treatment 33.6 20.9

8 Powder coating 17.4 64

9 Drilling 31.9 3.5

10 Inspection 16

11 packing 3

Page 14: PG Thesis Presentation

DISTANCE CALCULATION FOR PROPOSED LAYOUTPROJECT WORK REVIEW : Phase 2 DISTANCE CALCULATION

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 14 P S G T E CH

DISTANCE TRAVELED BY MATERIAL

S.NO Station Distance traveled with MHS (m)

Distance traveled without MHS (m)

1 Punching 14 8

2 Part removal 10

3 Filing 11.1

4 Deburring 3 7

5 Pressing 14.4

6 Welding 62.8 21.3

7 Pre-treatment 7.1 20.9

8 Powder coating 21 64

9 Drilling

10 Inspection

11 packing 31.9

Page 15: PG Thesis Presentation

COMPARISON OF CURRENT WITH EXISTING LAYOUTSPROJECT WORK REVIEW : Phase 2 COMPARISON WITH EXISTING LAYOUT

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 15 P S G T E CH

Welding Pre-treatment Powder coating Drilling paint touch up packing0

10

20

30

40

50

60

70

COMPARISON OF CURRENT LAYOUT & PROPOSED LAYOUT

Page 16: PG Thesis Presentation

EXPECTED RESULTS• Total distance travelled by a material in current layout

= 207.2 ft

• Total distance travelled by a material in the proposed layout = 165.3 ft

PROJECT WORK REVIEW : Phase 2 EXPECTED RESULTS

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 16 P S G T E CH

Page 17: PG Thesis Presentation

FUTURE STATE VALUE STREAM MAP

PROJECT WORK REVIEW : Phase 2 FSVSM

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 17 P S G T E CH

Page 18: PG Thesis Presentation

ARENA SIMULATION MODEL

PROJECT WORK REVIEW : Phase 2 Arena Model

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 18 P S G T E CH

Page 19: PG Thesis Presentation

PROJECT WORK REVIEW : Phase 2 KAIZEN

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 19 P S G T E CH

Page 20: PG Thesis Presentation

REAL TIME DATA TRACKING SYSTEM-FRONT END

PROJECT WORK REVIEW : Phase 2 Real time Data tracking system

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 20 P S G T E CH

Page 21: PG Thesis Presentation

REAL TIME DATA TRACKING SYSTEM-BACKEND

PROJECT WORK REVIEW : Phase 2 Database

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 21 P S G T E CH

Page 22: PG Thesis Presentation

PROJECT WORK REVIEW : Phase 2 KAIZEN

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 22 P S G T E CH

Page 23: PG Thesis Presentation

PROJECT WORK REVIEW : Phase 2 KAIZEN

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 23 P S G T E CH

Page 24: PG Thesis Presentation

PROJECT WORK REVIEW : Phase 2 KAIZEN

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 24 P S G T E CH

Page 25: PG Thesis Presentation

PROJECT WORK REVIEW : Phase 2 Multi Hoist-Electrically operated overhead crane

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 25 P S G T E CH

Page 26: PG Thesis Presentation

IMPLEMENTATION

PROPOSED LAYOUT:

Investment cost = Rs. 5000

Monthly cost saving = Rs. 500

Return Of Investment = 10 months

ROI calculation

PROJECT WORK REVIEW : Phase 2 Implementation

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 26 P S G T E CH

Page 27: PG Thesis Presentation

FUTURE WORK• Comparison of results for current and proposed layouts.

• Implementation of Visual studio application to store the necessary detail about

Scrap sheets.

• Implementation of Material Handling device to hold the material that is removed

from the conveyor.

• Design and development of Multi-Hoist Electrically operated overhead crane in

the pre-Treatment area.

PROJECT WORK REVIEW : Phase 2 FUTURE WORK

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 27 P S G T E CH

Page 28: PG Thesis Presentation

THANK YOU

PROJECT WORK REVIEW : Phase 2

Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 28 P S G T E CH