phenix future plans & upgrades

34
PHENIX FUTURE PLANS & UPGRADES Stefan Bathe for PHENIX, Users’ Meeting 2009

Upload: craig

Post on 22-Feb-2016

54 views

Category:

Documents


0 download

DESCRIPTION

PHENIX Future Plans & Upgrades. Stefan Bathe for PHENIX, Users’ Meeting 2009. 2008. 2008. HBD. 2009. 2008. HBD VTX. 2009. 2011. 2008. HBD VTX FVTX. 2009. 2011. 2012. 2008. HBD VTX FVTX. 2009. 2011. 2012. FOCAL. 2013?. 2008. HBD VTX FVTX. 2009. 2011. 2012. FOCAL. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PHENIX Future Plans & Upgrades

PHENIX FUTUREPLANS & UPGRADES

Stefan Bathe for PHENIX, Users’ Meeting 2009

Page 2: PHENIX Future Plans & Upgrades

Users’ Meeting 2009Stefan Bathe2

2008

Page 3: PHENIX Future Plans & Upgrades

Users’ Meeting 2009Stefan Bathe3

HBD

2008

2009

Page 4: PHENIX Future Plans & Upgrades

Users’ Meeting 2009Stefan Bathe4

HBDVTX

2008

20092011

Page 5: PHENIX Future Plans & Upgrades

Users’ Meeting 2009Stefan Bathe5

HBDVTXFVTX

2008

200920112012

Page 6: PHENIX Future Plans & Upgrades

Users’ Meeting 2009Stefan Bathe6

HBDVTXFVTX

FOCAL

2008

200920112012

2013?

Page 7: PHENIX Future Plans & Upgrades

Users’ Meeting 2009Stefan Bathe7

HBDVTXFVTX

FOCAL MuTr FEE

2008

200920112012

2013? 2009/10

Page 8: PHENIX Future Plans & Upgrades

Users’ Meeting 2009Stefan Bathe8

HBDVTXFVTX

FOCAL MuTr FEE

RPC

2008

200920112012

2013? 2009/10

2010/11

Page 9: PHENIX Future Plans & Upgrades

Users’ Meeting 2009Stefan Bathe9

HBDVTXFVTX

FOCAL MuTr FEE

RPC

Pb absorber

2008

200920112012

2013? 2009/10

2010/11

Page 10: PHENIX Future Plans & Upgrades

Users’ Meeting 2009Stefan Bathe10M

uon

trac

king

Muo

n tr

acki

ng

VTX & FVTX MPCMPC

-3 -2 -1 0 1 2 3 rapidity0

f

cove

rage

2p

EMC

EMC

FOCALFOCAL

track

ing

track

ing

MuTrig MuTrig

Page 11: PHENIX Future Plans & Upgrades

Hadron Blind Detector (HBD)

Users’ Meeting 2009Stefan Bathe

11

Windowless Cerenkov detector with CF4 avalanche/radiator gas (2 cm pads)signal electron

Cherenkov blobs

partner positronneeded for rejection e+

e-

qpair openingangle

~ 1 m

Designed for low-mass dileptons in A+A

Removes Dalitz and conversion pairs (small opening angle)

Comissioned in Run-9 p+pCsI photocathode covering triple GEMs

Page 12: PHENIX Future Plans & Upgrades

HBD Physics

Users’ Meeting 2009Stefan Bathe

12

Study electron continuum in low Mee region

Measure in medium-modifications of r, w, f

Chiral symmetry restoration

Measure temperature (internal conversion of direct photons)  arXiv:0706.3034

Page 13: PHENIX Future Plans & Upgrades

HBD Performance

Users’ Meeting 2009Stefan Bathe

13

Clear separation of signal and background

Suppression of background pairs increases effective statistics by factor 8-16

Taking data in Runs 9, 10

Will be replaced by VTX after Run-10

~40 pe

~20 pe

few pe hadron blind

background (Dalitz,

conversion): 40 photo-electrons

signal(separated

electrons): 40 photo-electrons

Measured in Run-9

Page 14: PHENIX Future Plans & Upgrades

Silicon Vertex (VTX & FVTX)

Users’ Meeting 2009Stefan Bathe

VTX: silicon VerTeX barrel tracker Fine granularity, low occupancy

50mm×425mm pixels for L1 and L2 R1=2.5cm and R2=5cm

Stripixel detector for L3 and L4 80mm×1000mm pixel pitch R3=10cm and R4=14cm

Large acceptance |h|<1.2, almost 2p in f plane

Standalone tracking

FVTX: Forward silicon VerTeX tracker 2 endcaps with 4 disks each pixel pad structure (75mm x 2.8 to

11.2 mm)FVTX endcaps1.2<|h|<2.7 mini strips

VTX barrel |h|<1.2

Page 15: PHENIX Future Plans & Upgrades

VTX Physics

Users’ Meeting 2009Stefan Bathe

15

Heavy Flavor as probe of dense partonic matter in A+A

RAA(pT) of single electron from charm decay and beauty decay separately

v2 (pT) of single electron from charm decay and beauty decay separately

Jet tomography (di-hadron, g-hadron, and c-hadron correlation)

Gluon polarization DG(x) in polarized p+p

Double spin asymmetry ALL of heavy flavor production (charm and beauty, separately)

ALL of g-jetPRL 98, 172301 (2007)

Page 16: PHENIX Future Plans & Upgrades

VTX Performance

Users’ Meeting 2009Stefan Bathe

16

Strong suppression of single electrons from heavy flavor is one of most surprising results

Present measurement is mixture of b and c VTX can separate b and c

Expected with VTX (0.4/nb ~3 weeks in RUN11)

Page 17: PHENIX Future Plans & Upgrades

VTX Progress

Users’ Meeting 2009Stefan Bathe

17

Pixel Detector Ladder

Strip Detector LadderStrip read-out

Pixel read-out Test Beam at FNAL

Installation in 2010

Successful DOE review this week

Page 18: PHENIX Future Plans & Upgrades

FVTX Physics & Schedule

Users’ Meeting 2009Stefan Bathe

18

adding high resolution tracking points for muons ahead of the hadron absorber

utilized together with muon arm tracks

quarkonium spectroscopy to probe color screening in medium

Single muons Background suppression for

direct photons in FOCAL Installation for Run-12

Without FVTX

WithFVTX

Prototype DAQ Electronics

Page 19: PHENIX Future Plans & Upgrades

The W

Users’ Meeting 2009Stefan Bathe

19

Energy v.s. Inclination of the track

W candidates, PHENIX Run-9, p+p@500 GeV

W program has started

Central arm ready for W measurement at mid-rapidity

Backward/forward measurement needs upgrade

Page 20: PHENIX Future Plans & Upgrades

Users’ Meeting 2009Stefan Bathe20

Page 21: PHENIX Future Plans & Upgrades

MuID- only existing trigger- no momentum selectivity..

<Muon Trigger Upgrade>• MuTr FEE Upgrade (MuTRG)• Install RPC (Resistive Plate Chamber)• Install additional Pb absorber

21

Rapidity: 1.2 < h <2.2 (2.4)

RPC

B

Basic Idea:Measure Δstrip in online level-> more momentum selective trigger

Muon Trigger

Animation byKen’ichi Karatsu

Page 22: PHENIX Future Plans & Upgrades

MuTrig Status MuTr.N

operational for Run-9

Good efficiency

Users’ Meeting 2009Stefan Bathe

22

From collision orout going beam

From beambackground

Engineering run for sectors in 2 RPC planes on south arm

Timing resolution helped understand background already now

Page 23: PHENIX Future Plans & Upgrades

Muon Trigger Physics: W

Users’ Meeting 2009Stefan Bathe

23

W parity violating Single (longitudinal) spin

asymmetry W selects (anti-)quarks

with negative (positive) helicity in polarized beam

Lepton rapidity determined by x of valence and sea quark as well as helicity of neutrino

Polarization of sea quarks

Page 24: PHENIX Future Plans & Upgrades

W sensitivity

Users’ Meeting 2009Stefan Bathe

24

24Central Arms: ready for W measurement

Muon Arms: trigger upgrade is ongoing will be ready for next 500 GeV run

(l- pT>20 GeV)

(l+ pT>20 GeV)

Page 25: PHENIX Future Plans & Upgrades

FOrward CALorimeter (FOCAL)

Users’ Meeting 2009Stefan Bathe

25

Tungsten absorber with silicon pad readout 1< h <3 2 p azimuth 24 X0 deep

3 layers pad readout for lateral and longitudinal shower profile Reject hadronic

background Si strips within first X0 for g/p0 ID

17 cm

6cm

85 cm

Page 26: PHENIX Future Plans & Upgrades

FOCAL Physics

Users’ Meeting 2009Stefan Bathe

26

Trigger on neutral pions and photons

Provide coincidence measurements with central arm

Constrain kinematics (x) p+p

Low x gluons Transverse spin physics

d+Au Gluon saturation in nucleus Pin down initial state in HI

collisions Au+Au

g-jet

pA physics – nuclear gluon pdf

Geant simulation20 GeV p0

Page 27: PHENIX Future Plans & Upgrades

FOCAL Status R&D ongoing

Users’ Meeting 2009Stefan Bathe

27

Test beam

Page 28: PHENIX Future Plans & Upgrades

DAQTRIG2010 Upgrade Currently

DAQ 5kHz bandwidth Up to Run-7, PHENIX able

to record every Au+Au mbias event (in Run-7: 80% of 7 kHz)

In p+p, Lvl1 triggers reduce 200-400 kHz rate to 6kHz of useful events

PHENIX able to effectively sample full luminosity for all rare channels

Users’ Meeting 2009-Stefan Bathe

28

Future 7MHz p+p@500GeV 2MHz p+p@200GeV 40kHz Au+Au Event size *1.7 with Si

detectors

Previous trigger strategy won’t work

Page 29: PHENIX Future Plans & Upgrades

DAQTRIG2010 Upgrade Possible solutions

Replace 10-year old EMCal electronics Medium-scale upgrade to DAQ

e.g. upgrade central data switch to 10 Gigabit networking

Various other small upgrades BBC w/ multiple vertex selection MuID Trigger FPGA upgrade VTX integration trigger

Users’ Meeting 2009Stefan Bathe

29

Page 30: PHENIX Future Plans & Upgrades

Timeline

Users’ Meeting 2009Stefan Bathe

30

RHIC PHENIXRUN9 First 500 GeV pp mTrig

FEE (half)long 200 GeV pp

RUN10stoch. cooling 2 mTrig FEE(full)

mTrig RPC(South)

RUN11EBIS (U+U) VTX mTrig

RPC(North)RUN1256 MHz RF FVTX

(electron lensing?)RUN13(e cooling AGS?) (Forward

Cal?)

Page 31: PHENIX Future Plans & Upgrades

Energy Scan PHENIX seriously

looking into low energy running Low energy task

force founded; reported in May

Suggestion to focus at first between full and injection energy

Opportunity to investigate dileptons in new energy regime with HBD

Users’ Meeting 2009Stefan Bathe

31

Physics How do dilepton excess

and r modification at SPS evolve into large low-mass excess at RHIC?

opacity of the produced medium, elliptic flow

onset of perfect liquid properties

Search for critical point Search for 1st order

phase transition

Page 32: PHENIX Future Plans & Upgrades

Beyond the next couple years . . . Transverse spin physics to understand

nucleon pA to understand initial state of HI

collisions DG with direct g and g-jet in high

luminosity 200 GeV p+p (cleaner than p0)

g-h, g-jet in high-luminosity Au+Au to measure modification of fragmentation function

. . . Users’ Meeting 2009Stefan Bathe

32

Page 33: PHENIX Future Plans & Upgrades

Conclusions

Users’ Meeting 2009Stefan Bathe

33

PHENIX has healthy upgrade program to carry current exciting results to further understanding

Immediate plans (next two years) determined by upgrade installation schedule (HBD, VTX)

Successful physics program relies on sufficient funding for 10 weeks each of HI and Spin running each year

Many opportunities for immediate and long-term future

Page 34: PHENIX Future Plans & Upgrades

Users’ Meeting 2009Stefan Bathe34

HBDVTXFVTX

FOCAL MuTr FEE

RPC

Pb absorber200920112012

2013? 2009/10

2010/11

2008