NEPSR Pipeline Safety Seminar
October 2015
PHMSA ER Enforcement Summary 2014 – 2015
Byron Coy PE Director, Eastern Region
Eastern Region Infrastructure System Type Mileage Operator Count
Gas Transmission (GT) 30,803 29
Hazardous Liquid (HL) 10,696 30
Liquefied Natural Gas (LNG) N/A (10 Plants, 22 Tanks) 9
Inspection System Assignments
Infrastructure by State State GT Miles GT Operators HL Miles HL Operators LNG Operators
CONNECTICUT 588 3 90 1 1 DELAWARE 329 3 27 3
DISTRICT OF COLUMBIA 4 2 MAINE 424 3 268 2 MARYLAND 711 5 317 2 1 MASSACHUSETTS 1,097 4 92 2 2 NEW HAMPSHIRE 232 4 71 1 NEW JERSEY 1,097 6 528 9 2 NEW YORK 3,498 13 1,109 8 OHIO 7,705 10 3,833 13 PENNSYLVANIA 8,862 12 2,921 11 1 RHODE ISLAND 95 2 13 1 1 VERMONT 1 1 117 1 VIRGINIA 2,579 5 1,136 2 1 WEST VIRGINIA 3,583 6 170 8 Total 30,803 10,696
Eastern Region Byron Coy, PE
Director
Stan Kastanas Director [MA] National Substance Abuse Program
Alex Dankanich CATS Manager [MD]
Karen Gentile CATS Manager [NJ]
Joe Klesin Project Manager [NY]
Mike Yazemboski Accident Coordinator [PA]
Tony Breen Program (Data) Analyst
David Hippchen Inspector [PA]
Stephen Gliebe, PE Supv., Tactical Operations
Open Program Assistant
Caitlin Nabinger Admin. Assist. (Ctr)
Horace Bethea Paralegal (Ctr)
Chris D’Souza Project Manager
Robert Smallcomb Inspector [MA]
Wayne Chan Inspector
Matt Valerio Inspector
Mark Wendorff Project Manager [VA]
Open Inspector
Alvin Schoen, PE Supv., Construction & Remediation
Open Auditor
Robert Burrough Supv., General Inspection
Michael Springer Inspector
Barry Small Inspector
Future PMF
Interstate Agents, Data Management, Perform. & Case Metrics, Hearing Prep, SRCs/Special Permits, Notifications, Advisory Bulletins
Marta Riendeau, PE Inspector EOD : 11-02-2015
Open Auditor
Inspection Plans, Profiles/Screening, General Inspection, PAM/SMART/NPMS, Inspection Assistant, Integrity Management
Ian Woods Inspector (TS)
Greg Puth Inspector [VA]
Open Inspector
Arhum Mirza Intern
Construction Project Tabulation, Construction Inspection, Emergency Planning, Investigation Support, Spill Drills, Facility Response Plans
(TS) – Transportation Specialist [State] – FT Telecommute Location
Barbara Dahlinger Inspector (TS)
Nita Raju Inspector (TS)
10-08-2015
Types of Enforcement Actions SO Safety Order
CAO Corrective Action Order
PCP Proposed Civil Penalty
PCO Proposed Compliance Order
NOPV Notice of Probable Violation
NOA Notice of Amendment
WL Warning Letter
LOC Letter of Concern
Enforcement Summary 2014 - 2015
Type 2014 2015 (est) Total
CAO 1 3 4
NOPV PCP & PCO 6 8 14
NOPV PCP 8 5 13
NOPV PCO 3 4 7
NOA 24 21 45
WL 3 22 25
LOC 2 2
Total 47 63 110
Enforcement Summary 2014 - 2015
0
2
4
6
8
10
12
14
1Q 2014 2Q 2014 3Q 2014 4Q 2014 1Q 2015 2Q 2015 3Q 2015 4Q 2015 (est.)
CAO
NOPV PCP & PCO
NOPV PCP
NOPV PCO
NOA
WL
LOC
Enforcement Breakdown 2014 - 2015
Type GT
2014 GT
2015 HL
2014 HL
2015 LNG 2014
LNG 2015
Total 2014
Total 2015
CAO 1 1 2 1 3
NOPV PCP & PCO 4 2 1 5 1 1 6 8
NOPV PCP 5 2 3 3 8 5
NOPV PCO 1 2 2 2 3 4
NOA 11 13 12 5 1 3 24 21
WL 2 15 6 1 1 3 22
LOC 1 1 2 0
Total 25 35 18 23 4 5 47 63
Proposed Civil Penalties 2014 - 2015
Quarter Gas Transmission
Hazardous Liquid
Liquefied Natural Gas
Totals
1Q 2014 $135,600 $135,600 2Q 2014 $33,700 $570,400 $604,100 3Q 2014 $100,000 $100,000 4Q 2014 $295,500 $64,600 $360,100 2014 Total $464,800 $735,000 $64,600 $1,264,400 1Q 2015 $665,600 $28,800 $694,400 2Q 2015 $48,800 $57,600 $106,400 3Q 2015 $34,500 $41,000 $75,500 4Q 2015 (est.) $20,000 $40,000 $60,000 2015 Total $103,300 $804,200 $28,800 $936,300 Total $568,100 $1,539,200 $93,400 $2,200,700
Case Distribution 2014 - 2015
0
2
4
6
8
10
12
14
16
18
20
1Q 2014 2Q 2014 3Q 2014 4Q 2014 1Q 2015 2Q 2015 3Q 2015 4Q 2015 (est.)
Hazardous Liquid
Gas Transmission
Liquefied Natural Gas
Total
Item Count in Compliance Letters 2014 - 2015
0
10
20
30
40
50
60
70
80
90
100
1Q 2014 2Q 2014 3Q 2014 4Q 2014 1Q 2015 2Q 2015 3Q 2015 4Q 2015 (est.)
Hazardous Liquid
Gas Transmission
Liquefied Natural Gas
Total
Average Items Per Case 2014 - 2015
0.00
2.00
4.00
6.00
8.00
10.00
12.00
1Q 2014 2Q 2014 3Q 2014 4Q 2014 1Q 2015 2Q 2015 3Q 2015 4Q 2015 (est.)
Hazardous Liquid
Gas Transmission
Liquefied Natural Gas
Total
GT Total Code Citation 2014 - 2015
2%
0% 1% 1%
0%
2% 2%
5%
77%
5%
0%
3%
1%
General
Materials
Pipe Design
Design of Pipeline Components
Welding of Steel in Pipelines
Joining of Materials Other Than by Welding
General Construction Requirements
Customer Meters, Service Regulators and Lines
Requirements for Corrosion Control
Test Requirements
Uprating
Operations
Maintenance
Qualification of Pipeline Personnel
Transmission Integrity Management
Distribution Integrity Management Program
HL Total Code Citation 2014 - 2015
1% 1%
2%
1%
82%
1% 12%
General
Annual, Accident, and SRC Reporting
Design Requirements
Construction
Pressure Testing
Operation and Maintenance
Operator Qualification
Corrosion Control
LNG Total Code Citation 2014 - 2015
10%
14%
57%
14%
5%
General
Siting Requirements
Design
Construction
Equipment
Operations
Maintenance
Personnel Qualifications and Training
Fire Protection
Security
Questions?
GT Enforcement Summary 2014-2015
Type 2014 2015 Total
CAO 1 1 2
NOPV PCP & PCO 4 2 6
NOPV PCP 5 2 7
NOPV PCO 1 2 3
NOA 11 13 24
WL 2 15 17
LOC 1 1
Total 25 35 60
HL Enforcement Summary 2014-2015
Type 2014 2015 Total
CAO 2 2
NOPV PCP & PCO 1 5 6
NOPV PCP 3 3 6
NOPV PCO 2 2 4
NOA 12 5 17
WL 6 6
LOC
Total 18 23 41
LNG Enforcement Summary 2014-2015
Type 2014 2015 Total
CAO
NOPV PCP & PCO 1 1 2
NOPV PCP
NOPV PCO
NOA 1 2 3
WL 1 1 2
LOC 1 1
Total 4 4 8
Enforcement Summary 2014-2015
Type 1Q
2014 2Q
2014 3Q
2014 4Q
2014 2014 Total
1Q 2015
2Q 2015
3Q 2015
4Q (est.)
2015 Total Total
CAO 0 1 0 0 1 0 0 0 3 3 4 NOPV PCP & PCO 1 1 0 4 6 4 2 1 1 8 14
NOPV PCP 2 3 1 2 8 0 1 1 3 5 13
NOPV PCO 1 2 0 0 3 0 1 1 2 4 7
NOA 13 7 2 2 24 3 7 8 3 21 45
WL 0 2 0 1 3 7 5 8 2 22 25
LOC 0 1 0 1 2 0 0 0 0 0 2
Total 17 10 3 10 47 14 16 19 14 63 110
GT Enforcement Summary 2014-2015
Type 1Q
2014 2Q
2014 3Q
2014 4Q
2014 2014 Total
1Q 2015
2Q 2015
3Q 2015
4Q (est.)
2015 Total Total
CAO 1 1 1 1 2 NOPV PCP &
PCO 1 3 4 2 2 6
NOPV PCP 2 1 2 5 1 1 2 7
NOPV PCO 1 1 1 1 2 3
NOA 5 4 1 1 11 1 4 7 1 13 24
WL 2 2 5 2 7 1 15 17
LOC 1 1 1
Total 8 10 1 6 25 6 9 15 5 35 60
HL Enforcement Summary 2014-2015
Type 1Q
2014 2Q
2014 3Q
2014 4Q
2014 2014 Total
1Q 2015
2Q 2015
3Q 2015
4Q (est.)
2015 Total Total
CAO 2 2 2 NOPV PCP & PCO 1 1 3 1 1 5 6
NOPV PCP 2 1 3 1 2 3 6
NOPV PCO 1 1 2 1 1 2 4
NOA 7 3 1 1 12 1 3 1 5 17
WL 1 3 1 1 6 6
LOC
Total 8 7 2 1 18 5 7 3 8 23 41
LNG Enforcement Summary 2014-2015
Type 1Q
2014 2Q
2014 3Q
2014 4Q
2014 2014 Total
1Q 2015
2Q 2015
3Q 2015
4Q (est.)
2015 Total Total
CAO 0 0 NOPV PCP & PCO 1 1 1 1 2
NOPV PCP 0 0
NOPV PCO 0 0
NOA 1 1 1 1 1 3 4
WL 1 1 1 1 2
LOC 1 1 1
Total 1 3 4 3 1 1 5 9
Total Case Summary 2014-2015 Quarter Hazardous
Liquid Gas
Transmission Liquefied
Natural Gas Total
1Q 2014 9 8 17 2Q 2014 6 10 1 17 3Q 2014 2 1 3 4Q 2014 1 6 3 10 2014 Total 18 25 4 47 1Q 2015 5 6 3 14 2Q 2015 7 9 16 3Q 2015 3 15 1 19 4Q 2015 (est.) 8 5 1 14 2015 Total 23 35 5 63 Total 41 60 9 110
Total Letter Sent Items Summary 2014-2015
Quarter Hazardous Liquid
Gas Transmission
Liquefied Natural Gas
Total
1Q 2014 17 39 56 2Q 2014 25 48 4 77 3Q 2014 11 1 12 4Q 2014 10 37 7 54 2014 Total 63 125 11 199 1Q 2015 19 18 5 42 2Q 2015 12 29 41 3Q 2015 22 65 2 89 4Q 2014 (est.) 32 30 2 64 2015 Total 85 142 9 236 Total 148 267 20 435
Total Letter Sent Items Per Case Summary 2014-2015
Quarter Hazardous Liquid
Gas Transmission
Liquefied Natural Gas
Total
1Q 2014 1.89 4.88 3.29 2Q 2014 4.17 4.80 4.00 4.53 3Q 2014 5.50 1.00 4.00 4Q 2014 10.00 6.17 2.33 5.40 2014 Total 3.50 5.00 2.75 4.23 1Q 2015 3.80 3.00 1.67 3.00 2Q 2015 1.71 3.22 2.56 3Q 2015 7.33 4.33 2.00 4.68 4Q 2014 (est.) 4.00 6.00 2.00 4.57 2015 Total 3.70 4.06 1.80 3.75 Total 3.61 4.45 2.22 3.95
GT Total Code Citation Summary 2014-2015 Subpart 2014 2015 Total
General 5 5 Materials 1 1 Pipe Design Design of Pipeline Components 2 2 Welding of Steel in Pipelines 1 2 3 Joining of Materials Other Than by Welding 1 1 General Construction Requirements 1 3 4 Customer Meters, Service Regulators and Lines 3 1 4 Requirements for Corrosion Control 8 4 12 Test Requirements Uprating Operations 98 85 183 Maintenance 6 7 13 Qualification of Pipeline Personnel 1 1
Transmission Integrity Management 6 6 Distribution Integrity Management Program 2 2 Total 125 112 237
GT Total Code Citation Summary 2014-2015 Subpart 2014 2015 Total
General 4% 2% Materials 1% 0% Pipe Design Design of Pipeline Components 2% 1% Welding of Steel in Pipelines 1% 2% 1% Joining of Materials Other Than by Welding 1% 0% General Construction Requirements 1% 3% 2% Customer Meters, Service Regulators and Lines 2% 1% 2% Requirements for Corrosion Control 6% 4% 5% Test Requirements Uprating Operations 78% 76% 77% Maintenance 5% 6% 5% Qualification of Pipeline Personnel 1% 0%
Transmission Integrity Management 5% 3% Distribution Integrity Management Program 2% 1%
HL Total Code Citation Summary 2014-2015
Subpart 2014 2015 Total
General 1 1
Annual, Accident, and SRC Reporting 1 1
Design Requirements
Construction 2 2
Pressure Testing 1 1
Operation and Maintenance 56 37 93
Operator Qualification 1 1
Corrosion Control 5 9 14
Total 61 52 113
HL Total Code Citation Summary 2014-2015
Subpart 2014 2015 Total
General 2% 1%
Annual, Accident, and SRC Reporting 2% 1%
Design Requirements
Construction 4% 2%
Pressure Testing 2% 1%
Operation and Maintenance 92% 71% 82%
Operator Qualification 2% 1%
Corrosion Control 8% 17% 12%
LNG Total Code Citation Summary 2014-2015 Subpart 2014 2015 Total
General 1 1 2
Siting Requirements
Design
Construction
Equipment
Operations 2 1 3
Maintenance 9 3 12
Personnel Qualifications and Training
Fire Protection 3 3
Security 1 1
Total 13 8 21
LNG Total Code Citation Summary 2014-2015 Subpart 2014 2015 Total
General 8% 13% 10%
Siting Requirements
Design
Construction
Equipment
Operations 15% 13% 14%
Maintenance 69% 38% 57%
Personnel Qualifications and Training
Fire Protection 38% 14%
Security 8% 5%