phone address
TRANSCRIPT
Phone: +964 (0) 773-775 5117
http://www.mwholding.org
Address: No.12/1, 42nd Street, Al-Wahda, Karrada, Baghdad, Iraq
PART1 : INTRODUCTION
– MW HODING MISSION & VISION
– ABOUT US
– TARGETS , MISSION & VISION
– SUPPLIED SERVICES
– FIELD OF ACTIVITY
– REGISTERATION DOCUMENTS
– GRADES & CERTIFICATES
PART2 : REFERENCE LIST
– REFRENCE LIST ( DONE AND ONGOING
PROJECTS )
– DESCRIPTION
PART3 : ORGANIZATIONAL TOP CHART
– ORGANIZATION CHART
– HUMAN RESOURCE
– PART4 : MACHINERY & TURN OVER
– FINANCIAL CREDITS
– MACHINARIES
– OFFICE FACILITIES
Madinat al- wafa
City of fidelity
Fidelity to earth (water, soil, resources, living things, human beings and human values)
Fidelity to time (past, now and future) and trying to improve the earth and making it more beautiful
for the posterities
In line with alignment with “Think globally, act locally”, this company has targeted its
organizational mission for taking 14 big, vital, effective and valuable steps for earth and improving
the life condition of the living things in it.
Taking each step will make one of the letters green
Because of the first step that is the birth of this idea and the company establishment in 2015, the M
letter has turned green.
The logo of the company is resulted from combining the green earth and whatever on it (M in green)
and soil and whatever in it (W in gray).
Also it has been matched with the company motto and it can be seen like the Infinity sign.
An infinite team in an infinite world; the motto that has been pinned to the company name. This
company will do its best to reach its organizational and sacred goals.
•The was founded in 2015 and since its establishment, it has been working as a
contractor in various engineering, procurement and construction departments. Acquiring various
experiences in the implementation of national projects in the fields of gas & oil, petrochemicals,
industry and environment during the activity, the company has been introduced as one of the active
EPC contractor companies with the ability to implement large projects from engineering to
commissioning And delivery to the client and after-sales service.
•Utilizing the knowledge of experienced and young professionals and insisting on observing the
principle of commitment and responsibility has been the guarantor of the dynamism and success of
this company in the implementation of industrial projects. Accordingly, effective cooperation with
clients and their satisfaction during and after the implementation of projects has been considered as
one of the strengths points of this company.
•The considers it its duty to provide the desired quality services and tries to complete
the assigned projects on time in accordance with the requirements of its clients, relying on quality
control, observance of safety principles and schedule.
•The specializes in the design and construction of storage and pressure tanks,
transmission lines, water and wastewater treatment units, refinery and power plant systems, all
activities related to reduction stations (GRS) and gas pressure boosting (GCS), petrochemical and
chemical industries, all matters related to industrial ICT, electricity, instrumentation, steam and
power generation, environmental protection, technical inspection and MC management.
Targets:To be one of the top ten contractors in Iraq and to do high tech, fundamental and
strategic projects by (2030) horizon.
Mission:Creating systematic organization respecting knowledge with proper ability for
executing high scale and strategic projects and increasing national wealth.
Values:Integration and conformity Result Orientated Organization commitment Credit and
acceptability Responsibility Innovation Mission & Vision.
Strategy:
Observe and predict market's requirements Extending area of activity to the neighbor
countries Try to achieve better performance through managing and executing
improvement projects Entering new markets Using new technologies with research
and development methods containing technology transfer Employing professional ,
committed and genius staffs respecting priority for jobs based on knowledge.
Construction
• Civil works• Erection of Fixed & rotary equipment.
• Piping
• Electrical & Instrumentation
• Painting , Insulation & Cathodic protection
• Pre - Commissioning
• Commissioning
• Operation & maintenance
Investment
• Market Research
• Finance and investment of project
Engineering
• Feasibility study
• Basic design
• Detail design
• Site Supervision
• Training
Procurement
• Suppliers Evaluation
• Letter of credit openings
• Inspection
• Insurance
• Shipping
Activity Water & Wastewater
• Water Treatment
• Wastewater treatment
• Water & wastewater pipeline Pumping Station
• Concrete storage tanks
Industry
• Industrial ICT
• Cement Factory
• Steel Factory
• Food Industries
• Medical industries
• others
Field
petrochemical
OIL &
GAS
Environment
water & wastewater
Industry
Power Plan
Oil , Gas & Petrochemical
• Oil and Gas refineries
• Oil & Gas pipelines
• Storage tanks
• Gas pressure reducing station
• Gas compressing station
• Petrochemical complexes
• Wellhead equipment & desalination
Power plants
• Combined cycle, gas & steam turbine power plants
• Cooling systems
• MV / LV substation
• Transmission & Distribution Networks
Company Name:
Type: Limited Liability Company; Ltd. Co
Subject of Activity: (EPCC) Contractor in Oil and Gas petrochemicals, industry ICT ,
environment and Energy.
Date of establishment: 2015
Bank account number:
Registered capital: 1 billion Iraqi Dinar
Members of the board of directors: 2 members
Registration Information
ProgressClientDateProject
%100Iraq Oil
Ministry
(OPC)
2015Civil and Mechanical implementation for AL-QUDS branch
48 Inch Gas Pipe Line Naftkhane – Baghdad Project
%100Iraq Oil
Ministry
(SCOP)
2016FOC Tests and installation Fiber Optic Cable and Enclosure
48 Inch Gas Pipe Line Abadan - Basrah Project
%100Iraq Oil
Ministry
(OPC)
2017Procurement, cabling, Wiring, Pre– Commissioning and
Commissioning, Operation, Maintenance AL-SADR Gas Reducing
Station(GRS)
%100Iraq
Electrical
Ministry
201726 Km Fiber Optic Cable implementation in separate trench for
AL-MANSOURIA branch
48 Inch Gas Pipe Line Naftkhane – Baghdad Project
%100Iraq Oil
Ministry
(OPC)
2017Civil and instrument implementation(include: Shelter, instrument
equipment, trenches, Cabling and wiring and atc)AL-QUDS Gas Reducing Station(GRS)
activeIraq Oil
Ministry
(OPC)
2018Commission, Operation and MaintenanceAL-QODS Gas Reducing Station(GRS)
ProgressClientDateProject
%100Iraq
Electrical
Ministry
2018
Civil and Foundation implementation for Solar system,
Telecommunication Container, VHF Tower in LBV Stations
and Telecom Node
48 Inch Gas Pipe Line Naftkhane – Baghdad Project
%50Iraq Oil
Ministry
(OPC)
2018
43 Km Right Of Way(R.O.W)implementation
AL-MANSOURIA branch
48 Inch Gas Pipe Line Naftkhane – Baghdad Project
%30
Iraq
Electrical
Ministry
(MOE)
2019
Civil and Construction implementation for 2 Unit
(Each Unit 160 Megawatt)
DIBIS Power Plant – Iraq
%100Iraq
Electrical
Ministry
2019Engineering, Tooling , construction of workshop implementation
North of Basrah – SHATT AL- ABRAB Water Project
%80Iraq Oil
Ministry
(OPC)
2018
Fiber Optic Cable Tests, Enclosure installation
Programing and Electronic markers installation
48 Inch Gas Pipe Line Naftkhane – Baghdad Project
%80Iraq
Electrical
Ministry
2020installation and implementation Power Supply system(Include: Earthing,
Lighting, Lightning, Solar and rectifier charger)
48 Inch Gas Pipe Line Naftkhane – Baghdad Project
%20
Iraq
Electrical Ministry
(MOE)
2020Piping and Mechanical implementation for 2 Unit
(Each Unit 160 Megawatt)
DIBIS Power Plant – Iraq
Project: 48 Inch Gas Pipe Line Naftkhane - Baghdad
Description: IRAQ Ministry of Electricity and IRAQ Ministry of Oil have intended to perform a new
gas pipe line from NAFTKHANEH in near to border of IRAN to Baghdad with about 116 Km length
48" pipeline as the main route including three main branches considered:
• AL-MANSOURIA branch with about 43 Km length 32" pipeline.
• AL-QUDS Receiver Trap stations branch with about 30 Km length 32" pipeline.
• AL-SADR branch with about 9 Km length 32" pipeline.
•8 Line Break Valve (LBV), Launcher/Receiver (L/R) Stations are in the main route, 7 LBV and
Launcher/Receiver (L/R) Stations are in three branches. 1 central control room (CCR) is in the
Baghdad.Activities
Civil and Mechanical implementation for AL-QUDS branch with about 30 Km length 32"
pipeline(include: excavation, Pipe Line, Welding, Tests, Boring, CCW, Geotextile, Backfill .
all implementation about Civil and Mechanical for LBV Stations and Interconnections for AL-QUDS
and AL-SADR branches
Client: Iraq Oil
Ministry (OPC)
Start Date: 2015
Progress: %100
Project: Fiber Optic Cable - 48 Inch Gas Pipe Line Abadan - Basrah
Description: Petroleum and Electric Ministries of Iraq are developing and implementing 48" and 16" Gas
Pipeline Project. The objective of the Project is to Design, Procurement, Construction and Commissioning of all
required facilities (Such as pipeline, LBV station, Gas reducing station and all other related equipment) to
transport the natural gas from IRAN to IRAQ. This pipeline (Main route) will be constructed from
ABADAN to SHATT AL-BASRAH, AL-NAJIBIYIA, RUMAILAH Electrical power station and
RUMAILAH Compressor station. It is a branch of IGAT-VI pipeline. The length of this pipeline is about 94
km, its diameter is 48" and the design pressure is 1400 psi. The 16" pipe line is about 11.5 Km will be branched
from main line to AL-NAJIBIYIA electrical power station. The main route branches as the following pipelines:
SHATT AL-BASRAH Branch:
•SHATT AL-BASRAH 36" pipeline will be branched from main pipe line to Shatt AL-Basrah electrical power
station. The design pressure is 1400 psi. SHATT AL-BASRAH gas reducing station will be constructed in this
branch to reduce the pressure to 40 bar (588psi).
AL-NAJIBIYIA Branch:
•AL-NAJIBIYIA 16" pipeline will be branched from main pipe line to AL-NAJIBIYIA electrical power station.
The design pressure of this branch is 1050 psi. AL-NAJIBIYIA pressure control station will be constructed the
start point of this branch and reduce the design pressure from
•1400 psi to 1050 psi. AL-NAJIBIYIA gas reducing station will be constructed to reduce the pressure to 40 bar
(588psi).
• RUMAILAH Branch:
•RUMAILAH 36" pipeline will be branched from main pipe line to RUMAILAH electrical power station. The
design pressure is 1400 psi. RUMAILAH gas reducing station will be constructed in this branch to reduce the
pressure to 40 bar (588psi).Activities
Fiber Optic Cable implementation in common trench with Gas Pipe line, according to Omnisense factory
procedure(Include: sand soil under & up the FOC, installation FOC, warning tape, backfill and FOC Tests,
program and install electronic markers, install 3M(2178s) FOC Enclosures).
This FOC will use for Gas Leak Detection(GLDS) and Intrusion Detection System(IDS)
The 24 core armored FOC has made by Prysmian Draka factory from Spain.
Client: Iraq Oil
Ministry(SCOP)
Start Date: 2016
Progress: %100
Project: Cabling, Wiring & Instrument GRS – AL-SADR
Description: The Iraqi Ministry of Electricity plans to use its natural gas and other countries to
increase electricity production and reduce environmental problems.
Thus, the OPC(a branch of Oil ministry) has implemented, Pipe line and has operated Gas Reducing
Station(GRS) in AL-SADR power plant.
AL-SADR power plant Near Baghdad Plays a Key Role in Helping to Meet the Iraq Country's Growing
Energy Needs.
Activities
Procurement, cabling, Wiring, Pre–Commissioning and Commissioning,
Operation, Maintenance AL-SADR Gas Reducing Station(GRS)
Client: Iraq Oil
Ministry (OPC)
Start Date: 2017
Progress: %100
active
Project: Piping and Mechanical implementation – DIBIS Power plant
• Description: The Iraqi Ministry of Electricity(MOE(a branch of Electricity ministry)) plans to build
two new 110-megawatt units to solve the electricity problem in the north of the country.
The equipment of new units (V94/2(SGT5)) will supply by SIEMENS factory.
The DEBIS power plant between Kirkuk and Erbil Plays a Key Role in Helping to Meet the Iraq
Country's Growing Energy Needs.
Activities
Full implementation and of the excavation , piping and mechanical.
Full implementation and of the LFO, HFO, Oil & Gas for Units.
Full implementation and of the Forwarding / On Loading, Auxiliary Boilers, Rotating Machinery and
GRS.
Client: Iraq Electricity
Ministry(MOE)
Start Date: 2020
Progress: %20
Project: Fiber Optic Cable 48 Inch Gas Pipe Line Naftkhane - Baghdad
Description: IRAQ Ministry of Electricity and IRAQ Ministry of Oil have intended to perform a new
gas pipe line from NAFTKHANEH in near to border of IRAN to Baghdad with about 116 Km length
48" pipeline as the main route including three main branches considered:
• AL-MANSOURIA branch with about 43 Km length 32" pipeline.
• AL-QUDS Receiver Trap stations branch with about 30 Km length 32" pipeline.
• AL-SADR branch with about 9 Km length 32" pipeline.
•8 Line Break Valve (LBV), Launcher/Receiver (L/R) Stations are in the main route, 7 LBV and
Launcher/Receiver (L/R) Stations are in three branches. 1 central control room (CCR) is in the
Baghdad.Activities
26Km Fiber Optic Cable implementation in separate trench for AL-MANSOURIA branch according to
procedure(Include: trench excavation, sand soil under & up the FOC, backfill and FOC Tests.
The 24 core FOC has made Nexans factory from Grecce
Client: Iraq
Electricity Ministry
Start Date: 2017
Progress: %100
Project: Cabling, Wiring & Instrument, Commissioning GRS – AL-QUDS
Description: The Iraqi Ministry of Electricity plans to use its natural gas and other countries to
increase electricity production and reduce environmental problems.
Thus, the OPC(a branch of Oil ministry) has implemented, Pipe line and has operated Gas Reducing
Station(GRS) in AL-QUDS power plant.
AL-QUDS power plant Near Baghdad Plays a Key Role in Helping to Meet the Iraq Country's Growing
Energy Needs.
Activities
Procurement, cabling, Wiring, Pre–Commissioning and Commissioning,
Operation, Maintenance AL-QUDS Gas Reducing Station(GRS)
Client: Iraq Oil
Ministry (OPC)
Start Date: 2018
Progress: %100
active
Project: (R.O.W) 48 Inch Gas Pipe Line Naftkhane - Baghdad
Description: IRAQ Ministry of Electricity and IRAQ Ministry of Oil have intended to perform a new
gas pipe line from NAFTKHANEH in near to border of IRAN to Baghdad with about 116 Km length
48" pipeline as the main route including three main branches considered:
• AL-MANSOURIA branch with about 43 Km length 32" pipeline.
• AL-QUDS Receiver Trap stations branch with about 30 Km length 32" pipeline.
• AL-SADR branch with about 9 Km length 32" pipeline.
•8 Line Break Valve (LBV), Launcher/Receiver (L/R) Stations are in the main route, 7 LBV and
Launcher/Receiver (L/R) Stations are in three branches. 1 central control room (CCR) is in the
Baghdad.Activities
43 Km Right Of Way(R.O.W)implementation in AL-MANSOURIA branch according to procedure
and Under tight security
Client: Iraq Oil
Ministry (OPC)
Start Date: 2018
Progress: %50
active
Project: Civil and Construction implementation – DIBIS Power plant
• Description: The Iraqi Ministry of Electricity(MOE(a branch of Electricity ministry)) plans to build
two new 110-megawatt units to solve the electricity problem in the north of the country.
The equipment of new units (V94/2(SGT5)) will supply by SIEMENS factory.
The DEBIS power plant between Kirkuk and Erbil Plays a Key Role in Helping to Meet the Iraq
Country's Growing Energy Needs.
Activities
Full implementation the Civil and Construction(Include: Pipe Rack, Concrete Sleepers
Full implementation the duct walls for the LFO, HFO, Oil & Gas for Units.
Full implementation the Cable trench for BOP and Units, The trenches under the road
Full implementation & Constructions the Duct Bank for the Units & BOP
Client: Iraq Electricity
Ministry(MOE)
Start Date: 2020
Progress: %20
Project: Fiber Optic Cable - 48 Inch Gas Pipe Line
Description: IRAQ Ministry of Electricity and IRAQ Ministry of Oil have intended to perform a new gas pipe
line from NAFTKHANEH in near to border of IRAN to Baghdad with about 116 Km length 48" pipeline as the
main route including three main branches considered:
• AL-MANSOURIA branch with about 43 Km length 32" pipeline.
• AL-QUDS Receiver Trap stations branch with about 30 Km length 32" pipeline.
• AL-SADR branch with about 9 Km length 32" pipeline.
•8 Line Break Valve (LBV), Launcher/Receiver (L/R) Stations are in the main route, 7 LBV and
Launcher/Receiver (L/R) Stations are in three branches. 1 central control room (CCR) is in the Baghdad.Activities
Fiber Optic Cable implementation in separate trench with Gas Pipe line, according to OPTASENSE
factory procedure(Include: sand soil under & up the FOC, installation FOC, warning tape, backfill and
FOC Tests, program and install 3M EMS 1421-XR/ID Electronic Ball markers, install FOC
Hellermann Tyton Enclosures from Enlgand), Under tight security
This FOC will use for Gas Leak Detection(GLDS) and Intrusion Detection System(IDS)
The 24 core FOC has made Nexans factory from Grecce.
Client: Iraq
Electricity Ministry
Start Date: 2018
Progress: %80
Project: Civil and Foundation implementation - 48 Inch Gas Pipe Line
Description: IRAQ Ministry of Electricity and IRAQ Ministry of Oil have intended to perform a new gas pipe
line from NAFTKHANEH in near to border of IRAN to Baghdad with about 116 Km length 48" pipeline as the
main route including three main branches considered:
• AL-MANSOURIA branch with about 43 Km length 32" pipeline.
• AL-QUDS Receiver Trap stations branch with about 30 Km length 32" pipeline.
• AL-SADR branch with about 9 Km length 32" pipeline.
•8 Line Break Valve (LBV), Launcher/Receiver (L/R) Stations are in the main route, 7 LBV and
Launcher/Receiver (L/R) Stations are in three branches. 1 central control room (CCR) is in the Baghdad.Activities
Civil and Foundation implementation for Solar system, Telecommunication Container, VHF Tower in
LBV Stations and Telecom Node
Client: Iraq Oil
Ministry (OPC)
Start Date: 2018
Progress: %100
Managing
Director
Executing
Dept
Technical
Dept
Financial
Dept
Administration
Dept
Commercial
Dept
Business
Development
Dept
Quality
ControlProcess
Mechanical
&
Piping
Electrical
Industry
ICT
Civil
Internal
Procurement
overseas
Procurement
Archive
Human
Resources
Project
Control
HSSE logistics
Warehouse
Accounting
Cost
Control
Legal
Dept
Instrument
Staff Person
Managers 2
Engineers 10
Suppliers 4
Executive Team 20
Business
Development Team2
Financial &
administration3
Academic
EducationPerson
Ph.D 1
MS 3
BS 9
Technician 7
Diploma 21
Academic Education
Ph.D
MS
BS
Technician
Diploma
Human Resources
manager
engineers
suppliers
executive team
Machineries
• Tower Crane
• Lift Truck
• Air Compressor
• Cars
• Trucks
Piping Equipment & Tank Erection
• Welding Diesel Equipment
• Rectifier
• Automatic Cutting Machine
• Plate Rolling Equipment
• Oven
• Tackle Magnet Drill Machine
• Erection Tools
• Hydro test Pumps
• Vacuum Box
• Chain block
Painting & Insulation
• furniture Painting Airless sprays
• Blasting Equipment
• DFT and WFT meter
• Roughness gauge
Electrical & Instrumentation
• Winch
• Cable Cutting Tool
• Conduit Bending Tool
• Calibrating Equipment
• OTDR
• Fusion
• Enclosure Tool kit
General Equipment
Total camera station
Portable Water Storage Tank
Portable Fuel Storage Tank
Container ( 20 & 40 ft )
Electricity Generator
Electrical panels
UPS
Cement Mixer
Scaffold system
Steel frame and jacks
The head office of company is allocated in a building with an area of 200m2 and
also with an area of 1000m2 workshop at the hart of business area of Baghdad.
To have a better performance in accomplishing tasks, the office is equipped with
all the required facilities consisting modem computer systems , Internet and
Intranet , technical and project control software to achieve exact reports and
documents. Furthermore, relying on our integrated management system and
SHARE POINT software, we have been trying to omit papers from our
bureaucracy. Our company has been successful in increasing its staff's efficiency
and empowering its relations with through a powerful coordination
26
Phone: +964 (0) 773-775 5117
http://www.mwholding.org
Address: No.12/1, 42nd Street, Al-Wahda, Karrada, Baghdad, Iraq