Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON April 20, 2020 RJC No. TOR.121290.0002 page 1 Photo 1: Overview of Basement 2. Red arrow points to a hallway leading to the elevator, washrooms, East Stairwell, and the Sump Pump Area Photo 2: Overview of Basement 2 – Sump Pump Area

Upload: others

Post on 08-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Photo 1: Overview of Basement 2. Red arrow points to a ...€¦ · Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON April 20, 2020 RJC No. TOR.121290.0002

Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON

April 20, 2020 RJC No. TOR.121290.0002 page 1

Photo 1: Overview of Basement 2. Red arrow points to a hallway leading to the elevator, washrooms,

East Stairwell, and the Sump Pump Area

Photo 2: Overview of Basement 2 – Sump Pump Area

Page 2: Photo 1: Overview of Basement 2. Red arrow points to a ...€¦ · Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON April 20, 2020 RJC No. TOR.121290.0002

Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON

April 20, 2020 RJC No. TOR.121290.0002 page 2

Photo 3: Overview of Basement 1 and elevator (red arrow). Yellow arrow points to approximate

location of East Stairwell entrance

Photo 4: Overview of Basement 1 and West Stairwell entrance. Green arrows point to approximate

location of Electrical and Sprinkler Room.

Page 3: Photo 1: Overview of Basement 2. Red arrow points to a ...€¦ · Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON April 20, 2020 RJC No. TOR.121290.0002

Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON

April 20, 2020 RJC No. TOR.121290.0002 page 3

Photo 5: Overview of Electrical Room and access platform in Basement 1

Photo 6: Overview of Electrical Room below access platform in Basement 1

Page 4: Photo 1: Overview of Basement 2. Red arrow points to a ...€¦ · Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON April 20, 2020 RJC No. TOR.121290.0002

Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON

April 20, 2020 RJC No. TOR.121290.0002 page 4

Photo 7: Overview of Sprinkler Room in Basement 1

Photo 8: Overview of Sprinkler Room in Basement 1

Page 5: Photo 1: Overview of Basement 2. Red arrow points to a ...€¦ · Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON April 20, 2020 RJC No. TOR.121290.0002

Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON

April 20, 2020 RJC No. TOR.121290.0002 page 5

Photo 9: Overview of Basement 1 Sprinkler Room

Photo 10: Overview of West Stairwell – Ground Floor stair landing

Page 6: Photo 1: Overview of Basement 2. Red arrow points to a ...€¦ · Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON April 20, 2020 RJC No. TOR.121290.0002

Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON

April 20, 2020 RJC No. TOR.121290.0002 page 6

Photo 11: Overview of West Stairwell – typical stair landing

Photo 12: Overview of West Stairwell – Basement 2 Level

Page 7: Photo 1: Overview of Basement 2. Red arrow points to a ...€¦ · Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON April 20, 2020 RJC No. TOR.121290.0002

Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON

April 20, 2020 RJC No. TOR.121290.0002 page 7

Photo 13: Overview of East Stairwell – typical stair landing

Photo 14: Overview of East Stairwell – typical stairwell configuration

Page 8: Photo 1: Overview of Basement 2. Red arrow points to a ...€¦ · Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON April 20, 2020 RJC No. TOR.121290.0002

Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON

April 20, 2020 RJC No. TOR.121290.0002 page 8

Photo 15: Overview of East Stairwell – Basement 2

Photo 16: Overview of Ground Floor front entrance and reception area. Red arrow points to hallway

leading to Cafeteria

Page 9: Photo 1: Overview of Basement 2. Red arrow points to a ...€¦ · Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON April 20, 2020 RJC No. TOR.121290.0002

Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON

April 20, 2020 RJC No. TOR.121290.0002 page 9

Photo 17: Overview of Ground Floor reception area

Photo 18: Overview of Ground Floor hallway to Cafeteria and West Stairwell entrance (red arrow)

Page 10: Photo 1: Overview of Basement 2. Red arrow points to a ...€¦ · Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON April 20, 2020 RJC No. TOR.121290.0002

Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON

April 20, 2020 RJC No. TOR.121290.0002 page 10

Photo 19: Overview of Ground Floor Cafeteria

Photo 20: Typical residential floor West Stairwell entrance

Page 11: Photo 1: Overview of Basement 2. Red arrow points to a ...€¦ · Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON April 20, 2020 RJC No. TOR.121290.0002

Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON

April 20, 2020 RJC No. TOR.121290.0002 page 11

Photo 21: Overview of typical residential floor

Phot 22: Overview of typical residential floor, elevator, and East Stairwell entrance (red arrow)

Page 12: Photo 1: Overview of Basement 2. Red arrow points to a ...€¦ · Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON April 20, 2020 RJC No. TOR.121290.0002

Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON

April 20, 2020 RJC No. TOR.121290.0002 page 12

Photo 23: Overview of east elevation and East Stairwell entrance

Photo 24: Overview of east elevation and podium deck

Page 13: Photo 1: Overview of Basement 2. Red arrow points to a ...€¦ · Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON April 20, 2020 RJC No. TOR.121290.0002

Davenport Shelter Renovation – Phase 3 348 Davenport Road, Toronto, ON

April 20, 2020 RJC No. TOR.121290.0002 page 13

Photo 25: Overview of east elevation and podium deck