Pico - Hydro Electric Power Generation for the Developing World Ben Morral and Andrew Reedy Problem: 1.6 Billion people in developing countries currently live without electricity. Accessible electricity advances economic op- portunity, socio-economic standing, and par- cipaon in the informaon age. Our Mission: The Pico-Hydro Energy Project (PHEP) be- lieves that all people deserve to have econom- ic prosperity to help them financially support themselves and their families. We believe small-scale hydro can bring jobs and economic prosperity to underdeveloped communies. Soluon: A small scale hydroelectric system that uses run-of stream water movement to generate electricity and charge baeries. Specificaons: Produce 300-800 was of electrical power Operate in stream velocies moving as slow as 2-3 ſt./sec Operate connuously for 3-5 years with no major component replacement Manufactured for under $500 Acknowledgements: Shane Braunworth (Team Member) Johnathan Rogers (Team Member) Caleb Sisson (Team Member) Dan Elliott (Engineering Consultant) Bob Hentz (Engineering Consultant) Dr. David Vader (Faculty) Will Kirtchner (Client Representative) Working Prototype: Undershot Water Wheel Mounted on Pontoon: Ubiquitous & low cost materials Easily adaptable design Self clearing Further Informaon: Project Manager: Andrew Breighner—[email protected] Student Project Manager 2017-2018: Johnathan Rogers—[email protected] Student Project Manager 2018-2019: Andrew Reedy—[email protected] https://www.messiah.edu/info/22228/our_projects Partner/Client: The PHEP is partnering with Engineering Ministries Inter- naonal to develop and implement our hydroelectric system in developing communies. Vision: “...see people restored by God and the world restored through design.Mission: “...to develop people, design structures, and construct facilies which serve communies and the Church.Conclusions: The PHEP is on its way to developing a small scale hydropower system that meets our clients needs. The future holds much excitement as we look forward to modifying initial prototype. Semester Goals: Choose an Electric Generator Develop Baery Charging System Design and Build Inial Tesng Prototype Future Work: Opmize Tesng Prototype Combine Electrical and Mechanical Systems emiworld.org

Upload: phamcong

Post on 14-Jul-2019

225 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pico Hydro Electric Power Generation for the Developing ... · Pico-Hydro Electric Power Generation for the Developing World en Morral and Andrew Reedy Problem: 1.6 illion people

Pico-Hydro Electric Power Generation for the Developing World

Ben Morral and Andrew Reedy

Problem:

1.6 Billion people in developing countries currently live without electricity.

Accessible electricity advances economic op-portunity, socio-economic standing, and par-ticipation in the information age.

Our Mission:

The Pico-Hydro Energy Project (PHEP) be-

lieves that all people deserve to have econom-

ic prosperity to help them financially support

themselves and their families. We believe

small-scale hydro can bring jobs and economic

prosperity to underdeveloped communities.

Solution:

A small scale hydroelectric system that uses

run-of stream water movement to generate

electricity and charge batteries.

Specifications:

Produce 300-800 watts of electrical power

Operate in stream velocities moving as slow

as 2-3 ft./sec

Operate continuously for 3-5 years with no

major component replacement

Manufactured for under $500

Acknowledgements: Shane Braunworth (Team Member)

Johnathan Rogers (Team Member)

Caleb Sisson (Team Member)

Dan Elliott (Engineering Consultant)

Bob Hentz (Engineering Consultant)

Dr. David Vader (Faculty)

Will Kirtchner (Client Representative)

Working Prototype:

Undershot Water Wheel Mounted on Pontoon:

Ubiquitous & low cost materials

Easily adaptable design

Self clearing

Further Information:

Project Manager: Andrew Breighner—[email protected]

Student Project Manager 2017-2018: Johnathan Rogers—[email protected]

Student Project Manager 2018-2019: Andrew Reedy—[email protected]

https://www.messiah.edu/info/22228/our_projects

Partner/Client:

The PHEP is partnering with Engineering Ministries Inter-

national to develop and implement our hydroelectric system

in developing communities.

Vision:

“...see people restored by God and the world restored through design.”

Mission:

“...to develop people, design structures, and construct facilities which

serve communities and the Church.”

Conclusions: The PHEP is on its way to developing

a small scale hydropower system that

meets our clients needs.

The future holds much excitement as

we look forward to modifying initial

prototype.

Semester Goals:

Choose an Electric Generator

Develop Battery Charging System

Design and Build Initial Testing

Prototype

Future Work:

Optimize Testing Prototype

Combine Electrical and

Mechanical Systems

emiworld.org