pid receiving inspection
TRANSCRIPT
-
7/23/2019 PID Receiving Inspection
1/10
RECEIVING INSPECTION
PROCEDURE
RECEIVING INSPECTION
PROCEDURE
1
JANUARY 2013
-
7/23/2019 PID Receiving Inspection
2/10
OUTLINE
Source of material
Inspection Levels
Wat to Cec! "OR#
Common pitfalls Receivin$ Inspection Cec!list Samples
2
-
7/23/2019 PID Receiving Inspection
3/10
SOURCE O" %&TERI&L
Te source of material in Sau'i &ramcosoul' (e)
&pprove' %anufacturer *it S&P num(erstartin$ *it +
Stoc!ists as per S&EP,+-. /Suppl0in$ %aterialfrom Stoc!ists12 &pprove' Stoc!ists can (eaccesse' from te (elo* lin! )
http://sharek/orgs/30003279/30003283/30003285/Pages/default.aspx
&ramco 'irect purcase or'er3&ramco Store
4Out(oun'5
3
http://sharek/orgs/30003279/30003283/30003285/Pages/default.aspxhttp://sharek/orgs/30003279/30003283/30003285/Pages/default.aspxhttp://sharek/orgs/30003279/30003283/30003285/Pages/default.aspx -
7/23/2019 PID Receiving Inspection
4/10
INSPECTION LEVELS
Non,inspect,a(le Level of Inspection ) None
Inspect,a(le %aterial
Inspect,a(le material sall (e procure' from anapprove' manufacturer2 Reference sall (e ma'e toS&EP,6676 / Inspection Re8uirements for ContractorProcure' %aterial1 for re8uire' level of inspection2
Inspect,a(le %aterial Inspection Levels)
Level 9 Documentation re8uirements onl0: no ven'orinspection re8uire'
Level 6
Onl0 ;nal inspection is re8uire' prior to sippin$
4
-
7/23/2019 PID Receiving Inspection
5/10
INSPECTION LEVELS 4Contcept tat /in pro$ress1surveillance inspection sall (e on re$ular(asis 4 Dail0: Wee!l0 OR,(i,*ee!l05
Level -
Resi'ent inspector continuall0 monitorin$te *or!
5
-
7/23/2019 PID Receiving Inspection
6/10
W?&T TO C?EC@ "OR#
Dama$e 'ue to transportation or an0 oter means
Cut oA Stan'ar' Date of te proBect
&ssure tat te Cut,oA Stan'ar' 'ate use' for inspectionof te activit0 is te same as te one for proBect
Cec! for an0 suspicious 'ocument
Inspection Release Notice
Te notice sall (ear te tir' part0 4 ?ire' (0 teContractor5 stamp2 Tis stamp veri;es tat te sippe'
material meets &ramco stan'ar's2 S&IR sall (e contacte' for an0 non conformit02 EDR sall
(e issue' if non conformit0 as (een foun'2
Note :Third party ( Hired by Saudi Aramco) will monitorthe activity
6
-
7/23/2019 PID Receiving Inspection
7/10
W?&T TO C?EC@ "OR4Cont
-
7/23/2019 PID Receiving Inspection
8/10
CO%%ON PIT"&LLS
Stoc!ist is approve' (ut not te manufacturer
Stoc!ist is approve' (ut not for te 'elivere'material
com num(er in P2O2 'oes not matc te'elivere' material2
"inal Disposition Report is not availa(le atte time of receivin$ inspection2 See sce'ule
/F1 for 'etail2
Re'uce' Inspection level *itout approval2
%aterial (rou$t to site *itout InspectionRelease Notice2
8
-
7/23/2019 PID Receiving Inspection
9/10
REC"EIVING INSPECTION C?EC@LISTSS&%PLES
Receivin$ Inspection of Pipes an' Pipecan$ers 4S&IC,E,=99=5
Receivin$ Inspection of Scraper Trap4S&IC,L,=66.5
9
-
7/23/2019 PID Receiving Inspection
10/10
Thank you