  • 7/23/2019 PID Receiving Inspection

    1/10

    RECEIVING INSPECTION

    PROCEDURE

    RECEIVING INSPECTION

    PROCEDURE

    1

    JANUARY 2013

  • 7/23/2019 PID Receiving Inspection

    2/10

    OUTLINE

    Source of material

    Inspection Levels

    Wat to Cec! "OR#

    Common pitfalls Receivin$ Inspection Cec!list Samples

    2

  • 7/23/2019 PID Receiving Inspection

    3/10

    SOURCE O" %&TERI&L

    Te source of material in Sau'i &ramcosoul' (e)

    &pprove' %anufacturer *it S&P num(erstartin$ *it +

    Stoc!ists as per S&EP,+-. /Suppl0in$ %aterialfrom Stoc!ists12 &pprove' Stoc!ists can (eaccesse' from te (elo* lin! )

    http://sharek/orgs/30003279/30003283/30003285/Pages/default.aspx

    &ramco 'irect purcase or'er3&ramco Store

    4Out(oun'5

    3

    http://sharek/orgs/30003279/30003283/30003285/Pages/default.aspxhttp://sharek/orgs/30003279/30003283/30003285/Pages/default.aspxhttp://sharek/orgs/30003279/30003283/30003285/Pages/default.aspx
  • 7/23/2019 PID Receiving Inspection

    4/10

    INSPECTION LEVELS

    Non,inspect,a(le Level of Inspection ) None

    Inspect,a(le %aterial

    Inspect,a(le material sall (e procure' from anapprove' manufacturer2 Reference sall (e ma'e toS&EP,6676 / Inspection Re8uirements for ContractorProcure' %aterial1 for re8uire' level of inspection2

    Inspect,a(le %aterial Inspection Levels)

    Level 9 Documentation re8uirements onl0: no ven'orinspection re8uire'

    Level 6

    Onl0 ;nal inspection is re8uire' prior to sippin$

    4

  • 7/23/2019 PID Receiving Inspection

    5/10

    INSPECTION LEVELS 4Contcept tat /in pro$ress1surveillance inspection sall (e on re$ular(asis 4 Dail0: Wee!l0 OR,(i,*ee!l05

    Level -

    Resi'ent inspector continuall0 monitorin$te *or!

    5

  • 7/23/2019 PID Receiving Inspection

    6/10

    W?&T TO C?EC@ "OR#

    Dama$e 'ue to transportation or an0 oter means

    Cut oA Stan'ar' Date of te proBect

    &ssure tat te Cut,oA Stan'ar' 'ate use' for inspectionof te activit0 is te same as te one for proBect

    Cec! for an0 suspicious 'ocument

    Inspection Release Notice

    Te notice sall (ear te tir' part0 4 ?ire' (0 teContractor5 stamp2 Tis stamp veri;es tat te sippe'

    material meets &ramco stan'ar's2 S&IR sall (e contacte' for an0 non conformit02 EDR sall

    (e issue' if non conformit0 as (een foun'2

    Note :Third party ( Hired by Saudi Aramco) will monitorthe activity

    6

  • 7/23/2019 PID Receiving Inspection

    7/10

    W?&T TO C?EC@ "OR4Cont

  • 7/23/2019 PID Receiving Inspection

    8/10

    CO%%ON PIT"&LLS

    Stoc!ist is approve' (ut not te manufacturer

    Stoc!ist is approve' (ut not for te 'elivere'material

    com num(er in P2O2 'oes not matc te'elivere' material2

    "inal Disposition Report is not availa(le atte time of receivin$ inspection2 See sce'ule

    /F1 for 'etail2

    Re'uce' Inspection level *itout approval2

    %aterial (rou$t to site *itout InspectionRelease Notice2

    8

  • 7/23/2019 PID Receiving Inspection

    9/10

    REC"EIVING INSPECTION C?EC@LISTSS&%PLES

    Receivin$ Inspection of Pipes an' Pipecan$ers 4S&IC,E,=99=5

    Receivin$ Inspection of Scraper Trap4S&IC,L,=66.5

    9

  • 7/23/2019 PID Receiving Inspection

    10/10

    Thank you