Page 1: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

Pile Foundation Prototype Execution and Applicability for Scandinavia

Miguel Turullols SanzMarketing and Sales+34 609 040 [email protected]

Pamplona, October 30th 2019PPT-2004 Rev. 0

Checked by:Approved by:

Page 2: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

2

AGENDA

1. NABRALIFT INTRODUCTION• Nabralift Technology• Nabralift 160m Tower Prototype

2. NABRALIFT FOUNDATION PORTFOLIO• Foundation Alternatives• Adaptation to Soil Characteristics

3. NABRALIFT PILE FOUNDATION DESIGN• Pile Foundation Design Basis• Cost Savings

4. PILE FOUNDATION IN COLD CLIMATES• Advantages

Page 3: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

3

Nabralift Description

Tower Transition

Framed Structure

Foundation

1 NABRALIFT® INTRODUCTION

Page 4: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

4

1 NABRALIFT® INTRODUCTIONNabralift Description

Video

Page 5: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

5

Easy IntegrationSoft-Stiff for HH>180m

Standard Interface

Ultra Low CostFoundation / Tower Components

Logistics / Assembly

Fast AssemblySelf-Erection in 3 days / Prefab Found.

Higher Wind Speeds for Erection

Self ErectionNo Large Cranes

Low Occupation of Small Cranes

Minimum LogisticsSized for Standard Containers

Optimum Packaging

Assembly Platform

Tower Foundation

Tower Components

Tower Logistics

Tower/WTG InstallationTOTAL-22%

160m Standard Steel Tower 160m Nabralift

-50%

-60%

-10%

-30%

-25%

Nabralift Description1 NABRALIFT® INTRODUCTION

Page 6: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

6

AGENDA

1. NABRALIFT INTRODUCTION• Nabralift Technology• Nabralift 160m Tower Prototype

2. NABRALIFT FOUNDATION PORTFOLIO• Foundation Alternatives• Adaptation to Soil Characteristics

3. NABRALIFT PILE FOUNDATION DESIGN• Pile Foundation Design Basis• Cost Savings

4. PILE FOUNDATION IN COLD CLIMATES• Advantages

Page 7: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

7

2 NABRALIFT® FOUNDATION PORTFOLIOInternal Loads Distribution

Page 8: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

8

Foundation Portfolio

Gravitational FoundationStandard Wind Solution

Deep FoundationsFast & Disruptive Cost

Piled FoundationsStandard Soil

Anchor RockBedrock in Surface

Page 9: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

9

Technology Basis

• Solution for Wind Turbines• Optimized for Nabralift

10-15m

0-15m

Fast Solution1 week / foundation

Minimum Cost for Hard Rock-50% vs wind rock found.

Anchor RockBedrock in Surface

12-15m

Page 10: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

10

Pile FoundationStandard Soil

Technology Basis

• Design: offshore jackets• Process/Cost: civil works

10-15m

0-15m

Fastest Solution4 days / foundation

Minimum Cost-60% vs std wind foundations

Page 11: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

11

12%

63%

25%

Gravitational Pile Anchor Rock

P

P

A

P

G

P

P

A

2 NABRALIFT® FOUNDATION PORTFOLIOApplicability as per Real Geotechnical Studies

Page 12: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

12

AGENDA

1. NABRALIFT INTRODUCTION• Nabralift Technology• Nabralift 160m Tower Prototype

2. NABRALIFT FOUNDATION PORTFOLIO• Foundation Alternatives• Adaptation to Soil Characteristics

3. NABRALIFT PILE FOUNDATION DESIGN• Pile Foundation Design Basis• Cost Savings

4. PILE FOUNDATION IN COLD CLIMATES• Advantages

Page 13: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

13

Pile Design (4MW-160m)Diameter (D) 1.5mDepth (L) 5MPa Rock 20m

10MPa Rock 15m15MPa Rock 15m

Pile Part List (10MPa Rock)Concrete 80m3

Reinforcement Steel 21TM36 Bolts (1.5m) 132udAnchor cage plates (250kg) 6ud

D

L

Pile Foundation Design3 NABRALIFT PILE FOUNDATION

Page 14: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

14

Materials & Equipments3 NABRALIFT PILE FOUNDATION MANUFACTURING PROCESS

Pile Reinforcement

Auxiliary Digger Kelly

Auxiliary Crane (60T)

Bolt Cages

Concrete

Page 15: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

15

3 NABRALIFT PILE FOUNDATION

1.-Drilling5MPa Rock 6h10MPa Rock 8h15MPa Rock 15h

Pile Foundation Manufacturing Process

Page 16: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

16

3 NABRALIFT PILE FOUNDATION

2.-Reinforcement Installation2h/pile

Pile Foundation Manufacturing Process

Page 17: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

17

3 NABRALIFT PILE FOUNDATION

3.-Concrete pouring1h/pile

Pile Foundation Manufacturing Process

Page 18: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

18

3 NABRALIFT PILE FOUNDATION

4.-Concrete setting

Pile Foundation Manufacturing Process

Page 19: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

19

FIRST PILE FOUNDATION

Page 20: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

20

Pile Design (3.6MW-144m)Diameter (D) 1.2mDepth (L) 4MPa Rock 24m

Pile Foundation Part ListConcrete 81m3

Reinforcement Steel 25TM36 Bolts (1.5m) 99udAnchor cage plates (250kg) 6ud

3 ONGOING PROJECTS FIRST PILE FOUNDATION

Detailed Design in Collaboration with

Page 21: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

21

Page 22: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

22

Page 23: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

23

Page 24: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

24

Drilling CompletedPiles to be executed in September

Page 25: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

25

Page 26: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

26

Page 27: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

27

Page 28: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

28

Page 29: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

29

Page 30: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

30

Page 31: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

31

AGENDA

1. NABRALIFT INTRODUCTION• XXL Tower Challenges• Nabralift Technology

2. NABRALIFT FOUNDATION PORTFOLIO• Foundation Alternatives• Adaptation to Soil Characteristics

3. NABRALIFT PILE FOUNDATION DESIGN• Pile Foundation Design Basis• Cost Savings

4. PILE FOUNDATION IN COLD CLIMATES• Advantages

Page 32: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

32

4 PILE FOUNDATION IN COLD CLIMATESAdvantages

Page 33: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

33

Nabralift® pile foundation only

requires 1 hour per pile, increasing the operational frame

Nabralift® pile foundation only requires 80-100 m2, so heating the concrete is a real

possibility

Working with the most reliable partners

Page 34: Pile Foundation Prototype Execution and Applicability for … · 2020-02-04 · Pile Foundation Prototype Execution and Applicability for Scandinavia Miguel Turullols Sanz Marketing

Thanks for Your Attention© Nabrawind Technologies 2020

All rights reserved. No part of this publication can be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical or photocopying, recording, or otherwise.