Pilot sites - progress. 5th PP meeting Lakatamia, 10-15 June 2014. Veronika Valentar. ENERGY EFFICIENCY BUILDINGS ENERGY SAVING WOOD BIOMASS SOLAR ENERGY BIOGASS WATER ENERGY FEASIBILITY STUDIES FINANCING PUBLIC LIGHTNING BIOCLIMATIC AREAS WATER PUMPING. WHAT ARE WE DOING?. - PowerPoint PPT PresentationTRANSCRIPT
Green Partnerships Local Partnerships for Greener Cities and
Regions
Pilot sites- progress
5th PP meeting
Lakatamia, 10-15 June 2014
Veronika Valentar
Green Partnerships Local Partnerships for Greener Cities and
Regions MARIBOR
KOPRIVNICA-KRIŽEVCI
RHETYMNO
LAKATAMIA
PODGORICA
LA SPEZIAVERDON,MEAILLES
GRANOLLERS
ALENTEJO
- ENERGY EFFICIENCY BUILDINGS
- ENERGY SAVING- WOOD BIOMASS- SOLAR ENERGY- BIOGASS- WATER ENERGY- FEASIBILITY
STUDIES- FINANCING- PUBLIC LIGHTNING- BIOCLIMATIC
AREAS- WATER PUMPING
SARAJEVO
INNOVATIVE APPROACH, CONCRETE RESULTS, FUTURE INVESTMENTS!
WHAT ARE WE DOING?
MANZA
Lakatamia, 10-15 June 20143
PILOTS 1-2- MARIBOR
MARIBOR 1:
Biomass heating boilers for public buildings:- 2 municipalities ( 1 new, 1 optimised)- The main obstacle: european, national, local elections, no
funding
MARIBOR 2:Energy efficiency in cultural heritage building:- Energy identity card in progress - Development of scenarios not in progres yet
The main obstacle: communication between stakeholders
Lakatamia, 10-15 June 20144
ALBANIA
- Problem: Waste management, water scarcity, pollution
- Focus: young generations
- Actions: Training courses:- How many training courses?- Any training materials developed?- Center for environmental and Green Energy?
PILOT 3- MANZA
Lakatamia, 10-15 June 20145
BOSNIA AND HERCEGOVINA
SARAJEVO 1: CO2 emmisionsActions: QuestionnairesResult: Feasibility studyQ1: how useful are project materials: e.g. funding, awareness etc.
SARAJEVO 2: Eco schoolsActions: awarenessQ2: any materials in your national language?
PILOTS 4-5: SARAJEVO
Lakatamia, 10-15 June 20146
LAKATAMIA:
Action: - Investment to the biomass boiler- Feasibility study about biomass supply
Obstacle: modification of the project; Q1: biomass supply?
PILOT 6- LAKATAMIA
Lakatamia, 10-15 June 20147
1. PARC NATURAL REGIONAL DU VERDONAction: - Territorial biogas projectQ1: Is this project realizable in the period 2014- 2020?
2. HYDROPOWER PLANT ON AN IRRIGATION CHANEL
Q2: How far are you?
PILOTS 7-8- FRANCE
Lakatamia, 10-15 June 20148
FEASIBILITY STUDIES
1. PUBLIC LIGHTNING2. WATER TREATEMENT AND PUMPING3. BIOCLIMATIC DESIGN OF OPEN SPACE
Q1: Have you already selected, suimulated and designed target places in old town of Rhetymno? Which criteria did you use by selection of target?
PILOTS 9-11- GREECE
Lakatamia, 10-15 June 20149
FEASIBILITY STUDIES
1. Possibilities for biogas and biomass producers: technical solutions and investment proposals
Q1: Funding possibilities since CRO is a member of EU?
2. Photovoltaic panels at the public buildingQ2: Development of a GIS model for data analysis and monitoring RES and energy efficiency?
3. Energy efficiency in public school building- technical solution and investment proposal
PILOTS 12-15 CROATIA
Lakatamia, 10-15 June 201410
The largest network of decision makers1. Strengtheening local public –private partnerships
supporting energy efficiency2. Raising awareness and implementing energy efficiency upgrading in schools3. Mobilisation funds for investment in sustainable energy at local level4. Training civil society organizations in energy certification
Q1: Nr. Of concrete locations (feasibility studies, energy audits, emission inventories) involved?Q2: Environmental and energy centre?Q3: Web platform tool for training course?
PILOTS 16-19- ITALY
Lakatamia, 10-15 June 201411
Feasibility studies about the use of hydro power
Case: Jezerstica
Q1: Nr. Of events? Any new obstacles identified?
PILOT 20-MONTE NEGRO
Lakatamia, 10-15 June 201412
1. Starting up of a “Championship for energy saving” in public buildings
2. Installation of remote control systems for energy management in public buildings participating in “championship”
3. Technical and economic feasibility study on the installation of trigeneration in the form of selfconsumption and provision of energy services to Granollers
Q1: does remote controll enable feedback on
PILOTS 21-23 CATALONIA
Lakatamia, 10-15 June 201413
1. Personalised trainings for SME-s2. Public lightning energy efficiency3. Network for electricity efficiency4. LEDs for traffic lights5. Zero emmisions communities
Q:The progress of work, investments?
PILOTS 24-29 PORTUGAL
Lakatamia, 10-15 June 201414
1st slide- Title of the Pilot case, which technical-non technical thematic area- LAG related to the specific pilot case (members) - Photo representative to the pilot project/areaIn addition, we propose a graphic sign for the country flag+partner’s logo- Start-End date of pilot case implementation
2nd slide
Starting point – which was the identified need - reasons for change that led to the
specific pilot actionSolution proposed
Cooperation established?Targets set (i.e. energy savings, people
reached, investments challenged, new jobs etc)
Key actions taken so far (i.e. to solve the problem “technically”, soft measures to raise
awareness/improve habits, capacity building)
3rd slide
Main barriers identified during the implementation of the projectBenefits for the community
Lessons learnt
4th slide
which are the next steps by the end of the project so that you will achieve the aim of the
pilot case as described in the Application Form (e.g. investment realized, investment
proposal prepared, technical solution prepared etc.)
POSTERS
Lakatamia, 10-15 June 201415
2nd slide- Starting point – which was the identified need - reasons for change that led to the specific pilot action- Solution proposed - Cooperation established?- Targets set (i.e. energy savings, people reached, investments challenged, new jobs etc) - Key actions taken so far (i.e. to solve the problem “technically”, soft measures to raise awareness/improve habits, capacity
Lakatamia, 10-15 June 201416
3rd slide- Main barriers identified during the implementation of the project- Benefits for the community- Lessons learnt
Lakatamia, 10-15 June 201417
4th slide
which are the next steps by the end of the project so that you will achieve the aim of the
pilot case as described in the Application Form (e.g. investment realized, investment
proposal prepared, technical solution prepared etc.)
Lakatamia, 10-15 June 201418
If you can‘t explain simply, you don‘t understand it well enough! (Albert Einstein)