pioneering lng as fuel for shipping : opportunities and ... 2/o.m... · •100% hsd 136,371 ltrs,...

17
PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND CONSTRAINTS By : Dir. Armatek 17 September 2015

Upload: others

Post on 10-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

PIONEERING LNG AS FUEL FOR SHIPPING :

OPPORTUNITIES AND CONSTRAINTS

By : Dir. Armatek

17 September 2015

Page 2: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

2

COMPANY PROFILE

PT. PELNI (PERSERO)

Page 3: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

CORPORATE VISION AND MISSION

33

“To be a solid shipping company and customers first choice”

VISION PT PELNI

• Managing and developing the sea transport to ensure public accessibility in order to support the establishment “Archipelago Principle;

• Improving the contribution of revenue for the state, employees, and role in the environment and service to the community;

• Improving the value of the company through creativity, innovation and human resource development competencies;

• Conducting business fairly with the princiiples of benefit to all parties involved (stakeholders) and apply Good Corporate Governance

MISSION PT PELNI

Page 4: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

National Network Routes of Ship

Passangers

4

BIMA

KUPANG

KENDARI

TUALMAKASSAR

PONTIANAK

PANJANG

BATAM

BANYUWANGI

BIRINGKASI

PARE PARE

SORONG

JAYAPURA

TARAKAN

BONTANGSAMARINDA

BATU LICIN

KWANDANG

PALU

SIAU

TAHUNA

TERNATE

RAHA

PANTOLOAN

TOLI TOLISANGKULIRANG

BERAU

SENGATA

BENGALON

BALIKPAPAN

BELAWANKUALA TANJUNG

LHOKSEUMAWE

DUMAI

MALAHAYATI

SINGAPORE

BENGKULU

PALEMBANG

KUPANG

TUALMAKASSARBIRINGKASI

SORONG

KETAPANG

SIAU

TAHUNA

TERNATE

RAHA

GALELA

PANTOLOAN

SINGAPORE

PADANG

BENGKULU

KUPANG

TUALMAKASSAR

BITUNG

BELANG BELANG

SORONG

BLINYU

SIAU

TAHUNA

TERNATE

BAU BAU

PANTOLOAN

BENGKULU

MERAUKE

NABIRE

SERUI

BIAK

AMAHAI

MAKASSAR

LAMPUNG

Tg. PANDAN/BELITUNG FAK FAK

BANJARMASIN

GORONTALO

TOBELO

BENGKULU

DARWIN

TIMIKA

MALAYSIA

SIBOLGA

KIJANG

NUNUKAN

BANDA

LABUHAN BAJO

LARANTUKA

DOBO

SAUMLAKI

KAIMANA

AGATS

GEBE

SABUROTE

ENDE

WAINGAPU

MAUMERE KALABAHI

KISAR

KANGEAN

BAWEAN

SAMPIT

KARIMUN

LETUNG

TAREMPA MIDAI

SERASAN

TAMBELAN

KOLONEDALE

GN. SITOLI/NIAS

KUMAII

WANCI

LIRUNG

ENGGANO

NATUNA

MUNTOK

TJ.BALAI

CIGADINGTG.PRIOK

CILACAP

CIREBON SEMARANGSURABAYA

DENPASAR

LEMBAR

BADAS DILI

PALOPO

LUWUKBANGGAI

NAMLEAAMBON

MANOKWARI

KUALA ENOK

wASIOR

LOWELEBA

GESER

KARATUNG

MIANGAS

SANANA

BULA

LETI TEPAILWAKI

Number of Port in 2015 : 95 Ports

MARORELIRUNG

Page 5: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

Fleet

5

Passangers Ship (3000 Pax) = 1 Unit

Passangers Ship (2000 Pax) = 9 Units

3 in 1 Vessel (Modification) = 2 Units

Passangers Ship (1000 Pax) = 9 Units

Passangers Ship (500 pax) = 3 Units

Ro-Ro & High Speed Craft = 2 Units

General Cargo = 3 Units

TOTAL 29 Units

Page 6: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

PT.PELNI Ships Engine

6

MAIN ENGINE

MaK

DAIHATSU

B & W MITSUI

MTU

AUX. ENGINE

DAIHATSU

MaK

MaK -Caterpillar

Page 7: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

PT.PELNI Ships Engine

7

MaK6MU601AK(6000 kW)

MaK6M601C

(6400 kW)

MaK8M601CC(8400 kW)

MaK9M43

(8400 kW)

MaK6M43C

(6600 kW)

TIDARUMSINI

B. SIGUNTANGCIREMAI

DOBONSOLOLAMBELU

KELUDSINABUNGNGGAPULU

DOROLONDA

LABOBAR G. DEMPO

MaK6MU453B(1600 kW)

MaK6MU453C(1600 kW)

MaK8M20

(1200 kW)DAIHATSU

B & WMITSUI

KELIMUTULAWIT

AWUBINAIYAB. RAYALEUSER

SIRIMAUTATAMAILAU

TILONGKABILA

PANGRANGOSANGIANG

WILISEGON

CJN III-4CJN III-22CJN III-32

Page 8: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

8

DUAL FUEL SHIP

CONVERSION

(FEASIBILITY STUDY)

Page 9: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

Dual Fuel Conversion Background

9

There are opportunity for passengers to

use other transport with competitive

rates, a faster and better service (Low

Cost Carrier)

Fuel cost is the biggest cost componenti.e 54% of the total operational cost ofshipping.

Increasing of fuel cost (HSD) within 15years of more than 1000%.

Ship design is fixed (not easy tochanged) causes high operational cost.

54%

9%

11%

15%

8%

3%

Fuel Cost

Cost of Passangers and Cargo

Cost of Ship's Crew

Maintenance Cost

Depreciation

Others

Component of Operational Cost

Page 10: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

Dual Fuel Goal

10

• Reducing the use of subsidized fuel, accordingGovernment Direction.

• Potential savings in fuel costs as a the largest component of ship vessel operating cost (54% of Total Cost of Operations)

• Green Shipping for healthy environment

• Reducing the amount of exhaust emissions (NOx, SOx, COx) due to operation of the vessel

Page 11: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

Additional Equipment Scheme for Dual

Fuel Conversion

11

Page 12: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

Dual Fuel Usage Scheme

(Case Study : KM. Ciremai)

12

Page 13: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

Results of KM.Ciremai

Dual Fuel Study (2013)

13

Fuel Consumption Of KM Ciremai (Jakarta – Surabaya – Jakarta):• 100% HSD 136,371 Ltrs, • 40% HSD dan 60% LNG 54,548 Ltrs HSD and 2,498.96 mmbtu LNG

The total cost of the dual fuel modification at KM.Ciremai 8,052 Billion rupiah

Operating Dual Fuel is FEASIBLE (NPV is positive)• Net present value/ net saving value (subsidized HSD)

• With opportunity loss 1,13 Billion Rupiah• Without Opportunity loss 14,99 Billion Rupiah

• Net present value/ net saving value (Non-Subsidized HSD)• With opportunity loss 86,12 Billion Rupiah• Without Opportunity loss 99,89 Billion Rupiah

Limit of Dual Fuel FEASIBILITY is maximum price of LNG (dual fuel scenario 40% HSD and 60% LNG) • With opportunity loss 14,3 USD/mmbtu• Without Opportunity loss 17,8 USD/mmbtuNote : Price of Subsisidized HSD (5.500 Rp/liter)

Page 14: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

Constraints of Dual Fuel Aplication On

Ship

14

1. No Recommendation from Engine Maker to Dual Fuel Modification for Existing Engine

2. The uncertainty of the availability and sustainability of the Gas Supply

3. Pelni ships classified by BKI, but Guidelines for The Use of Gas as Fuel for Ship still in the process of refinement at the time (2013)

Page 15: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

Follow Up (Action) to Minimize

The Constraints

15

1 Engine Maker Recomendation

2 Uncertainty Gas Supply

3Guidelines for The Use of Gas as

Fuel for Ship

Back to Class Regulation

MoU with PGN

MoU with BKI

Refinement of Guidelines By BKI2013 Edition (9 Sections) to 2015 Edition (19 Sections)

MoU with Pertamina

Page 16: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

Conclusion and Hope

16

1. Usage of Gas (LNG) as Fuel Ship is a must and can not be avoided, because it is the world needs and provide the great potential saving.

2. Need Goverment Policy on National Gas Allocation :

• Gas allocation for Domestic Shipping

• Various locations of Gas Supply in Indonesia Port

• Guarantee the reliability and sustainability of the gas supply

• The stability of gas prices

3. Specific Regulations/Guidelines for Passangers Vessel with Gas as Fuel is required.

Page 17: PIONEERING LNG AS FUEL FOR SHIPPING : OPPORTUNITIES AND ... 2/O.M... · •100% HSD 136,371 Ltrs, ... No Recommendation from Engine Maker to Dual Fuel Modification for ... 2013 Edition

Thank You