pipeline and piping deliverables

38
Client Number Rev. NG 22 082 SOF PVV GER 002023 9 NG 22 082 SOF PVV LAY 002046 4 NG 22 082 SOF PVV LAY 002047 4 NG 22 082 SOF PVV LAY 002048 4 NG 22 082 SOF PVV LAY 002049 4 NG 22 085 SOF PVV LIS 005060 1 NG 22 84 SOF PPL ANL 000001 2 NG 22 84 SOF PPL SPE 000001 3 NG 22 84 SOF PPL SPE 000002 3 NG 22 84 SOF PPL SPE 000003 3 NG 22 84 SOF PPL SPE 000004 2 NG 22 84 SOF PLR CAL 010001 1 NG 22 84 SOF PPL DRW 000001 4 NG 22 84 SOF PPL DRW 000002 3 NG 22 84 SOF PPL DRW 000003 2 NG 22 84 SOF PPL DRW 000004 3 NG 22 84 SOF PPL DRW 000005 2 NG 22 84 SOF PPL DRW 000006 2 NG 22 84 SOF PPL DRW 000007 2 NG 22 84 SOF PPL DRW 000008 2 NG 22 84 SOF PPL DRW 000009 2 NG 22 84 SOF PPL DRW 000010 2 NG 22 84 SOF PPL DRW 000011 3 NG 22 84 SOF PPL DRW 000012 2 NG 22 84 SOF PPL DRW 000013 2 NG 22 84 SOF PPL DRW 000014 2 NG 22 84 SOF PPL DRW 000015 2 NG 22 84 SOF PPL DRW 000016 2 NG 22 84 SOF PPL DRW 000017 2 NG 22 84 SOF PPL DRW 000018 2 NG 22 84 SOF PPL DRW 000019 2 NG 22 84 SOF PPL DRW 000020 2 NG 22 84 SOF PPL TYP 000030 2 NG 22 84 SOF PPL TYP 000031 2 NG 22 84 SOF PPL TYP 000032 2 NG 22 84 SOF PPL TYP 000033 4 NG 22 84 SOF PPL TYP 000034 2 NG 22 84 SOF PPL TYP 000035 3 NG 22 84 SOF PPL TYP 000036 2

Upload: lavanyan-satchithananthan

Post on 04-Jan-2016

386 views

Category:

Documents


4 download

DESCRIPTION

Pipeline

TRANSCRIPT

Page 1: Pipeline and Piping Deliverables

APPENDIX 0Client Number Rev. Title

PIPING, VALVES & VESSELS

NG 22 082 SOF PVV GER 002023 9 OBITE TC AREA ARRANGEMENT PLOT PLAN

NG 22 082 SOF PVV LAY 002046 4 OBITE TC - PIPING LAYOUT AREA 07

NG 22 082 SOF PVV LAY 002047 4 OBITE TC - PIPING LAYOUT AREA 08

NG 22 082 SOF PVV LAY 002048 4 OBITE TC - PIPING LAYOUT AREA 09

NG 22 082 SOF PVV LAY 002049 4 OBITE TC - PIPING LAYOUT AREA 10

NG 22 085 SOF PVV LIS 005060 1 IPP-GSU TIE-IN BOOK

APPENDIX 1:PIPELINES & RISERS

NG 22 84 SOF PPL ANL 000001 2 PIPELINE GAP ANALYSIS REPORT

NG 22 84 SOF PPL SPE 000001 3 TECHNICAL SPECIFICATION FOR PIPELINE ROUTE TOPOGRAPHIC SURVEY

NG 22 84 SOF PPL SPE 000002 3 STRESS ANALYSIS BASIC REQUIREMENTS

NG 22 84 SOF PPL SPE 000003 3 PIPELINE BENDS RADII SPECIFICATION

NG 22 84 SOF PPL SPE 000004 2 CONCRETE COATING WEIGHT SPECIFICATION

NG 22 84 SOF PLR CAL 010001 1 PIPELINE CALCULATION NOTE / ALTERNATE 42"

NG 22 84 SOF PPL DRW 000001 4 ROUTE MAP FROM KP 00+000 TO KP 2+000

NG 22 84 SOF PPL DRW 000002 3 ROUTE MAP FROM KP 2+000 TO KP 4+500

NG 22 84 SOF PPL DRW 000003 2 ROUTE MAP FROM KP 4+500 TO KP 7+000

NG 22 84 SOF PPL DRW 000004 3 ROUTE MAP FROM KP 7+000 TO KP 9+500

NG 22 84 SOF PPL DRW 000005 2 ROUTE MAP FROM KP 9+500 TO KP 12+000

NG 22 84 SOF PPL DRW 000006 2 PIPELINE ROUTE MAP FROM KP 12+000 TO KP 14+500

NG 22 84 SOF PPL DRW 000007 2 PIPELINE ROUTE MAP FROM KP 14+500 TO KP 17+000

NG 22 84 SOF PPL DRW 000008 2 PIPELINE ROUTE MAP FROM KP 17+000 TO KP 19+500

NG 22 84 SOF PPL DRW 000009 2 PIPELINE ROUTE MAP FROM KP 19+500 TO KP 22+000

NG 22 84 SOF PPL DRW 000010 2 PIPELINE ROUTE MAP FROM KP 22+000 TO KP 24+500

NG 22 84 SOF PPL DRW 000011 3 PIPELINE ROUTE MAP FROM KP 24+500 TO KP 27+000

NG 22 84 SOF PPL DRW 000012 2 PIPELINE ROUTE MAP FROM KP 27+000 TO KP 29+500

NG 22 84 SOF PPL DRW 000013 2 PIPELINE ROUTE MAP FROM KP 29+500 TO KP 32+000

NG 22 84 SOF PPL DRW 000014 2 PIPELINE ROUTE MAP FROM KP 32+000 TO KP 34+500

NG 22 84 SOF PPL DRW 000015 2 PIPELINE ROUTE MAP FROM KP 34+500 TO KP 37+000

NG 22 84 SOF PPL DRW 000016 2 PIPELINE ROUTE MAP FROM KP 37+000 TO KP 39+500

NG 22 84 SOF PPL DRW 000017 2 PIPELINE ROUTE MAP FROM KP 39+500 TO KP 42+000

NG 22 84 SOF PPL DRW 000018 2 PIPELINE ROUTE MAP FROM KP 42+000 TO KP 44+500

NG 22 84 SOF PPL DRW 000019 2 PIPELINE ROUTE MAP FROM KP 44+500 TO KP 45+474.04

NG 22 84 SOF PPL DRW 000020 2 GENERAL LAYOUT ROUTE MAP

NG 22 84 SOF PPL TYP 000030 2 SAMBREIRO RIVER CROSSING DRAWING

NG 22 84 SOF PPL TYP 000031

2

NG 22 84 SOF PPL TYP 000032

2

NG 22 84 SOF PPL TYP 000033 4 TYPICAL DITCH DIMENSIONS

NG 22 84 SOF PPL TYP 000034 2 TYPICAL ROAD CROSSING OF STEEL CASING PIPE

NG 22 84 SOF PPL TYP 000035 3 TYPICAL CASING PIPE ASSEMBLY CONSTRUCTION DETAILS

NG 22 84 SOF PPL TYP 000036 2 TYPICAL ROAD CROSSING OF UNCASED PIPE

TYPICAL ROW SECTION IN DRY AREA

SUPERSEDED BY NG22 180 CST CPY 300038

TYPICAL ROW SECTION IN SWAMP AREA

SUPERSEDED BY NG22 180 CST CPY 300039

Page 2: Pipeline and Piping Deliverables

NG 22 84 SOF PPL TYP 000037 3 TYPICAL CROSSING OF EXISTING A/G PIPES

NG 22 84 SOF PPL TYP 000038 2 TYPICAL EXISTING BURIED CABLE CROSSINGS

NG 22 84 SOF PPL TYP 000039 2 TYPICAL WATERCOURSE CROSSING

NG 22 84 SOF PPL TYP 000040 2 TYPICAL RIVER BANK PREVENTION AGAINST POST CONSTRUCTION EROSION

NG 22 84 SOF PPL TYP 000041 2 TYPICAL CROSS OF EXISTING PIPELINES AND FLOWLINES

NG 22 84 SOF PPL TYP 000042 3 TYPICAL MARKERS AND WARNING SIGNS

NG 22 84 SOF PLR MTO 010001 1 STEEL LINE PIPES & INDUCTION BENDS MTO'S / ALTERNATE 42"

NG 22 84 SOF PPL MTO 010002 2 CROSSING MATERIAL MTO FOR COST ESTIMATE / ALTERNATE 42"

NG 22 84 SOF PPL DTS 000002 3 SCHEDULE OF CROSSINGS

NG 22 84 SOF PLR DTS 010001 1 KP INFORMATION DATA / ALTERNATE 42"

NG 22 84 SOF PPL REQ 000001 2

NG 22 84 SOF PPL REQ 010002 1 TECHNICAL REQUISITION FOR STEEL LINE PIPES / ALTERNATE 42"

NG 22 84 SOF PPL REQ 010003 1 TECHNICAL REQUISITION FOR & INDUCTION BENDS / ALTERNATE 42"

PIPING, VALVES & VESSELS

NG 22 84 SOF PVV PRC 000001 1 PIPING PROCEDURE FOR NODE SITE SURVEY

NG 22 84 SOF PVV ANL 000001 4 PIPING GAP ANALYSIS REPORT

NG 22 84 SOF PVV SPE 000003 4 PIPING DESIGN SPECIFICATION

NG 22 84 SOF PVV SPE 010004 3 PIPING MATERIAL SPECIFICATION / ALTERNATE 42"

NG 22 84 SOF PIP SPE 010002 3 VALVE SPECIFICATION / ALTERNATE 42"

NG 22 84 SOF PVV STD 000001 3 PIPING HOOK UP STANDARD BOOK

NG 22 84 SOF PVV STD 010002 1 PIPING SUPPORT STANDARD BOOK

NG 22 84 SOF PVV DTS 010003 3 VALVE DATA SHEETS / ALTERNATE 42"

NG 22 84 SOF PVV DTS 010004 2 SPECIAL ITEMS DATA SHEET / ALTERNATE 42"

NG 22 84 SOF PVV REQ 010003 2 TECHNICAL REQUISITION FOR FORGINGS & BARRED TEES / ALTERNATE 42"

NG 22 84 SOF PVV REQ 010002 1 TECHNICAL REQUISITION FOR 36" MANUAL BALL VALVES ON PIPELINE / ALTERNATE 42"

NG 22 84 SOF PVV REP 000001 0 PIPING REPORT OF NODE SITE SURVEY

NG 22 84 SOF PVV ANL 000002 3 MECHANICAL EQUIPMENT GAP ANALYSIS REPORT

NG 22 84 SOF PVV SPE 010001 1 PARTICULAR PROJECT SPECIFICATION FOR PIG LAUNCHER/RECEIVER / ALTERNATE 42"

NG 22 84 SOF PVV REQ 010001 1 REQUISITION FOR PIG LAUNCHER/RECEIVER / ALTERNATE 42"

NG 22 84 SOF PVV DTS 010001 1 MECHANICAL DATA SHEET - PIG LAUNCHER 82 VP 691 / ALTERNATE 42"

NG 22 84 SOF PVV DTL 010001 1 OBITE DETAIL DRAWING - TIE IN POTENTIAL SPDC CONNECTION / ALTERNA

NG 22 84 SOF PVV LIS 010201 2 OBITE TC - LINE LIST / ALTERNATE 42"

NG 22 84 SOF PVV MTO 010201 4 OBITE TC PIPING MTO FOR COST ESTIMATE / ALTERNATE 42"

NG 22 84 SOF PVV CAL 010401 1 UBETA PIPING STRESS CALCULATION NOTE / ALTERNATE 42"

NG 22 84 SOF PIP LAY 000403 2 UBETA DISMANTLING DRAWING

NG 22 84 SOF PVV GEA 010401 1 UBETA PIPING GENERAL ARRANGEMENT DRAWING / ALTERNATE 42"

NG 22 84 SOF PVV GEA 010402 1 UBETA PIPING GENERAL ARRANGEMENT DRAWING / ALTERNATE 42"

NG 22 84 SOF PVV LIS 000402 3 UBETA CRITICAL LINE LIST FOR STRESS CALCULATIONS

NG 22 84 SOF PVV LIS 010401 1 UBETA - LINE LIST / ALTERNATE 42"

NG 22 84 SOF PIP LAY 010401 1 UBETA LAYOUT DRAWING / ALTERNATE 42"

NG 22 84 SOF PVV MTO 010401 3 UBETA PIPING MTO FOR COST ESTIMATE / ALTERNATE 42"

NG 22 84 SOF PVV MAM 000401 4 UBETA PIPING TIE-IN BOOK

NG 22 84 SOF PVV ISO 000401 2 UBETA TIE-IN ISOMETRIC

NG 22 84 SOF PVV DTS 010502 1 MECHANICAL DATA SHEET - PIG RECEIVER / ALTERNATE 42"

NG 22 84 SOF PVV CAL 010501 1 RUMUJI PIPING STRESS CALCULATION NOTE / ALTERNATE 42"

NG 22 84 SOF PIP LAY 000503 2 RUMUJI DISMANTLING DRAWING

NG 22 84 SOF PVV GEA 010501 1 RUMUJI PIPING GENERAL ARRANGEMENT DRAWING / ALTERNATE 42"

TECHNICAL REQUISITION FOR PIPELINE ROUTE SURVEY NOT APPLICABLE

Page 3: Pipeline and Piping Deliverables

NG 22 84 SOF PVV GEA 010502 1 RUMUJI PIPING GENERAL ARRANGEMENT DRAWING / ALTERNATE 42"

NG 22 84 SOF PVV LIS 000502 3 RUMUJI CRITICAL LINE LIST FOR STRESS CALCULATIONS

NG 22 84 SOF PVV LIS 010501 1 RUMUJI - LINE LIST / ALTERNATE 42"

NG 22 84 SOF PIP LAY 010501 1 RUMUJI LAYOUT DRAWING / ALTERNATE 42"

NG 22 84 SOF PVV MTO 010501 2 RUMUJI PIPING MTO FOR COST ESTIMATE / ALTERNATE 42"

NG 22 84 SOF PVV MAM 000501 3 RUMUJI PIPING TIE-IN BOOK

NG 22 84 SOF PVV ISO 000501 2 RUMUJI TIE-IN ISOMETRIC

APPENDIX 2PIPELINES & RISERS

NG 22 184 PLR CPY 000001 1

NG 22 184 PLR CPY 000002 1

NG 22 184 PLR CPY 000003 1

NG 22 184 PLR CPY 000004 1

NG 22 186 PLR CPY 000006 1

NG 22 186 PLR CPY 000007 1

NG 22 186 PLR CPY 000008 1

NG 22 186 PLR CPY 000009 1

NG 22 184 PLR CPY 000100 0 OUR GAS PIPELINE SPECIFICATION FOR UBETA HOT TAPPING

NG 22 180 PLR CPY 000100 0 Supply of Above Ground Installation Ball Valves Between 8” and 42”

0 typical row section in dry area

0 typical row section in swamp area

UBETA NODE ISOMETRIC DRAWING NEW LAYOUT OF OUR PIPELINE, FUTURE 42’’ CONNECTION & TIE-IN PIPING TO GTS

UBETA NODE GENERAL ARGTT – TIE-IN CONNECTION FROM EXISTING 28’’ GTS1 PIPELINE TO TP1 (CONVENTIONNAL HOT TAP METHOD)

UBETA NODE – PIPING LAYOUT – VENT SYSTEM RELOC. TO ACCOMMODATE OUR & FUTURE NLNG PIPELINE AND PIG TRAP

UBETA NODE – PIPING LAYOUT – NEW LAYOUT OF OUR PIPELINE AND FUTURE NLNG PIG RECEIVERS

RUMUJI NODE ISOMETRIC DRAWING – NEW LAYOUT OF PIG RECEIVERS PIPING, FUTURE GTS6 CONNECTION & TIE-IN TO GTS 4 (SH. 1 OF 2)

RUMUJI NODE ISOMETRIC DRAWING – NEW LAYOUT OF PIG RECEIVERS PIPING, FUTURE GTS6 CONNECTION & TIE-IN TO GTS 4 (SH. 2 OF 2)

RUMUJI NODE – GENERAL ARRANGEMENT – NEW LOCATION OF PIG TRAP RECEIVER A-0221 & ASSOCIATED PIPING

RUMUJI NODE – GENERAL ARRANGEMENT – NEW TIE-IN TO GTS1 VIA EXISTING 20’’ SPDC FUTURE CONNECTION (OPTION)

NG22 180 CST CPY 300038

NG22 180 CST CPY 300039

Page 4: Pipeline and Piping Deliverables

OBITIEOBITIEOBITIEOBITIEOBITIEOBITIE

TECHNICAL SPECIFICATION FOR PIPELINE ROUTE TOPOGRAPHIC SURVEY

Page 5: Pipeline and Piping Deliverables

TYPICAL RIVER BANK PREVENTION AGAINST POST CONSTRUCTION EROSION

By Client

By ClientBy Client

TECHNICAL REQUISITION FOR FORGINGS & BARRED TEES / ALTERNATE 42"

TECHNICAL REQUISITION FOR 36" MANUAL BALL VALVES ON PIPELINE / ALTERNATE 42"

PARTICULAR PROJECT SPECIFICATION FOR PIG LAUNCHER/RECEIVER / ALTERNATE 42"

OBITIEOBITIEOBITIEUBETAUBETAUBETAUBETAUBETAUBETAUBETAUBETAUBETAUBETA

RUMUJIRUMUJIRUMUJI

NOT APPLICABLE

Page 6: Pipeline and Piping Deliverables

RUMUJIRUMUJIRUMUJIRUMUJIRUMUJIRUMUJIRUMUJI

UBETA

UBETA

UBETA

UBETA

RUMUJI

RUMUJI

RUMUJI

RUMUJI

Page 7: Pipeline and Piping Deliverables

OML 58 Upgrade Documents - OBITE TC

APPENDIX 0OML58 Upgrade Documents (for information only)

Client Number Document Number Rev.

INSTRUMENTATION

NG 22 082 SOF INS DTS 000014 S4001303-200-INS-10.17-00014 1

NG 22 082 SOF INS DTS 000015 S4001303-200-INS-10.17-00015 1

NG 22 085 SOF INS DTS 000092 S4001304-500-INS-10.17-00092 1

NG 22 085 SOF INS DTS 000093 S4001304-500-INS-10.17-00093 1

NG 22 085 SOF INS SPE 000095 S4001304-500-INS-10.04-00095 2

PROCESS

NG 22 082 SOF PRO DTS 026010 S4001303-200-PCS-10.17-26010 2

NG 22 082 SOF PRO PFD 032606 S4001303-200-PCS-10.11-32606 2

NG 22 082 SOF PRO PHI 020202 S4001303-200-PCS-10.65-20202 5

NG 22 082 SOF PRO PID 012655 S4001303-200-PCS-10.12-12655 3

NG 22 082 SOF PRO PID 012656 S4001303-200-PCS-10.12-12656 6

NG 22 082 SOF PRO PID 012656 S4001303-200-PCS-10.12-12656 6

NG 22 085 SOF PRO PFD 032043 S4001304-500-PCS-10.11-32043 3

NG 22 085 SOF PRO DTS 057018 S4001304-500-PCS-10.17-57018 3

NG 22 085 SOF PRO PID 012711 S4001304-500-PCS-10.12-12711 3

PIPING, VALVES & VESSELS

NG 22 082 SOF PVV GER 002023 S4001303-200-PIP-10.13-02023 9

NG 22 082 SOF PVV LAY 002046 S4001303-200-PIP-10.13-02046 4

NG 22 082 SOF PVV LAY 002047 S4001303-200-PIP-10.13-02047 4

NG 22 082 SOF PVV LAY 002048 S4001303-200-PIP-10.13-02048 4

NG 22 082 SOF PVV LAY 002049 S4001303-200-PIP-10.13-02049 4

NG 22 085 SOF PVV LIS 005060 S4001304-500-PIP-10.19-05060 1

APPENDIX 1List of FEED Documents (issued during Basic Engineering)

Client Number Document Number Rev.

CIVIL ENGINEERING

NG 22 84 SOF CIV ANL 000001 S40021-000-CIV-10.01-00001 2

NG 22 84 SOF CIV SPE 000001 S40021-000-CIV-10.04-00001 2

NG 22 84 SOF CIV SPE 000003 S40021-000-CIV-10.04-00003 1

NG 22 84 SOF CIV SPE 000004 S40021-000-CIV-10.04-00004 2

Page 8: Pipeline and Piping Deliverables

NG 22 84 SOF CIV SPE 000005 S40021-000-CIV-10.04-00005 2

NG 22 84 SOF CIV SPE 000006 S40021-400-CIV-10.04-00001 2

NG 22 84 SOF CIV GEA 010002 S40021-400-CIV-10.07-10002 1

NG 22 84 SOF CIV MTO 010001 S40021-400-CIV-10.16-10001 1

NG 22 84 SOF CIV SPE 000007 S40021-500-CIV-10.04-00001 1

NG 22 84 SOF CIV GEA 010002 S40021-500-CIV-10.07-10002 1

NG 22 84 SOF CIV MTO 010002 S40021-500-CIV-10.16-10001 1

CORROSION

NG 22 84 SOF COR REP 001001 S40021-000-COR-10.01-00001 2

NG 22 84 SOF COR SPE 000003 S40021-000-COR-10.04-00003 3

NG 22 84 SOF COR SPE 010001 S40021-000-COR-10.04-10001 2

NG 22 84 SOF COR SPE 010002 S40021-000-COR-10.04-10002 2

NG 22 84 SOF COR SPE 010004 S40021-000-COR-10.04-10004 1

NG 22 84 SOF COR REP 000001 S40021-000-COR-10.65-00001 3

NG 22 84 SOF COR REP 002001 S40021-000-PCC-10.01-00001 3

NG 22 84 SOF COR SPE 002001 S40021-000-PCC-10.04-00001 2

NG 22 84 SOF COR SPE 002002 S40021-000-PCC-10.04-00002 2

NG 22 84 SOF COR SPE 002003 S40021-000-PCC-10.04-00003 1

NG 22 84 SOF COR SPE 012004 S40021-000-PCC-10.04-10004 2

NG 22 84 SOF COR CAL 012001 S40021-000-PCC-10.05-10001 1

NG 22 84 SOF COR DRW 002001 S40021-000-PCC-10.07-00001 1

NG 22 84 SOF COR DRW 002002 S40021-000-PCC-10.07-00002 2

NG 22 84 SOF COR MTO 012001 S40021-000-PCC-10.16-10001 1

NG 22 84 SOF COR REQ 012001 S40021-000-PCC-10.21-10001 1

NG 22 84 SOF COR SPE 004001 S40021-000-WEL-10.04-00001 2

NG 22 84 SOF COR SPE 004002 S40021-000-WEL-10.04-00002 1

CONSTRUCTION

NG 22 84 SOF CNS SPE 000001 S40021-000-CNS-10.04-00001 4

NG 22 84 SOF CNS SPE 000003 S40021-000-CNS-10.04-00003 3

NG 22 84 SOF CNS SPE 000004 S40021-000-CNS-10.04-00004 3

NG 22 84 SOF CNS SPE 010002 S40021-000-CNS-10.04-10002 1

NG 22 84 SOF CNS TYP 000001 S40021-000-CNS-10.07-00001 2

ELECTRICAL

NG 22 84 SOF ELE PRC 000001 S40021-000-ELE-05.81-00001 1

NG 22 84 SOF ELE PRC 000001 S40021-000-ELE-10.01-00001 2

NG 22 84 SOF ELE SPE 000001 S40021-000-ELE-10.04-00001 3

NG 22 84 SOF ELE SPE 000002 S40021-000-ELE-10.04-00002 3

NG 22 84 SOF ELE STD 000001 S40021-000-ELE-10.07-00001 1

NG 22 84 SOF ELE STD 000002 S40021-000-ELE-10.07-00002 1

NG 22 84 SOF ELE REP 000001 S40021-000-ELE-10.65-00001 0

NG 22 84 SOF ELE SLD 000401 S40021-400-ELE-10.07-00001 2

NG 22 84 SOF ELE LAY 000402 S40021-400-ELE-10.07-00002 1

NG 22 84 SOF ELE LAY 000403 S40021-400-ELE-10.07-00003 1

NG 22 84 SOF ELE LIS 000401 S40021-400-ELE-10.08-00001 2

NG 22 84 SOF ELE MTO 000401 S40021-400-ELE-10.16-00001 2

NG 22 84 SOF ELE MAN 000401 S40021-400-ELE-10.19-00001 3

NG 22 84 SOF ELE SLD 000501 S40021-500-ELE-10.07-00001 2

NG 22 84 SOF ELE LAY 010502 S40021-500-ELE-10.07-10002 1

Page 9: Pipeline and Piping Deliverables

NG 22 84 SOF ELE LAY 010503 S40021-500-ELE-10.07-10003 1

NG 22 84 SOF ELE LIS 000501 S40021-500-ELE-10.08-00001 2

NG 22 84 SOF ELE MTO 010501 S40021-500-ELE-10.16-10001 1

NG 22 84 SOF ELE MAN 000501 S40021-500-ELE-10.19-00001 3

GEOTECHNIC, GEOPHYSIC, OCEANO METEO

NG 22 84 SOF CIV SPE 000002 S40021-000-CIV-10.04-00002 2

NG 22 84 SOF GEO REQ 000001 S40021-000-CIV-10.21-00001 2

NG 22 84 SOF GEO LAY 000001 S40021-400-CIV-10.07-00001 2

NG 22 84 SOF GEO LAY 000002 S40021-500-CIV-10.07-00001 2

HSE

NG 22 84 SOF HSE ANL 000001 S40021-000-SAF-10.01-00001 2

NG 22 84 SOF HSE SPE 000001 S40021-000-SAF-10.04-00001 3

NG 22 84 SOF HSE LIS 000001 S40021-000-SAF-10.08-00001 2

NG 22 84 SOF HSE REP 000001 S40021-000-SAF-10.65-00001 2

NG 22 84 SOF HSE REP 000002 S40021-000-SAF-10.65-00002 2

NG 22 84 SOF HSE REP 000003 S40021-000-SAF-10.65-00003 1

NG 22 84 SOF HSE REP 000004 S40021-000-SAF-10.65-00004 2

NG 22 84 SOF HSE REP 000005 S40021-000-SAF-10.65-00005 3

NG 22 84 SOF HSE REP 000006 S40021-000-SAF-10.63-00001 3

NG 22 84 SOF HSE DRW 010401 S40021-400-SAF-10.07-10001 1

NG 22 84 SOF HSE DRW 010402 S40021-400-SAF-10.07-10002 1

NG 22 84 SOF HSE LIS 000401 S40021-400-SAF-10.08-00001 2

NG 22 84 SOF HSE DRW 010501 S40021-500-SAF-10.07-10001 1

NG 22 84 SOF HSE DRW 010502 S40021-500-SAF-10.07-10002 1

NG 22 84 SOF HSE LIS 000501 S40021-500-SAF-10.08-00001 2

INSTRUMENTATION

NG 22 84 SOF INS PRC 000001 S40021-000-INS-05.81-00001 1

NG 22 84 SOF INS REP 000002 S40021-000-INS-10.01-00001 1

NG 22 84 SOF INS SPE 000003 S40021-000-INS-10.04-00001 1

NG 22 84 SOF INS SPE 000004 S40021-000-INS-10.04-00002 2

NG 22 84 SOF INS SPE 000005 S40021-000-INS-10.04-00003 3

NG 22 84 SOF INS SPE 000007 S40021-000-INS-10.04-00005 2

NG 22 84 SOF INS SPE 000008 S40021-000-INS-10.04-00006 2

NG 22 84 SOF INS SPE 000009 S40021-000-INS-10.04-00007 2

NG 22 84 SOF INS SPE 000039 S40021-000-INS-10.04-00008 2

NG 22 84 SOF INS SPE 010006

S40021-000-INS-10.04-10004

10

NG 22 84 SOF INS SPE 010040 S40021-000-INS-10.04-10009 1

NG 22 84 SOF INS SPE 000010 S40021-000-INS-10.14-00001 3

NG 22 84 SOF INS REQ 000013 S40021-000-INS-10.21-00002 3

NG 22 84 SOF INS REQ 010012 S40021-000-INS-10.21-10001 2

NG 22 84 SOF INS REP 000014 S40021-000-INS-10.65-00001 0

NG 22 84 SOF INS LAY 000015 S40021-200-INS-10.07-00001 2

NG 22 84 SOF INS LIS 000017 S40021-200-INS-10.08-00001 3

NG 22 84 SOF INS LIS 000018 S40021-200-INS-10.08-00002 3

NG 22 84 SOF INS SPE 000019 S40021-200-INS-10.09-00001 1

NG 22 84 SOF INS MTO 000020 S40021-200-INS-10.16-00001 1

NG 22 84 SOF INS DTS 010021 S40021-200-INS-10.17-10001 2

Page 10: Pipeline and Piping Deliverables

NG 22 84 SOF INS LAY 000023 S40021-400-INS-10.07-00001 2

NG 22 84 SOF INS LAY 000024 S40021-400-INS-10.07-00002 2

NG 22 84 SOF INS LIS 000025 S40021-400-INS-10.08-00001 2

NG 22 84 SOF INS SPE 000026 S40021-400-INS-10.08-00002 1

NG 22 84 SOF INS SPE 000027 S40021-400-INS-10.09-00001 1

NG 22 84 SOF INS MTO 000028 S40021-400-INS-10.16-00001 1

NG 22 84 SOF INS DTS 010029 S40021-400-INS-10.17-10001 1

NG 22 84 SOF INS LAY 000031 S40021-500-INS-10.07-00001 2

NG 22 84 SOF INS LAY 000032 S40021-500-INS-10.07-00002 2

NG 22 84 SOF INS LIS 000033 S40021-500-INS-10.08-00001 2

NG 22 84 SOF INS SPE 000034 S40021-500-INS-10.08-00002 1

NG 22 84 SOF INS SPE 000035 S40021-500-INS-10.09-00001 1

NG 22 84 SOF INS MTO 000036 S40021-500-INS-10.16-00001 1

NG 22 84 SOF INS DTS 010037 S40021-500-INS-10.17-10001 1

OPERATION

NG 22 84 ELF OPE PRC 000001 S40021-000-CPY-10.65-00001 1

NG 22 84 ELF OPE PRC 000002 S40021-000-CPY-10.65-00002 0

PAINTING

NG 22 84 SOF COR REP 003001 S40021-000-PAI-10.01-00001 1

NG 22 84 SOF COR SPE 003001 S40021-000-PAI-10.04-00001 3

NG 22 84 SOF COR SPE 003002 S40021-000-PAI-10.04-00002 2

NG 22 84 SOF COR SPE 003003 S40021-000-PAI-10.04-00003 2

NG 22 84 SOF COR SPE 003004 S40021-000-PAI-10.04-00004 2

PROJECT MANAGEMENT

NG 22 84 SOF PJM REP 010002

S40021-000-PMT-01.60-10002

20

NG 22 84 SOF PJM REG 010001 S40021-000-PMT-02.08-10001 1

NG 22 84 SOF PJM PRC 000001 S40021-000-PMT-05.03-00001 2

NG 22 84 SOF PJM PRC 000002 S40021-000-PMT-05.03-00002 2

NG 22 84 SOF PJM PRC 000003 S40021-000-PMT-05.03-00003 2

NG 22 84 SOF QUA PRC 100004 S40021-000-PMT-05.03-00004 2

NG 22 84 SOF PJM PRC 000005 S40021-000-PMT-05.03-00005 2

NG 22 84 SOF PJM PRC 100001 S40021-000-PMT-05.81-00001 2

NG 22 84 SOF PJM PRC 100002

S40021-000-PMT-05.81-00002

20

NG 22 84 SOF QUA PRC 100003 S40021-000-PMT-05.81-00003 3

NG 22 84 SOF PJM PRN 100004 S40021-000-PMT-05.81-00004 2

NG 22 84 SOF QUA PRC 100005 S40021-000-PMT-05.81-00005 3

NG 22 84 SOF QUA PRC 100006

S40021-000-PMT-05.81-00006

20

NG 22 84 SOF QUA PRC 100007 S40021-000-PMT-05.81-00007 3

NG 22 84 SOF QUA PRC 100008 S40021-000-PMT-05.81-00008 3

NG 22 84 SOF PJM PRN 100009 S40021-000-PMT-05.81-00009 3

NG 22 84 SOF PJM PRN 100010 S40021-000-PMT-05.81-00010 3

NG 22 84 SOF PJM PRN 100011 S40021-000-PMT-05.81-00011 3

NG 22 84 SOF PJM PRN 100012 S40021-000-PMT-05.81-00012 3

NG 22 84 SOF PJM SPE 000002 S40021-000-PMT-10.04-00002 2

NG 22 84 SOF PJM SPE 010001 S40021-000-PMT-10.04-10001 2

Page 11: Pipeline and Piping Deliverables

NG 22 84 SOF PJM LIS 000001 S40021-000-PMT-10.08-00001 2

NG 22 84 SOF PJM LIS 010002 S40021-000-PMT-10.08-10002 1

NG 22 84 SOF PJM PLN 010001 S40021-000-PMT-81.10-10001 1

PIPELINES & RISERS

NG 22 84 SOF PPL ANL 000001 S40021-000-PPL-10.01-00001 2

NG 22 84 SOF PPL SPE 000001 S40021-000-PPL-10.04-00001 3

NG 22 84 SOF PPL SPE 000002 S40021-000-PPL-10.04-00002 3

NG 22 84 SOF PPL SPE 000003 S40021-000-PPL-10.04-00003 3

NG 22 84 SOF PPL SPE 000004 S40021-000-PPL-10.04-00004 2

NG 22 84 SOF PLR CAL 010001 S40021-000-PPL-10.05-10001 1

NG 22 84 SOF PPL DRW 000001 S40021-000-PPL-10.07-00001 4

NG 22 84 SOF PPL DRW 000002 S40021-000-PPL-10.07-00002 3

NG 22 84 SOF PPL DRW 000003 S40021-000-PPL-10.07-00003 2

NG 22 84 SOF PPL DRW 000004 S40021-000-PPL-10.07-00004 3

NG 22 84 SOF PPL DRW 000005 S40021-000-PPL-10.07-00005 2

NG 22 84 SOF PPL DRW 000006 S40021-000-PPL-10.07-00006 2

NG 22 84 SOF PPL DRW 000007 S40021-000-PPL-10.07-00007 2

NG 22 84 SOF PPL DRW 000008 S40021-000-PPL-10.07-00008 2

NG 22 84 SOF PPL DRW 000009 S40021-000-PPL-10.07-00009 2

NG 22 84 SOF PPL DRW 000010 S40021-000-PPL-10.07-00010 2

NG 22 84 SOF PPL DRW 000011 S40021-000-PPL-10.07-00011 3

NG 22 84 SOF PPL DRW 000012 S40021-000-PPL-10.07-00012 2

NG 22 84 SOF PPL DRW 000013 S40021-000-PPL-10.07-00013 2

NG 22 84 SOF PPL DRW 000014 S40021-000-PPL-10.07-00014 2

NG 22 84 SOF PPL DRW 000015 S40021-000-PPL-10.07-00015 2

NG 22 84 SOF PPL DRW 000016 S40021-000-PPL-10.07-00016 2

NG 22 84 SOF PPL DRW 000017 S40021-000-PPL-10.07-00017 2

NG 22 84 SOF PPL DRW 000018 S40021-000-PPL-10.07-00018 2

NG 22 84 SOF PPL DRW 000019 S40021-000-PPL-10.07-00019 2

NG 22 84 SOF PPL DRW 000020 S40021-000-PPL-10.07-00020 2

NG 22 84 SOF PPL TYP 000030 S40021-000-PPL-10.07-00030 2

NG 22 84 SOF PPL TYP 000031

S40021-000-PPL-10.07-00031

20

NG 22 84 SOF PPL TYP 000032

S40021-000-PPL-10.07-00032

20

NG 22 84 SOF PPL TYP 000033 S40021-000-PPL-10.07-00033 4

NG 22 84 SOF PPL TYP 000034 S40021-000-PPL-10.07-00034 2

NG 22 84 SOF PPL TYP 000035 S40021-000-PPL-10.07-00035 3

NG 22 84 SOF PPL TYP 000036 S40021-000-PPL-10.07-00036 2

NG 22 84 SOF PPL TYP 000037 S40021-000-PPL-10.07-00037 3

NG 22 84 SOF PPL TYP 000038 S40021-000-PPL-10.07-00038 2

NG 22 84 SOF PPL TYP 000039 S40021-000-PPL-10.07-00039 2

NG 22 84 SOF PPL TYP 000040 S40021-000-PPL-10.07-00040 2

NG 22 84 SOF PPL TYP 000041 S40021-000-PPL-10.07-00041 2

NG 22 84 SOF PPL TYP 000042 S40021-000-PPL-10.07-00042 3

NG 22 84 SOF PLR MTO 010001 S40021-000-PPL-10.16-10001 1

NG 22 84 SOF PPL MTO 010002 S40021-000-PPL-10.16-10002 2

NG 22 84 SOF PPL DTS 000002 S40021-000-PPL-10.17-00002 3

Page 12: Pipeline and Piping Deliverables

NG 22 84 SOF PLR DTS 010001 S40021-000-PPL-10.17-00001 1

NG 22 84 SOF PPL REQ 000001 S40021-000-PPL-10.21-00001 2

NG 22 84 SOF PPL REQ 010002 S40021-000-PPL-10.21-10002 1

NG 22 84 SOF PPL REQ 010003 S40021-000-PPL-10.21-10003 1

PROCESS

NG 22 84 SOF PRO REP 000001 S40021-000-PCS-10.01-00001 2

NG 22 84 SOF PRO REP 010002 S40021-000-PCS-10.04-10001 1

NG 22 84 SOF PRO LIS 000001 S40021-000-PCS-10.08-00001 2

NG 22 84 SOF PRO BLD 010001 S40021-000-PCS-10.11-10001 2

NG 22 84 SOF PRO PFD 010002 S40021-000-PCS-10.11-10002 2

NG 22 84 SOF PRO PFD 010003 S40021-000-PCS-10.11-10003 1

NG 22 84 SOF PRO PID 000001 S40021-000-PCS-10.12-00001 3

NG 22 84 SOF PRO BLD 000002 S40021-000-PCS-10.14-00001 2

NG 22 84 SOF PRO DTS 010001 S40021-000-PCS-10.17-10001 1

NG 22 84 SOF PRO REP 000003 S40021-000-PCS-10.65-00001 2

NG 22 84 SOF PRO REP 000004 S40021-000-PCS-10.65-00002 2

NG 22 84 SOF PRO REP 000006 S40021-000-PCS-10.65-00004 3

NG 22 84 SOF PRO REP 000007 S40021-000-PCS-10.65-00005 2

NG 22 84 SOF PRO REP 010005 S40021-000-PCS-10.65-10003 1

NG 22 84 SOF PRO DTS 010002 S40021-200-PCS-10.17-10001 1

NG 22 84 SOF PRO DTS 010003 S40021-500-PCS-10.17-10001 1

NG 22 84 SOF PRO PID 010401 S40021-400-PCS-10.12-10001 1

NG 22 84 SOF PRO PID 010501

S40021-500-PCS-10.12-10001

20

NG 22 84 SOF PRO PID 010502

S40021-500-PCS-10.12-10002

10PIPING, VALVES & VESSELS

NG 22 84 SOF PVV PRC 000001 S40021-000-PIP-05.81-00001 1

NG 22 84 SOF PVV ANL 000001 S40021-000-PIP-10.01-00001 4

NG 22 84 SOF PVV SPE 000003 S40021-000-PIP-10.04-00003 4

NG 22 84 SOF PVV SPE 010004 S40021-000-PIP-10.04-10001 3

NG 22 84 SOF PIP SPE 010002 S40021-000-PIP-10.04-10002 3

NG 22 84 SOF PVV STD 000001 S40021-000-PIP-10.06-00001 3

NG 22 84 SOF PVV STD 010002 S40021-000-PIP-10.06-10002 1

NG 22 84 SOF PVV DTS 010003 S40021-000-PIP-10.17-10001 3

NG 22 84 SOF PVV DTS 010004 S40021-000-PIP-10.17-10002 2

NG 22 84 SOF PVV REQ 010003 S40021-000-PIP-10.21-10001 2

NG 22 84 SOF PVV REQ 010002 S40021-000-PIP-10.21-10002 1

NG 22 84 SOF PVV REP 000001 S40021-000-PIP-10.65-00001 0

NG 22 84 SOF PVV ANL 000002 S40021-000-EQP-10.01-00001 3

NG 22 84 SOF PVV SPE 010001 S40021-000-EQP-10.04-10001 1

NG 22 84 SOF PVV REQ 010001 S40021-000-EQP-10.21-10001 1

NG 22 84 SOF PVV DTS 010001 S40021-200-EQP-10.17-10001 1

NG 22 84 SOF PVV DTL 010001 S40021-200-PIP-10.07-10001 1

NG 22 84 SOF PVV LIS 010201 S40021-200-PIP-10.08-10001 2

NG 22 84 SOF PVV MTO 010201 S40021-200-PIP-10.16-10001 4

NG 22 84 SOF PVV CAL 010401 S40021-400-PIP-10.05-10001 1

NG 22 84 SOF PIP LAY 000403 S40021-400-PIP-10.07-00003 2

Page 13: Pipeline and Piping Deliverables

NG 22 84 SOF PVV GEA 010401 S40021-400-PIP-10.07-10001 1

NG 22 84 SOF PVV GEA 010402 S40021-400-PIP-10.07-10002 1

NG 22 84 SOF PVV LIS 000402 S40021-400-PIP-10.08-00002 3

NG 22 84 SOF PVV LIS 010401 S40021-400-PIP-10.08-10001 1

NG 22 84 SOF PIP LAY 010401 S40021-400-PIP-10.13-10001 1

NG 22 84 SOF PVV MTO 010401 S40021-400-PIP-10.16-10001 3

NG 22 84 SOF PVV MAM 000401 S40021-400-PIP-10.19-00001 4

NG 22 84 SOF PVV ISO 000401 S40021-400-PIP-10.74-00001 2

NG 22 84 SOF PVV DTS 010502 S40021-500-EQP-10.17-10002 1

NG 22 84 SOF PVV CAL 010501 S40021-500-PIP-10.05-10001 1

NG 22 84 SOF PIP LAY 000503 S40021-500-PIP-10.07-00003 2

NG 22 84 SOF PVV GEA 010501 S40021-500-PIP-10.07-10001 1

NG 22 84 SOF PVV GEA 010502 S40021-500-PIP-10.07-10002 1

NG 22 84 SOF PVV LIS 000502 S40021-500-PIP-10.08-00002 3

NG 22 84 SOF PVV LIS 010501 S40021-500-PIP-10.08-10001 1

NG 22 84 SOF PIP LAY 010501 S40021-500-PIP-10.13-10001 1

NG 22 84 SOF PVV MTO 010501 S40021-500-PIP-10.16-10001 2

NG 22 84 SOF PVV MAM 000501 S40021-500-PIP-10.19-00001 3

NG 22 84 SOF PVV ISO 000501 S40021-500-PIP-10.74-00001 2

APPENDIX 2COMPANY Documents (issued after Basic Engineering)

Client Number Comments Rev.

HSE

NG22 180 HSE CPY 001000 0

INSTRUMENTATION

NG 22 180 INS CPY 001077 Superseding NG 22 84 SOF INS 1

OPERATION

NG 22 180 OPE CPY 000872 Superseding NG 22 84 ELF OPE 0

NG 22 180 OPE CPY 000873 Superseding NG 22 84 ELF OPE 0

NG 22 280 OPE CPY 000127 Refers to TB No 61 0

PROJECT MANAGEMENT

NG 22 080 PJM CPY 000003 Refers to TB No 61 3

NG 22 080 PJM CPY 000002 Superseding NG 22 84 SOF PJM P 3

NG22-280-PJM-CPY-000005 Refers to TB No 61 1

NG 22 080 PJM CPY 000007 2

NG 22 180 PJM CPY 000874 Superseding NG 22 84 SOF PJM 0

NG 22 080 SOF LCS PRC 000001 Refers to TB No 61 0

PIPELINES & RISERS

NG 22 184 PLR CPY 000001 Refers to TB No 63 for Rev00 1

NG 22 184 PLR CPY 000002 Refers to TB No 63 for Rev00 1

NG 22 184 PLR CPY 000003 Refers to TB No 63 for Rev00 1

Page 14: Pipeline and Piping Deliverables

NG 22 184 PLR CPY 000004 Refers to TB No 63 for Rev00 1

NG 22 186 PLR CPY 000006 Refers to TB No 64 for Rev00 1

NG 22 186 PLR CPY 000007 Refers to TB No 64 for Rev00 1

NG 22 186 PLR CPY 000008 Refers to TB No 64 for Rev00 1

NG 22 186 PLR CPY 000009 Refers to TB No 64 for Rev00 1

NG 22 184 PLR CPY 000100 0

NG 22 180 PLR CPY 000100 0

Superseding NG22 84 SOF PPL TYP0Superseding NG22 84 SOF PPL TYP0

PROCESS

NG 22 184 PRO CPY 000005 Marked up P&ID additional to NG 1

NG 22 186 PRO CPY 000010 Marked up P&ID additional to NG 1

NG 22 186 PRO CPY 000011 Marked up P&ID additional to NG 1

NG 22 182 PRO CPY 000012 Marked up P&ID additional to NG 1

SECURITY

NG 22 180 SEC CPY 000242 2

TELECOMMUNICATIONS

NG 22 180 TEL CPY 000160 1

NG 22 180 TEL CPY 000161 0

NG 22 180 TEL CPY 000163 0

NG22 180 CST CPY 300038

NG22 180 CST CPY 300039

Page 15: Pipeline and Piping Deliverables

OML 58 Upgrade Documents - OBITE TC

APPENDIX 0OML58 Upgrade Documents (for information only)

Title

INSTRUMENTATION

OBITE TC - FLOW METERS (METERING)

OBITE TC - ANALYSERS (METERING)

IPP GSU - FLOW METERS (METERING)

IPP GSU - ANALYSERS (METERING)

IPP GSU - SPECIFICATION FOR BACK-UP METERING SYSTEM (85 UA 701)

PROCESS

OBITE TC – EXPORT GAS METERING

OBITE TC – GAS MIXING AND EXPORT

OBITE TC – MAIN LOOPS PROCESS CONTROL PHILOSOPHY

NOT APPLICABLE

IPP GSU - GENERAL BLOCK FLOW

IPP GSU - BACK UP GAS METERING (85 UA 701 A/B)

IPP GSU - BACK UP GAS METERING (85 UA 701)

PIPING, VALVES & VESSELS

OBITE TC AREA ARRANGEMENT PLOT PLAN AvailableOBITE TC - PIPING LAYOUT AREA 07 AvailableOBITE TC - PIPING LAYOUT AREA 08 AvailableOBITE TC - PIPING LAYOUT AREA 09 AvailableOBITE TC - PIPING LAYOUT AREA 10 AvailableIPP-GSU TIE-IN BOOK Available

APPENDIX 1List of FEED Documents (issued during Basic Engineering)

Title

CIVIL ENGINEERING

CIVIL & STRUCTURE GAP ANALYSIS REPORT

CIVIL & STRUCTURE BASIS OF DESIGN

GENERAL SPECIFICATION FOR EARTHWORKS, UNDERGROUND NETWORKS, ROADS, PAVING AND FENCING

GENERAL SPECIFICATION FOR REINFORCED CONCRETE WORK CONSTRUCTION

Native Files

status

OBITE TC - TRAIN 2 EXPORT GAS METERING NOT APPLICABLE

OBITE TC – TRAIN 2 GAS EXPORT

PID -TRAIN 2 - GAS EXPORT – SEE ADDITIONAL MARKED UP PID NG 22 184 PRO CPY 000012

Page 16: Pipeline and Piping Deliverables

GENERAL SPECIFICATION FOR STEEL STRUCTURE

DESCRIPTION OF UBETA CIVIL & STRUCTURAL WORKS

UBETA GENERAL CIVIL LAYOUT DRAWING / ALTERNATE 42"

UBETA CIVIL & STRUCTURE BILL OF QUANTITIES FOR COST ESTIMATE / ALTERNATE 42"

DESCRIPTION OF RUMUJI CIVIL & STRUCTURAL WORKS

RUMUJI GENERAL CIVIL LAYOUT DRAWING / ALTERNATE 42"

RUMUJI CIVIL & STRUCTURE BILL OF QUANTITIES FOR COST ESTIMATE / ALTERNATE 42"

CORROSION

MATERIAL & CORROSION GAP ANALYSIS REPORT

PARTICULAR PROJECT SPECIFICATION FOR 42" CARBON STEEL FLANGES/ ALTERNATE 42"

PARTICULAR PROJECT SPECIFICATION FOR 42" CARBON STEEL LINEPIPE / ALTERNATE 42"

PARTICULAR PROJECT SPECIFICATION FOR 42" HOT INDUCTION BENDS / ALTERNATE 42"

PROJECT PARTICULAR SPECIFICATION FOR PIPELINE TEES AND FITTINGS / ALTERNATE 42"

MATERIALS SELECTION REPORT

CATHODIC PROTECTION GAP ANALYSIS REPORT

CP DESIGN GENERAL PHILOSOPHY

SPECIFICATION FOR ROUTE SURVEY

CP MATERIALS SPECIFICATION

CP ISOLATING JOINTS SPECIFICATION / ALTERNATE 42"

CATHODIC PROTECTION CALCULATION NOTE / ALTERNATE 42"

CP GROUND BED LAYOUT - TYPICAL DRAWING BOOK

CP MATERIALS INSTALLATION - TYPICAL DRAWING BOOK

CATHODIC PROTECTION MTO FOR COST ESTIMATE / ALTERNATE 42"

TECHNICAL REQUISITION - ISOLATION JOINT / ALTERNATE 42"

PROJECT PARTICULAR WELDING SPECIFICATION FOR PIPELINE

PROJECT PARTICULAR SPECIFICATION FOR PIPING WELDING

CONSTRUCTION

PIPELINE CONSTRUCTION SPECIFICATION

NODE FACILITIES CONSTRUCTION SPECIFICATION

PIPELINE PRE-COMMISSIONING SPECIFICATION

PIPELINE CLEANING, GAUGING & HYDROTESTING SPECIFICATION / ALTERNATE 42"

ACCESS PLAN

ELECTRICAL

ELECTRICAL PROCEDURE FOR NODE SITE SURVEY

ELECTRICAL GAP ANALYSIS REPORT

ELECTRICAL DESIGN AND INSTALLATION SPECIFICATION

PROJECT PARTICULAR ELECTRICAL SPECIFICATION FOR POWER GENERATION

LIGHTING TYPICAL DRAWING

EARTHING TYPICAL DRAWING

ELECTRICAL REPORT OF NODE SITE SURVEY

UBETA SINGLE LINE DIAGRAM

UBETA LIGHTING LAYOUT AND MAIN CABLE ROUTING DRAWING

UBETA EARTHING NETWORK LAYOUT DRAWING

UBETA POWER BALANCE AND CONSUMERS LIST

UBETA ELECTRICAL MTO FOR COST ESTIMATE

UBETA ELECTRICAL TIE-IN BOOK

RUMUJI SINGLE LINE DIAGRAM

RUMUJI LIGHTING LAYOUT AND MAIN CABLE ROUTING DRAWING / ALTERNATE 42"

Page 17: Pipeline and Piping Deliverables

RUMUJI EARTHING NETWORK LAYOUT DRAWING / ALTERNATE 42"

RUMUJI POWER BALANCE AND CONSUMERS LIST

RUMUJI ELECTRICAL MTO FOR COST ESTIMATE / ALTERNATE 42"

RUMUJI ELECTRICAL TIE-IN BOOK

GEOTECHNIC, GEOPHYSIC, OCEANO METEO

GEOTECHNICAL NODE SITE SURVEY

TECHNICAL REQUISITION FOR GEOTECHNICAL NODE SITE SURVEY

UBETA GEOTECHNICAL SURVEY - BOREHOLES LAYOUT DRAWING

RUMUJI GEOTECHNICAL SURVEY - BOREHOLES LAYOUT DRAWING

HSE

SAFETY GAP ANALYSIS REPORT

SPECIFICATION FOR FIRE DETECTION & SAFETY EQUIPMENT IN ELECTRICAL SHELTER

HAZARD EQUIPMENT TABLE

SAFETY CONCEPT

SAFETY PLAN

SAFETY DOSSIER

HAZARD ANALYSIS

HAZID1 & HAZOP1/PTR1 AND HAZOP2/PTR2 ACTIONS TRACKING SYSTEM

HAZID 1 REPORT

UBETA HAZARDOUS AREA CLASSIFICATION DRAWING / ALTERNATE 42"

UBETA SAFETY EQUIPMENT & ESCAPE ROUTES LAYOUT DRAWING / ALTERNATE 42"

UBETA SAFETY EQUIPMENT LIST

RUMUJI HAZARDOUS AREA CLASSIFICATION DRAWING / ALTERNATE 42"

RUMUJI SAFETY EQUIPMENT & ESCAPE ROUTES LAYOUT DRAWING / ALTERNATE 42"

RUMUJI SAFETY EQUIPMENT LIST

INSTRUMENTATION

CONTROL & INSTRUMENT PROCEDURE FOR NODE SITE SURVEY

CONTROL & INSTRUMENT GAP ANALYSIS REPORT

CONTROL & INSTRUMENT DESIGN SPECIFICATION

CONTROL & INSTRUMENT INSTALLATION SPECIFICATION

TECHNICAL SPECIFICATION FOR EXTENSION OF SCADA

TECHNICAL SPECIFICATION FOR EXTENSION OF CCTV

TECHNICAL SPECIFICATION FOR FIBRE OPTIC CABLE

TECHNICAL SPECIFICATION FOR LAYING OF FIBRE OPTIC CABLE

INSTRUMENTATION & CONTROL PHILOSOPHY

SUPERSEDED BY NG 22 180 INS CPY 001077

SPECIFICATION FOR ON/OFF VALVES ACTUATORS

SCADA / CCTV / LSDS ARCHITECTURE DIAGRAM

TECHNICAL REQUISITION FOR FIBRE OPTIC CABLE

TECHNICAL REQUISITION FOR ACTUATED PIPELINE VALVES / ALTERNATE 42"

CONTROL & INSTRUMENT REPORT OF NODE SITE SURVEY

OBITE - CONTROL EQUIPMENT IN TELECOM SHELTER LAYOUT DRAWING

OBITE INSTRUMENT LIST

OBITE - SCADA I/O LIST

OBITE INSTRUMENT CABLE LIST

OBITE - CONTROL & INSTRUMENT MTO FOR COST ESTIMATE

OBITE ON/OFF VALVE ACTUATOR DATA SHEET / ALTERNATE 42"

TECHNICAL SPECIFICATION FOR LSDS / ALTERNATE 42"

Page 18: Pipeline and Piping Deliverables

UBETA - CONTROL EQUIPMENT IN TELECOM SHELTER LAYOUT DRAWING

UBETA - MAIN CABLE ROUTING DRAWING

UBETA INSTRUMENT LIST

UBETA - SCADA I/O LIST

UBETA INSTRUMENT CABLE LIST

UBETA - CONTROL & INSTRUMENT MTO FOR COST ESTIMATE

UBETA ON/OFF VALVE ACTUATOR DATA SHEET / ALTERNATE 42"

RUMUJI - CONTROL EQUIPMENT IN TELECOM SHELTER LAYOUT DRAWING

RUMUJI - MAIN CABLE ROUTING DRAWING

RUMUJI INSTRUMENT LIST

RUMUJI - SCADA I/O LIST

RUMUJI INSTRUMENT CABLE LIST

RUMUJI - CONTROL & INSTRUMENT MTO FOR COST ESTIMATE

RUMUJI ON/OFF VALVE ACTUATOR DATA SHEET / ALTERNATE 42"

OPERATION

PAINTING

COATING & PAINTING GAP ANALYSIS REPORT

PROJECT PARTICULAR COATING SPECIFICATION FOR STEEL LINE PIPE

PROJECT PARTICULAR COATING SPECIFICATION FOR INDUCTION BENDS

PARTICULAR PROJECT SPECIFICATION FOR FIELD JOINT COATING

PARTICULAR PROJECT SPECIFICATION FOR PAINTING

PROJECT MANAGEMENT

SUPERSEDED BY NG 22 180 PJM CPY 000874

SUPERSEDED BY NG 22 080 PJM CPY 000002

NOT APPLICABLE

PROJECT BASIS OF DESIGN / ALTERNATE 42"

OPERATING PHILOSOPHY SUPERSEDED BY NG 22 180 OPE CPY 000872

SIMOPS ON OUR PIPELINE SUPERSEDED BY NG 22 080 OPE CPY 000873

TECHNICAL PUNCH LIST / ALTERNATE 42"

MASTER DOCUMENT REGISTER / ALTERNATE 42" NOT APPLICABLE

PROJECT EXECUTION PLAN NOT APPLICABLE

PROJECT ENGINEERING PLAN NOT APPLICABLE

PROJECT QUALITY PLAN NOT APPLICABLE

PROJECT HSE PLAN NOT APPLICABLE

PROJECT IT PLAN NOT APPLICABLE

OFFICIAL FILE PROCEDURE NOT APPLICABLE

CORRESPONDENCE PROCEDURE

PROJECT DOCUMENT IDENTIFICATION PROCEDURE NOT APPLICABLE

PROJECT DOCUMENT CONTROL PROCEDURE NOT APPLICABLE

CONTROL OF NON CONFORMING PRODUCT NOT APPLICABLE

MANAGEMENT OF CORRECTIVE AND PREVENTIVE ACTIONS PROCEDURE

AUDIT PROCEDURE NOT APPLICABLE

CUSTOMER SATISFACTION EVALUATION NOT APPLICABLE

TIMESHEET PROCEDURE NOT APPLICABLE

PLANNING & PROGRESS MEASUREMENT PROCEDURE NOT APPLICABLE

MAN-HOURS, COST CONTROL & INVOICING PROCEDURE NOT APPLICABLE

CHANGE ORDER PROCEDURE NOT APPLICABLE

MATRIX OF INTERFACES & BATTERY LIMITS NOT APPLICABLE

Page 19: Pipeline and Piping Deliverables

LIST OF APPLICABLE CODES & STANDARDS

PROJECT EQUIPMENT LIST / ALTERNATE 42"

PIPELINES & RISERS

PIPELINE GAP ANALYSIS REPORT Available

TECHNICAL SPECIFICATION FOR PIPELINE ROUTE TOPOGRAPHIC SURVEY Available

STRESS ANALYSIS BASIC REQUIREMENTS Available

PIPELINE BENDS RADII SPECIFICATION Available

CONCRETE COATING WEIGHT SPECIFICATION Available

PIPELINE CALCULATION NOTE / ALTERNATE 42" Available Analyzer files req.

ROUTE MAP FROM KP 00+000 TO KP 2+000 Available

ROUTE MAP FROM KP 2+000 TO KP 4+500 Available

ROUTE MAP FROM KP 4+500 TO KP 7+000 Available

ROUTE MAP FROM KP 7+000 TO KP 9+500 Available

ROUTE MAP FROM KP 9+500 TO KP 12+000 Available

PIPELINE ROUTE MAP FROM KP 12+000 TO KP 14+500 Available

PIPELINE ROUTE MAP FROM KP 14+500 TO KP 17+000 Available

PIPELINE ROUTE MAP FROM KP 17+000 TO KP 19+500 Available

PIPELINE ROUTE MAP FROM KP 19+500 TO KP 22+000 Available

PIPELINE ROUTE MAP FROM KP 22+000 TO KP 24+500 Available

PIPELINE ROUTE MAP FROM KP 24+500 TO KP 27+000 Available

PIPELINE ROUTE MAP FROM KP 27+000 TO KP 29+500 Available

PIPELINE ROUTE MAP FROM KP 29+500 TO KP 32+000 Available

PIPELINE ROUTE MAP FROM KP 32+000 TO KP 34+500 Available

PIPELINE ROUTE MAP FROM KP 34+500 TO KP 37+000 Available

PIPELINE ROUTE MAP FROM KP 37+000 TO KP 39+500 Available

PIPELINE ROUTE MAP FROM KP 39+500 TO KP 42+000 Available

PIPELINE ROUTE MAP FROM KP 42+000 TO KP 44+500 Available

PIPELINE ROUTE MAP FROM KP 44+500 TO KP 45+474.04 Available

GENERAL LAYOUT ROUTE MAP Available

SAMBREIRO RIVER CROSSING DRAWING Available

TYPICAL DITCH DIMENSIONS Available

TYPICAL ROAD CROSSING OF STEEL CASING PIPE Available

TYPICAL CASING PIPE ASSEMBLY CONSTRUCTION DETAILS Available

TYPICAL ROAD CROSSING OF UNCASED PIPE Available

TYPICAL CROSSING OF EXISTING A/G PIPES Available

TYPICAL EXISTING BURIED CABLE CROSSINGS Available

TYPICAL WATERCOURSE CROSSING Available

TYPICAL RIVER BANK PREVENTION AGAINST POST CONSTRUCTION EROSION Available

TYPICAL CROSS OF EXISTING PIPELINES AND FLOWLINES Available

TYPICAL MARKERS AND WARNING SIGNS Available

STEEL LINE PIPES & INDUCTION BENDS MTO'S / ALTERNATE 42" Available

CROSSING MATERIAL MTO FOR COST ESTIMATE / ALTERNATE 42" Available

SCHEDULE OF CROSSINGS Available

FEED Step 2 Schedule / ALTERNATE 42" NOT APPLICABLE

TYPICAL ROW SECTION IN DRY AREA

SUPERSEDED BY NG22 180 CST CPY 300038

TYPICAL ROW SECTION IN SWAMP AREA

SUPERSEDED BY NG22 180 CST CPY 300039

Page 20: Pipeline and Piping Deliverables

KP INFORMATION DATA / ALTERNATE 42" Available

TECHNICAL REQUISITION FOR STEEL LINE PIPES / ALTERNATE 42" Available

TECHNICAL REQUISITION FOR & INDUCTION BENDS / ALTERNATE 42" AvailablePROCESS

PROCESS GAP ANALYSIS REPORT

PROCESS DESIGN BASIS / ALTERNATE 42"

FLUID LIST

BFD - PIPELINE BLOCK FLOW DIAGRAM / ALTERNATE 42"

PFD - HEAT AND MATERIAL BALANCE - 0BIAFU-OBITE-UBETA / ALTERNATE 42"

PFD - HEAT AND MATERIAL BALANCE - RUMUJI-BONNY / ALTERNATE 42"

PID SYMBOLS

PSD - PROCESS & SAFETY DIAGRAM

PROCESS DATA SHEET - ON/OFF VALVES / ALTERNATE 42"

PROCESS DESCRIPTION

PIPELINES HYDRAULIC STUDY REPORT

LINE SIZING REPORT

RE-PRESSURISATION CALCULATION NOTE

PIPELINES DEPRESSURISATION STUDY REPORT / ALTERNATE 42"

PROCESS DATA SHEET - PIG LAUNCHER / ALTERNATE 42"

PROCESS DATA SHEET - PIG RECEIVER / ALTERNATE 42"

PID - PIG RECEIVER STATION-RUMIJI NODE / ALTERNATE 42"

– SEE ADDITIONAL MARKED UP PID NG 22 186 PRO CPY 000010

PID - CONNECTIONS ON EXISTING RUMUJI NODE / ALTERNATE 42"

– SEE ADDITIONAL MARKED UP PID NG 22 186 PRO CPY 000011

PIPING, VALVES & VESSELS

PIPING PROCEDURE FOR NODE SITE SURVEY Available

PIPING GAP ANALYSIS REPORT Available

PIPING DESIGN SPECIFICATION Available

PIPING MATERIAL SPECIFICATION / ALTERNATE 42" Available

VALVE SPECIFICATION / ALTERNATE 42" Available

PIPING HOOK UP STANDARD BOOK Available

PIPING SUPPORT STANDARD BOOK Available

VALVE DATA SHEETS / ALTERNATE 42" Available

SPECIAL ITEMS DATA SHEET / ALTERNATE 42" Available

TECHNICAL REQUISITION FOR FORGINGS & BARRED TEES / ALTERNATE 42" Available

TECHNICAL REQUISITION FOR 36" MANUAL BALL VALVES ON PIPELINE / ALTERNATE 42" Available

PIPING REPORT OF NODE SITE SURVEY Available

MECHANICAL EQUIPMENT GAP ANALYSIS REPORT Available Mechanical

PARTICULAR PROJECT SPECIFICATION FOR PIG LAUNCHER/RECEIVER / ALTERNATE 42" Available Mechanical

REQUISITION FOR PIG LAUNCHER/RECEIVER / ALTERNATE 42" Available Mechanical

MECHANICAL DATA SHEET - PIG LAUNCHER 82 VP 691 / ALTERNATE 42" Available Mechanical

OBITE DETAIL DRAWING - TIE IN POTENTIAL SPDC CONNECTION / ALTERNATE 42" Available

OBITE TC - LINE LIST / ALTERNATE 42" Available

OBITE TC PIPING MTO FOR COST ESTIMATE / ALTERNATE 42" Available

UBETA PIPING STRESS CALCULATION NOTE / ALTERNATE 42" Available

UBETA DISMANTLING DRAWING Available

TECHNICAL REQUISITION FOR PIPELINE ROUTE SURVEY NOT APPLICABLE

PID - 36" PIPELINE & INTERCONNECTING LINES UBETA NODE / ALTERNATE 42" – SEE ADDITIONAL MARKED UP PID NG 22 184 PRO CPY 000005

Page 21: Pipeline and Piping Deliverables

UBETA PIPING GENERAL ARRANGEMENT DRAWING / ALTERNATE 42" Available

UBETA PIPING GENERAL ARRANGEMENT DRAWING / ALTERNATE 42" Available

UBETA CRITICAL LINE LIST FOR STRESS CALCULATIONS Available

UBETA - LINE LIST / ALTERNATE 42" Available

UBETA LAYOUT DRAWING / ALTERNATE 42" Available

UBETA PIPING MTO FOR COST ESTIMATE / ALTERNATE 42" Available

UBETA PIPING TIE-IN BOOK Available

UBETA TIE-IN ISOMETRIC Available

MECHANICAL DATA SHEET - PIG RECEIVER / ALTERNATE 42" Available Mechanical

RUMUJI PIPING STRESS CALCULATION NOTE / ALTERNATE 42" Available

RUMUJI DISMANTLING DRAWING Available

RUMUJI PIPING GENERAL ARRANGEMENT DRAWING / ALTERNATE 42" Available

RUMUJI PIPING GENERAL ARRANGEMENT DRAWING / ALTERNATE 42" Available

RUMUJI CRITICAL LINE LIST FOR STRESS CALCULATIONS Available

RUMUJI - LINE LIST / ALTERNATE 42" Available

RUMUJI LAYOUT DRAWING / ALTERNATE 42" Available

RUMUJI PIPING MTO FOR COST ESTIMATE / ALTERNATE 42" Available

RUMUJI PIPING TIE-IN BOOK Available

RUMUJI TIE-IN ISOMETRIC Available

APPENDIX 2COMPANY Documents (issued after Basic Engineering)

Title

HSE

OUR GAS PIPELINE ENVIRONMENTAL IMPACT ASSESSMENT – FINAL REPORT

INSTRUMENTATION

TECHNICAL SPECIFICATION FOR LEAK & SHOCK DETECTION SYSTEM (LSDS)

OPERATION

OPERATING PHILOSOPHY

SIMOPS ON OUR PIPELINE

OPERATING MANUAL

PROJECT MANAGEMENT

ENGINEERING DOCUMENT MANAGEMENT PROCEDURE

CORRESPONDENCE PROCEDURE

EQUIPMENT NUMBERING PROCEDURE

DMZ PROCEDURE

OUR TECHNICAL PUNCH LIST

HAZOP PROCEDURE

PIPELINES & RISERS

UBETA NODE ISOMETRIC DRAWING NEW LAYOUT OF OUR PIPELINE, FUTURE 42’’ CONNECTION & TIE-IN PIPING TO GTS

UBETA NODE GENERAL ARGTT – TIE-IN CONNECTION FROM EXISTING 28’’ GTS1 PIPELINE TO TP1 (CONVENTIONNAL HOT TAP METHOD)

UBETA NODE – PIPING LAYOUT – VENT SYSTEM RELOC. TO ACCOMMODATE OUR & FUTURE NLNG PIPELINE AND PIG TRAP

Page 22: Pipeline and Piping Deliverables

OUR GAS PIPELINE SPECIFICATION FOR UBETA HOT TAPPING

Supply of Above Ground Installation Ball Valves Between 8” and 42”

typical row section in dry area

typical row section in swamp area

PROCESS

MARKED UP PID (UBETA NODE) - PIPELINE & INTERCONNECTING LINES – LOCATION OF TP1 (HOT TAP 28’’ x 24’’)

MARKED UP PID (RUMUJI NODE) – LOCATION OF FUTURE GTS 6 CONNECTION

MARKED UP PID (RUMUJI NODE) - TIE-IN FROM OUR PIPELINE TO GTS1 VIA EXISTING 20’’ SODC FUTURE CONNECTION (OPTION)

MARKED UP PID (OBITE TC) – TRAIN 2 – GAS EXPORT

SECURITY

SECURITY PHILOSOPHY OUR PIPELINE CONSTRUCTION

TELECOMMUNICATIONS

OUR CAMP SPECIFICATION FOR TELECOM SCOPE OF WORK

SPLIT OF RESPONSIBILITY FOR TELECOM, CCTV, LSDS, SCADA SYSTEMS

OUR CAMP - MTO - TELECOM

UBETA NODE – PIPING LAYOUT – NEW LAYOUT OF OUR PIPELINE AND FUTURE NLNG PIG RECEIVERS

RUMUJI NODE ISOMETRIC DRAWING – NEW LAYOUT OF PIG RECEIVERS PIPING, FUTURE GTS6 CONNECTION & TIE-IN TO GTS 4 (SH. 1 OF 2)

RUMUJI NODE ISOMETRIC DRAWING – NEW LAYOUT OF PIG RECEIVERS PIPING, FUTURE GTS6 CONNECTION & TIE-IN TO GTS 4 (SH. 2 OF 2)

RUMUJI NODE – GENERAL ARRANGEMENT – NEW LOCATION OF PIG TRAP RECEIVER A-0221 & ASSOCIATED PIPING

RUMUJI NODE – GENERAL ARRANGEMENT – NEW TIE-IN TO GTS1 VIA EXISTING 20’’ SPDC FUTURE CONNECTION (OPTION)

Page 23: Pipeline and Piping Deliverables

Analyzer files req.

Page 24: Pipeline and Piping Deliverables

– SEE ADDITIONAL MARKED UP PID NG 22 184 PRO CPY 000005

Page 25: Pipeline and Piping Deliverables

MARKED UP PID (RUMUJI NODE) - TIE-IN FROM OUR PIPELINE TO GTS1 VIA EXISTING 20’’ SODC FUTURE CONNECTION (OPTION)

Page 26: Pipeline and Piping Deliverables

OML 58 UPGRADE - O.U.R. Gas Pipeline ProjectSl.No. Deliverable Description

1 PIPELINE GAP ANALYSIS REPORT

2 TECHNICAL SPECIFICATION FOR PIPELINE ROUTE TOPOGRAPHIC SURVEY

3 STRESS ANALYSIS BASIC REQUIREMENTS

4 PIPELINE BENDS RADII SPECIFICATION

5 CONCRETE COATING WEIGHT SPECIFICATION

6 PIPELINE CONSTRUCTION SPECIFICATION

7 PARTICULAR PROJECT SPECIFICATION FOR 42" CARBON STEEL LINEPIPE / ALTERNATE 4

8 PARTICULAR PROJECT SPECIFICATION FOR 42" HOT INDUCTION BENDS / ALTERNATE 42"

9 PARTICULAR PROJECT SPECIFICATION FOR SITE WELDING OF PIPELINE

10 Profile Drawings

11 Profile Drawings

12 Profile Drawings

13 Profile Drawings

14 Concrete Coating Calculations

15 Pipeline Stability Report

16 Pipe Wall Thickness Calculation Report

17 PIPELINE CALCULATION NOTE / ALTERNATE 42"

18 ROUTE MAP FROM KP 00+000 TO KP 2+000

19 ROUTE MAP FROM KP 2+000 TO KP 4+500

20 ROUTE MAP FROM KP 4+500 TO KP 7+000

21 ROUTE MAP FROM KP 7+000 TO KP 9+500

22 ROUTE MAP FROM KP 9+500 TO KP 12+000

23 PIPELINE ROUTE MAP FROM KP 12+000 TO KP 14+500

24 PIPELINE ROUTE MAP FROM KP 14+500 TO KP 17+000

25 PIPELINE ROUTE MAP FROM KP 17+000 TO KP 19+500

26 PIPELINE ROUTE MAP FROM KP 19+500 TO KP 22+000

27 PIPELINE ROUTE MAP FROM KP 22+000 TO KP 24+500

28 PIPELINE ROUTE MAP FROM KP 24+500 TO KP 27+000

29 PIPELINE ROUTE MAP FROM KP 27+000 TO KP 29+500

30 PIPELINE ROUTE MAP FROM KP 29+500 TO KP 32+000

31 PIPELINE ROUTE MAP FROM KP 32+000 TO KP 34+500

32 PIPELINE ROUTE MAP FROM KP 34+500 TO KP 37+000

33 PIPELINE ROUTE MAP FROM KP 37+000 TO KP 39+500

34 PIPELINE ROUTE MAP FROM KP 39+500 TO KP 42+000

35 PIPELINE ROUTE MAP FROM KP 42+000 TO KP 44+500

36 PIPELINE ROUTE MAP FROM KP 44+500 TO KP 45+474.04

37 GENERAL LAYOUT ROUTE MAP

38 SAMBREIRO RIVER CROSSING DRAWING

39 TYPICAL ROW SECTION IN DRY AREA

40 TYPICAL ROW SECTION IN SWAMP AREA

41 TYPICAL DITCH DIMENSIONS

42 TYPICAL ROAD CROSSING OF STEEL CASING PIPE

43 TYPICAL CASING PIPE ASSEMBLY CONSTRUCTION DETAILS

44 TYPICAL ROAD CROSSING OF UNCASED PIPE

45 TYPICAL CROSSING OF EXISTING A/G PIPES

46 TYPICAL EXISTING BURIED CABLE CROSSINGS

47 TYPICAL WATERCOURSE CROSSING

Page 27: Pipeline and Piping Deliverables

48 TYPICAL RIVER BANK PREVENTION AGAINST POST CONSTRUCTION EROSION

49 TYPICAL CROSS OF EXISTING PIPELINES AND FLOWLINES

50 TYPICAL MARKERS AND WARNING SIGNS

50 TYPICAL MARKERS AND WARNING SIGNS

51 STEEL LINE PIPES & INDUCTION BENDS MTO'S / ALTERNATE 42"

52 CROSSING MATERIAL MTO FOR COST ESTIMATE / ALTERNATE 42"

53 SCHEDULE OF CROSSINGS

54 KP INFORMATION DATA / ALTERNATE 42"

55 TECHNICAL REQUISITION FOR STEEL LINE PIPES / ALTERNATE 42"

56 TECHNICAL REQUISITION FOR & INDUCTION BENDS / ALTERNATE 42"

57 PARTICULAR PROJECT SPECIFICATION FOR PIG LAUNCHER/RECEIVER / ALTERNATE 42"

58 REQUISITION FOR PIG LAUNCHER/RECEIVER / ALTERNATE 42"

59 MECHANICAL DATA SHEET - PIG LAUNCHER 82 VP 691 / ALTERNATE 42"

60 MECHANICAL DATA SHEET - PIG RECEIVER / ALTERNATE 42"

PIPELINE - DETAILED ENGINEERING

Page 28: Pipeline and Piping Deliverables

OML 58 UPGRADE - O.U.R. Gas Pipeline ProjectClient Number Document Number Point Doc. Number

NG 22 84 SOF PPL ANL 000001 S40021-000-PPL-10.01-00001 NG22-180-PLR-ZBJ-400002NG 22 84 SOF PPL SPE 000001 S40021-000-PPL-10.04-00001 NG22-180-PLR-ZBJ-400018NG 22 84 SOF PPL SPE 000002 S40021-000-PPL-10.04-00002 NG22-180-PLR-ZBJ-400006NG 22 84 SOF PPL SPE 000003 S40021-000-PPL-10.04-00003 NG22-180-PLR-ZBJ-400005NG 22 84 SOF PPL SPE 000004 S40021-000-PPL-10.04-00004 NG22-180-PLR-ZBJ-400019NG 22 84 SOF CNS SPE 000001 S40021-000-CNS-10.04-00001 NG22-180-PLR-ZBJ-400014

NG 22 84 SOF COR SPE 010001 S40021-000-COR-10.04-10001 NG22-180-PLR-ZBJ-400009NG 22 84 SOF COR SPE 010002 S40021-000-COR-10.04-10002 NG22-180-PLR-ZBJ-400010

NG-22-84-SOF-COR-SPE-004001 S40021-000-WEL-10.04-00001 NG22-180-PLR-ZBJ-400011

NG22-180-PLR-ZBJ-400007

NG22-180-PLR-ZBJ-400016

NG22-180-PLR-ZBJ-400020

NG 22 84 SOF PLR CAL 010001 S40021-000-PPL-10.05-10001 NG22-180-PLR-ZBJ-400015NG 22 84 SOF PPL DRW 000001 S40021-000-PPL-10.07-00001 NG22-180-PLR-ZBJ-400023NG 22 84 SOF PPL DRW 000002 S40021-000-PPL-10.07-00002 NG22-180-PLR-ZBJ-400024NG 22 84 SOF PPL DRW 000003 S40021-000-PPL-10.07-00003 NG22-180-PLR-ZBJ-400025NG 22 84 SOF PPL DRW 000004 S40021-000-PPL-10.07-00004 NG22-180-PLR-ZBJ-400026NG 22 84 SOF PPL DRW 000005 S40021-000-PPL-10.07-00005 NG22-180-PLR-ZBJ-400027NG 22 84 SOF PPL DRW 000006 S40021-000-PPL-10.07-00006 NG22-180-PLR-ZBJ-400028NG 22 84 SOF PPL DRW 000007 S40021-000-PPL-10.07-00007 NG22-180-PLR-ZBJ-400029NG 22 84 SOF PPL DRW 000008 S40021-000-PPL-10.07-00008 NG22-180-PLR-ZBJ-400030NG 22 84 SOF PPL DRW 000009 S40021-000-PPL-10.07-00009 NG22-180-PLR-ZBJ-400031NG 22 84 SOF PPL DRW 000010 S40021-000-PPL-10.07-00010 NG22-180-PLR-ZBJ-400032NG 22 84 SOF PPL DRW 000011 S40021-000-PPL-10.07-00011 NG22-180-PLR-ZBJ-400033NG 22 84 SOF PPL DRW 000012 S40021-000-PPL-10.07-00012 NG22-180-PLR-ZBJ-400034NG 22 84 SOF PPL DRW 000013 S40021-000-PPL-10.07-00013 NG22-180-PLR-ZBJ-400035NG 22 84 SOF PPL DRW 000014 S40021-000-PPL-10.07-00014 NG22-180-PLR-ZBJ-400036NG 22 84 SOF PPL DRW 000015 S40021-000-PPL-10.07-00015 NG22-180-PLR-ZBJ-400037NG 22 84 SOF PPL DRW 000016 S40021-000-PPL-10.07-00016 NG22-180-PLR-ZBJ-400038NG 22 84 SOF PPL DRW 000017 S40021-000-PPL-10.07-00017 NG22-180-PLR-ZBJ-400039NG 22 84 SOF PPL DRW 000018 S40021-000-PPL-10.07-00018 NG22-180-PLR-ZBJ-400040NG 22 84 SOF PPL DRW 000019 S40021-000-PPL-10.07-00019 NG22-180-PLR-ZBJ-400041NG 22 84 SOF PPL DRW 000020 S40021-000-PPL-10.07-00020 NG22-180-PLR-ZBJ-400012NG 22 84 SOF PPL TYP 000030 S40021-000-PPL-10.07-00030 NG22-180-PLR-ZBJ-400001

S40021-000-PPL-10.07-00031 NG22-180-PLR-ZBJ-400042S40021-000-PPL-10.07-00032 NG22-180-PLR-ZBJ-400043

NG 22 84 SOF PPL TYP 000033 S40021-000-PPL-10.07-00033 NG22-180-PLR-ZBJ-400044NG 22 84 SOF PPL TYP 000034 S40021-000-PPL-10.07-00034 NG22-180-PLR-ZBJ-400045NG 22 84 SOF PPL TYP 000035 S40021-000-PPL-10.07-00035 NG22-180-PLR-ZBJ-400046NG 22 84 SOF PPL TYP 000036 S40021-000-PPL-10.07-00036 NG22-180-PLR-ZBJ-400047NG 22 84 SOF PPL TYP 000037 S40021-000-PPL-10.07-00037 NG22-180-PLR-ZBJ-400048NG 22 84 SOF PPL TYP 000038 S40021-000-PPL-10.07-00038 NG22-180-PLR-ZBJ-400049NG 22 84 SOF PPL TYP 000039 S40021-000-PPL-10.07-00039 NG22-180-PLR-ZBJ-400050

NG22 180 CST CPY 300038

NG22 180 CST CPY 300039

Page 29: Pipeline and Piping Deliverables

NG 22 84 SOF PPL TYP 000040 S40021-000-PPL-10.07-00040 NG22-180-PLR-ZBJ-400051NG 22 84 SOF PPL TYP 000041 S40021-000-PPL-10.07-00041 NG22-180-PLR-ZBJ-400052NG 22 84 SOF PPL TYP 000042 S40021-000-PPL-10.07-00042 NG22-180-PLR-ZBJ-400053 sht 1 of 2NG 22 84 SOF PPL TYP 000042 S40021-000-PPL-10.07-00042 NG22-180-PLR-ZBJ-400053 sht 2 of 2NG 22 84 SOF PLR MTO 010001 S40021-000-PPL-10.16-10001 NG22-180-PLR-ZBJ-400013NG 22 84 SOF PPL MTO 010002 S40021-000-PPL-10.16-10002 NG22-180-PLR-ZBJ-400021NG 22 84 SOF PPL DTS 000002 S40021-000-PPL-10.17-00002 NG22-180-PLR-ZBJ-400017NG 22 84 SOF PLR DTS 010001 S40021-000-PPL-10.17-00001 NG22-180-PLR-ZBJ-400022NG 22 84 SOF PPL REQ 010002 S40021-000-PPL-10.21-10002 NANG 22 84 SOF PPL REQ 010003 S40021-000-PPL-10.21-10003 NANG 22 84 SOF PVV SPE 010001 S40021-000-EQP-10.04-10001 NG22-180-PLR-ZBJ-400003NG 22 84 SOF PVV REQ 010001 S40021-000-EQP-10.21-10001 NANG 22 84 SOF PVV DTS 010001 S40021-200-EQP-10.17-10001 NG22-180-PLR-ZBJ-400004NG 22 84 SOF PVV DTS 010502 S40021-500-EQP-10.17-10002 NG22-180-PLR-ZBJ-400008

Page 30: Pipeline and Piping Deliverables

OML 58 UPGRADE - O.U.R. Gas Pipeline ProjectTyp. Rev. Responsibilty IDC Remarks

DOC B0 ChenduDOC B0 KrishnaDOC B0 KrishnaDOC B0 KrishnaDOC DanielDOC By Const.

DOC B0 Krishna

DOC B0 Krishna

DOC B0 Krishna

DWG Survey

DWG Survey

DWG Survey

DWG Survey

CAL Daniel

CAL Daniel

CAL Daniel

CAL DanielDWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG Chendu/EguvereDWG Chendu/EguvereDWG Chendu/EguvereDWG Chendu/EguvereDWG Chendu/EguvereDWG Chendu/EguvereDWG Chendu/EguvereDWG Chendu/EguvereDWG Chendu/EguvereDWG Chendu/EguvereDWG Chendu/Eguvere

Page 31: Pipeline and Piping Deliverables

DWG Chendu/EguvereDWG Chendu/EguvereDWG Chendu/EguvereDWG Chendu/EguvereMTO ChenduMTO ChenduDOC ChenduDOC Chendu

By Client

By Client

DOC DanielVictor NA

DOC DanielDOC Daniel

Page 32: Pipeline and Piping Deliverables

OML 58 UPGRADE - O.U.R. Gas Pipeline ProjectSl.No. Title

1 OBITE TC AREA ARRANGEMENT PLOT PLAN

2 OBITE TC - PIPING LAYOUT AREA

3 OBITE TC - PIPING LAYOUT AREA

4 OBITE TC - PIPING LAYOUT AREA

5 OBITE TC ISOMETRICS

6 IPP-GSU TIE-IN BOOK

7 PIPING GAP ANALYSIS REPORT

8 PIPING DESIGN SPECIFICATION

9 Drawings Index10 VALVE SPECIFICATION / ALTERNATE 42"

11 PROJECT PARTICULAR SPECIFICATION FOR PIPELINE TEES AND FITTINGS / ALTERNATE 42"

12 PARTICULAR PROJECT SPECIFICATION FOR 42" CARBON STEEL FLANGES/ ALTERNATE 42"

13 PARTICULAR PROJECT SPECIFICATION FOR WELDING OF PIPING

14 PIPING MATERIAL SPECIFICATION / ALTERNATE 42"

15 PIPING HOOK UP STANDARD BOOK

16 PIPING SUPPORT LIST

17 PIPING SUPPORT STANDARD BOOK / DRAWINGS

18 VALVE DATA SHEETS / ALTERNATE 42"

19 SPECIAL ITEMS DATA SHEET / ALTERNATE 42"

20 TECHNICAL REQUISITION FOR FORGINGS & BARRED TEES / ALTERNATE 42"

21 TECHNICAL REQUISITION FOR 36" MANUAL BALL VALVES ON PIPELINE / ALTERNATE 42"

22 OBITE DETAIL DRAWING - TIE IN POTENTIAL SPDC CONNECTION / ALTERNATE 42"

23 OBITE TC PIPING MTO FOR COST ESTIMATE / ALTERNATE 42"

24 OBITE CRITICAL LINE LIST FOR STRESS CALCULATIONS

25 UBETA PIPING STRESS CALCULATION NOTE / ALTERNATE 42"

26 UBETA DISMANTLING DRAWING

27 UBETA PIPING GENERAL ARRANGEMENT DRAWING / ALTERNATE 42"

28 UBETA PIPING GENERAL ARRANGEMENT DRAWING / ALTERNATE 42"

29 UBETA CRITICAL LINE LIST FOR STRESS CALCULATIONS

30 UBETA LAYOUT DRAWING / ALTERNATE 42"

31 UBETA PIPING MTO FOR COST ESTIMATE / ALTERNATE 42"

32 UBETA ISOMETRICS

33 UBETA PIPING TIE-IN BOOK

34 UBETA TIE-IN ISOMETRIC

35 RUMUJI PIPING STRESS CALCULATION NOTE / ALTERNATE 42"

36 RUMUJI DISMANTLING DRAWING

37 RUMUJI PIPING GENERAL ARRANGEMENT DRAWING / ALTERNATE 42"

38 RUMUJI PIPING GENERAL ARRANGEMENT DRAWING / ALTERNATE 42"

39 RUMUJI CRITICAL LINE LIST FOR STRESS CALCULATIONS

40 RUMUJI LAYOUT DRAWING / ALTERNATE 42"

41 RUMUJI PIPING MTO FOR COST ESTIMATE / ALTERNATE 42"

42 RUMUJI ISOMETRICS

43 RUMUJI PIPING TIE-IN BOOK

44 RUMUJI TIE-IN ISOMETRIC

45

46

47

UBETA NODE ISOMETRIC DRAWING NEW LAYOUT OF OUR PIPELINE, FUTURE 42’’ CONNECTION & TIE-IN PIPING TO GTS

UBETA NODE GENERAL ARGTT – TIE-IN CONNECTION FROM EXISTING 28’’ GTS1 PIPELINE TO TP1 (CONVENTIONNAL HOT TAP METHOD)

UBETA NODE – PIPING LAYOUT – VENT SYSTEM RELOC. TO ACCOMMODATE OUR & FUTURE NLNG PIPELINE AND PIG TRAP

Page 33: Pipeline and Piping Deliverables

48

49

50

51

5253 OUR GAS PIPELINE SPECIFICATION FOR UBETA HOT TAPPING

54 Supply of Above Ground Installation Ball Valves Between 8” and 42”

55 Piping Hydroesting, Cleaning and Flushing Procedures

UBETA NODE – PIPING LAYOUT – NEW LAYOUT OF OUR PIPELINE AND FUTURE NLNG PIG RECEIVERS

RUMUJI NODE ISOMETRIC DRAWING – NEW LAYOUT OF PIG RECEIVERS PIPING, FUTURE GTS6 CONNECTION & TIE-IN TO GTS 4 (SH. 1 OF 2)

RUMUJI NODE ISOMETRIC DRAWING – NEW LAYOUT OF PIG RECEIVERS PIPING, FUTURE GTS6 CONNECTION & TIE-IN TO GTS 4 (SH. 2 OF 2)

RUMUJI NODE – GENERAL ARRANGEMENT – NEW LOCATION OF PIG TRAP RECEIVER A-0221 & ASSOCIATED PIPING

RUMUJI NODE – GENERAL ARRANGEMENT – NEW TIE-IN TO GTS1 VIA EXISTING 20’’ SPDC FUTURE CONNECTION (OPTION)

Page 34: Pipeline and Piping Deliverables

OML 58 UPGRADE - O.U.R. Gas Pipeline ProjectPoint Doc. Number Rev. Typ ResponsibiltyCompletion DateRemarks

NG22-182-PVV-ZBJ-600002 Dwg OBITIE

NG22-182-PVV-ZBJ-600003 Dwg OBITIE

NG22-182-PVV-ZBJ-600004 Dwg OBITIE

NG22-182-PVV-ZBJ-600005 Dwg OBITIE

NG22-182-PVV-ZBJ-600006 Dwg OBITIE

NG22-182-PVV-ZBJ-600007 Doc OBITIE

NG22-180-PVV-ZBJ-600002 Doc Chendu General

NG22-180-PVV-ZBJ-600001 Doc Victor General

NG22-180-PVV-ZBJ-600012 Doc General

NG22-180-PVV-ZBJ-600016 Doc General

NG22-180-PVV-ZBJ-600006 Doc General

NG22-180-PVV-ZBJ-600010 Doc General

NG22-180-PVV-ZBJ-600011 Doc General

NG22-180-PVV-ZBJ-600009 Doc Victor General

NG22-180-PVV-ZBJ-600003 Doc Victor General

NG22-180-PVV-ZBJ-600020 Doc General

NG22-180-PVV-ZBJ-600021 Doc Daniel General

NG22-180-PVV-ZBJ-600007 Doc Chendu General

NG22-180-PVV-ZBJ-600008 Doc Chendu General

NG22-180-PVV-ZBJ-600004 DOC General

NG22-180-PVV-ZBJ-600005 DOC General

NG22-182-PVV-ZBJ-600008 DWG OBITIE

NG22-182-PVV-ZBJ-600001 MTO Victor OBITIEDoc NA

NG22-184-PVV-ZBJ-600002 Cal Daniel UBETA

NG22-184-PVV-ZBJ-600005 Dwg UBETA

NG22-184-PVV-ZBJ-600006 Dwg UBETA

NG22-184-PVV-ZBJ-600007 Dwg UBETA

NG22-184-PVV-ZBJ-600008 Doc Daniel UBETA

NG22-184-PVV-ZBJ-600009 Dwg UBETA

NG22-184-PVV-ZBJ-600004 MTO Victor UBETA

NG22-184-PVV-ZBJ-600010 Dwg UBETA

NG22-184-PVV-ZBJ-600011 Doc UBETA

NG22-184-PVV-ZBJ-600012 Dwg UBETA

NG22-186-PVV-ZBJ-600002 Cal Daniel RUMUJI

NG22-186-PVV-ZBJ-600005 Dwg RUMUJI

NG22-186-PVV-ZBJ-600006 Dwg RUMUJI

NG22-186-PVV-ZBJ-600007 Dwg RUMUJI

NG22-186-PVV-ZBJ-600001 Doc Daniel RUMUJI

NG22-186-PVV-ZBJ-600008 Dwg RUMUJI

NG22-186-PVV-ZBJ-600003 MTO Victor RUMUJI

NG22-186-PVV-ZBJ-600009 Dwg RUMUJI

NG22-186-PVV-ZBJ-600004 Doc RUMUJI

NG22-186-PVV-ZBJ-600010 Dwg RUMUJI

UBETA

UBETA

UBETA

Page 35: Pipeline and Piping Deliverables

UBETA

RUMUJI

RUMUJI

RUMUJI

RUMUJI

NG22-184-PVV-ZBJ-600003 Doc UBETA

NG22-180-PVV-ZBJ-600014 Doc General