piping activities schedule for dh3 extn r-1
DESCRIPTION
Piping activitiesTRANSCRIPT
DH-3 PIPING SCHEDULEDate :- 10th Feb 2016.
P&ID Description Activities Finish Date
1 P&ID - 892 Start Up Piping AMR Release 22-Feb-16 Palani RajaIsometric Drawing Release 10-Mar-16 Palani Raja
2 P&ID - 892 Start Up Piping Support Fabrication Drg Release
21-Mar-16
Palani Raja
Support load data by B&WFabrication Drg Release E8 + 10 days
3 P&ID - 892 Vent to Stack Piping Line Sizing and Routing by B&WAMR Release E10 + 1 WeekIsometric Drawing Release E10 + 4 Week
4 P&ID - 892 Vent to Stack Piping Support AMR Release E10 + 6 WeekFabrication Drg Release E10 + 8 Week
5 P&ID - 895 Attemperator Spray Water Piping P&ID 24-Dec-15 GauravRevised Line Sizing 17-Dec-15 ParagRouting 26-Feb-16AMR Release 1-Mar-16 Palani RajaIsometric Drawing Release 7-Mar-16 Palani Raja
6 P&ID - 895 Attemperator Spray Water Piping Supports Fabrication Drg Release 21-Mar-16 Palani Raja7 P&ID - 897 Soot Blower Piping( incl SCR, BLR, RAPH) P&ID 31-Dec-15 Gaurav
Line Sizing 18-Dec-15 Parag/GauravRouting 8-Mar-16 Palani RajaAMR Release 10-Mar-16 Palani RajaIsometric Drawing Release 30-May-16 Palani Raja
8 P&ID - 897 Soot Blower Piping Supports Fabrication Drg Release 29-Jun-16 Palani Raja
13-Jun-16 Palani Raja
9 P&ID - 897 Soot Blower Pressure Relief Valve Specs Release 24-Dec-15 Parag
10 P&ID - 897 Soot Blower Vent Line Line Sizing 29-Apr-16 Gaurav
AMR Release 30-Apr-16 Palani RajaIsometric Drawing Release 30-May-16 Palani Raja
11 P&ID - 897 Soot Blower Vent Line Supports Fabrication Drg Release 29-Jun-16 Palani Raja12 P&ID - 913 Drain and Vent Line P&ID 21-Jan-16 Gaurav
Line Sizing 21-Jan-16 Gaurav
AMR Release 15-Mar-16 Palani RajaIsometric Drawing Release 15-May-16 Palani Raja
13 P&ID - 913 Drain and Vent Line Support Fabrication Drg Release 14-Jun-16 Palani Raja14 P&ID - 898 Hydro Jet P&ID 27-Jan-16 Gaurav
Line Sizing GauravAMR Release E39 + 14 days Palani RajaIsometric Drawing Release E39 + 30 days Palani Raja
15 P&ID - 898 Hydro Jet Support Fabrication Drg Release E39 + 45 days Palani Raja16 Riser & supply Fabrication Drg Release 15-Jan-15 Palani Raja17 Riser and Supply supports Fabrication Drg Release 15-Feb-15 Palani Raja18 Attemperator Piping Fabrication Drg Release 31-Dec-15 Palani Raja19 Attemperator Piping supports Fabrication Drg Release 28-Feb-15 Palani Raja20 Eco. Vent Line AMR Release 24-Dec-16 Palani Raja21 Isometric Drawing Release 15-May-16 Palani Raja22 Eco. Vent Line Support Fabrication Drg Release 14-Jun-16 Palani Raja23 Boiler Mounting Isometric Drawing Release +30 Days Palani Raja
Sr No
Responsible Person
Spring Supports/ Hanger Rods + Supports Specs Release
DH-3 PIPING SCHEDULEDate :- 10th Feb 2016. 18-Apr-16
Comments AMR released Weight in MT Drg Released Remarks
4/22/2016 100% Amr released 100% Released. Strainer balance
??? Approx 2 MT
Working copy received.
Input not yet received Input not yet received Input not yet received
Input not yet received Input not yet received
100% Amr released 100% Released.
???? 15-Jun-16100% Amr released 30-May-16
???? 15-Jun-16
AMR - By End of Apr.30-May-16
???? 15-Jun-16100% Amr released 15-May-16
???? 14-Jun-16Input awaited.
Input balance from B&W
Input awaited.
Conection Details Required Clarity - up to second valve ? terminal point ?
Revison due to B&W split in valves inputVendor
Finalization Balance
Waiting for Primary Support vendor finalisation.
Brgen drawings are awaited. Fabricated secondary supports based on vendor finalisation. Snubber issue - Bergen regreted, New vendor to be proposed.
Safety valve GA send
Layout Sub to B&W-15th Mar
Engg Issues
F53 Coal Piping supportsS61 Architectural Inputs
Soot blower SupportsTurning vanesBurner Cooling air duct
Mill Bay inputs - Structure Layout required from B&W.Cladding vendor to be confirm. Engg to give the completion date.CIS, Information from B&W.BOM list
Input criticality form B&WNeed follow upCladding profile input from B&W.No balance inputs from B&WRequired before finish of fabricationNot critical
TBWES MASTER WBS LIST FOR CFBC & SUPERCRITICAL BOILERS
A00
A10A1PA1TA1UA1VA1X
C00C10
C11C12C13C14C15C16C17C18C19C1AC1BC1C
C20C21C22C23C24C25C26C27C28C29C2AC2BC2CC2DC2E
C30C31C32C33C34C35C36
C40C41C42C43C44C45C46C47
C50C51C52C53C54C55
C60C61
C70C71
C80C81C82C83
D00D10
D11D12D13D14D15D16D17D18
D20D30
D31D32D33D34D35
D40D41D42D43D44D45D46D47D48D49D4AD4BD4CD4DD4ED4FD4GD4H
D50D51D52D53D54D55D56D57D58D59D5AD5BD5CD5DD5ED5FD5GD5HD5JD5K
D5LD5MD5N
D60D61D62D63D64D65D66D67D68D69D6AD6BD6C
D70D71D72D73D74D75D76
F00F50
F51F52F53
F60F63F64F65F67F68F6A
F70F73
G10G11G12G13G1UG1VG1XG1Y
G40G44G47
G50G52G53
I00I10
I14I15I18
I20I21I22I23I24I25I27
I30I31I32I33I34I35I36I37I38I39
I50I51
L00L10
L11L30
L36M11
N00N10
N11N12N13
P00P20
P23P25
P30P31P32P33P34
P40P41P42P43P44P4AP4BP4CP4DP4EP4FP4GP4HP4JP4KP4LP4MP4NP4PP4QP4RP4SP4TP4Up4VP4WP4X
P50P51P52P53P56P57P58
P60P61P62P63P64
P70P73P74P7JP7L
P80P81P82P83
P90P91P92P93P94P96p97P98
PB0PB1
R00R20
R21R22
S00S10
S11S12S13S14S15S16S17S18
S20S29S2A
S60S66
W00W40
W4DW4E
Z00Z10
Z11Z12Z13Z14Z1UZ1V
Z20Z21Z22Z23Z27
Z40Z46
Sr. No.
1
2
3
4
5
6
7
8
TBWES MASTER WBS LIST FOR CFBC & SUPERCRITICAL BOILERS
AIR SYSTEM
AIR DUCTS DUCT - PA TO TEMPERING AIR WINDBOX /SUPPORT STRUCTURE /EXPANSION BELLOW EXPANSION JOINTS FOR AIR DUCTING METALIC EXPANSION JOINTS FOR AIR NON METALIC/FABRIC DAMPERS IN AIR (SECONDARY & PRIMARY) SYSTEMACCOUNTING HEADSOTHER DIRECT COSTSTRANSPORTATIONINSURANCEDEMMURAGESAND BLASTINGB&W ENGINEERING FEESPACKAGINGTHIRD PART INSPECTION CHARGESWARRANTY CHARGESFOREIGN TRAVEL - JOB RELATEDROYALTY CHARGESENGINEERING SUBCONTRACT COSTENGINEERING FEES / PROFESSIONAL -CONSULTENCY FEES MATERIAL COSTSDRUM FABRICATIONHEADER DRILLINGERECTION & COMMISSIONINGACID CLEANINGSPECIAL JIGS AND FIXTURES / PATTERNS PANEL AASEMBLYSUPERHEATER & REHEATER ASSEMBLYSPECIAL CONSUMABLESCONTINGENCYESCALATIONFORWARD COVER CHARGESMISSOUTS/ MISC - MFG & SUBCONTRACTMISSOUTS/MISC - BOUGHTOUTSOTHERS (CASH PURCHASE)MISCELLANEOUS OTHER DIRECT COSTSTESTING - DT/ NDT/ HYDRO ETC.SPECIAL TOOLINGSITE EXPENSESSTRESS RELIEVINGMISCELLANEOUSSHOP SUBCONTRACTING CHARGESMANHOURS COSTSENGINEERING INHOUSE MANHOURSPROJECT MANAGEMENT MANHOURSMANUFACTURING MANHOURSCONSTRUCTION MAHOURSFIELD SERVICE MANHOURSE&I MANHOURSSUPPLY CHAIN MAINHOURS FINANCE COSTSECGC COMMISSIONBG COMMISSIONLC CHARGESSALES TAX NOT RECOVERABLEBANK CHARGES (JOB RELATED)SALES COMMISSIONSALES COMMISSION
CAPITAL EXPENDITURECAPITAL EXPENDITURE - CONTRACT SPECIFICREVENUE CODESSALES PRICEREIMBURSEMENT OF TAXES AND DUTIESREIMBURSEMENT OF FREIGHTDOCUMENTATIONDRAWINGSARRANGEMENT AND INTERFACE DRAWINGSOPERATION AND MAINTENANCE MANUALSIBR FOLDERSPROCEDURE FOR SITEERECTION DRAWINGSINTERNAL ENGGINEERING CALCULATION (CONTRACT ENGINEERING )REFRACTORY APPLICATION PROCEDURES INSULATION APPLICATION PROCEDURES / DRAWINGS PROCESS RELATED DOCUMENTSINSTRUMENT SPECIFICATION DOCUMENTSINSTRUMENT TAGGING PHELOSOPHYINSTRUMENT SPECIFICATION FOR PULVERISER LUBE OIL SYST.INSTRUMENT SPECIFICATION FOR ACCUMULATOR INSTRUMENT SPECIFICATION FOR PUBLIC ADDRESSING SYSTEMINSTUMENT SPECIFICATION FOR FIRE DETECTION SYSTEMINSTRUMENT CONTROL SYSTEM DOCUMENTS & DRAWINGSLOGIC & DRAWINGS BURNER MANAGEMENT SYSTEM CONTROL SCHEME & DRAWINGS FOR BOILER CONTROL SYSTEM COMBUSTION CONTROL SYSTEM AND DRAWINGS DCS I/O LIST BMS I/O LIST ALARM & TRIP POINT LIST SOOT BLOWER LOGIC AND DRAWINGSFIRING P&IDS INSTRUMENT LOCATION & JB LOCATION DRAWINGS INSTRUMENT CABLE TRAY LAYOUT DRAWINGS INSTRUMENTATION AIR DISTRIBUTION DRAWINGSINSTRUMENT HOOK UP DRAWINGS BOUGHT OUT EQUIPMENTS INSTRUMENT DIAGRAMS GRAPHICSCALCULATION FOR FUEL FIRING LINE SIZING INSTRUMENT AIR CALCULATION SHEET MISCELLANEOUS CONTROL SYSTEM FOR BOUGHTOUTSINSTRUMENT SPECS FOR PROCESS BOUGHT OUT EQUIPMENTS INSTRUMENT SPECIFICATION FOR AXIAL FAN BLADE PITCH CONTROL & LUBRICATION OIL SYSTEM INSTRUMENT SPECIFICATION FOR FLUID COUPLING INSTRUMENT SPECIFICATION FOR BEARING COOLING FORCED OIL SYSTEMINSTRUMENT SPECIFICATION FOR ELECTROSTATIC PRECIPITATOR INSTRUMENT SPECIFICATION FOR FGD SYSTEM INSTRUMENT SPECIFICATION FOR RAPHINSTRUMENT SPECIFICATION FOR ASH CONVEYING SYSTEMINSTRUMENT SPECIFICATION FOR SOOT BLOWING SYSTEM INSTRUMENT SPECIFICATION FOR ELECTROMATIC SAFETY RELIEF VALVE INSTRUMENT SPECIFICATION FOR SONIC SOOT BLOWING SYSTEMINSTRUMENT SPECIFICATION FOR AMMONIA DOSING SYSTEM INSTRUMENT SPECIFICATION FOR PULVERISER REJECT HANDLING COMPRESSOR SYSTEM INSTRUMENT SPECIFICATION FOR AIR COMPRESSOR SYSTEM INSTRUMENT SPECIFICATION FOR SERVICE AIR COMPRESSOR SYSTEM INSTRUMENT SPECIFICATION FOR BOILER CIRCULATION PUMP INSTRUMENT SPECIFICATION FOR HP & LP BYPASS SYSTEMINSTRUMENT SPECIFICATION FOR BOILER FEED PUMP INSTRUMENT SPECIFICATION FOR HP DOSING SYSTEMINSTRUMENT SPECIFICATION FOR LP DOSING SYSTEM
INSTRUMENT SPECIFICATION FOR EQUIPMENT COOLING WATER SYSTEM INSTRUMENT SPECIFICATION FOR AIR COOLED CONDENSER SYSTEMINSTRUMENT SPECIFICATION FOR DEARATOR / DEGASSERINSTRUMENT SPECS FOR MECHANICAL BOUGHT OUT EQUIPMENTS INSTRUMENT SPECIFICATION FOR FLY ASH EVACUATION SYATEMINSTRUMENT SPECIFICATION FOR BOTTOM ASH EVACUATION SYSTEMINSTRUMENT SPECIFICATION FOR ASH HANDLING SYSTEM INSTRUMENT SPECIFICATION FOR FURNACE CLEANING SYSTEM USING PRESSURISED WATER INSTRUMENT SPECIFICATION FOR PENTHOUSE COOLING SYSTEMINSTRUMENT SPECIFICATION FOR PULVERISER REJECT HANDLING AND CONVEYING SYSTEMINSTRUMENT SPECIFICATION FOR ELEVATOR/ LIFTS INSTRUMENT SPECIFICATION FOR HOISTS AND CRAINS INSTRUMENT SPECIFICATION FOR SKY CLIMBERINSTRUMENT SPECIFICATION FOR LEVEL GAUGE - REFLAX TYPE INSTRUMENT SPECIFICATION FOR COAL HANDLING PLANT INSTRUMENT SPECIFICATION FOR COAL CONVEYING SYSTEM
ELECTRICAL DOCUMENTS ELECTRICAL SPECIFICATION FOR MOTOR (EMS1)ELECTRICAL SPECIFICATION FOR ELECTRICAL ACTUATORELECTRICAL EQUIPMENT LAYOUT DRAWING EARTHING LAYOUT DRAWING ILLUMINATION LAYOUT DRAWING DRIVE/ MOTOR INTERLOCK LOGIC AND DRAWING SOLID FUEL SYSTEMFUEL FEEDING SYSTEMCOAL FEED PIPES FROM COAL MILL TO BURNER (CIRAMIC LINED & UN-LIGNED )COAL FEED PIPE COUPLING COAL FEED PIPE SUPPORTS PULVERISER / COAL MILL PULVERISER - TOP HOUSING ASSLYPULVERISER - INTERMEDIATE HOUSING ASSLYPULVERISER - BOTTOM HOUSING ASSLYPULVERISER - GEAR BOX BASE PLATE PULVERISER - CASTINGS PULVERISER - INTERNAL COMPONENTS PULVERISER INSTRUMENTAION PULVERISER VALVES FLUE GAS DUCTSDUCT - BOILER TO ECONOMISERDUCT - ECONOMISER TO AIR PRE HEATERDUCT - AIR HEATER TO ESP/MDC/BAGFILTEREXPANSION JOINTS FOR GAS DUCTING - METALIC EXPANSION JOINTS FOR GAS DUCTING - NON-METALIC/ FABRIC DAMPERS IN GAS SYSTEMSPRING HANGERS IN GAS DUCTING AIR POLLUTION CONTROL EQUIPMENTWET SCRUBBER SYSTEM/ SCR NOX PORT ASSLYHOPPERS IN FLUE GAS SYSTEMSHOPPERS BELOW ECONOMISERHOPPERS BELOW AIR PRE HEATERINSTRUMENTATION SYSTEMPANELS & ENCLOSURESSMART SOOT BLOWING SYSTEM,HEAT FLUX SENSORS CONTROL PANELS FOR BOUGHTOUT SYSTEMS (COAL/ASH HANDLING /SOOT BLOWER ETC.)PLC SYSTEMS- MISC EQUIPMENT (SOOTBLOWER,FUEL HANDLING , ETC)INSTUMENT ERECTION MATERIALINSTRUMENT CABLESINSTRUMENT JB & ACCESSORIES FOR CABLINGAIR LINE / DRAFT LINE / IMPULSE LINE MATERIALINSTUMENT HARDWARE FOR IMPULSE PINGING SYSTEMINSTRUMENT CABLE TRAYS & SUPPORTSINSTUMENT ENCLOSURES / LIE / LIR / CABINETS, CANOPIESFIELD INSTRUMENTSTRANSMITTERS GAUGES & SWITCHESCONTROL VALVES - NON CRITICAL APPLICATIONSENSORS POWER CYLINDERSREMOTE OPERATED QUICK SHUT OFF VALVES - PNEUMATIC SKIN METAL TC / SPECIAL TC CONTROL VALVES - CRITICAL APPLICATION/ START UP APPLICATION MISCELLANEOUS INSTRUMENTS FOR BOUGHTOUT EQUIPMENTS ANALYTICAL INSTRUMENTS ANALYTICAL INSTRUMENTS & ANALYSERSLIQUID/GASEOUS FUEL SYSTEMOIL / GAS FIRING SYSTEMMAIN BURNER ASSEMBLY BURNER INSTRUMENTATION HEA IGNITORLUBRICANTSFINAL PLANT PAINTING AND PROTECTIONPAINTINGPAINTS FOR SHOP - CUSTOMER SPECIFIEDPAINTS FOR SITE PAINTS (FOR SUBCONTRACTORS)PRESSURE PARTSSTEAM DRUM ASSLY / VERTICLE SEPERATOR VERTICAL STEAM SEPERATORSWATER COLLECTION TANK (WCT)ECONOMISER ASSLYECONOMISER ECONOMISER INLET HEADER ECONOMISER INTERMEDIATE HEADERECONOMISER OUTLET HEADER BOILER FURNACERH PANELFRONT PANEL / ROOF PANEL - RADIATIONLH PANEL - RADIATIONREAR PANEL - RADIATIONSPIRAL FURNACE RH SIDE WALL (VERTICAL)FRONT SIDE WALL (VERTICAL)LH SIDE WALL (VERTICAL)REAR WALL ARCH/PCP FLOORFRONT PCP RH SIDE WALL HCP FRONT PANEL WITH SCREEN HCP BAFFEL WALL WITH SCREEN FRONT PCP LH SIDE WALL PCP REAR RH SIDE WALL PCP REAR LH SIDE WALL ROOF PANELHCP REAR WALL HCP RIGHT SIDE WALL HCP LEFT REHEATER SIDE WALL SPIRAL FURNACE BOTTOM HEADER SPIRAL TRANSITION HEADERS LH, FRONT & RH TOP HEADERS ROOF MIX HEADERS HCP HEADER STRINGER HEADER VERTICAL SEPERATOR MANIFOLD HEADER SUPERHEATER ASSEMBLYPRIMARY SUPERHEATER COILS PLATTEN SUPERHEATER COILS SECONDARY SUPERHEATER COILS PRIMARY SUPERHEATER HEADERSPLATTEN SUPERHEATER HEADERSSECONDARY SUPERHEATER HEADERSREHEAT SYSTEM PRIMARY REHEATER COILS FINAL REHEATER COILS PRIMARY REHEATER HEADER FINAL REHEATER HEADER RISERS & DOWNCOMERSDOWNCOMERS RISERS & SUPPLY PIPES (SUPER CRITICAL)ECO OUTLET HEADER TO VERTICAL SEPERATOR ECO OUTET HEADER TO SPIRAL FURNACE BOTTOM HEADER ATTEMPERATOR ASSEMBLYFIRST STAGE SUPERHEATER ATTEMPERATOR SECOND STAGE SUPERHEATER ATTEMPERATOR REHEATER ATTEMPERATOR PRESSURE PART SUPPORTSPRESSURE PART SUPPORTSPRESSURE PART ATTACHMENTS - TO BE WELDED AT SITEBUCKSTAY PRESSURE PART SPRINGS SUPPORTS CASTINGS FOR PRESSURE PART SUPPORT (LOOSE)SUPPORT STRUCTURE FOR RISERS & SUPPLY PIPES SUPPORT STRUCTURE FOR DOWNCOMMERS SOOT BLOWER ASSEMBLYSOOT BLOWERSBOILER REFRACTORY & INSULATION CASING, ACCESS DOORS & PEEP HOLES BOILER CASING / PENTHOUSE (CS & AS)ACCESS DOORS AND PEEPHOLES STRUCTUREBOILER STRUCTURESTRUCTURE COLUMNS - BOILERSTRUCTURAL & PLATFORM BEAMS - BOILERBRACINGS - BOILERSTAIRCASE AND LADDERS - BOILERGRILLS & CHEQUERED PLATES - BOILERHAND RAILINGS - BOILERHARDWARE - BOILER STRUCTURETOP DECK STEEL GIRDERS WITH HARDWARE LIFT STRUCTURE CANOPY - LIFT STRUCTURE SHEETING AND ACESSORIES - LIFT AUXILIARY EQUIPMENT SUPPORT STRUCTURESUPPORT STRUCTURE FOR DUCTS BETWEEN RAPH & ESPFEED WATER SYSTEMPUMPSBOILER CIRCULATION PUMPMOTOR FOR BOILER CIRCULATION PUMP PIPING SYSTEMSPIPINGINTEGRAL PIPING WITH HARDWARENON-INTEGRAL PIPING ( DRAIN& VENTS ) WITH HARDWARE (IBR)NON-INTEGRAL PIPING (AUXILARY STEAM PIPING ) WITH HARDWARE (IBR)BOILER AREA PIPING (NON-IBR ) BOUGHTOUT SILENCERSSPRING HANGERS (PIPING)VALVES & MOUNTINGSMOTORISED PROCESS VALVESMANUAL PROCESS VALVESVALVES FOR OIL FIRING & GAS FIRINGSAFETY VALVES FOR BOILERSPECIAL VALVES / DAMPERS (BOUGHTOUT)BIASING DAMPER
Name Sign
Mr. N.M. PawgiProcess Engineering
Mr. P.ManoharanContract Engineering
Mr. Sudhir PanditContract Engineering
Mr. Dilip PawseE&I Engineering
Mr. Narayana DeshkulkarniProjects
Mr. Subhash GandheProposal Management
Mr. Vikram ZutshiSupply Chain Management
Mr. Tamal DuttaQAC
TBWES MASTER WBS LIST FOR CFBC & SUPERCRITICAL BOILERS
CFBC SUPER CRITICAL Erection Drg
CFBC SUPER CRITICAL DH-3- SUPER CRITICAL DH-3 NA- SUPER CRITICAL DH-3 22-Apr-16
CFBC SUPER CRITICAL DH-3 22-Apr-16CFBC SUPER CRITICAL DH-3 Not requiredCFBC SUPER CRITICAL DH-3 Not requiredCFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3
Applicable for the project
CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3
DH-3DH-3
CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3
SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3
DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3
SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3
DH-3SUPER CRITICAL DH-3
CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3
SUPER CRITICAL DH-3SUPER CRITICAL DH-3
CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3
CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3
DH-3CFBC SUPER CRITICAL DH-3
SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3
DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Balance- SUPER CRITICAL DH-3- SUPER CRITICAL DH-3- SUPER CRITICAL DH-3- SUPER CRITICAL DH-3- SUPER CRITICAL DH-3- SUPER CRITICAL DH-3- SUPER CRITICAL DH-3
DH-3- SUPER CRITICAL DH-3
CFBC SUPER CRITICAL DH-3CFBC - DH-3 19-Apr-16CFBC SUPER CRITICAL DH-3 ReleasedCFBC - DH-3 ReleasedCFBC SUPER CRITICAL DH-3 Not requiredCFBC SUPER CRITICAL DH-3 Not requiredCFBC SUPER CRITICAL DH-3 Not requiredCFBC SUPER CRITICAL DH-3 Not requiredCFBC SUPER CRITICAL DH-3CFBC - DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3 19-Apr-16CFBC SUPER CRITICAL DH-3 ReleasedCFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3- SUPER CRITICAL DH-3- SUPER CRITICAL DH-3 For Windbox Dampers
CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3 For Skin TC of BurnersCFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3
DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3
DH-3- SUPER CRITICAL DH-3
CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3- SUPER CRITICAL DH-3 Engg to confirm- SUPER CRITICAL DH-3 Engg to confirm
CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3 19-Apr-16CFBC SUPER CRITICAL DH-3 19-Apr-16- SUPER CRITICAL DH-3 Not applicable
CFBC SUPER CRITICAL DH-3 19-Apr-16CFBC SUPER CRITICAL DH-3CFBC - DH-3 Not applicableCFBC - DH-3 Not applicableCFBC - DH-3 Not applicableCFBC - DH-3 Not applicable- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released
DH-3 Released- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Not applicable- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Not applicable- SUPER CRITICAL DH-3 19-Apr-16- SUPER CRITICAL DH-3 Engg to confirm
CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released
CFBC SUPER CRITICAL DH-3 ReleasedCFBC SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released
CFBC SUPER CRITICAL DH-3 ReleasedCFBC SUPER CRITICAL DH-3- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Not applicable- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Not applicable
CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Released- SUPER CRITICAL DH-3 Balance for piping.- SUPER CRITICAL DH-3 Not applicable
CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3- SUPER CRITICAL DH-3
CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3 ReleasedCFBC SUPER CRITICAL DH-3 90 % released. Balance CFBC SUPER CRITICAL DH-3 23-Apr-16CFBC SUPER CRITICAL DH-3 Vendor - Bergen issue.CFBC SUPER CRITICAL DH-3 Not applicableCFBC SUPER CRITICAL DH-3 ReleasedCFBC SUPER CRITICAL DH-3 ReleasedCFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3 Not applicableCFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3 19-Apr-16CFBC SUPER CRITICAL DH-3 Not applicableCFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3 Vendor - profile issue.CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3- SUPER CRITICAL DH-3- SUPER CRITICAL DH-3
CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3CFBC SUPER CRITICAL DH-3- SUPER CRITICAL DH-3 Released
Model IssueMill Area Is balance