Pittsburgh, PA 15213-3890 CMMI Acquisition Module - Page M7-1 CMMI ® Sponsored by the U.S. Department of Defense © 2005 by Carnegie Mellon University This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. M7-Conclusion v0.1 Introduction to the CMMI ® Acquisition Module (CMMI-AM) SM CMM Integration, IDEAL, and SCAMPI are service marks of Carnegie Mellon University. ® Capability Maturity Model, Capability Maturity Modeling, CMM, and CMMI are registered in the U.S. Patent and Trademark Office by Carnegie Mellon University. Module 7: Conclusion

Upload: claud-stevens

Post on 16-Dec-2015

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Pittsburgh, PA 15213-3890 CMMI Acquisition Module - Page M7-1 CMMI ® Sponsored by the U.S. Department of Defense © 2005 by Carnegie Mellon University This

Pittsburgh, PA 15213-3890

CMMI Acquisition Module - Page M7-1

CMMI ®

Sponsored by the U.S. Department of Defense© 2005 by Carnegie Mellon UniversityThis material is approved for public release. Distribution is limited by the Software Engineering Institute toattendees.

M7-Conclusion v0.1

Introduction to the CMMI®

Acquisition Module(CMMI-AM)

SM CMM Integration, IDEAL, and SCAMPI are service marks of Carnegie Mellon University.® Capability Maturity Model, Capability Maturity Modeling, CMM, and CMMI are registered in the U.S. Patent and Trademark Office

by Carnegie Mellon University.

Module 7:

Conclusion

Page 2: Pittsburgh, PA 15213-3890 CMMI Acquisition Module - Page M7-1 CMMI ® Sponsored by the U.S. Department of Defense © 2005 by Carnegie Mellon University This

© 2005 by Carnegie Mellon University CMMI Acquisition Module - Page M7-2

CMMI ®

M7-Conclusion v0.1

“Ad Hoc” Acquisition Practices

Operational Need

Page 3: Pittsburgh, PA 15213-3890 CMMI Acquisition Module - Page M7-1 CMMI ® Sponsored by the U.S. Department of Defense © 2005 by Carnegie Mellon University This

© 2005 by Carnegie Mellon University CMMI Acquisition Module - Page M7-3

CMMI ®

M7-Conclusion v0.1

Explicit Acquisition Practices

Acquisition Planning

RFPPrep.

Solicita-tion

Source Selection

System Acceptance

Program Leadership Insight / Oversight

Transition

Plan DesignIntegrate

& TestDevelop Deliver

CMMI-SE/SW/IPPD/SS

CMMI Acquisition Module

Operational Need

Developer

Acquirer

Page 4: Pittsburgh, PA 15213-3890 CMMI Acquisition Module - Page M7-1 CMMI ® Sponsored by the U.S. Department of Defense © 2005 by Carnegie Mellon University This

© 2005 by Carnegie Mellon University CMMI Acquisition Module - Page M7-4

CMMI ®

M7-Conclusion v0.1

Questions to Ask About Your Program 1

If you are in the pre-award phase:

1. Do I have a sound risk management program with the PMO?

2. Do I have the proper staffing for the acquisition of a software intensive system?

3. Have I established good working relationships with ALL my stakeholders?

4. Have I considered and documented several alternative acquisition strategies?

5. Have I negotiated my acquisition strategy with all my stakeholders?

6. Do my RFP and/or contract address issues specific to software intensive systems?

7. Are my top-level requirements sound and do they include the “ilities?”

Page 5: Pittsburgh, PA 15213-3890 CMMI Acquisition Module - Page M7-1 CMMI ® Sponsored by the U.S. Department of Defense © 2005 by Carnegie Mellon University This

© 2005 by Carnegie Mellon University CMMI Acquisition Module - Page M7-5

CMMI ®

M7-Conclusion v0.1

Questions to Ask About Your Program 2

If you are early in execution (concept definition, risk reduction, and/or design phase):

1. Do my PMO and contractor teams have sound processes in place, and can they be integrated appropriately?

2. Does my contractor have a robust risk management program that interfaces to the PMO risk program?

3. Are my system and software architectures responsive to functional and non-functional requirements and are they well documented? Has there been a technical evaluation?

4. Is my software design and code well documented and reviewed?

5. Are my test plans being written and reviewed early?

6. Is my schedule slipping such that the test time will be reduced unacceptably?

Page 6: Pittsburgh, PA 15213-3890 CMMI Acquisition Module - Page M7-1 CMMI ® Sponsored by the U.S. Department of Defense © 2005 by Carnegie Mellon University This

© 2005 by Carnegie Mellon University CMMI Acquisition Module - Page M7-6

CMMI ®

M7-Conclusion v0.1

Questions to Ask About Your Program 3

If you are later in execution (integration & test phase):

1. Does the contractor have a robust defect handling/tracking system?

2. Are the transition to operations and support plans being developed in time, does it include user input, and does it include any required system certifications?

3. Is the contractor developing a software maintenance plan (to include COTS/GOTS/Open Source)?

4. Is the configuration management system in place?

5. Is the software being tested for robustness as part of the system testing?

6. Are all the interfaces being tested?

Page 7: Pittsburgh, PA 15213-3890 CMMI Acquisition Module - Page M7-1 CMMI ® Sponsored by the U.S. Department of Defense © 2005 by Carnegie Mellon University This

© 2005 by Carnegie Mellon University CMMI Acquisition Module - Page M7-7

CMMI ®

M7-Conclusion v0.1

What Do I Do Now? 1

If you are in an early program phase:• Evaluate the current state of process within the PMO• Develop and execute a PMO process improvement plan

If you haven’t released your RFP:• Ensure the RFP includes contractor process

requirements• Ensure the evaluation criteria reflect areas of process

maturity• Ensure you are asking for appropriate measures and

artifacts to provide on-going assessment of contractor process compliance

Page 8: Pittsburgh, PA 15213-3890 CMMI Acquisition Module - Page M7-1 CMMI ® Sponsored by the U.S. Department of Defense © 2005 by Carnegie Mellon University This

© 2005 by Carnegie Mellon University CMMI Acquisition Module - Page M7-8

CMMI ®

M7-Conclusion v0.1

Government ContactsOffice Of The Secretary Of Defense:

Kristen Baldwin OUSD(AT&L) Defense Systems System Engineering

Room 3D1075, 3090 Defense Pentagon, Washington, DC 20301-3090(703) 695-2300 – Fax: (703) 614-9884 [email protected]

Air Force:Mike Nicol, Government Co-Chair USAF ASC/EN –

Technical Advisor, Embedded Computer Systems SoftwareBldg 560, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101(937) 255-9566 – Fax: (937) 255-5305 [email protected]

Army:Anthony D’Agosto US Army RECOM-ARDEC – Director, Fire Control Systems & TechnologyAMSRD-AAR-AEF, Picatinny Arsenal, NJ 07806-5000(973) 724-3439 – Fax: (973) 724-7321 [email protected]

Navy:Brenda Zettervall US Navy, ASN/RDA CHENG – Software Systems Engineer1333 Iasaac Hull Ave, SE, Stop 5012, Washington Navy Yard, DC 20376-5012(202) 781-3261 [email protected]

NASA:Dr. John C. Kelly NASA HQ – Suite 2J40, Office of Chief EngineerWashington, DC 20546-0001(202) 358-3296 – Cell: (202) 997-0245 – Fax: (202) 358-3296 [email protected]

Defense Contract Management Agency:Kathryn (Kathy) Lundeen Defense Contract Management Agency,

DCMA CMMI Project Manager, DCMA-OCT6350 Walker Lane, Metro Park 2, Alexandria, VA 22130(703) 428-1830 – Fax: (703) 428-1898 [email protected]

Page 9: Pittsburgh, PA 15213-3890 CMMI Acquisition Module - Page M7-1 CMMI ® Sponsored by the U.S. Department of Defense © 2005 by Carnegie Mellon University This

© 2005 by Carnegie Mellon University CMMI Acquisition Module - Page M7-9

CMMI ®

M7-Conclusion v0.1