plan now to save time in spring 2014

30
Copyright © 2010, SAS Institute Inc. All rights reserved. SY2013-2014 PIMS/Educator Effectiveness/PVAAS Teacher Specific Reporting IU1 LEA Administrators October 24, 2013

Upload: rhoda

Post on 23-Feb-2016

39 views

Category:

Documents


0 download

DESCRIPTION

SY2013-2014 PIMS/Educator Effectiveness/PVAAS Teacher Specific Reporting IU1 LEA Administrators October 24 , 2013. Plan NOW to Save Time in Spring 2014. Staff Time – Teachers and Administrators - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Plan  NOW  to Save Time in Spring 2014

SY2013-2014 PIMS/Educator Effectiveness/PVAAS Teacher

Specific Reporting

IU1 LEA AdministratorsOctober 24, 2013

Page 2: Plan  NOW  to Save Time in Spring 2014

Plan NOW to Save Time in Spring 2014

Staff Time – Teachers and Administrators• Accurate and complete data into PIMS WILL

save time for your teachers who are eligible for a PVAAS score

• Accurate and complete data into PIMS WILL save time for your principals and district admin who will support the teachers who are eligible for a PVAAS score

• Approximately 30-40% of your teaching staff will be eligible for a PVAAS teacher specific score 2

Page 3: Plan  NOW  to Save Time in Spring 2014

3

Page 4: Plan  NOW  to Save Time in Spring 2014

What is PVAAS teacher-specific reporting?• Estimates the effect of a teacher’s

performance on the academic growth of a group of students.

• Taking into account both their endpoint and their entering achievement level.

• By concentrating on growth, PVAAS puts the emphasis on what educators can influence. 4

Page 5: Plan  NOW  to Save Time in Spring 2014

Which Teachers?

A PA certified educator with full or partial responsibility for content specific instruction of the assessed eligible content as measured by a

PA state assessment

Face to Face Online Instruction

5

Page 6: Plan  NOW  to Save Time in Spring 2014

PVAAS Teacher Reporting: Teachers in Which Tested Grades/Subjects/Courses?

• PSSA: With/Without Accommodations (Not PASA)• Grades 4-8: Reading and Math• Grades 4 & 8: Science• Grades 5 & 8: Writing

• Future: Transition into ELA Assessment• Courses Culminating in Keystone Exams: With/Without

Accommodations• Algebra I• Literature• Biology

Approximately 30-40% of your teaching staff will be

eligible for a PVAAS teacher specific score

6

Page 7: Plan  NOW  to Save Time in Spring 2014

What is content-specific instruction?• Responsibility to plan the instruction of the assessed

eligible content, provide the instruction of the assessed eligible content, and use the assessment information to evaluate the effectiveness of the instruction of the assessed eligible content on a PA state assessment.

• Defined on the Framework for Teaching by both Domains 1 and 3:

• Content specific instruction is a determination made locally by the LEA.

7

Page 8: Plan  NOW  to Save Time in Spring 2014

Are special education teachers, intervention specialists, reading/math specialists, ESL teachers, and gifted teachers eligible for a PVAAS score?

• Yes, if the teacher is responsible for Domains 1 & 3.

• There may be more than one teacher planning, instructing, and assessing the students (i.e., co-teaching, team teaching).

8

Page 9: Plan  NOW  to Save Time in Spring 2014

Are instructional coaches eligible for a PVAAS score?

• If the role of the instructional coach is only to provide support and consultation to PA certified educator(s)/adults this does not meet the criteria for PVAAS teacher-specific reporting.

• PVAAS teacher-specific reporting is provided to those who provide content specific instruction to the students. (Framework for Teaching, Domains 1 and 3)

9

Page 10: Plan  NOW  to Save Time in Spring 2014

Ensuring Accurate Information: PVAAS Roster Verification

Provide PVAAS teacher specific reporting based on an accurate representation of a teacher’s responsibility and influence on the academic growth of students. 10

Page 11: Plan  NOW  to Save Time in Spring 2014

Essential Linkages in PIMS• Make sure the right teachers are linked to the right

students for the right proportion of instructional responsibility for the right tested grade/subject/course to yield PVAAS Teacher Reporting.

Teacher

Student Proportion of Instructional

Responsibility

Course & Grade/Subject

11

Page 12: Plan  NOW  to Save Time in Spring 2014

Teachers, school administrators and district administrators verifying data that is used to yield PVAAS teacher specific reporting– data that will ultimately be used as part of a teacher’s evaluation.

The PVAAS rosters are prepopulated from the

PIMS Course/HQT submitted by LEAs to PIMS (Student, Staff, Course Templates)

What is this process all about?

12

Page 13: Plan  NOW  to Save Time in Spring 2014

When is SY13-14 PVAAS Roster Verification?

• April 28 – June 6

Verification Windows: Open and Close Dates LEA Pre-Step/Setup Window: 1 weekTeacher Window: 2 weeksSchool Admin Window: 2 weeksDistrict Admin Window: 1 week

Hard Deadlines

13

Page 14: Plan  NOW  to Save Time in Spring 2014

New Terms: % Instructional Responsibility

% Student + Teacher

Enrollment

Full or Partial % of Instruction

• This % is your total Instructional Responsibility for a student.

• This % reflects how much the student will be weighted in the PVAAS analyses.

• The % Instructional Responsibility is calculated by multiplying the (% Student + Teacher Enrollment) by (Full or Partial % of Instruction).

% Instructional Responsibility

14

Page 15: Plan  NOW  to Save Time in Spring 2014

3 New Terms

15

Page 16: Plan  NOW  to Save Time in Spring 2014

% Student + Teacher Enrollment

IS …• The % of a grade/subject/course

that a student and teacher are concurrently enrolled

• Total Days Possible: Day 1 through last school day before LEA’s state testing window opens for that grade/subject/course

IS NOT…• Attendance % Student +

Teacher Enrollment

See PVAAS Pilot FAQ 6.4 for additional details on calculation

16

Page 17: Plan  NOW  to Save Time in Spring 2014

Calculating:% Student + Teacher Enrollment

% Student + Teacher

Enrollment

What proportion of the grade/subject/course are the student and teacher concurrently enrolled?

Day 1Day 140

Last Day Before Testing WindowGrade/Subject/Course

Student Enrolled

Teacher Enrolled

% Student + Teacher Enrollment = Concurrent

Enrollment

17

See PVAAS Pilot FAQ 6.4 for additional details on calculation

Page 18: Plan  NOW  to Save Time in Spring 2014

Calculating: Full or Partial % of Instruction

Full or Partial % of Instruction

Full % of Instruction = 100%

Are you the only PA certified educator responsible for the content-specific instruction (Domains 1 and 3) of the assessed eligible

content in the grade/subject/course?YES NO

Partial % of Instruction = <100%Proportion of responsibility for the content-specific instruction of the assessed eligible content in the

grade/subject/course (Domains 1 and 3)

18

Page 19: Plan  NOW  to Save Time in Spring 2014

From your LEA into PIMS

19

Page 20: Plan  NOW  to Save Time in Spring 2014

Data: PIMS and PVAAS Roster System

• Data in PVAAS roster system reflects data submitted into PIMS from your LEA.

• SY13-14 Roster Verification: • VERIFICATION PROCESS for teachers and

administrators as info will come from PIMS• Should NOT be major editing, adding, removing

if PIMS data is complete and accurate

20

Page 21: Plan  NOW  to Save Time in Spring 2014

Session Focus

•PVAAS Teacher Specific Reporting•PVAAS Roster Verification

PVAAS Teacher Specific

Reporting

•Changes to PIMS to Align with Educator Effectiveness

PIMS and PVAAS

•LEA Student Information System•Professional Development

Next Steps for SY13-14

Implementation 21

Page 22: Plan  NOW  to Save Time in Spring 2014

Quality PIMS Data

• Expanded Use of PIMS Data• PIMS Course/HQT data are used for:

• Federal Reporting/Accountability• State Reporting/Accountability• Educator Effectiveness

22

Page 23: Plan  NOW  to Save Time in Spring 2014

Quality PIMS Data

• PIMS Course/HQT data are used to support • Educator Effectiveness (PVAAS)• School Performance Profiles• Federal reports

• The PIMS Course/HQT collection has become high stakes. It is critical that PIMS data are accurate and timely.• All core-content courses must be submitted• All teachers and students enrolled in each course

section must be accounted• Courses must be mapped accurately to State course

codes 23

Page 24: Plan  NOW  to Save Time in Spring 2014

NEW FOR 2013-2014 SCHOOL YEARCollection Cycle

• Collection Window• LEA must submit data• List of LEAs that fail to submit sent to PDE executive

offices• Correction Window

• No overrides necessary• No overrides will be granted after Correction window

closes• LEAs that fail to submit data by end of this window will be

non-compliant with State and Federal requirements24

Page 25: Plan  NOW  to Save Time in Spring 2014

Impact in PIMS and Local SIS

• PIMS Course/HQT (Student-Staff-Course)• NEW: All teachers linked to a student for a

grade/subject/course• Teacher data differ from HQT ( HQT is a different PIMS need)• Report teachers REALLY having responsibility for planning the

instruction, delivering the instruction, and assessing the effectiveness of the instruction( Domains 1 AND 3)

• Could include, at times, LTS (Long-term Substitutes)• NEW: % of Instructional Responsibility (factors)• NEW: Keystone Related Course Codes/Courses that

“trigger” a Keystone exam• NEW: Departmentalized Elementary Courses 25

Page 26: Plan  NOW  to Save Time in Spring 2014

Impact in PIMS and Local SIS

• PIMS Course/HQT (Student-Staff-Courses)• NEW: Substitutes are now to be submitted in

limited cases• NEW: Staff Emails (teachers and admin)• NEW: PVAAS Account Roles• NEW: Submission of non-core content courses is

NO longer required.• New Use of PIMS data – School Performance

Profile26

Page 27: Plan  NOW  to Save Time in Spring 2014

New Student/Staff/Course Template

• Emailed to PIMS

Administrators on July 18, 2013

27

Page 28: Plan  NOW  to Save Time in Spring 2014

Copyright © 2010, SAS Institute Inc. All rights reserved.

Policy and Implementation Implications Requiring Leadership

• PIMS Changes – Start Planning Now• SIS Alignment to PIMS SY13-14

• Managing a new process• New concept of “% Instructional Responsibility”

• % Student + Teacher Enrollment• % Instruction

• Co-teaching, team teaching, etc.• Teachers in various roles:

• Regular Ed, Special Ed Teachers• Reading/Math Specialists• ELL Teachers• Gifted Teachers• Intervention Specialists• Others

28

Page 29: Plan  NOW  to Save Time in Spring 2014

Copyright © 2010, SAS Institute Inc. All rights reserved.

Policy and Implementation Implications Requiring Leadership

• Communications to LEA Staff• Professional Development and Support

• Who?• When?

• District and School Admin Accounts• Who “signs off” on rosters?

29

Page 30: Plan  NOW  to Save Time in Spring 2014

Sum it up!

• Complete and accurate data in PIMS this year will save your teachers and admin time

• Plan now for your teachers eligible for PVAAS Score• Communications• Professional Development

• Access resources and support• [email protected]

30