planilla leed for homes
TRANSCRIPT
-
8/9/2019 Planilla Leed for Homes
1/98
Please submit this sheet, along with the completed documentation package, by e-mail, fax, or mail.
To: USGBC, LEED for Homes From:
c/o Courtney Baker
Fax: 202 - 828 - 5110 Pages:Phone: 202 - 587 - 7187 Date:
Documentation Package
Signed LEED for Homes Checklist Signed Durability Inspection Checklist
Signed Accountability Forms Certification fee
Signed Durability Evaluation Form
Project Information Certifier Information
Project address(es) Provider Certifier
City Company
Metro. Area Green Rater
State Company
Project Team Information
Builder
Team Leader
CompanyAddress
Fax / email
Project Information
Type of building (how to choose?) Single detached # of bedrooms:
Type of project (how to choose?) Custom Floor area (square feet):
# of homes: Home Size Adjustment: 0
# of stories EA pathway? Performance
IECC climate zone HERS Index (if any) 85EPA radon zone
Recommended for Certification
Name:
Company:
Signature:
Date:
Project Summaryfor a Completed LEED for Homes Project
or mail: U.S. Green Building Council, 1800 Massachusetts Avenue, NW, Suite 300, Washington, DC 20036
or scan and e-mail: [email protected]
Other TeamMembers
I have evaluated this project's documentationpackage and conducted the necessary QA/QCprocedures with the Green Rater, and I herebydeclare and affirm to USGBC that this project isready to earn LEED for Homes certification, as perthe attached checklist.
-
8/9/2019 Planilla Leed for Homes
2/98
-
8/9/2019 Planilla Leed for Homes
3/98
US Green Building Council Page 3 of 98
LEED for Homes Project Che
for Homes Builder Name:
Project Team Leader:
Home Address (Street/City/State):
Project Description Adjusted Certification Thres
Building Type: Single detached Project type: Custom Certified: 45.0
# of Bedrooms: 0 Floor Area: 0 Silver: 60.0
Project Point Total Final Credit Category Point Totals
Prelim: 0 + 0 maybe pts Final: 0 ID: 0 SS: 0 EA
Certification Level LL: 0 WE: 0 MR
Prelim: Not Certified Final: Not Certified Min. Point Thresholds Not Met for P
0 0
date last updated : Max Pts. Preliminary Rating
last updated by : Available Y / Pts Maybe No
Max: 11 Y:0 M:0
1. Integrated Project Planning 0 01.1 Preliminary Rating Prereq.
Target performance tier:
1.2 1 0 0
1.3 Professional Credentialed with Respect to LEED for Homes 1 0 0
1.4 Design Charrette 1 0 0
1.5 1 0 0
2. Quality Management for Durability
2.1 Prereq.
2.2 Prereq.
Innovation & Design Process (ID) (Minimum 0 ID Points Required)
.
Integrated Project Team (meet all of the following)
Building Orientation for Solar Design (meet all of the following)
Durability Planning (meet all of the following)
Durability Management (meet one of the following)
a) Individuals or organizations with necessary capabilities c) Regular meetings held with project team
b) All team members involved in various project phases
a) Durability evaluation completed
c) Moisture control measures from Table 1 incorporated
b) Strategies developed to address durability issues
a) Glazing area on north/south walls 50% greater than on east/west walls c) At least 450 sq. ft. of south-facing roof area
b) East-west axis is within 15 degrees of due east-west d) 90% of south-facing glazing is shaded in su
Builder has a quality management process in place Builder conducted inspection using durability
d) Durability strategies incorporated into proje
e) Durability measures listed in durability insp
-
8/9/2019 Planilla Leed for Homes
4/98
US Green Building Council Page 4 of 98
2.3 Third-Party Durability Management Verification 3 0 0
-
8/9/2019 Planilla Leed for Homes
5/98
US Green Building Council Page 5 of 98
3. Innovative or Regional Design
3.1 Innovation 1 (ruling #): 1 0 0
3.2 Innovation 2 (ruling #): 1 0 0
3.3 Innovation 3 (ruling #): 1 0 0
3.4 Innovation 4 (ruling #): 1 0 0
Max: 10 Y:0 M:0
1. LEED for Neighborhood Development 0 0
1 LEED for Neighborhood Development 10 0 0
2. Site Selection
2 2 0 0
3. Preferred Locations
3.1 Edge Development 1 0 0
OR 3.2 Infill 2 0 0
AND/OR 3.3 Previously Developed 1 0 0
4. Infrastructure
4 Existing Infrastructure 1 0 0
5. Community Resources / Transit
5.1 1 0 0
OR 5.2 2 0 0
OR 5.3 3 0 0
6. Access to Open Space
6 Access to Open Space 1 0 0
Location & Linkages (LL) (Minimum 0 LL Points Required)
Site Selection (meet all of the following)
Basic Community Resources / Transit (meet one of the following)
Extensive Community Resources / Transit (meet one of the following)
Outstanding Community Resources / Transit (meet one of the following)
a) Built above 100-year floodplain defined by FEMA
c) Not built within 100 ft of water, including wetlands
b) Not built on habitat for threatened or endangered species
d) Not built on land that was public parkla
e) Not built on land with prime soils, uniq
a) Within 1/4 mile of 4 basic community resources c) Within 1/2 mile of transit services prov
b) Within 1/2 mile of 7 basic community resources
a) Within 1/4 mile of 7 basic community resources c) Within 1/2 mile of transit services prov
b) Within 1/2 mile of 11 basic community resources
a) Within 1/4 mile of 11 basic community resources c) Within 1/2 mile of transit services prov
b) Within 1/2 mile of 14 basic community resources
-
8/9/2019 Planilla Leed for Homes
6/98
US Green Building Council Page 6 of 98
Max: 22 Y:0 M:0
1. Site Stewardship 0 0
1.1 Prereq.
1.2 1 0 0
Where the site is not previously developed, meet all the following:
ORWhere the site is previously developed, meet all the following:
OR
2. Landscaping
2.1 No Invasive Plants Prereq.
2.2 2 0 0
AND/OR 2.3 Limit Conventional Turf 3 0 0
100% Percentage of designed landscape softscape area that is turf
AND/OR 2.4 Drought-Tolerant Plants 2 0 0
0% Percentage of installed plants that are drought-tolerant
OR 2.5 Reduce Overall Irrigation Demand by at Least 20% 6 0 0
0% Percentage reduction in estimated irrigation water demand
3. Reduce Local Heat Island Effects
3 1 0 0
Sustainable Sites (SS) (Minimum 5 SS Points Required)
Erosion Controls During Construction (meet all of the following)
Minimize Disturbed Area of Site (meet the appropriate requirements)
Basic Landscaping Design (meet all of the following)
Reduce Local Heat Island Effects (meet one of the following)
a) Stockpile and protect disturbed topsoil from erosion.
c) Protect sewer inlets, streams, and lakes with straw bales, silt fenc
b) Control the path and velocity of runoff with silt fencing or equival
d) Provide swales to divert surface water
e) Use tiers, erosion blankets, compost b
b) Leave 40% of buildable lot area, not including area under roof, un
a) Develop tree / plant preservation plan with "no-disturbance" zone
c) Develop tree / plant preservation plan with "no-disturbance" zone
Rehabilitate lot; undo soil compaction and remove invasive plant
Meet the requirements of SS 2.2
d) Build on a lot of 1/7 acre or less, or 7 units per acre.
a) Any turf must be drought-tolerant.
c) Do not use turf in areas with slope of 25%
b) Do not use turf in densely shaded areas.
d) Add mulch or soil amendments as appropriate.
e) All compacted soil must be filled to at least 6 inches.
a) Locate trees / plantings to provide shade for 50% of hard b) Install light-colored, high-albedo mate
-
8/9/2019 Planilla Leed for Homes
7/98
US Green Building Council Page 7 of 98
4. Surface Water Management
4.1 Permeable Lot 4 0 0
0% vegetative landscape
0% permeable paving
0% impermeable surfaces directed to infiltration features
4.2 1 0 0
4.3 2 0 0
5. Nontoxic Pest Control
5 2 0 0
e) In 'moderate' to 'very heavy' termite risk are
6. Compact Development
6.1 Moderate Density 2 0 0
OR 6.2 High Density 3 0 0
OR 6.3 Very High Density 4 0 0
Max: 15 Y:0 M:0
1. Water Reuse 0 0
1.1 Rainwater Harvesting System 4 0 0
0% Percentage of roof area used for harvesting
Application
AND/OR 1.2 Graywater Reuse System 1 0 0
OR 1.3 Use of Municipal Recycled Water System 3 0 0
Permanent Erosion Controls (meet one of the following)
Management of Runoff from Roof(meet any, see Rating System for pts)
Pest Control Alternatives (meet any of the following, 1/2 pt each)
Water Efficiency (WE) (Minimum 3 WE Points Required)
a) For portions of lot on steep slope, use terracing and retaining wall b) Plant trees, shrubs, or groundcover
a) Install permanent stormwater controls to manage runoff from the c) Install vegetated roof to cover 100% of
b) Install vegetated roof to cover 50% of roof area d) Have lot designed by professional to m
a) Keep all wood at least 12" above soil
c) Include no wood-to-concrete connections, or separate connections w
b) Seal external cracks, joints, etc. with caulking and install pest-pro
d) Install landscaping so mature plants are 24" from home
i) Treat all cellulosic material with borate
ii) Install sand or diatomaceous earth bar
iii) Install steel mesh barrier termite contr
iv) Install non-toxic termite bait system
v) Use noncellulosic wall structure
vi) Use solid concrete foundation walls or
-
8/9/2019 Planilla Leed for Homes
8/98
US Green Building Council Page 8 of 98
2. Irrigation System
2.1 3 0 0
AND/OR 2.2 Third-party Inspection1 0
0
2.3 Reduce Overall Irrigation Demand by at Least 45% 4 0 0
0% Percentage reduction in estimated irrigation water demand
3. Indoor Water Use
3.1 3 0 0
3.2 6 0 0
Max: 38 Y:0 M:0
1. Optimize Energy Performance 0.0 0.0
1.1 Performance of ENERGY STAR for Homes Prereq.
1.2 Exceptional Energy Performance 34 0 0
0 IECC climate zone 85 HERS Index
7. Water Heating
7.1 2 0 0
7.2 Pipe Insulation 1 0 0
11. Residential Refrigerant Management
11.1 Refrigerant Charge Test Prereq.
11.2 1 0 0
High-Efficiency Irrigation System (meet any of the following, 1 pt each)
High-Efficiency Fixtures and Fittings (meet any of the following, 1 pt each)
Very High-Efficiency Fixtures and Fittings (meet any, 2 pts each)
Energy & Atmosphere (EA) (Minimum 0 EA Points Required)
Efficient Hot Water Distribution System (meet one of the following)
Appropriate HVAC Refrigerants (meet one of the following)
a) Irrigation system designed by EPA Water Sense certified professi
c) Install central shut-off valve
b) Irrigation system with head-to-head coverage
d) Install submeter for the irrigation system
e) Use drip irrigation for 50% of planting beds
f) Create separate zones for each type of bedding
g) Install timer or controller for each wat
h) Install pressure-regulating devices
i) High-efficiency nozzles with distribution
j) Check valves in heads
k) Install moisture sensor or rain delay co
Full points earned in SS 2.3
a) Average flow rate of lavatory faucets is 2 gpm c) Average flow rate for all toilets is 1.3
b) Average flow rate for all showers is 2.0 gpm per stall Toilets are dual-flush; OR
Toilets meet the EPA Water Sense spe
a) Average flow rate of lavatory faucets is 1.5 gpm; OR b) Average flow rate for all showers 1.7
Lavatory faucets meet the EPA Water Sense specification c) Average flow rate for all toilets is 1.1
a) Structured plumbing system c) Compact design of conventional systeb) Central manifold distribution system
a) Use no refrigerants c) Use refrigerants that complies with glo
b) Use non-HCFC refrigerants
-
8/9/2019 Planilla Leed for Homes
9/98
US Green Building Council Page 9 of 98
Max: 16 Y:0 M:0
1. Material-Efficient Framing 0 0
1.1 Framing Order Waste Factor Prereq.
1.2 Detailed Framing Documents 1 0 0
1.3 Detailed Cut List and Lumber Order 1 0 0
AND/OR 1.4 3 0 0
OR 1.5 4 0 0
2. Environmentally Preferable Products
2.1 Prereq.
2.2 8 0 0
Assembly : component (a) EPP (b) Low emission
Exterior wall: framing type:
Exterior wall: siding or masonry type:
Floor: flooring (45%) type: 90% hard flooring
Floor: flooring (90%) type: SCS FloorScore
Floor: carpet type: Green Label Plus
Floor: framing type:
Foundation: aggregate
Foundation: cement
Interior wall: framing type:
Interior wall, ceiling: gypsum board
Interior wall, ceiling, millwork: paint
Landscape: decking or patio type:
Other: cabinet type:
Other: counter type:
Other: door type:
Other : trim type:
Other : adhesive, sealant
Other : window frame type:
Roof: framing
Roof: roofing
Roof, floor, wall: insulation
Roof, floor, wall (2 of 3): sheathing type:
Materials & Resources (MR) (Minimum 2 MR Points Required)
Framing Efficiencies (meet any of the following, see Rating System for pts)
Off-site Fabrication (meet one of the following)
FSC Certified Tropical Wood (meet both of the following)
Environmentally Preferable Products (meet any, 1/2 pt each)
Precut framing packages
Structural insulated panel walls
Open-web floor trusses
Structural insulated panel roof
Stud spacing greater than 16" on center
Structural insulated panel floors
Ceiling joist spacing greater than 16" on c
Roof rafter spacing greater than 16" on c
Floor joist spacing greater than 16" on ce
Two of the following: Size headers for loa
a) Panelized construction b) Modular, prefabricated construction
a) Provide wood suppliers with a notice of preference for FSC-certifi b) Only use tropical wood that is FSC-cert
Requirements of MR 1.2 have been met Detailed cut list and lumber order corresp
-
8/9/2019 Planilla Leed for Homes
10/98
US Green Building Council Page 10 of 98
3. Waste Management
3.1 Prereq.
3.2 3 0 0
4.0 a) pounds waste / square foot 0
25.5 cubic yards waste / 1,000 square feet 0
0% b) percentage of waste diverted 0
Max: 21 Y:0 M:0
1. ENERGY STAR with Indoor Air Package 0 0
1 ENERGY STAR with Indoor Air Package 13 0 0
2. Combustion Venting
2.1 Prereq.
2.2 2 0 0
Type of Fireplace or stove Better practice (1 pt) Best practice (2 pts)
(must also meet Better
None granted automati
Masonry wood-burning fireplace masonry heater back-draft potent
Factory-built wood-burning fireplace listed by testing lab and meets EPA standards back-draft potent
Woodstove and fireplace insert listed by testing lab and meets EPA standards back-draft potent
Natural gas, propane, or alcohol stove listed, power- or direct-vented, fixed doors electronic pilot
Pelle stove EPA certified or meets safety requirements power- or direct-v
3. Moisture Control
3 1 0 0
4. Outdoor Air Ventilation4.1 Prereq.
4.2 2 0 0
4.3 Third-Party Performance Testing 1 0 0
Construction Waste Management Planning (meet both of the following)
Construction Waste Reduction (use one of the following methods)
Indoor Environmental Quality (EQ) (Minimum 6 EQ Points Required)
Basic Combustion Venting Measures (meet all of the following)
Enhanced Combustion Venting Measures (meet one of the following)
Moisture Load Control (meet one of the following)
Basic Outdoor Air Ventilation (meet one of the following)
Enhanced Outdoor Air Ventilation (meet one of the following)
a) Investigate local options for waste diversion
a) no unvented combustion appliances
c) all fireplaces and woodstoves have doors
b) carbon monoxide monitors on each floor
d) space, water heating equipment desig
space and water heating equipment
space and water heating equipment
no space- or water-heating equipmen
b) Central HVAC system equipped with a
a) Located in a climate with 4,500 infiltration degree days c) Intermittent ventilation
b) Continuous ventilation d) Passive ventilation
a) In climates with 4,500 infiltration degree days, install active ve b) Install heat recovery system
b) Document diversion rate for construc
a) Additional dehumidification system
-
8/9/2019 Planilla Leed for Homes
11/98
US Green Building Council Page 11 of 98
5. Local Exhaust
5.1 Prereq.
5.2 1 0 0
5.3 Third-Party Performance Testing 1 0 0
6. Distribution of Space Heating and Cooling
6.1 Room-by-Room Load Calculations Prereq.
6.2 1 0 0
A. Forced-Air Systems B. Nonducted HVAC Systems
6.3 2 0 0
A. Forced-Air Systems B. Nonducted HVAC Systems
7. Air Filtering
7.1 Good Filters Prereq.
7.2 Better Filters 1 0 0
OR 7.3 Best Filters 2 0 0
8. Contaminant Control
8.1 Indoor Contaminant Control during Construction 1 0 0
8.2 2 0 0
8.3 Preoccupancy Flush 1 0 0
9. Radon Protection
9.1 Radon-Resistant Construction in High-Risk Areas Prereq.
9.2 Radon-Resistant Construction in Moderate-Risk Areas 1 0 0
Basic Local Exhaust (meet all of the following)
Enhanced Local Exhaust (meet one of the following)
Return Air Flow / Room-by-Room Controls (meet one of the following)
Third-Party Performance Test / Multiple Zones (meet one of the following)
Indoor Contaminant Control (meet any of the following, 1 pt each)
a) Bathroom and kitchen exhaust meets ASHRAE Std. 62.2 air flow r c) Air exhausted to outdoors
b) Fans and ducts designed and installed to ASHRAE Std. 62.2 d) ENERGY STAR labeled bathroom exha
a) Occupancy sensor c) Automatic timer tied to switch
b) Automatic humidistat controller d) Continuously operating exhaust fan
b) Limited pressure differential between closed room and adjacent s
a) Return air opening of 1 sq. inch per cfm of supply Flow control valves on every radiator
Have supply air flow rates in each room tested and confirme Install at least two distinct zones with in
a) Design and install permanent walk-off mats at each entry c) Install central vacuum system with ex
b) Design shoe removal and storage space near primary entryway
-
8/9/2019 Planilla Leed for Homes
12/98
US Green Building Council Page 12 of 98
10. Garage Pollutant Protection
10.1 No HVAC in Garage Prereq.
10.2 2 0 0
a) In conditioned spaces above garage: b) In conditioned spaces next to garage
AND/OR 10.3 1 0 0
OR 10.4 Detached Garage or No Garage 3 0 0
Max: 3 Y:0 M:0
1. Education of the Homeowner or Tenant 0 0
1.1 Prereq.
1.2 Enhanced Training 1 0 0
1.3 1 0 0
2. Education of the Building Manager
2 1 0 0
Project Team Leader Company
Signature Date
Green Rater Company
Signature Date
Provider's Certifier Company
Signature Date
Minimize Pollutants from Garage (meet all of the following)
Exhaust Fan in Garage (meet one of the following)
Awareness & Education (AE) (Minimum 0 AE Points Required)
Basic Operations Training (meet both of the following)
Public Awareness (meet three of the following)
Education of the Building Manager(meet both of the following)
By affixing my signature below, the undersigned does hereby declare and affirm to the USGBC that the LEED for Homes requirements, as specifiedSystem, have been met for the indicated credits and will, if audited, provide the necessary supporting documents.
By affixing my signature below, the undersigned does hereby declare and affirm to the USGBC that the required inspections and performance testirequirements, as specified in the LEED for Homes Rating System, have been completed, and will provide the project documentation file, if requeste
By affixing my signature below, the undersigned does hereby declare and affirm to the USGBC that the required inspections and performance testirequirements, as specified in the LEED for Homes Rating System, have been completed, and will provide the project documentation file, if requeste
Seal all penetrations and connecting floor and ceiling joist bays Weather-strip all doors
Paint walls and ceilings of shared walls, including garage carbon monoxide detectors in rooms that sh
Seal all penetrations and cracks at the base
a) Fan runs continuously b) Fan designed with automatic timer contro
a) Operations and training manual b) One-hour walkthrough with occupant(s)
b) Website about features and benefits of LEED homes
c) Newspaper article on the projecta) Open house on at least four weekends
d) Display LEED signage on the exterior of th
a) Operations and training manual b) One-hour walkthrough with building mana
-
8/9/2019 Planilla Leed for Homes
13/98
US Green Building Council Page 13 of 98
-
8/9/2019 Planilla Leed for Homes
14/98
-
8/9/2019 Planilla Leed for Homes
15/98
US Green Building Council Page 15 of 98
A. Forced-Air Systems B. Nonducted HVAC Systems
a) Duct leakage of 1.0 CFM at 25 Pascals per 100 sq.ft. Outdoor reset control to set distribution
b) Air-handler and all ductwork is within conditioned envelope and E
c) Air-handler and all ductwork visibly within conditioned spaces (no
-
8/9/2019 Planilla Leed for Homes
16/98
US Green Building Council Page 16 of 98
6. Space Heating and Cooling Equipment
6.1 Prereq.
Type of HVAC
Cooling efficiency (SEER / EER) Heating Efficiency (AFUE / HSPF / COP)
6.2 High-Efficiency HVAC 2 0 0
OR 6.3 Very High Efficiency HVAC 3 0 0
7. Water Heating
7.1 2 0 0
7.2 Pipe Insulation 1 0 0
7.3 Efficient Domestic Hot Water Equipment 3 0 0
Type of DHW system
Efficiency Solar: Percentage of annual DHW load
8. Lighting
8.1 ENERGY STAR Lights Prereq.
8.2 1.5 0 0
OR 8.3 3 0 0
9. Appliances
9.1 2 0 0
9.2 Water-Efficiency Clothes Washer 1 0 0
10. Renewable Energy
10 Renewable Energy System 10 0 0
0 Reference electric load, kWh/yr (based on HERS model) 0 Electricity supplie
0.0% Percentage of annual reference electric load met by renewable system 0.0 0.0
11. Residential Refrigerant Management
11.1 Refrigerant Charge Test Prereq.
11.2 1 0 0
Good HVAC Design and Installation (meet all of the following)
Efficient Hot Water Distribution System (meet one of the following)
Improved Lighting (meet one of the following, see Rating System for pts)
Advanced Lighting Package (meet one of the following)
High-Efficiency Appliances (meet any, see Rating System for pts)
Appropriate HVAC Refrigerants (meet one of the following)
a) Design and size HVAC equipment using ACCA Manual J or equival
b) Install efficient heating and cooling equipment (see Table)
c) Install ENERGY STAR programmable th
Heat pump or hydronic installed and e
a) Structured plumbing system
b) Central manifold distribution system
c) Compact design of conventional system
a) Indoor lighting - 3 additional ENERGY STAR lights in high-use roo b) Exterior lighting - motion sensor contro
a) 60% of fixtures are ENERGY STAR fixtures b) 80% of lamps are ENERGY STAR CFLs
a) ENERGY STAR labeled refrigerator
b) ENERGY STAR labeled ceiling fans in living/family room and all be
c) ENERGY STAR labeled dishwasher usin
d) ENERGY STAR clothes washer
-
8/9/2019 Planilla Leed for Homes
17/98
US Green Building Council Page 17 of 98
a) Use no refrigerants c) Use refrigerants that complies with g
b) Use non-HCFC refrigerants
-
8/9/2019 Planilla Leed for Homes
18/98
US Green Building Council Page 18 of 98 May 12, 20
-
8/9/2019 Planilla Leed for Homes
19/98
US Green Building Council Page 19 of 98
-
8/9/2019 Planilla Leed for Homes
20/98
US Green Building Council Page 20 of 98
-
8/9/2019 Planilla Leed for Homes
21/98
US Green Building Council Page 21 of 98
-
8/9/2019 Planilla Leed for Homes
22/98
US Green Building Council Page 22 of 98
-
8/9/2019 Planilla Leed for Homes
23/98
US Green Building Council Page 23 of 98
-
8/9/2019 Planilla Leed for Homes
24/98
US Green Building Council Page 24 of 98
-
8/9/2019 Planilla Leed for Homes
25/98
-
8/9/2019 Planilla Leed for Homes
26/98
US Green Building Council Page 26 of 98
-
8/9/2019 Planilla Leed for Homes
27/98
US Green Building Council Page 27 of 98
-
8/9/2019 Planilla Leed for Homes
28/98
US Green Building Council Page 28 of 98
-
8/9/2019 Planilla Leed for Homes
29/98
US Green Building Council Page 29 of 98
-
8/9/2019 Planilla Leed for Homes
30/98
US Green Building Council Page 30 of 98
-
8/9/2019 Planilla Leed for Homes
31/98
US Green Building Council Page 31 of 98
-
8/9/2019 Planilla Leed for Homes
32/98
US Green Building Council Page 32 of 98
-
8/9/2019 Planilla Leed for Homes
33/98
US Green Building Council Page 33 of 98
LEED for Homes Project Checklist, Project Notes
Date project began:
Initiated by:
Credits Responsible Party Last Updated Additional Notes
ID 1. Integrated Project
Planning 1.1
1.2
1.3
1.4
1.5
ID 2. Quality Mgmt forDurability 2.1
2.2
This section was created to give project teams additional space to make internal notes on the progress of the project. It does not need to be used and it sThis section is unlocked, so project teams are welcome to make changes to the format as necessary. Any comments or directions provided below have nGreen Building Council.
-
8/9/2019 Planilla Leed for Homes
34/98
US Green Building Council Page 34 of 98
2.3
-
8/9/2019 Planilla Leed for Homes
35/98
US Green Building Council Page 35 of 98
3. Innovative or Regional
Design 3.1
3.2
3.3
3.4
Credits Responsible Party Last Updated Additional Not
LL 1. LEED for Nbrhd
Development 1
LL 2. Site Selection
2
LL 3. Preferred Loc.
3.1
3.2
3.3
LL 4. Infrastructure
4
LL 5. Community
Resources 5.1
5.2
5.3
LL 6. Access to Open
Space 6
-
8/9/2019 Planilla Leed for Homes
36/98
US Green Building Council Page 36 of 98
Credits Responsible Party Last Updated Additional Not
SS 1. Site Stewardship
1.1
1.2
SS 2. Landscaping
2.1
2.2
2.3
2.4
2.5
SS 3. Reduce Local Heat
Island Effects 3
-
8/9/2019 Planilla Leed for Homes
37/98
US Green Building Council Page 37 of 98
SS 4. Surface Water
Management 4.1
4.2
4.3
SS 5. Nontoxic Pest
Control 5
SS 6. Compact Dev.
6.1
6.2
6.3
Credits Responsible Party Last Updated Additional No
WE 1. Water Reuse
1.1
1.2
1.3
-
8/9/2019 Planilla Leed for Homes
38/98
US Green Building Council Page 38 of 98
WE 2. Irrigation System
2.1
2.2
2.3
WE 3. Indoor Water Use
3.1
3.2
Credits Responsible Party Last Updated Additional No
EA 1. Optimize Energy
Performance 1.1
1.2
EA 7. Water Heating
7.1
7.2
EA 11. Residential Refrig
Management 11.1
11.2
-
8/9/2019 Planilla Leed for Homes
39/98
US Green Building Council Page 39 of 98
Credits Responsible Party Last Updated Additional Not
MR 1. Material-Efficient
Framing 1.1
1.2
1.3
1.4
1.5
MR 2. Environmentally
Pref. Products 2.1
2.2
-
8/9/2019 Planilla Leed for Homes
40/98
US Green Building Council Page 40 of 98
MR 3. Waste Mgmt
3.1
3.2
Credits Responsible Party Last Updated Additional Not
EQ 1. ENERGY STAR
w/ IAP 1
EQ 2. Combustion
Venting 2.1
2.2
EQ 3. Moisture Control
3
EQ 4. Outdoor Air
Ventilation 4.1
4.2
4.3
-
8/9/2019 Planilla Leed for Homes
41/98
US Green Building Council Page 41 of 98
EQ 5. Local Exhaust
5.1
5.2
5.3
EQ 6. Distribution of
Space Htg & Clg 6.1
6.2
6.3
EQ 7. Air Filtering
7.1
7.2
7.3
EQ 8. Contaminant
Control 8.1
8.2
8.3
EQ 9. Radon Protection
9.1
9.2
-
8/9/2019 Planilla Leed for Homes
42/98
US Green Building Council Page 42 of 98
EQ 10. Garage Pollutant
Protection 10.1
10.2
10.3
10.4
Credits Responsible Party Last Updated Additional No
AE 1. Education of Home
Owner / Tenant 1.1
1.2
1.3
AE 2. Education of theBuilding Mgr 2
-
8/9/2019 Planilla Leed for Homes
43/98
US Green Building Council Page 43 of 98
-
8/9/2019 Planilla Leed for Homes
44/98
US Green Building Council Page 44 of 98
Credits Responsible Party Last Updated Additional No
EA 2. Insulation
2.1
2.2
EA 3. Air Infiltration
3.1
3.2
OR 3.3
EA 4. Windows
4.1
4.2
OR 4.3
EA 5. Htg and Clg
Distribution 5.1
5.2
OR 5.3
-
8/9/2019 Planilla Leed for Homes
45/98
US Green Building Council Page 45 of 98
-
8/9/2019 Planilla Leed for Homes
46/98
US Green Building Council Page 46 of 98
EA 6. Space Htg and Clg
Equipment 6.1
6.2
OR 6.3
EA 7. Water Heating
7.1
7.2
7.3
EA 8. Lighting
8.1
8.2
OR 8.3
EA 9. Appliances
9.1
9.2
EA 10. RenewableEnergy 10
EA 11. Residential Refrig
Management 11.1
11.2
-
8/9/2019 Planilla Leed for Homes
47/98
US Green Building Council Page 47 of 98
-
8/9/2019 Planilla Leed for Homes
48/98
LEED for Homes Simplified Project Checklist
for Homes Builder Name:
Project Team Leader (if different):
Home Address (Street/City/State):
Project Description: Adjusted Certification Thresholds
Building type: Single detached Project type: Custom Certified: 45.0 Gold: 75.0
# of bedrooms: 0 Floor area: 0 Silver: 60.0 Platinum: 90.0
Project Point Total: 0 ID: 0 SS: 0 EA: 0 E
Certification Level: Not Certified LL: 0 WE: 0 MR: 0 A
date last updated : Max Points Proj
last updated by : Available Poin
Innovation and Design Process (ID) (No Minimum Points Required) Y / Pts Ma
1. Integrated Project Planning 1.1 Preliminary Rating Prerequisite
1.2 Integrated Project Team 1 0 0
1.3 Professional Credentialed with Respect to LEED for Homes 1 0 0
1.4 Design Charrette 1 0 0
1.5 Building Orientation for Solar Design 1 0 0
2. Durability Management 2.1 Durability Planning Prerequisite
Process 2.2 Durability Management Prerequisite
2.3 Third-Party Durability Management Verification 3 0 0
3.Innovative or Regional @ 3.1 Innovation #1 1 0 0
Design @ 3.2 Innovation #2 1 0 0
@ 3.3 Innovation #3 1 0 0
@ 3.4 Innovation #4 1 0 0
Sub-Total for ID Category: 11 0
Location and Linkages (LL) (No Minimum Points Required) OR Y / Pts Ma
1. LEED ND 1 LEED for Neighborhood Development LL2-6 10 0 0
2. Site Selection @ 2 Site Selection 2 0 0
3. Preferred Locations 3.1 Edge Development 1 0 0
3.2 Infill LL 3.1 2 0 0
3.3 Previously Developed 1 0 0
4. Infrastructure 4 Existing Infrastructure 1 0 0
5. Community Resources/ 5.1 Basic Community Resources / Transit 1 0 0
Transit 5.2 Extensive Community Resources / Transit LL 5.1, 5.3 2 0 0
5.3 Outstanding Community Resources / Transit LL 5.1, 5.2 3 0 0
6. Access to Open Space 6 Access to Open Space 1 0 0
Sub-Total for LL Category: 10 0
Sustainable Sites (SS) (Minimum of 5 SS Points Required) OR Y / Pts Ma
1. Site Stewardship 1.1 Erosion Controls During Construction Prerequisite
1.2 Minimize Disturbed Area of Site 1 0 0
2. Landscaping @ 2.1 No Invasive Plants Prerequisite
@ 2.2 Basic Landscape Design SS 2.5 2 0 0@ 2.3 Limit Conventional Turf SS 2.5 3 0 0
@ 2.4 Drought Tolerant Plants SS 2.5 2 0 0
@ 2.5 Reduce Overall Irrigation Demand by at Least 20% 6 0 0
3. Local Heat Island Effects @ 3 Reduce Local Heat Island Effects 1 0 0
4. Surface Water @ 4.1 Permeable Lot 4 0 0
Management 4.2 Permanent Erosion Controls 1 0 0
4.3 Management of Run-off from Roof 2 0 0
5. Nontoxic Pest Control 5 Pest Control Alternatives 2 0 06. Compact Development 6.1 Moderate Density 2 0 0
6.2 High Density SS 6.1, 6.3 3 0 0
6.3 Very High Density SS 6.1, 6.2 4 0 0
Sub-Total for SS Category: 22 0
-
8/9/2019 Planilla Leed for Homes
49/98
LEED for Homes Simplified Project Checklist (continued)Max Points Pr
Available Po
Water Efficiency (WE) (Minimum of 3 WE Points Required) OR Y / Pts M
1. Water Reuse 1.1 Rainwater Harvesting System WE 1.3 4 0
1.2 Graywater Reuse System WE 1.3 1 0
1.3 Use of Municipal Recycled Water System 3 0
2. Irrigation System @ 2.1 High Efficiency Irrigation System WE 2.3 3 0
2.2 Third Party Inspection WE 2.3 1 0
@ 2.3 Reduce Overall Irrigation Demand by at Least 45% 4 0
3. Indoor Water Use3.1
High-Efficiency Fixtures and Fittings 3 03.2 Very High Efficiency Fixtures and Fittings 6 0
Sub-Total for WE Category: 15
Energy and Atmosphere (EA) (Minimum of 0 EA Points Required) OR Y / Pts M
1. Optimize Energy Performance 1.1 Performance of ENERGY STAR for Homes Prerequisite
1.2 Exceptional Energy Performance 34 0
7. Water Heating @ 7.1 Efficient Hot Water Distribution 2 0
7.2 Pipe Insulation 1 0
11. Residential Refrigerant 11.1 Refrigerant Charge Test Prerequisite
Management 11.2 Appropriate HVAC Refrigerants 1 0
Sub-Total for EA Category: 38
Materials and Resources (MR) (Minimum of 2 MR Points Required) OR Y / Pts M
1. Material-Efficient Framing 1.1 Framing Order Waste Factor Limit Prerequisite
1.2 Detailed Framing Documents MR 1.5 1 01.3 Detailed Cut List and Lumber Order MR 1.5 1 0
1.4 Framing Efficiencies MR 1.5 3 0
1.5 Off-site Fabrication 4 0
2. Environmentally Preferable @ 2.1 FSC Certified Tropical Wood Prerequisite
Products @ 2.2 Environmentally Preferable Products 8 0
3. Waste Management 3.1 Construction Waste Management Planning Prerequisite
3.2 Construction Waste Reduction 3 0
Sub-Total for MR Category: 16
Indoor Environmental Quality (EQ) (Minimum of 6 EQ Points Required) OR Y / Pts M
1. ENERGY STAR with IAP 1 ENERGY STAR with Indoor Air Package 13 0
2. Combustion Venting 2.1 Basic Combustion Venting Measures EQ 1 Prerequisite
2.2 Enhanced Combustion Venting Measures EQ 1 2 0
3. Moisture Control 3 Moisture Load Control EQ 1 1 04. Outdoor Air Ventilation @ 4.1 Basic Outdoor Air Ventilation EQ 1 Prerequisite
4.2 Enhanced Outdoor Air Ventilation 2 0
4.3 Third-Party Performance Testing EQ 1 1 0
5. Local Exhaust @ 5.1 Basic Local Exhaust EQ 1 Prerequisite
5.2 Enhanced Local Exhaust 1 0
5.3 Third-Party Performance Testing 1 0
6. Distribution of Space @ 6.1 Room-by-Room Load Calculations EQ 1 Prerequisite
Heating and Cooling 6.2 Return Air Flow / Room by Room Controls EQ 1 1 0
6.3 Third-Party Performance Test / Multiple Zones EQ 1 2 0
7. Air Filtering 7.1 Good Filters EQ 1 Prerequisite
7.2 Better Filters 1 0
7.3 Best Filters EQ 7.2 2 0
8. Contaminant Control @ 8.1 Indoor Contaminant Control during Construction EQ 1 1 0
8.2 Indoor Contaminant Control 2 0@ 8.3 Preoccupancy Flush EQ 1 1 0
9. Radon Protection @ 9.1 Radon-Resistant Construction in High-Risk Areas EQ 1 Prerequisite
@ 9.2 Radon-Resistant Construction in Moderate-Risk Areas EQ 1 1 0
10. Garage Pollutant Protection 10.1 No HVAC in Garage EQ 1 Prerequisite
10.2 Minimize Pollutants from Garage EQ 1 2 0
10.3 Exhaust Fan in Garage EQ 1 1 0
10.4 Detached Garage or No Garage EQ 1, 10.2, 10. 3 0
Sub-Total for EQ Category: 21
Awareness and Education (AE) (Minimum of 0 AE Points Required) Y / Pts M
1. Education of the @ 1.1 Basic Operations Training Prerequisite
Homeowner or Tenant @ 1.2 Enhanced Training 1 0
1.3 Public Awareness 1 0
@ 2 Education of Building Manager 1 0
Sub Total for AE Category: 3
2. Education of BuildingManager
-
8/9/2019 Planilla Leed for Homes
50/98
-
8/9/2019 Planilla Leed for Homes
51/98
LEED for Homes Simplified Project Checklist
for Homes Addendum: Prescriptive Approach for Energy and Atmosphere (EA) Cre
Max Points Pro
Points cannot be earned in both the Prescriptive (below) and the Performance Approach (pg 2) of the EA section.Available Po
Energy and Atmosphere (EA) (No Minimum Points Required) OR Y / Pts M
2. Insulation 2.1 Basic Insulation Prerequisite
2.2 Enhanced Insulation 2 0
3. Air Infiltration 3.1 Reduced Envelope Leakage Prerequisite 0
3.2 Greatly Reduced Envelope Leakage 2 0
3.3 Minimal Envelope Leakage EA 3.2 3 0
4. Windows 4.1 Good Windows Prerequisite
4.2 Enhanced Windows 2 0
4.3 Exceptional Windows EA 4.2 3 0
5. Heating and Cooling 5.1 Reduced Distribution Losses Prerequisite
Distribution System 5.2 Greatly Reduced Distribution Losses 2 0
5.3 Minimal Distribution Losses EA 5.2 3 0
6. Space Heating and Cooling @ 6.1 Good HVAC Design and Installation Prerequisite
Equipment 6.2 High-Efficiency HVAC 2 06.3 Very High Efficiency HVAC EA 6.2 4 0
7. Water Heating @ 7.1 Efficient Hot Water Distribution 2 0
7.2 Pipe Insulation 1 0
7.3 Efficient Domestic Hot Water Equipment 3 0
8. Lighting 8.1 ENERGY STAR Lights Prerequisite
8.2 Improved Lighting 2 0
8.3 Advanced Lighting Package EA 8.2 3 0
9. Appliances 9.1 High-Efficiency Appliances 2 0
9.2 Water-Efficient Clothes Washer 1 0
10. Renewable Energy @ 10 Renewable Energy System 10 0
11. Residential Refrigerant 11.1 Refrigerant Charge Test Prerequisite
Management 11.2 Appropriate HVAC Refrigerants 1 0
Sub-Total for EA Category: 38
-
8/9/2019 Planilla Leed for Homes
52/98
US Green Building Council Page 52 of 98
LEED for Homes Field Checklistfor Homes
Instructions
Step 1: complete the preliminary rating and fill out preliminary rating fields (columns m and n) in the LEED-H checklist.
Step 2: Provider should complete pg.1 and check the boxes for when to verify each measure (pre-drywall vs. post-construction, see columns M & N
Step 3: Provider should hide rows for any measures that the project team is definitely not pursuing. These are indicated by a "N" in column A below
Step 4: Green Rater should initial each measure as it is verified in the field.
Project InformationProvider: Project contact:
Green Rater: Home address:
Project name: Home address:
Planned Inspections
Date scheduled: Date conducted: Type: pre-drywall
Date scheduled: Date conducted: Type: pre-drywall
Date scheduled: Date conducted: Type: final
Inspector Feedback
Additional notes:
Inspector Signature: Date:
Site Rep. Signature: Date:
Special instructionsfrom Provider:
Significant failures orproblems:
-
8/9/2019 Planilla Leed for Homes
53/98
US Green Building Council Page 53 of 98
for Homes
General Information
Home Size Adjustment
X
Estimated conditioned square footage: X
Innovation & Design Process (ID)
ID Credit 1.5: Building Orientation for Solar Design
Visually verified calculations or simulations associated with the credit. X
X
The east-west axis of the building is within 15 degrees of due east-west. X
X
X
ID Credit 2.3: Third-party Durability Management Verification
Used durability inspection checklist to verify durability measures in the home. X X
@ ID Credit 3.1: Innovation 1 (ruling #):
to be input by the Provider X
@ ID Credit 3.2: Innovation 2 (ruling #):
to be input by the Provider X
@ ID Credit 3.3: Innovation 3 (ruling #):
to be input by the Provider X
@ ID Credit 3.4: Innovation 4 (ruling #):
to be input by the Provider X
Location & Linkages (LL)
@ LL Credit 2: Site Selection
LEED for HomesField Checklist
pre-drywall
post-const.
verified(initial)
Number of rooms that could reasonably be used as abedroom:
pre-drywall
post-const.
verified(initial)
Glazing on north- and south-facing walls of the building is at least 50% greater than sum ofglazing area on east- and west-facing walls.
There is considerable south-facing roof area (~450 square feet) oriented appropriately for solar
applications.
Home includes shading devices, overhangs, etc. for south-facing glazing to provide muchshading in summer and little shading in winter.
pre-drywall
post-const.
verified(initial)
-
8/9/2019 Planilla Leed for Homes
54/98
US Green Building Council Page 54 of 98
for HomesLEED for Homes
Field Checklist
Land is not within 100 feet of any existing water bodies or wetlands. X
LL Credit 3.1: Edge Development
At least 25% of the perimeter of the lot borders previously developed land. X
LL Credit 3.2: Infill
At least 75% of the perimeter of the lot borders previously developed land. X
LL Credit 3.3: Previously Developed
Visually verified documentation to demonstrate that the lot was previously developed. X
LL Credit 4: Existing Infrastructure
X
LL Credit 5.1 & 5.2 & 5.3: Community Resources / Transit
Number of community resources within 1/4 mile: X
Number of community resources within 1/2 mile: X
LL Credit 6: Access to Open Space
X
Sustainable Sites (SS)
SS Prerequisite 1.1: Erosion Controls During Construction
X X
SS Credit 1.2: Minimize Disturbed Area of Site
Visually verified documentation to demonstrate that the lot is within 1/2 mile of existing water andsewer service lines.
Types ofcommunityresources:
Home is within 1/2 mile of publicly accessible or community-based open space of at least 3/4acre.
pre-drywall
post-const.
verified(initial)
Erosion controls installed, including:* disturbed topsoil stockpiled & protected from erosion; silt fencing to control path andvelocity of runoff;
* straw bales, silt sacks, rock filters, or comparable measures to protect storm sewerinlets, streams and lakes;
* swales to divert surfact water from hillsides;* tiers, erosion blankets, compost blankets, filters socks or comparable measures tostabilize soil in sloped areas.
-
8/9/2019 Planilla Leed for Homes
55/98
US Green Building Council Page 55 of 98
for HomesLEED for Homes
Field Checklist
There is a tree or plant preservation plan with "no-disturbance" zones on the lot. X
Less than 40% of the buildable lot area (not including area under roof) is disturbed. X
@ SS Prerequisite 2.1: No Invasive Plants
X
SS Credit 2.2: Basic Landscaping Design
No turf installed in densely shaded areas or slopes of 25% or more. X
Mulch or soil amendments used around plant beds. X
@ SS Credit 2.3: Limit Conventional TurfVisually verified that turf calculations are completed and reasonable. X
@ SS Credit 2.4: Drought-tolerant PlantsVisually verified that planting calculations are completed and reasonable. X
X
@ SS Credit 2.5: Reduce Overall Irrigation Demand by at Least 20%Visually verified that irrigation demand calculations are completed and reasonable. X
Type of irrigation system installed: X
Any microclimate factors (shading, wind, etc.) X
@ SS Credit 3: Reduce Local Heat Island EffectsX
X
@ SS Credit 4.1: Permeable LotVisually verify that irrigation demand calculations are completed and reasonable. X
There is permeable paving material installed. X
Permanent infiltration features (vegetated swales, rain gardens, etc.) are installed. X
The list of plants being installed on the project does not include any plants from a list of regional
invasive plants.
The list of plants being claimed credit for on the project match those from a list of regionaldrought-tolerant plants, or have been verified in some other way.
Trees or plantings provided for shading of at least 50% of sidewalks, patios, and driveways within50 feet of the home.
At least 50% of sidewalks, patios, and driveways within 50 feet of the home are light-colored:white concrete, gray concrete, open pavers, or other light material.
-
8/9/2019 Planilla Leed for Homes
56/98
US Green Building Council Page 56 of 98
for HomesLEED for Homes
Field Checklist
SS Credit 4.2: Permanent Erosion Controls
Terracing or retaining walls were installed. X
# of trees: X
@SS Credit 4.3: Management of Runoff from Roof
Permanent infiltration features (vegetated swales, rain gardens, etc.) are installed. X
Vegetated roof installed on 100% of roof. X
Vegetated roof installed on approximately 50% of roof. X
SS Credit 5: Pest Control Alternatives
All wood (e.g. siding, trim, structures) is at least 12 inches above soil . X
X
X
Landscaping installed such that mature plants will be 2 feet from the home. X
Sand or diatomaceous earth barrier installed. X
Steel mesh barrier termite control system installed. X
Non-toxic termite bait system installed. X
Non-cellulosic (i.e. not wood or straw) wall structure used. X
X
Water Efficiency (WE)
WE Credit 1.1: Rainwater Harvesting System
Rainwater harvest system installed with roof capture and storage tank. X
Visually verified that rainwater capture calculations are completed and reasonable. X
# of 5-gallonshrubs:
Estimated ft2 ofnative groundcover
All external cracks, joints, penetrations, edges, and entry points are sealed with caulking. Whereopenings cannot be sealed, rodent- and corrosion-proof screens are used. Exposed foundationinsulation protected with moisture-resistant, pest-proof covers.
There are no wood-to-concrete connections (e.g. at posts, deck supports, stair stringers), or theyare separated with metal or plastic fasteners or dividers.
Foundation walls are either solid concrete, masonry walls with top course of solid block bondbeam, or concrete-filled block.
pre-drywall
post-const.
verified(initial)
-
8/9/2019 Planilla Leed for Homes
57/98
US Green Building Council Page 57 of 98
for HomesLEED for Homes
Field Checklist
WE Credit 1.2: Graywater Reuse System
Graywater reuse system installed. X
Visually verified that rainwater capture calculations are completed and reasonable. X
WE Credit 1.3: Use of Municipal Recycled Water System
Separate pipes for municipal recycled water system installed and marked. X
@ WE Credit 2.1: High-Efficiency Irrigation SystemIrrigation system installed with head-to-head coverage X
Central shut-off valve installed X
Submeter installed for the irrigation system X
At least 50% of the landscape area utilizes drip irrigation X
Separate zones used for each type of bedding area
XTimer or controller installed to activate irrigation system at appropriate times X
Pressure-regulating devices installed to maintain optimal pressure X
'check valves' are installed X
Moisture sensor controller or rain delay controller installed X
WE Credit 2.2: Third-Party Inspection
All spray heads are operating and delivering water only to intended zones X
Any switches or shut-off valves are working properly X
Any timers or controllers are set properly X
Any irrigation systems are located at least 2 feet from the home X
Irrigation spray does not hit the home X
WE Credit 3.1 & 3.2: High-Efficiency Fixtures and Fittings
-
8/9/2019 Planilla Leed for Homes
58/98
-
8/9/2019 Planilla Leed for Homes
59/98
US Green Building Council Page 59 of 98
for HomesLEED for Homes
Field Checklist
All dishwashers are ENERGY STAR labeled, with 6.0 gallons/cycle or less. X
All clothes washers are ENERGY STAR labeled. X
EA Prerequisite 2.1: Basic Insulation / Credit 2.2
Completed the Thermal Bypass Inspection Checklist (see form) X
Insulation R-values (must exceed IECC minimum values) X
Wall: Attic: Foundation / Slab:
EA Prerequisite 3.1: Reduced Envelope Leakage / Credit 3.2 / Credit 3.3
Blower door test result: X
EA Prerequisite 4.1: Good Windows / Credit 4.2 / Credit 4.3
Window U-factor: Window SHGC: X
Skylight glazing does not exceed 3% X
X
EA Prerequisite 5.1: Reduced Distribution Losses / Credit 5.2 / Credit 5.3
Equipment type: X
Duct leakage rate: X
No ducts installed in exterior walls; no wall cavities used as ductwork X
R-6 insulation around ducts in unconditioned space. X
X
Air-handler unit and all ductwork located visibly within conditioned spaces. X
@ EA Prerequisite 6.1: Good HVAC Design and Installation / Credit 6.2 / Credit 6.3Visually verify ACCA Manual J or equivalent HVAC equipment sizing calculations. X
X
Estimated window area (ft2):
Air-handler unit and all ductwork located within conditioned envelope, with some ductwork hiddenbehind walls, chases, floors, etc.
Heating and cooling equipment meets performance requirements of national ENERGY STARBuilder Option Package.
Cooling efficiency(SEER/HSPF):
Heating efficiency(AFUE/HSPF/COP):
-
8/9/2019 Planilla Leed for Homes
60/98
US Green Building Council Page 60 of 98
for HomesLEED for Homes
Field Checklist
X
X
@ EA Credit 7.1: Efficient Hot Water Distribution SystemStructured plumbing system installed with the following features:
Demand-controlled circulation loop with R-4 insulation X
Estimated length of circulation loop (linear feet): X
X
X
Central manifold distribution system installed with the following features:
Central manifold trunk is no more than 6 feet in length X
Central manifold trunk is insulated to at least R-4. X
X
Branch lines from the manifold are no more than 1/2-inch in nominal diameter. X
Compact design of conventional system installed with the following features:
X
Branch lines are no more than 1/2-inch in nominal diameter. X
EA Credit 7.2: Pipe Insulation
All domestic hot water piping is insulated with at least R-4 insulation. X
EA Credit 7.3: Efficient Domestic Hot Water Equipment
Hot water type (gas/electric; size, tank/tankless, etc.): X
Efficiency (EF or CAE): X
ENERGY STAR labeled programmable thermostat installed (unless heat pump or hydronicsystem is installed)
For ground-source heat pump systems: any piping designed to carry water that is well above orbelow the temperature setting in the home must have R-4 insulation.
Branch lines from the circ. loop to each fixture is no more than 10 feet long and 1/2-inchnominal diameter
System includes push-button controls in each full bathroom and kitchen, and includes anautomatic pump shut-off.
Estimated maximum length of any branch in linear feet to anyfixture:
Estimated maximum length of any branch in linear feet to anyfixture:
-
8/9/2019 Planilla Leed for Homes
61/98
US Green Building Council Page 61 of 98
for HomesLEED for Homes
Field Checklist
EA Prerequisite 8.1: ENERGY STAR Lights
X
EA Credit 8.2: Improved Lighting
X
X
EA Credit 8.3: Advanced Lighting Package
At least 60% of lighting fixtures are ENERGY STAR labeled. X
At least 80% of the lamps are ENERGY STAR labeled. X
100% of ceiling fans are ENERGY STAR labeled, or no ceiling fans installed X
EA Credit 9.1: High-Efficiency Appliances
All refrigerators are ENERGY STAR labeled. X
At least one ENERGY STAR labeled ceiling fan in living or family room, and one per bedroom. X
All dishwashers are ENERGY STAR labeled, with 6.0 gallons/cycle or less. X
All clothes washers are ENERGY STAR labeled. X
EA Credit 9.2: Water-Efficient Clothes Washer
All clothes washers have modified energy factor greater than 2.0 and water factor less than 5.5. X
@ EA Credit 10: Renewable Energy SystemRenewable energy system installed on-site. X
Visually verified renewable energy system calculations. X
EA Prerequisite 11.1: Refrigerant Charge Test
Visually verified refrigerant charge test results. X
EA Credit 11.2: Appropriate HVAC Refrigerants
Visually verified type of refrigerant, using system manuals, equipment specs., etc. X
At least 4 ENERGY STAR labeled light fixtures or CFLs installed in high-use rooms (kitchen,dining room, living room, family room, hallways).
At least 3 additional ENERGY STAR labeled light fixtures or CFLs installed in high-use rooms (7total with the prerequisite).
All exterior lighting has either motion sensors or integrated photovoltaic cells. Emergency lightingis exempt.
-
8/9/2019 Planilla Leed for Homes
62/98
US Green Building Council Page 62 of 98
for HomesLEED for HomesField Checklist
Materials & Resources (MR)
MR Prerequisite 1.1: Framing Order Waste Factor
Visually verified framing waste factor calculations X
MR Credit 1.2: Detailed Framing Documents
X
MR Credit 1.3: Detailed Cut List and Lumber Order
Visually verified detailed cut list and lumber order. X
MR Credit 1.4: Framing Efficiencies
Precut framing package installed. X
Open-web floor trusses installed. X
SIP walls installed. X
SIP roof installed. X
SIP floors installed. X
Stud spacing greater than 16" on center. X
Ceiling joists spaced greater than 16" on center. X
Floor joists spaced greater than 16" on center. X
Roof rafter spaced grater than 16" on center. X
Headers sized for actual loads. X
Ladder blocking or drywall clips used. X
Two-stud corners used. X
MR Credit 1.5: Off-site Fabrication
Panelized or modular, prefabricated construction for all wall, floor, and roof components. X
pre-drywall
post-const.
verified(initial)
Visually verified detailed framing plans. Specific locations, spacing, and sizes of all framingmembers in floors, walls, roof, and ceiling were indicated.
-
8/9/2019 Planilla Leed for Homes
63/98
-
8/9/2019 Planilla Leed for Homes
64/98
US Green Building Council Page 64 of 98
for HomesLEED for Homes
Field Checklist
X
X
EQ Credit 2.2: Enhanced Combustion Venting Measures
Masonry heater installed that meets ASTM Standard E-1602 and IBC Standard 2112.1. X
X
X
X
Pellet stove installed that is either EPA certified or meets requirements of ASTM E 1509-04. X
EQ Credit 3: Moisture Control
Dehumidification system installed, in addition to cooling system. X
Central HVAC system equipped with additional controls to operate in dehumidification mode. X
@ EQ Prerequisite 4.1: Outdoor Air VentilationVisually verified ventilation calculations. X
Type of ventilation system installed: X
EQ Credit 4.2: Enhanced Outdoor Air Ventilation
A heat-recovery ventilator (HRV) or energy-recovery ventilator (ERV) is installed. X
EQ Credit 4.3: Third-Party Performance Testing
Ventilation air flow rate tested. X
Outdoor air flow rate:
Exhaust-only ventilation system installed. X
Flow rate of air out of the home. X
Combustion space heating equip. installed with closed combustion OR power-vented exhaustOR located in a detached or open-air facility OR there is no combustion space heating equip.
Combustion water heating equip. installed with closed combustion OR power-vented exhaust ORlocated in a detached or open-air facility OR there is no combustion water heating equip.
Factory-built wood-burning fireplace installed that is listed by safety test facility (UL, CSA, ETL,etc.), meets EPA certification, and/or includes catalytic combustor that emits
-
8/9/2019 Planilla Leed for Homes
65/98
US Green Building Council Page 65 of 98
for HomesLEED for Homes
Field Checklist
Exhaust ducts installed according to ASHRAE Std. 62.2 X
@ EQ Prerequisite 5.1: Basic Local ExhaustExhaust systems installed in all bathrooms and kitchens. Exhaust air is delivered to the outdoors. X
X
EQ Credit 5.2: Enhanced Local Exhaust
X
EQ Credit 5.3: Third-Party Performance Testing
kitchen #1 exhaust rate: kitchen #2 exhaust rate: X
bathroom #1 exhaust: bathroom #4 exhaust: X
bathroom #2 exhaust: bathroom #5 exhaust: X
bathroom #3 exhaust: bathroom #6 exhaust: X
@ EQ Prerequisite 6.1: Room-by-Room Load CalculationsVisually verified HVAC and duct design calculations. X
EQ Credit 6.2: Return Air Flow / Room-by-Room Controls
Ducted: visually verified return air flow calculations. X
Ducted: every room has returns, transfer grilles, jump ducts, or significant space under the door. X
Nonducted: flow controls installed on every radiator. X
EQ Credit 6.3: Third-Party Performance Test / Multiple Zones
expected air flow, room 1: measured air flow, rm 1: X
expected air flow, room 2: measured air flow, rm 2: X
expected air flow, room 3: measured air flow, rm 3: X
expected air flow, room 4: measured air flow, rm 4: X
expected air flow, room 5: measured air flow, rm 5: X
Any bathroom exhaust fans are ENERGY STAR labeled OR bathroom exhaust fans servemultiple bathrooms.
Every bathroom has an occupancy sensor OR automatic humidistat controller OR automatictimer to operate fan after use OR continuous exhaust fan.
-
8/9/2019 Planilla Leed for Homes
66/98
US Green Building Council Page 66 of 98
for HomesLEED for Homes
Field Checklist
expected air flow, room 6: measured air flow, rm 6: X
expected air flow, room 7: measured air flow, rm 7: X
expected air flow, room 8: measured air flow, rm 8: X
expected air flow, room 9: measured air flow, rm 9: X
EQ Prerequisite 7.1: Good Filters / Credit 7.2 / Credit 7.3
Air filter MERV Rating (must be minimum of MERV 8): X
@ EQ Credit 8.1: Indoor Contaminant Control during ConstructionDucts and vents are sealed during construction X X
EQ Credit 8.2: Indoor Contaminant Control
X X
X X
Central vacuum system installed with exhaust to outdoors. X X
@ EQ Prerequisite 9.1: Radon-Resistant Construction in High-Risk Areas / Credit 9.2Radon-resistant new construction techniques installed. X X
EQ Prerequisite 10.1: No HVAC in Garage
No air-handling equipment or ductwork is located within the fire-rated envelope of the garage. X X
EQ Credit 10.2: Minimize Pollutants from Garage
All penetrations sealed, and all wall/ceiling/floor seams and cracks are sealed. X
Garage walls and ceiling are painted. X
All doors to conditioned spaces are weather-stripped. X
Carbon monoxide detectors in every room that shares a door with the garage. X
EQ Credit 10.3: Exhaust Fan in Garage
Continuous exhaust fan in garage (70 CFM nonducted or 100 CFM ducted). X
Permanent walk-off mats installed at each entry are >4 feet in length and allow accessibility forcleaning (e.g. grating with catch basin).
Shoe removal and storage space included near primary entryway, separated from living area. It
has no wall-to-wall carpeting and is large enough for a bench and 2 pairs of shoes per bedroom.
-
8/9/2019 Planilla Leed for Homes
67/98
US Green Building Council Page 67 of 98
for HomesLEED for HomesField Checklist
X
EQ Credit 10.4: Detached Garage or No Garage
The garage is detached from the home OR there is no garage. X
Awareness & Education (AE)
@ AE Prerequisite 1.1: Basic Operations TrainingVisually verify operations and maintenance manual for homeowner or occupant. X
@ AE Credit 1.3: Public AwarenessX
Web site has at least 2 pages with detailed information about the LEED home. X
Newspaper article published on the LEED for Homes project X
LEED for Homes signage installed on the exterior of the home measuring at least 6 square feet. X@ AE Credit 2: Education of Building Manager
Visually verify operations and maintenance manual for building manager. X
Fan designed with timer linked to occupant sensor, light switch, garage door, CO monitor, orequivalent. Timer is set to provide 3 air changes each time it turns on.
pre-drywall post-const. verified(initial)
Open-house dates and information is advertised, and the home has at least four stations aboutLEED for Homes features.
-
8/9/2019 Planilla Leed for Homes
68/98
US Green Building Council Page 68 of 98
-
8/9/2019 Planilla Leed for Homes
69/98
US Green Building Council Page 69 of 98
-
8/9/2019 Planilla Leed for Homes
70/98
US Green Building Council Page 70 of 98
-
8/9/2019 Planilla Leed for Homes
71/98
US Green Building Council Page 71 of 98
-
8/9/2019 Planilla Leed for Homes
72/98
US Green Building Council Page 72 of 98
-
8/9/2019 Planilla Leed for Homes
73/98
US Green Building Council Page 73 of 98
-
8/9/2019 Planilla Leed for Homes
74/98
US Green Building Council Page 74 of 98
-
8/9/2019 Planilla Leed for Homes
75/98
US Green Building Council Page 75 of 98
-
8/9/2019 Planilla Leed for Homes
76/98
US Green Building Council Page 76 of 98
-
8/9/2019 Planilla Leed for Homes
77/98
US Green Building Council Page 77 of 98
-
8/9/2019 Planilla Leed for Homes
78/98
US Green Building Council Page 78 of 98
-
8/9/2019 Planilla Leed for Homes
79/98
US Green Building Council Page 79 of 98
-
8/9/2019 Planilla Leed for Homes
80/98
US Green Building Council Page 80 of 98
-
8/9/2019 Planilla Leed for Homes
81/98
US Green Building Council Page 81 of 98
-
8/9/2019 Planilla Leed for Homes
82/98
US Green Building Council Page 82 of 98
-
8/9/2019 Planilla Leed for Homes
83/98
US Green Building Council Page 83 of 98
-
8/9/2019 Planilla Leed for Homes
84/98
-
8/9/2019 Planilla Leed for Homes
85/98
for Homes
This approach can be used to determine an overall home size adjuster for for multi-family buildings and attached townho
but it cannot be used to determine an overall home size adjuster for a complex with multiple multi-family buildings. If a pr
includes multiple multi-family buildings, each building must have its own home size adjustment.
Please insert the # of units in each building, and the average square footage for units with the corresponding bedroom
number. For example, if building 1 has three 2-bedroom units that are 1300, 1400, and 1500 square feet, insert "3" in
cell G10 and "1400" in cell H10. Please leave zeros or blanks where appropriate.
0-Bedroom 1-Bedroom 2-Bedroom 3-Bedroom 4-Bedroom 5-Bedroom
# of units # of units # of units # of units # of units # of units
LEED Building
LEED Building 0.0 0.0 0.0 0.0 0.0 0.0
LEED Building 0.0 Average unit size: 00
0.0
0.0
LEED for HomesMulti-family Home Size Adjuster Calculator
Avg. ft2 Avg. ft2 Avg. ft2 Avg. ft2 Avg. ft2 Avg.
UnitAdjustment
UnitAdjustment
UnitAdjustment
UnitAdjustment
UnitAdjustment
UnitAdjustment
Overall AverageAdjustment Return to the Summary tab
Avg. # ofBedrooms:
Avg. SFper unit:
-
8/9/2019 Planilla Leed for Homes
86/98
-
8/9/2019 Planilla Leed for Homes
87/98
-
8/9/2019 Planilla Leed for Homes
88/98US Green Building Council Page 8
LEED for Homes Durability Guidelines
Introduction:
Durability Evaluation Steps:
5. Ensure that the durability management plan includes a specific design and/or construction strategy.
7. Ensure that each strategy is adequately drawn and/or described in the relevant project documents.
Durability Inspection Checklist Steps:
These guidelines are provided as a tool to assist you in evaluating durability risks and implementing durability
measures for your LEED Home.
You should develop a program and set of durability measures that are specific to your project and location. Thestrategies listed in the following pages are intended only as guidance and may or may not be appropriate for a givenhome. This is not an exhaustive list of possibilities, nor is it intended to represent a set of strategies appropriate forany specific project. Additional and/or different strategies may be needed, depending on the home's location, detailsof construction, and anticipated occupant requirements.
An effective durability management program will consider -- among other things -- the important interrelationshipsamong energy, moisture, and air quality, and how those dynamics are addressed in other LEED for Homes creditsthat you may or may not pursue. Many of the credits in the LEED for Homes Rating System can serve as durabilitystrategies, and may be used in the creation of a durability inspection checklist. If this is done, the home can stillreceive LEED points for those credits.
The Durability Strategies page contains a list of resources you may find helpful for your durability management plan.It includes a list of durability measures that are required or rewarded in other green homebuilding programs.
1. Collect site- and project-specific data on environmental conditions (outdoor and indoor) and occupancy and enterinto the appropriate sections of the Durability Risk Evaluation Form.
2. If you have a quality management plan in place, review documents and records of callbacks, warranty claims, andlitigation in order to identify recurring quality problems.
3. Identify issues of particular interest or concern, and include these in the Durability Risk Evaluation Form, which listsmajor issues for which durability management strategies typically are needed and provides space for others to beadded.
4. Characterize the degree of risk (low, moderate, or high) for each of the issues listed. For each moderate and highrisk issue, complete steps 5 through 8 below.
6. Ensure that the strategy addresses each of the applicable building systems, assemblies, components, and areas,and that it addresses all connections, intersections, and interactions between and among them.
1. Prior to construction, create adurability inspection checklist, listing the durability management measures to beincorporated in the home and noting where those measures appear in the project documents (drawings,specifications, scopes of work). Note that the Durability Inspection Checklist Template lists a sample strategy undereach heading; these strategies are not intended to be universal, although some may apply to a variety of projects andsites. They are included for illustrative purposes only.
2. Use the durability inspection checklist to confirm that the measures shown in the project documents are
incorporated in the home as drawn and/or specified. This should be done through the use of a quality managementplan or on-site inspections by the builder team and check-off on the durability inspection checklist.
3. If the project is pursuing optional credit ID 2.3, have the third-party rater verify that the measures are incorporatedinto the home and complete the checklist.
-
8/9/2019 Planilla Leed for Homes
89/98
US Green Building Council
Builder Name:
Project Team Leader:
Home Address (Street/City/State):
HomeBuilding type: Single detached Floor Area: 0 Structure type: Convention
Project type: Custom # of Bedrooms: 0 Exterior roofing:
Number of stories: Number of full bathrooms: 0 Garage: Attached
Site
Terrain / topography: Depth of soil to bedrock:
Predominant landscaping: Depth of ground water below structure:
Common regional pests: Proximity to bodies of water?
Other significant features:
Additional comments:
Climate
IECC 2004 Climate Zone:
Natural disaster risks:
Issues
Issue Type Risk Level Issue Type R
Exterior water: Pests:
Interior moisture: Heat loss:
Air infiltration: Ultraviolet radiation:
LEED for HomesDurability Evaluation Form
(for prerequisite ID 2.1)
EPA Radon Zone: Type of soil:
Above FEMA 100-year floodplain?
Annual rainfall (inches/yr):
Heating degree days (HDD): Annual maximum wind speed (mph):
Cooling degree days (CDD): Avg annual solar radiation (kWh/m2/day):
hurricanes
tornados
earthquakes
floods
wildfires
blizzards
http://www.epa.gov/iaq/radon/zonemap.htmlhttp://websoilsurvey.nrcs.usda.gov/app/http://msc.fema.gov/webapp/wcs/stores/servlet/info?storeId=10001&catalogId=10001&langId=-1&content=productQ3Map&title=Q3%20Availability%20-%20State%20Map&parent=productInfo&parentTitle=Product%20Informationhttp://gis.ncdc.noaa.gov/website/ims-climatls/index.htmlhttp://cdo.ncdc.noaa.gov/cgi-bin/climatenormals/climatenormals.pl?directive=prod_select2&prodtype=CLIM84&subrnumhttp://gis.ncdc.noaa.gov/website/ims-climatls/index.htmlhttp://cdo.ncdc.noaa.gov/cgi-bin/climatenormals/climatenormals.pl?directive=prod_select2&prodtype=CLIM84&subrnumhttp://www.nrel.gov/gis/images/us_pv_annual_may2004.jpghttp://www.nrel.gov/gis/images/us_pv_annual_may2004.jpghttp://cdo.ncdc.noaa.gov/cgi-bin/climatenormals/climatenormals.pl?directive=prod_select2&prodtype=CLIM84&subrnumhttp://gis.ncdc.noaa.gov/website/ims-climatls/index.htmlhttp://cdo.ncdc.noaa.gov/cgi-bin/climatenormals/climatenormals.pl?directive=prod_select2&prodtype=CLIM84&subrnumhttp://gis.ncdc.noaa.gov/website/ims-climatls/index.htmlhttp://msc.fema.gov/webapp/wcs/stores/servlet/info?storeId=10001&catalogId=10001&langId=-1&content=productQ3Map&title=Q3%20Availability%20-%20State%20Map&parent=productInfo&parentTitle=Product%20Informationhttp://websoilsurvey.nrcs.usda.gov/app/http://www.epa.gov/iaq/radon/zonemap.html -
8/9/2019 Planilla Leed for Homes
90/98
US Green Building Council
Interstitial condensation: Other:
-
8/9/2019 Planilla Leed for Homes
91/98
US Green Building Council 08/24/2010
-
8/9/2019 Planilla Leed for Homes
92/98
US Green Building Council
-
8/9/2019 Planilla Leed for Homes
93/98
US Green Building Council Page 93 of 98
Builder Name:
Project Team Leader:
Home Address (Street/City/State):
Durability Strategies by Issue Type
Exterior Water
Example: Site graded to drain rainwater away from building o
o
o
o
Interior Moisture
Example: Clothes washer uses stainless steel hoses & position washer on drainage basin o
o
o
o
Air Infiltration
Example: Install all recessed light fixtures inside of the thermal envelope o
o
o
o
Interstitial Condensation
Example: Wall sections designed so vapor condensate within wall can dry to outside of bldg o
o
o
o
Heat Loss
Example: Above-code insulation installed in walls, ceiling, under floor o
o
o
o
Durability Inspection Checklist Template(for prerequisite ID 2.1 & 2.2)
For each of the high and moderate risk areas indicated in the Risk Evaluation Form, list the durability strategies used in the home. If none are used for a pa
statement explaining why not. Remove example strategies and add lines as needed.
Location inDrawings, Specs,
and/or Scopes
Pre-workVerified
(Builder/trade) (
Location inDrawings, Specs,
and/or Scopes
Pre-workVerified
(Builder/trade) (
Location inDrawings, Specs,
and/or Scopes
Pre-workVerified
(Builder/trade) (
Location inDrawings, Specs,
and/or Scopes
Pre-workVerified
(Builder/trade) (
Location inDrawings, Specs,
and/or Scopes
Pre-workVerified
(Builder/trade) (
-
8/9/2019 Planilla Leed for Homes
94/98
US Green Building Council Page 94 of 98
Builder Name:
Project Team Leader:
Home Address (Street/City/State):
Durability Strategies by Issue Type
Durability Inspection Checklist Template(for prerequisite ID 2.1 & 2.2)
For each of the high and moderate risk areas indicated in the Risk Evaluation Form, list the durability strategies used in the home. If none are used for a particula
statement explaining why not. Remove example strategies and add lines as needed.
Ultraviolet Radiation
Example: Overhangs above south windows o
o
o
o
Pests
Example: Termite shields installed o
o
o
o
Natural Disasters
Example: Non-flammable roofing specified o
o
o
o
Other
o
o
o
Builder Declaration for ID prerequisite 2.1 & 2.2
Name:
Title:
Signature:
Date:
Location inDrawings, Specs,
and/or Scopes
Pre-workVerified
(Builder/trade)
CoV
(Bui
Location inDrawings, Specs,
and/or Scopes
Pre-workVerified
(Builder/trade)
CoV
(Bui
Location inDrawings, Specs,and/or Scopes
Pre-workVerified(Builder/trade)
CoV(Bui
Location inDrawings, Specs,
and/or Scopes
Pre-workVerified
(Builder/trade)
CoV
(Bui
I hereby declare and affirm to USGBC that I have evaluated this project's durability risks,completed the Durability Risk Evaluation Form, and incorporated appropriate durabilitymeasures into the design to adequately address the moderate and high risks. The constructiondrawings and specifications have been updated accordingly, and the the measures were verifiedto be completed appropriately.
-
8/9/2019 Planilla Leed for Homes
95/98US Green Building Council May 12, 200
Example Durability Strategies
Notes
Notes:
Please see these programs for other ideas:
CGB - California Green Builder program
EFL - Masco's Environments for Living Diamond Class
GCI - Enterprise Foundation's Green Communities Initiative
IAP - Energy Star for Homes Indoor Air Package
VBG - Vermont Builds Greener
Strategies by Issue Type
Exterior Water
Keep dry all building materials stored on-site
FOUNDATIONS:
Provide drainage away from walls and foundations
Provide proper drainage to the lowest level of concrete
Seal all plumbing, electrical, and other penetrations of walls and floors, and seal joints
Air-seal sump pump coversSurface water management system (final grade tamped & sloped away from foundation)
Capillary break at all concrete slabs (poly not reqd if 8above soil, roof/wall flashing siding cut 2 above roofing, and minimum 10 overhang size at eaves with a sloped roof.
-
8/9/2019 Planilla Leed for Homes
96/98
US Green Building Council May 12, 2008
Wet Rooms (Interior Water)
Install drains or drain pans to capture leaks under water heaters or use tankless water heaters
Properly design and install washer and water heater drain pansUse highly durable materials in wet areas
Install no carpet in kitchens, bathrooms, spa areas, or within 3' of exterior door.
Air Infiltration
Scope of Work: Air SealingScope of Work: Insulation Installation
IC Airtight rated recessed lights in insulated ceilings
Complete air barrier between attic and conditioned space & all penetrations sealedAir filter housings must be airtight to prevent bypass or leakage.
Air seal ventilation ductwork.
Interstitial Condensation
Clothes dryers vented outdoors
Insulate all cold water pipes and avoid plumbing in exterior walls
>1 Perm finish on inside of exterior walls (only reqd in hot/humid & mixed/humid climates)
Heat Loss
Install insulation wind baffles at attic eave bays
Insulate exterior walls per IECC; do not install impermeable vapor barrier on interior side of wallCrawl spaces unvented, insulated, & conditioned (except IECC Marine Climates)
Insulate all ventilation exhaust ductwork (minimum R-8) outside of the insulated envelope.
Ultraviolet Radiation
Pests
Rodent & corrosion proof screens
Termite management measures ("Moderate to Heavy" & "Very Heavy" areas)
Additional termite management measures for "Very Heavy" areas (insulation restrictions)
Other Program-specific Requirements
Minimum 25-year expected lifetime roof warranty.
10 year warranty on vertical insulated glass.
Define "proper refrigerant charge" to be within 10% of manufacturer recommendations.Mechanical equipment must be accessible for service, including AC condensate drain pan and trap.
Use rigid duct or other methods to keep fan back-pressure below 0.2 for EOV systems.
Scope of Work: HVAC
Crawlspaces not vented; crawlspace walls insulated; crawlspace floor with complete, continuous sealed vapor retarder, also sealeto walls. (Must complete all approaches.)
Whenver carpet is installed on slab on grade or on concrete basement floor, must have: minimum R-10 continuous insulation undslab and minimum R-5 slab edge insulation break at foundation wall intersection and R-10 slab edge insulation outward of any wa
Install materials with proper detailing to control degradation from sun, including minimum 10 overhang size at eaves with a sloproof.
-
8/9/2019 Planilla Leed for Homes
97/98
This page includ
Date
7-Feb-08
7-Feb-08
7-Feb-08
7-Feb-08
7-Feb-08
15-Feb-0822-Feb-08
27-Mar-08
31-Mar-08
9-Apr-08
9-Apr-08
9-Apr-08
9-Apr-08
9-Apr-08
9-Apr-08
12-May-0812-May-08
12-May-08
12-May-08
12-May-08
12-May-08
12-May-08
12-May-08
This document w
-
8/9/2019 Planilla Leed for Homes
98/98
s a description of any changes that have been made to the LEED for Homes 2008 Checklist since its creation and re
Description of Changes
Fixed the 'Dur Risk Eval Form' headings so if the project is a multi-family building, cell G11 shows "# of Units" instead
Fixed the misspelling of 'prescriptive' on the Summary tab.
Fixed the pull-down menu in MR 3.2 on the 'Exp Checklist' tab. It had previously included the option for '1.1.5' pts.On "Accountability Form" tab, fixed the form so the contact information for the team leader (cell J80) would show up p
The LEED logo images were changed to a different format type, to prevent them from expanding when printed.
Included definitions for project type and building type on the Summary page.
Included a new page of sample durability strategies.
Updated footnotes on various pages so there are no references to Version 1.11.
Corrected the Accountability Form page so SS 4.3 appears, as appropriate.
Included space on the Expanded Checklist for information about "date last updated" and "last updated by".
Changed the name "Checklist" to "Short Checklist" and change the name "Expanded Checklist" to "Checklist".Created a "Field Checklist" tab with a flexible checklist for field verification.
as last updated on May 12, 2008.
Fixed the calculation in the multi-family home size calculator on the "MFHSA calc' tab. The previous calculator workedthe Unit Adjustments, but it miscalculated the Overall Average Adjustments for any buildings with smaller-than-averag
Fixed the assessment of certified vs. not certified in the 'Checklist' tab. The previous calculation was based on inputs tab, so if a project team only filled out the 'Checklist' tab, the project was not shown as earn certification even if it met thresholds.
Changed the format of the cells for Project Team Leader, Green Rater, Provider Certifier, and the associated companChecklist' and 'Checklist' tabs so the cells shrink to fit longer names.
Some parts of the checklist include unnecessary rounding, particularly in the energy calculation in EA 1 and the multi-adjustment calculation. These values now show the extra digit so any rounding is not hidden.
On the Summary page, included an automatic calculation for average # of bedrooms and average square footage for based on the inputs in the MF HAS calc page.
On "Accountability Form" tab, removed the option to hide credits that were not being pursued by the project team. Cowhether the project team is planning to pursue a credit or not, but all credits are visible at the top part of the sheet.
Linked the "Simple Checklist" tab with the "Checklist" tab so that when the Checklist is filled out, the Simple Checklistalso.
Removed the signature information from the bottom of the Simple Checklist. This document can no longer be submittfull Checklist (formerly the Expanded Checklist) must be submitted now.